G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO

Page created by Lori Wagner
 
CONTINUE READING
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
G. Riccobene INFN-LNS
                        KM3NeT Calib WG leader
G. Riccobene INFN-LNS        CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
KM3NeT: the giant scale neutrino telescope

neutrino telescope                  Network of cabled observatories located in deep waters
                                    of the Mediterranean Sea.
                  Array of
                  optical sensors
                                    Centrally managed: common hardware, software, data
                                    handling and control
      Cherenkov light
                                    Astronomy: ARCA @ Capo Passero
                  muon              Phase 1 under construction, Phase 2 defined:
 Cable to shore                     2 building blocks (few km among the blocks)
                  interaction       115 Detection Units(DU) / block
                                    18 DOMs (36 m inter-DOM)
           neutrino                 90 m inter-DU distance
                                    1 km3 volume
                                    Oscillations and Mass Hierarchy: ORCA @ Toulon
                                    1 building block
                                    115 detection Units
                                    18 DOMs (9 m inter-DOM)
                                    6 Mton volume

G. Riccobene INFN-LNS                       CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
KM3NeT: The Detector

                                                                                          750 m
Digital Optical Module (DOM)
A fly’s eye light detector Inside
a 17’’ glass sphere                                                  2 km2

Plus:
compass, acoustic sensor,                                           KM3NeT - ARCA
front-end and data                  Detection Unit                  230 Detection Units
transmission electronics            A vertical slender sling        KM3NeT - ORCA
                                    with 18 DOMs                    115 Detection Units
1 hydrophone at each                260 W
Detection Unit base                 400 Mbps                        Data sent in real-time to shore for analysis

 G. Riccobene INFN-LNS                          CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
KM3NeT: The Sites

 ORCA: 2500 m wd, 45 km offshore                  ARCA: 3500 m wd, 95 km offshore
                                                           230 DUs
          115 DUs                                          Footprint: 2 x 1000 x 1000 m
          Footprint: 300 x 300 m                           height: 700 m
          height: 300 m                                    inter DU distance (average): 80 m
          inter DU distance: 25 m
                                                           Phase 1:
          Phase 1:                                         24 DUs
          7 DUs

G. Riccobene INFN-LNS               CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
KM3NeT: Challenges

Transportation (truck, ship)
        “Standard”

Deployment and Recovery (ship, rov)
       Design: safe monoueving
       Marking: rigging, lashing, connection, disconnection, grabbing
       Labelling: WiA, WiW
       Interaction with third parties: certifications

Operation (seawater)
        “No” vibration
        Constant “low” temperature (13.5°)
        High External Pressure
        Conductive and “live” medium: Corrosion, short circuit propagation

No maintenance during detector operation lifetime!

G. Riccobene INFN-LNS                 CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
This Review: Who are we
Miles Lindsay Clark (APC): Technical Coordinator of KM3NeT
Ernst Jan Buis (TNO): Chief System Engineer of KM3NeT
Giorgos Androulakis (Demokritos): QA/QC Task leader of KM3NeT

Giorgio Riccobene: Calibration WG leader

IU ORCA: P. Keller (L), Ph. Lagier, A. Cosquer - CPPM
CB ARCA: M. Anghinolfi (L), R. Cereseto, S. Ottonello – INFN Genova
Laser Beacon: R. Le Breton (L), A. Creusot, A. Ilioni, S. Boutonet - APC
CB ORCA: A. Ilioni (L), C. Boutonet, S. Colonges, L. Confucius – APC
IU ARCA: Rovelli (L), C. D’Amato, A. Grmek – INFN LNS

  G. Riccobene INFN-LNS         CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
This Review: what we want
Deals with mechanics of the assets (but suggestions on others are welcome!)

We ask you to help us to:
     verify that materials and design are OK to fulfil the request
     all documentation is in place and clear

Tell us clearly:
       what is good
       what is “wrong”
       what is not clear
       what we must do, yet
       what would be diligent to do
  G. Riccobene INFN-LNS        CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
This Review: Documentation

We use CERN indico
        https://indico.cern.ch/event/829590/

and vydio
            https://vidyoportal.cern.ch/join/3moTzTrv6r

Documents will be stored on Google Drive
       https://drive.google.com/open?id=1OjRW4kaF8G2Ngfut4BPAuBsWFBGerTQf

G. Riccobene INFN-LNS                        CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
This Review: Documentation

On Indico and Gdrive:

Calibration_Unit_Preliminary_Design_Review_PDR.zip

On Gdrive:
KM3NeT_CALIB_2019_103_MechReview_RIDtemplate.xlsx

https://drive.google.com/open?id=1rgdelCxhyGiOxgLkhSkhr90
CrqbSRlcczCmUswnRrnQ

  G. Riccobene INFN-LNS                   CU PDR 02/07/2019
G. RICCOBENE INFN-LNS KM3NET CALIB WG LEADER - CU PDR 02/07/2019 G. RICCOBENE INFN-LNS - CERN INDICO
KM3NeT at Capo Passero: The ARCA Calib Unit
                             Calibration Base
                                      Lifetime 20 y                                     300 m
                                                                                        electro-optical interlink
                                                                                        cable CB-JB
                                                                                        Teldyne ODI NRH

                              CB electronics/optics container
                              (DU base design)

                                                                Host 2 instruments
                                                                Hydrophone        -> Acoustic Positioning System
                         M.Anghinolfi INFN-Genova               Acoustic Beacon   -> Acoustic Positioning System
                                                                Permits connection to IU

 G. Riccobene INFN-LNS        CU PDR 02/07/2019
KM3NeT at Capo Passero: The ARCA Calib Unit
  Instrumentation Unit
          Recovered evey 2/3 years for instrument recalibration and battery change
                                                                                    A.Rovelli INFN-LNS

                                                          Base of the IU: design inherited from ITF and SHB
                                                          Working at CP site since January 2019

 G. Riccobene INFN-LNS                CU PDR 02/07/2019
KM3NeT at Toulon: The ORCA Calibration Unit
                                          Calibration Base
                                                   Lifetime 15 y

Host 3 instruments
Laser Beacon      -> Time Calibration
Hydrophone        -> Positioning System
Acoustic Beacon   -> Positioning System
Permits connection to IU                                           A. Ilioni APC

   G. Riccobene INFN-LNS                  CU PDR 02/07/2019
KM3NeT at Toulon: The ORCA Calib Unit
  Instrumentation Unit                                                                         P. Keller CPPM
          Recovered evey 2/3 years for instrument recalibration and battery change

                                                                             Base of the IU

                                                                                              IU electronics
                                                                                              vessel
                                                                                              (ANTARES)

                                                          Base of the IU: design inherided from ITF and SHB

 G. Riccobene INFN-LNS                CU PDR 02/07/2019
The Laser Beacon
Lifetime
20 years

Emit short pulses of laser light to                                       Flange
illuminate all DUs at the “same” time
                                                               Laser

Same Design for                                  Titanium cylinder
       ORCA (Calibration Base)                                                                   Quartz rod
       ARCA (JB)                             LPMI+
                                                                                           O-rings
                                        Flange
                                                                                   Laser board control

                              Connector
                                                                            Internal Structure
                                                                O-rings
                                                                                                         R. Le Breton APC

  G. Riccobene INFN-LNS                   CU PDR 02/07/2019
PBS

 G. Riccobene INFN-LNS   CU PDR 02/07/2019
You can also read