Planning Commission January 11, 2021 Ames Center Amendment to Site Plan #1 Rezoning Vacation 1820 and 1830 Fort Myer Drive
Subject Items Z- 2622-19-1 REZONING from C-O Mixed Use District to C-O Rosslyn Mixed Use Rosslyn District SP #244 SITE PLAN AMENDMENT for a 740-unit multifamily residential development consisting of two building towers, with approximately 10,146 square feet of retail, 8,291 square feet of commercial office or retail flex space, approximately 16,633 square feet associated with proposed church and 7,855 square feet associated with proposed fueling station space, and up to 225 residential units proposed for interim hotel use for a limited period; and modifications of use regulations to include: additional density, density exclusions, required parking, compact parking percentage, loading requirements, and other modifications as necessary to achieve the proposed development plan; an additional modification for increased mechanical penthouse height has also been requested VACATION of 1) a portion of a public street and utilities easement running north from Wilson Boulevard parallel to the west side of North Ft. Myer Drive; 2) portions of a public street and utilities easement running north from Wilson Boulevard parallel to the west side of North Ft. Myer Drive; 3) a portion of a public street and utilities easement running north from Wilson Boulevard parallel to the west side of North Ft. Myer Drive; and 4) walkway easements running through the site to the north 2
Site Location Turnberry Tower (SP #19) 1812 North Moore (SP #18) Nash Street Office Building (SP #21) Rosslyn City Oakhill Center Office (SP #94) Building (SP #7) Hyatt Centric Arlington (SP #92) 3
Site Context: Approved and Pending Site Plans Key Bridge Marriott (SP #53) Rosslyn Gateway Rosslyn (SP #419) RCA Holiday Inn Building (SP #21) (SP #66) 1555 Wilson (SP #445) Rosslyn 1401 Wilson Plaza (SP #429) (SP #422) 4
Background Existing Development – Ames Center office building and parking garage (1966) – Arlington Temple United Methodist Church and Sunoco gas station (1971) Subject to Site Plan #1 – Approved by the County Board on March 24, 1962 – Permitted construction of a 12-story office building and conceptual approval for a proposed church – An amendment in April 1973 allowed approval of the Hyatt Centric Arlington hotel site as Site Plan #92 Rosslyn Sector Plan adopted in July 2015 5
General Land Use Plan & Zoning GLUP Designation: “High” Office Apartment Hotel Existing Zoning: “C-O” Mixed Use District Proposed Zoning: “C-O Rosslyn” Mixed Use Rosslyn District 7
Site Plan Proposal Rezoning from “C-O” to “C-O Rosslyn” New mixed-use development with 740 total residential units within 30-story and 31-story towers consisting of: – 225 residential units proposed for interim hotel use for a limited period of up to five years – 10,146 sq. ft. of retail space – 8,291 sq. ft. of commercial office or retail flex space – 16,633 sq. ft. associated with the existing redeveloped church and 7,855 square feet associated with redeveloped fueling station uses that will be reconstructed with the north building tower – 574 parking spaces in below grade and above grade structured parking Modifications: – Required residential parking (0.72 spaces per unit) – Compact parking percentage – Required loading spaces – Mechanical penthouse height* – Density exclusions (16,337 sq. ft.) – Additional density: • 0.30 FAR green building bonus density for LEED Silver certification + 2 Priority Credits • Affordable housing units on-site • Off-site transportation improvement contribution 8
Rosslyn Sector Plan: 18th Street Corridor Map 3.13 Public Parks and Open Space 11
Rosslyn Sector Plan: 18th Street Corridor 12
Rosslyn Sector Plan 13
Rosslyn Sector Plan: Penthouse Design Sector Plan guidelines for architectural composition of towers and caps include the following guideline: “Buildings tops within view of the public Observation Deck should be designed so as to create a thoughtful, complementary foreground view for the monumental core and other key vistas, minimizing any adverse visual impact. Sculpting, transparency, and other design strategies to minimize the height and size of penthouses should be considered in order to better preserve views as described on pages 170-175 of the plan.” 14
Elevator Overruns Proposed North Building Tower 15
Site Plan Improvements & Community Benefits Anticipated community benefits to achieve base 3.8/4.8 FAR density: Standard Conditions: – Streetscape and pedestrian improvements around the perimeter of the site – $100,470 contribution to the County’s Utility Underground Fund – Transportation Demand Management (TDM) program – $75,000 contribution to the County’s Public Art Fund – Affordable Housing base contribution: $1,059,587 contribution; or 8 CAFs on-site, 11 CAFs off-site nearby, or 15 CAFs off-site – Installation of an in-building wireless emergency responder communications system Sector Plan goals: – Nash Street bicycle facilities – Skywalk removal – Priority View Corridors – 18th Street Corridor 16
Site Plan Improvements & Community Benefits Anticipated contributions/improvements for additional density above 3.8/4.8 FAR: 24 committed on-site affordable units at 80% AMI (14 1-BR and 10 2-BR units) $5 Million cash contribution for off-site transportation improvements in the Rosslyn Coordinated Redevelopment District Construction and maintenance of a major plaza segment of the 18th Street Corridor Removal of existing skywalks/pedestrian bridges above Nash Street and Fort Myer Drive 17
Phasing Phase I – 13 CAFs at 80% AMI (8 1-BR and 5 2-BR units) – $2M contribution for off-site transportation improvements – All on-site, including interim improvements, associated with this phase Phase II – 11 CAFs at 80% AMI (6 1-BR and 5 2-BR) – $3M for off-site transportation improvements – Removal of skywalks/pedestrian bridges – Completion of all remaining on and off-site improvements Phase I Interim Plaza Condition (view looking from Fort Myer Drive) 18
Public Process Site Plan Review Committee – February 24, 2020: SPRC Meeting – July 16 – July 23, 2020: Online Community Engagement – September 17, 2020: Virtual SPRC Meeting Transportation Commission – Two meetings (March 5, 2020 and January 7, 2021) – Recommended approval of the project Housing Commission – Anticipated to be heard on January 14, 2021 19
Recommendation Recommend approval for the request to rezone the subject site from C-O Mixed Use District to C-O Rosslyn Mixed Use Rosslyn District Recommend approval for the amendment to Site Plan #1 for a 740-unit multifamily residential development consisting of two building towers, with approximately 10,146 square feet of retail, 8,291 square feet of commercial office or retail flex space, approximately 16,633 square feet associated with proposed church and 7,855 square feet associated with proposed fueling station space, and up to 225 residential units proposed for interim hotel use for a limited period; and modifications of use regulations to include: additional density, density exclusions, required parking, compact parking percentage, loading requirements, and other modifications as necessary to achieve the proposed development plan* Recommend approval for the request to vacate 1) a portion of a public street and utilities easement running north from Wilson Boulevard parallel to the west side of North Ft. Myer Drive; 2) portions of a public street and utilities easement running north from Wilson Boulevard parallel to the west side of North Ft. Myer Drive; 3) a portion of a public street and utilities easement running north from Wilson Boulevard parallel to the west side of North Ft. Myer Drive; and 4) walkway easements running through the site to the north 20
Thank You 21