Grass Tennis Court Conversion and Floodlight Installation Project Presentation for Tennis Section Members 13th June 2018
• The contents of this document are CONFIDENTIAL and for the information of AETC Members only. Please do not Confidentiality discuss or circulate the document or its contents outside of the section membership
A big THANKYOU to over 500 people who have supported the project, directly or indirectly, we have raised over £175k including grants which is £25k more than our original target. We believe this outstanding opportunity for making our Club the ‘place to play tennis’ is now within our grasp.
• Recap: Why do this project? • Project Scope • Progress and timing • Project Finances • Summary • Any Questions? Presentation Agenda for 13th June
At the end of the presentation we would like you to feel ….. If you don’t feel like this, ask more questions to remove doubts • It makes sense for the Club • This project is in good hands and that you want to support the project • That we are nearly there. It has been challenging but we will get there • The Club/Section can afford this - it is low risk • This project is not just about adding facilities - it is making a step change and opening many opportunities for new members, more activities and involvement - overall a better place to play • Eager to get onto the new courts/floodlights
A premium Club with the best facilities for its members We have a long term Business plan and Our Vision is to be one of the premier clubs in Cheshire, recognised for our strategy … junior performance and involvement programmes, and comprehensive adult which has been tennis, both social and competitive. endorsed by the Tennis Committee and GC
Strengths Opportunities • Large number of tennis members 428+ adults / 190+ • More tennis throughout the year, especially winter juniors (2017 figures) and dark evenings. • Top Class Head Coach and talented assistant • More engagement with local schools • Increased participation of large membership base in • Provide team tennis for more adults and juniors box leagues and matches • Development of Junior Performance Programme • Substantial junior participation in coaching • Ability to offer more adults and juniors with private programme coaching • Increased numbers of adults and juniors wishing to • Capacity to provide juniors with dedicated courts play team tennis where they can play tennis • Large number of junior non-members playing at the • ‘Open Days’ and marketing to secure more senior club – 200+ drawn from 14 senior schools and 15 members, particularly, younger, working adults As part of the • junior schools Latent demand for coaching – both adults and juniors • • Grow our coaching team further Convert more non-member juniors to members as Business Plan we • • Links with local schools are growing Large Adult recreational tennis base fills the courts they grow older looked at the • • mornings and evenings Fantastic clubhouse and social facilities for members Financial Security Strengths and Weaknesses • Lack of court and floodlight availability for: • Threats Constraints of court time and floodlights: Weaknesses of the o Junior coaching programme o Junior performance coaching o May cause coaches to leave as cannot deliver their vision, and earn sufficient income Tennis Section o Offering talented juniors private coaching o Coaching of teams and adults especially in winter o May cause members to leave to seek o Team tennis - more members wishing to play alternative tennis club to: team matches than club can support ▪ Play socially • Lack of availability of courts for members when ▪ Play under floodlights summer league matches are played ▪ Play team tennis • Minimal winter league tennis for adults and juniors ▪ Receive coaching • Few members can play winter tennis on week-day o Already causes individuals to seek private evenings due to floodlight court limitations coaching elsewhere • No dedicated courts for juniors o Already causes juniors to seek performance coaching elsewhere o Growing conflict of interest between adult membership and coaching staff for court time
A premium Club with the best facilities for its members • More courts to enable members to play tennis whenever they wish • Provide courts capacity for more members to play on teams • Meet the demand to substantially increase winter We formulated the evening tennis – social, intra club box leagues, matches following goals: and coaching • Increase the availability of coaching to members and non-members, juniors and adults, which will stimulate new membership and hence more people playing the game. • Increase our participation with local schools to encourage the junior feed to the Club’s programmes • Become a local Performance Centre, developing a pipeline of the best junior talent from the Club
We need to modernise our playing facilities. We are falling behind. We need to provide more court capacity for use throughout the year Why this Project is We must become an attractive/ ‘go to’ so important place to play for new members We must support the tremendous increase achieved in Junior Member participation Leverage the huge benefits we have as a site and club
Project Scope • 5 new Artificial Clay Courts in Advantage Green Court • New LED floodlights on Courts 1,2,4,5 • New LED floodlights on Court 14 • Token meters for operation of all new and existing floodlit courts • Booking system for floodlit courts • New path from car park to Mottram road for entry to courts 1-3, 4-6 & 7/8
A premium Club with the best facilities for its members • Provides 14 courts available for play all year round • Provides court availability for non-team players Why convert 5 courts? during the summer season • Coaching availability at peak times for those Fundamental to the who work vision of more tennis for • Potential for addition of more adult teams everybody and providing • Potential for addition of more winter tennis the best facilities for our teams members • Potential to run two coaching squads at the same time • Secures the area for tennis long term
A premium Club with the best facilities for its members • Grass courts can only be used 50-60 days per year • LTA and Cheshire LTA funding is based on 5 Why converting only 3 courts and floodlights courts is not a good • Cannot run two coaching squads at the same time unless 5 courts are converted option? • A lot of maintenance for 1/2 grass courts that even in good weather are barely used • It would cost more per court if done in two phases i.e. 3 now and 2 later • Additional coaching income supports the payback of the additional two courts
About artificial Clay ….. • The carpet is basically the same as Artificial Grass, but plays like real clay court • The carpet is covered by a 2mm layer of infill, which means you play on the sand, not the carpet • ITF Classified Court Pace 1 (slow) – great for coaching and competition • No watering required like real clay courts • Softer on joints than harder surfaces • Potentially slower pace is better for older slower players • The white lines are slightly higher than the carpet to help visibility
Why choose Artificial Clay over Artificial Grass? • It offers the Club a different all-weather surface providing members with a choice • ALL the clubs we contacted said that their members prefer them to Artificial Grass • Better for coaching, development, and recognised as an International Competition surface • Leading local clubs have chosen Artificial Clay – Bramhall Lane and Bramhall Queensgate, Prestbury, Brabyns, Bowdon Bowling, Bowden Lawn Tennis • May last longer than Artificial Grass as players are not directly treading on the carpet AECC members playing at Hoole LTC
* • Edelgrass has been installed since 2006 • It has been installed on over 300 courts • In our research Edelgrass was the only carpet & infill system without problems • The Clubs we contacted who have the oldest courts do *It is a planning condition not have any plans to that we install green replace or rejuvenate • It has recently been installed at Hoole LTC, and those who visited thought it was a very Why choose Edelgrass Advantage good surface GreenCourt?
Artificial Clay basically needs similar Maintenance to Artificial Grass • Regular removal of debris (to stop clogging) • Weekly deep brushing with motorised unit • Annual moss-killer/weed-killer • Annual infill clean • Annual or 6-monthly top-up of infill But also • Brushing by members after use • Infill top-up is likely to be Impact on Maintenance? more
Why 5 extra floodlights and Club Members Floodlight Booking Club Courts System Nights LEDS? Every Knutsford 271 6 Roll Up • Compared to other clubs Weekday our ratio of members/ Paper Bramhall Two Per floodlit court is very high 280 6 system at Park Week club • Will allow more members to Bramhall Two per play after work 480 10 On line Lane week • Will allow better balance 5 with goal Two per between members play and Prestbury 507 On line of 3 more week coaching needs Block One per • Will facilitate ability to book AECC* 618 3 booking week sessions rather than season AECC block booking Planned* 618 8 On Line ? • LEDs use half the energy * AETC Membership Numbers for 2017
LED Floodlights • We are aiming to have LTA recommended lighting levels on courts 1,2,4,5 • Average 500 lux in the player area (cf. 200- 300 courts 9-13) • Uniformity should be much improved • Minimum LTA level for Court 14 (400lux average) • Have to ensure spillage levels for our neighbours are very low (
Light spillage is critical and a big focus for our designs
Current proposed layout plan
We have made some excellent progress • Planning permission for courts AND floodlights achieved first time • Offer of LTA loan and grant • Offer of Cheshire LTA loan and grant • Fundraising achieving £175k including grants • Request for Tenders issued
What next? Key Milestones • Choose Courts and Floodlighting Target completion is end Q1 2019 Contractors • Finalise Tender Contracts and Schedule • Obtain ‘GO’ from Club and Due Diligence • Sign off on all contracts: • LTA Loan and Grant • Bank Loan • Cheshire LTA Loan and Grant • Tenders • Prepare for Construction We aim to be playing on the courts by Q2 2019
Project Finances Costs, Funding and Pay-back
Costs; Funding; Pay-back • Our costs are in the process of being finalised as we receive the Tender responses • The funding is looking good but we have had a challenge with agreeing the terms and conditions for the LTA loans and grants • The pay-back predictions are looking realistic based on actual income in 2017 Let’s take a brief look at each one
Project budget - £388k Costs of Project The project now includes: Five courts - base Five courts - surface • Token meters & mgt for 9,11,13 Five courts - floodlights Fencing • 5m fence along cricket boundary Lanscaping and Ancillary of court 1 Court Equipment • New motherboard & meters Professional Fees • Upgrade to artificial clay Contingency VAT (10%) We are now working with contractors to bring overall costs within budget
Fund Raising £200,000 £180,000 We have raised £175k and exceeded our target by £25k £160,000 Grants Thanks to £140,000 Events everyone £120,000 Any extra money we who Corporate Sponsorship 2017 raise helps reduce supported £100,000 2015 / 2016 / 2017 Section Profit loans, interest fund raising £80,000 Sale of Benches payments, and hence £60,000 Personal Donations pay-back time £40,000 £20,000 £0
Funds Raised by Tennis Current view of Loans, 52% Section including Funding grants, 48% Originally we had budgeted for loans of 62%
How will the loans be paid back? Estimated realistic future sources of pay-back cf. 2017 actuals We have been monitoring profits from 30000 our activities and are able to make predictions of realistic future income for 25000 pay-back purposes 20000 Target Pay-back £18k In 2017 we accumulated over £24k, not including the Spring Ball. 15000 Sponsorship Social Events We estimate we need approximately 10000 £18k per year for pay-back. Floodlights Income 5000 Non-member and guest fees In a typical future year, post project, we Coaching Income think £22k income is very realistic 0 2017 Future
Rationale and summary of why pay-back is low risk • We already achieved the pay-back figure in 2017 (without Spring Ball) • Additional coaching and floodlight income will add to the tennis section income • Occasional one-off events (e.g. Spring Ball) can contribute to pay-back • Future one-off events will lower annual pay-back • Floodlight income could be significantly higher than our prudent estimate
• There are a number of risks associated with the project that we are managing on an ongoing basis • We have regular, in-depth meetings with a Due Diligence Team led by Charles McKeown • A final review document will be prepared for the Tennis Section Committee and GC to approve • The Club has to give the ‘OK to proceed’ decision before any contracts are signed Risk Management
• Share knowledge with other members - share the joy ☺ Explain to others what this project is about and the benefits to the Club • Be openly supportive of the project • Ask questions if you have any • Continue to attend any fund- raising events - any money we raise will reduce our loans, quicken pay-back and then we can replace old floodlights • Offer to get involved / help • Offer a free place to offload 85 How can you now help support the lorry loads of topsoil. This is Project? equivalent to 30cm taken off each of the 5 grass courts.
Summary • As a premium Club our aim is provide the best facilities for our members • The Project is AFFORDABLE both in terms of Capital Outlay and Annual Cost and is UNDERWRITTEN by AECC, resulting in very low risk to the Tennis Section • AFTER very thorough research of the best options, we believe that the plan, including the chosen surface, offers the best opportunity to achieve this.
Thank you Any Questions??? A premium Club with the best facilities for its members