Drawings & Archival research by: Finbarr Deurden Rosie Feeney Clara Quinn Audrey Murphy Shona Quigley and Emma Geoghegan Acknowledgements Dermot O’Brien, Old Carlow Photos Braun AG Archives Industrial Development Authority Carlow County Council Planning
A special factory for the IDA at Carlow Source: Braun AG Archives The former Braun building occupies a 30 acre site on the north eastern edge of Carlow town. A colossal building with over 20,000sqm of floor area, it has loomed large as a physical presence, and for four decades has marked an arrival and departure point into the town. Braun (Gillette) AG arrived in Carlow in 1974, as part of the Industrial Development Authority’s investment strategy in regional towns and aligned with the earlier development of Carlow Regional Technical College (now IT Carlow). At its peak it employed over 1400 people, mostly women, manufacturing small personal appliances and then later Oral B toothbrushes. The factory closed in 2010 and was a significant loss to the town, economically, culturally and socially. The site had a significant impact on the urban development of Carlow, influencing the expansion eastwards of the town. The site was part of a substantial estate developed by the IDA as shown on the drawing above. Whilst the Lapple building on the eastern plot was designed by Robinson Keefe and Devane (RKD) Architects, the Braun building was designed by the IDA’s own inhouse design team with input from Braun‘s professional team in Frankfurt on the operational and organisational strategies. It originally comprised two simple volumes, the large factory building and an entrance pavilion to the east. The design of these buildings followed a modernist style with a repeating bay pattern of ribbed 150mm precast concrete panels and full height bronze anodised windows on a precast concrete structure. It was constructed by SISK and works began in 1974. Due to a significant increase in staff numbers the carpark was extended and vehicular layout modified in 1979.
IDA Planning Application 1973 Plans for Lapple Building, RKD Architects, The Nationalist & Leinster Times, date Carlow County Council Planning Archives unknown
Braun Betriebs- spiegel article 1974 Translation 1. Braun’s new production facility in Ireland, which is being built on a 124 square meter site in Carlow, around 85 km south-west of Dublin, already exists in the model. In more than 80 hours of work, Walter Wlober, Os- EI, assembled the more than 8,500 Lego bricks into a true-to-scale model. The main hall, without the administration building, will have the respectable size of 117 m long and 90 m wide with a height of 6 m. The individual phases of the work process can be clearly seen in the picture. Goods receipt and spare parts warehouse on the right, production in the middle, finished goods warehouse and dispatch on the left. The annex on the far left shows the administration building. Bern Untermann, who is responsible for organization and personnel issues of the Irish project, keeps the model like the ‘apple of his eye’ so that nobody misuses the Lego bricks. To play with, a model like the apple of his eye. The legos will only released for his sons to play with when the building is finished. However, this will take a little longer than the model building! Completion is scheduled for the end of 1974.
Braun Betriebs- spiegel article 1974 2. When considering the Ireland project, the purchase of Kilkea Castle was initially up for discussion. On closer inspection, however, it turns out that the flow of material is not optimally guaranteed here. So the decision was made in favor of Carlow, a little further south, in which Braun is building a production hall of around 12,000 square meters with a prefabricated office wing. 3. Construction, which began in February 1974, is expected to be completed by November of this year. This rapid processing is possible through the use of prefabricated components for the frame construction and the facades. In addition, the beautiful weather in Ireland favours the construction work extremely. Source: Braun AG Archives, Deutschland 2021
Status Report Project Ireland May 1974 Copy of May 1974 Status Report Braun (Gillette AG ) Source:Dermot O’Brien
Status Report Project Ireland May 1974 Construction Photos Copy of May 1974 Status Report Braun (Gillette AG) Source:Dermot O’Brien
Proposed Bypass route through IDA estate Carlow County Council Planning Archives
1979 Carpark Expansion Carlow County Council Planning Archives Carlow County Council Planning Archives
Braun as a Workplace 1974 -1985 Photo Credits: Susan Reid / Old Carlow Photos
Braun as a Workplace 1974 - 1985 Photo Credits: Susan Reid / Old Carlow Photos