Droitwich Spa Yew Tree Village Local Centre - An opportunity to acquire a prime local centre investment with a national foodstore anchor ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Droitwich Spa Yew Tree Village Local Centre An opportunity to acquire a prime local centre investment with a national foodstore anchor 1
Average number of baskets of items bought between March-July 2020 rose 32% at local convenience stores 51% of shoppers said they were planning to continue shopping at their local convenience store 2 in 3 said their local corner store had everything they need Retail Gazette 2 Yew Tree Village Local Centre | Woodland Way | Pulley Lane | Droitwich Spa WR9 7FY INVESTMENT SUMMARY • Prime new local centre development • The Co-op foodstore anchor providing nearly 50% of the income • Four new retail units of 1,000 sq ft each • New day nursery up to 6,000 sq ft, can be made available • The centre adjoins a new private care home 3
DROITWICH SPA Birmingham M5 Droitwich Spa is situated 6 miles north of Worcester A442 A456 and 30 miles south of Birmingham, with easy access A38 in both directions thanks to the nearby M5 accessed Kidderminster at Junctions 5 and 6. 4 A435 All the facilities of the city of Worcester are just six 2 miles south via Droitwich Road (A38) and nearby M42 3 schools in the area include Meadows, St Peters & Stourport- A448 4a Alvechurch Hadzor & Oddingley Pre-School. on-Severn Bromsgrove A441 Worcester 6.2 miles A38 A448 Reddich 12 miles Reddich Kidderminster 12.8 miles Birmingham City Centre Great Witley 30 miles A449 5 Gloucester 32 miles Hanbury Hereford 35 miles Droitwich Approximate distances from the Local Centre Spa A441 A435 Martley M5 6 Alcester Knightwick A442 Worcester A44 A38 A44 7 4 Yew Tree Village Local Centre | Woodland Way | Pulley Lane | Droitwich Spa WR9 7FY
YEW TREE VILLAGE Vines Park Yew Tree Village is part of a 70-acre new residential AD RO housing development located approximately three PE WITTON AR AY miles to the south of Droitwich Spa town centre. LW EW SA LT DROITWICH SPA TOWN CENTRE providing 765 new homes. SA Great Pool O M B E R L E Y WAY A38 L NA School The Droitwich National house builders Persimmon, Taylor Wimpey CA Hospital Y A W N and Redrow have been developing new homes, H A TH M RO UE which commenced in 2016. IC E H EN W School IT OLLOW V A O RS DR A Y FR IA W K A new local retail centre will be built at the heart of C AY A L B the housing development with access via Pulley Lane Y E L R E from the Worcester Road (B4090). O B O M LD COAC H RO Droitwich School AD Lido Park AD School R O LL R O AD R A GW E R ER Droitwich Town Centre 2.8 miles ST O M ER A C E L V N Gaudet Luce RC Droitwich Spa Station 2.9 miles TAG WE L L W Golf and Leisure O A E S T Y W UNE WA Y W Complex M5 South (Junction 6) 3.7 miles A D AN Y SL IM P R R OAD ND W MSL A PRI AY M5 North (Junction 5) 4.4 miles Water Tower AD Approximate distances from the Local Centre D Y E S WAY COPCUT The Orchards LA NE LE Y PUL A38 Yew Tree Village D LA N E N LA EW N 5
DESCRIPTION The local centre provides retail and nursery facilities to a wider catchment of Droitwich Spa, which has a population of 24,000 all within a 10 km radius of the centre. The scheme is being constructed by Henry Davidson Developments, an established specialist Local Centre developer (www.hddl.co.uk) providing a convenience store and four new retail units which will be available to lease. In addition to the retail units, a new day nursery extending up to circa 6,000 sq ft on two floors with dedicated demised parking can be made available. Design and layout for the nursery is flexible at this stage and can be tailored to specific operators requirements. The retail units available offer a uniform in line terrace adjoining a convenience food store of 4,000 sq ft to be occupied by The Co-operative. Shared parking for 40 vehicles is provided within the centre. The new development will be surrounded by new housing. This plan is indicative only and may have varied during construction. 6 Yew Tree Village Local Centre | Woodland Way | Pulley Lane | Droitwich Spa WR9 7FY
ACCOMMODATION The property will comprise the following CUCKOO CLOSE approximate floor areas: 1k 40 s pa ces m/c il Reta ce 1k Te rra Sq M Sq Ft t/b gate 1k C-Store 371.61 4,000 d ya rd 1k 3 LOT P Retail Unit 1 92.90 1,000 acce tore C' S s 4k s cycle sign ss deli veri es acce Retail Unit 2 92.90 1,000 en gard 6k urse N ry Retail Unit 3 92.90 1,000 CUC rey 2 sto priv Y WA KOO EST ate R LDC Retail Unit 4 92.90 1,000 CLO GO SE Total 743.22 8,000 WOO LOT 2 D LAND P WAY New Day Nursery* 557.41 6,000 *NEW DAY NURSERY 24 ing Park es Spa c The new Day Nursery plot does not form part of this transaction however HDD would be prepared to discuss options. T1 PLO JENN YW REN ROW 7
PROPOSAL PROPOSED INCOME Unit Sq ft Rent psf Rent (PA) Term R/R Tenant Comment C Store 4,000 £18.00 £72,000 20 years 5-yearly OMV Co-op AFL exchanged with Kenmare Estates Limited. 9 months rent free Retail 1 1,000 £20.00 £20,000 - - Void Marketing Retail 2 1,000 £20.00 £20,000 - - Void Marketing Retail 3 1,000 £20.00 £20,000 - - To be advised Under Offer Retail 4 1,000 £20,00 £20,000 - - Void Marketing £152,000 • A forward funding of this opportunity is sought on the basis of a land purchase and WIP cost of £350,000, with a further two interim payments to be made, and a final balancing payment at practical completion. • Upon this traditional funding structure and a rent role on the completed scheme of £152,000 per annum the maximum commitment to the investor is £2,175,000 (TWO MILLION, ONE HUNDRED AND SEVENTY FIVE THOUSANDS POUNDS), which reflects a net initial yield of 6.57% after purchase costs of 6.33%. • Consideration will be given to proposals offering a 50:50 share of the the SDLT saving available. Land Payment 1 and WIP Upon Planning Consent becoming unconditional Payment 2 3 Months post-unconditional Planning £1,300,000 split to be agreed. Payment 3 Balancing payment at Practical Completion Payment 4 Top up for lettings as they occur £525,000 to be released incrementally as void units are Let. 8 Yew Tree Village Local Centre | Woodland Way | Pulley Lane | Droitwich Spa WR9 7FY
TIMING • Planning Mid March 2021 • End of judicial review period End of April 2021 • Start on site May 2021 • Practical Completion November/December 2021. TENURE Freehold. ENERGY PERFORMANCE Energy Performance Asset Rating: TBC. VAT All figures quoted are exclusive of Value Added Tax which will be charged at the prevailing rate. ANTI MONEY LAUNDERING The successful purchaser will be required to submit information to comply with anti-money laundering regulations. 9
CONTACT For further information please contact Duncan MacLaren MRICS duncan@maclarenpartners.co.uk D | 020 7317 3132 M | 07770 648 755 W | maclarenpartners.co.uk MacLaren & Partners for themselves and for the vendors or lessors of this property for whom they act, give notice that: (i) these particulars are a general outline only, for the guidance of prospective purchasers or tenants, and do not constitute the whole or any part of an offer or contract; (ii) MacLaren & Partners cannot guarantee the accuracy of any description, dimensions, references to condition, necessary permissions for use and occupation, and other details contained herein, and prospective purchasers or tenants must not rely on them as statements of fact or representations, and must satisfy themselves as to their accuracy; (iii) no employee of MacLaren & Partners has any authority to make or give any representation or warranty or enter into any contract whatever in relation to the property; (iv) rents, prices, premiums and service charge quoted in these particulars may be subject to VAT in addition; 10 Yew Tree Village and (v)Local Centre MacLaren | Woodland & Partners Way will not be liable, | PulleyorLane in negligence | Droitwich otherwise, Spa WR9 for any loss arising from the7FY use of these particulars. February 2021. Produced by creativewiredesign.co.uk
You can also read