RAIL PROJECT Leeward CC Improvements… • Phase I • Construction of New OCEWD Building Complex • Construction of New Motorcycle Range Lot • Construction of New Parking Lot and CDL Range Lot • Phase II • Realignment of Ala Ike • Construction of Rail Station • Construction of Middle Loch Connector • Construction of New Overflow Parking Lot
RENOVATION PROJECTS FUNDED PROJECTS: PROJECTS AWAITING FUNDING: Chill Water Loop Project AM & FA Buildings Restrooms One-Stop Center – Admin Building Reroofing – BE, Theatre, Learning Commons, LA Diamond Head Portables Renovation Waianae Coast Project BS & PS Buildings Air Conditioning Seal Building Joints Fascias and Sidewalks BE Building Air Conditioning Cafeteria Kitchen/Serving Renovation ‘Reroofing – Campus Center Cafeteria Dining/Bookstore Project Title III (science labs, shade house, amphitheater) Replacement of Exterior Light Poles Native Hawaiian Center for Excellence Model Classroom Project – BS-208A/208B & Theatre Renovation PS-201A/201B Electrical Transformers Model Classroom Project – AM Building Second Flag Pole
SUSTAINABILITY AT LEEWARD CC EDUCATION BUILDING GREEN ROOF AUGUST 2016
ELEMENTS COMPLETED – ENERGY CONSERVATION MEASURES Controls HVAC Lighting Water EV Charge Kitch Exhaust Solar PC Power Solar Water Vending UHCC, May 4, 2016
ELEMENTS COMPLETED – ENERGY CONSERVATION MEASURES What buildings are submetered? What has been done on my campus? UHCC, May 4, 2016
ELEMENTS COMPLETED – ENERGY CONSERVATION MEASURES UHCC, May 4, 2016
If you can read this If you can read this Click on the icon Click on the icon to choose a to choose a picture or picture or Reset the slide. To Reset: Right click on the Achieving Results Reset the slide. To Reset: Right click on the slide thumbnail and select ‘reset slide’ or choose the ‘Reset’ button on the ‘Home’ ribbon (next to the font The Presentslide thumbnail and select ‘reset slide’ or choose the ‘Reset’ button on the ‘Home’ ribbon (next to the font choice box) choice box)
RESULTS – ARE WE SAVING ENERGY? UHCC All seven campuses Power from fossil-fuel Overall Total 22% power use power use from solar 15% 8% As compared to 2008 baseline UHCC, May 4, 2016
RESULTS – ARE WE SAVING ENERGY? Leeward CC kWh Sqft Leeward CC 18.0000 16.0000 14.0000 12.0000 Solar 10.0000 production 8.0000 Power 14% 6.0000 use 4.0000 2.0000 29% 0.0000 Overall Oahu winner reduced use + renewable energy production UHCC, May 4, 2016
RESULTS – MEASUREMENT & VERIFICATION HIGHLIGHTS Leeward CC $834,565 Verified total savings Lighting Chiller Plant Solar PV PPA $205,081 $191,079 $146,856 UHCC, May 4, 2016
Reaching goals The Future
NET ZERO BY 2035 – THE GOAL (PRODUCING AS MUCH RENEWABLE ENERGY AS THE UH SYSTEM CONSUMES BY 1/1/2035) UH Policies and Ige net-zero approval: UHCC Strategic Directions: UH Total Renewable Fossil Fuel UHCC Total Renewable Fossil Fuel Year Year System Energy Energy Energy System Energy Energy Energy baseline 2008 100% 0% 100% baseline 2008 100% 0% 100% target 2020 90% 25% 75% target 2021 70% 15% 85% target 2025 80% 50% 50% target 2025 target 2030 70% 75% 25% target 2030 goal 2035 60% 100% 0% goal 2035 60% 100% 0% What we don’t know: • How UH will calculate the numbers? • Which set of goals supersedes the others? • Reduction goals: How they will handle considerations like increased student body numbers, addition of buildings, increased power required by ever-improving technology, and lots of other “exceptions” or unique concerns? • Renewable goals: Will they allow and facilitate use of RECs? Will HECO consider off-hour buy back or other unique sharing scenarios? • Will UH consider the UHCC system as a group, or each individual campus? • Will there be any funding, or funding considerations? UHCC, May 4, 2016
DISCUSSION TOPICS Parking and Permit System Managed Food Services Pedestrian Mall Improvements College Sustainability Plan Pearl Harbor Bike Path – Middle Loch Connector