Cornerstone CAPITAL CAMPAIGN - Heritage Preparatory ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
“ Every so often we are faced with opportunities that have an extraordinary For the past two decades, impact on our future. I like to refer to them Heritage Preparatory School has as inflection points: that point in time when nurtured children who: the arc of a story shifts and changes in a fundamental fashion. I believe Heritage think with excellence Preparatory School is facing that type of believe with confidence transformational opportunity with the live with character purchase of Rock Spring Presbyterian Church. The story of Heritage Prep will fundamentally As our school has grown in shift with this chance to plant a flag in the both size and vision under His sovereign hand, we have prayed heart of Atlanta and establish a permanent that the Lord would make a way presence for our school. I could not be more for our students to experience a excited about God’s plan for Heritage and complete K-12 classical Christian invite you to join us on this journey. education—all at one school. — Matthew H. Skinner, President Move to current campus Announcement of plans Opportunity presented 2007 2003 2017 Enrollment reaches Anticipated close on Launch of High School at Morningside Baptist for inaugural High to purchase Rock Spring 100 students Rock Spring property program Fall 2021 Church School class in fall 2021 Presbyterian Church Heritage Preparatory 99-year lease extension Launch of Renovations to new 2005 2021 2020 Expansion to Enrollment reaches 1998 2013 School is founded with signed with Morningside Cornerstone North and South Middle School 150 students 15 students Baptist Church Capital Campaign Campuses
God’s Plan Through God’s faithfulness and favor—at times challenging our own understanding and timeline—our plans were stalled several times and then suspended. This is when the Lord led us to a once-in-a-lifetime opportunity to purchase the Rock Spring Presbyterian Church property that “ We are grateful to be a part of a community of families who are devoted to advancing the Kingdom of God, steadfastly committed to raising children who are courageous and equipped to use their faith and intellect is uniquely designed to meet our short- and to change the world. We are eager to long-term needs. provide our children with a Christ-centered educational environment to inspire them Situated on 1.6 acres directly across the street and to help nurture them into leaders who from our existing campus, this is the first time will serve the Lord and impact the world in 150 years the property has been available around them. This campaign offers our for sale. The beautiful space can be ready to children the opportunity to remain on this accommodate our middle and high school critical path through their formative high students in August 2021 with minimal renovations school years as they grow and mature from and provides room to enroll up to 425 students in child to young adult. the future across both campuses. Most — Andy and Julia Fisher importantly, it secures our enduring presence in Parents of Lydia, Drew, Rhett, & Lane the heart of Atlanta—all at a third of the cost of our original plans. CLO STAIR 104 BATH 0 50’ 100’ 102 107 2 5 SF 4 64 SF 47 SF SUPPLY A man’s heart plans his way, 1 NORTH OFFICE AREA 1 109 111 KITCHEN CLOSET 105 SF 95 SF 112 101 HALLWAY 49 SF 103 3 CLASSROOM 2 2 411 SF 106 81 SF 1 1 408 SF STORAGE 2 2 108 CLO but the Lord directs his steps. 47 SF 105 STORAGE PANTRY 8 SF 4 2 110 113 MULTI-PURPOSE 74 SF ROOM 63 SF 115 CLO 2 2 1 1 1920 SF 114 10 SF 2 Our Plan 5 Proverbs 16:9 VESTIBULE CORRIDOR 116 117 CLO 92 SF 476 SF 122 2 2 9 SF CLO MECH / ELEVATOR 128 ELEC 119 1 11 SF 127 54 SF 72 SF 2 1 1 STAIR MECH 123 1 129 CLASSROOM CLASSROOM 156 SF 90 SF 118 121 SOUTH CAMPUS NORTH CAMPUS 412 SF STORAGE 398 SF 1 120 2 47 SF 2 8 2 CLO STAIR BATH MEN'S 104 102 107 124 2 5 SF 4 64 SF 47 SF CORRIDOR SUPPLY 110 SF 1 OFFICE AREA 126 1 109 111 KITCHEN 1 306 SF CLOSET 105 SF 95 SF 112 101 HALLWAY 3 CLASSROOM 2 2 411 SF 2 49 SF 103 106 81 SF 1 1 408 SF STORAGE 2 2 108 Current Building: CLO MECH 105 47 SF STORAGE PANTRY 130 8 SF 4 2 110 113 MULTI-PURPOSE 229 SF 74 SF 63 SF ROOM 115 CLO 2 1. Renovate restrooms 2 1 1 1920 SF 1 114 10 SF 2 WOMEN'S 5 125 Outdoor/Nature VESTIBULE CORRIDOR 111 SF 116 117 CLO We faithfully sought His guidance, While we were carefully laying plans to this end, 1 92 SF 476 SF 122 2 2 9 SF CLO Studies Classroom MECH / ELEVATOR 128 ELEC 119 1 11 SF 127 54 SF 72 SF 2 1 1 ELEVATOR KEYNOTE LEGEND the Lord was setting in motion an even greater 133 STAIR MECH engaged the Heritage community, and in 2018 123 1 129 81 SF CLASSROOM CLASSROOM 156 SF 90 SF 118 121 STORAGE 1 NO WORK IN THIS AREA 1 412 SF 120 398 SF 1 2 47 SF 2 LOBBY HALLWAY 8 2 2 NEW PAINTING, CEILINGS, FLOORING, FINISHES, LIGHTING A 131 132 MEN'S STAIR Hedgewood lot 217 SF 110 SF 124 MECH CORRIDOR CORRIDOR 110 SF 156 vision for the Heritage community than we VESTIBULE 126 157 3 REMOVE EXISTING COUNTERTOP, SINK, CABINETS 1 1 1 100 SF began preparing for an $18 million endeavor 155 306 SF 145 53 SF 216 SF 1 2 77 SF 1 4 REMOVE EXISTING DOOR & FRAME. INFILL WALL 2 2 MECH 130 STORAGE IT ROOM 2 229 SF 5 NEW DOOR & FRAME 154 138 1 22 SF 20 SF WOMEN'S to grow our school from one building into an could have asked for or imagined. OFFICE COPY ROOM 6 REMOVE EXISTING WALL PARTITION 125 134 137 111 SF 2 CLO 102 SF 62 SF 1 158 7 NEW WALL PARTITION. PAINT 2 2 9 SF B HALLWAY 2 8 REMOVE EXISTING TOILET FIXTURES CLO ELEVATOR 146 CHORAL KEYNOTE LEGEND 133 established campus that would serve students 101 SF 159 162 81 SF 9 NEW COUNTERTOP, SINK, CABINETS 9 SF 599 SF WORKROOM 1 2NO WORK IN THIS AREA ART ROOM 1 139 153 2 LOBBY HALLWAY OFFICE 110 SF 2 695 SF NEW PAINTING, CEILINGS, FLOORING, FINISHES, LIGHTING A 2 131 132 135 CLO STAIR 217 SF 110 SF MECH 132 SF 160 CORRIDOR 156 2 3 REMOVE EXISTING COUNTERTOP, SINK, CABINETS 2 9 SF 1 1 VESTIBULE 145 155 100 SF 157 53 SF 216 SF 1 2 77 SF 2 2 1 throughout their entire K-12 educational journey. 4 REMOVE EXISTING DOOR & FRAME. INFILL WALL 2 HALLWAY VESTIBULE STORAGE FLOOR PLAN LEGEND CLO STORAGE 140 163 STAIR 2 5 147NEW DOOR & FRAME 161 IT ROOM 154 138 74 SF 62 SF 9 SF 25 SF 165 22 SF 20 SF OFFICE COPY ROOM 6 REMOVE EXISTING WALL PARTITION 2 VESTIBULE 137 34 SF EXISTING TO REMAIN 2 2 2 134 2 CLO 102 SF 164 62 SF 158 7 NEW WALL PARTITION. PAINT CLO 2 2 CLO C CLO 92 SF 9 SF EXISTING TO BE REMOVED 151 2 166 2 8 REMOVE EXISTING TOILET FIXTURES 152 B HALLWAY OFFICE 13 SF 1 5 SF 1 146 CLO CHORAL 16 SF 136 CLO CLO VESTIBULE 1 101 SF 159 162 NEW PARTITIONS 137 SF 141 142 143 9 NEW COUNTERTOP, VESTIBULE SINK, CABINETS WORKROOM 2 ART ROOM 9 SF 599 SF 139 153 2 14 SF 17 SF 44 SF 149 OFFICE 2 2 65 SF 135 110 SF 695 SF CLO 2 2 2 OFFICE 132 SF 2 2 160 2 150 2 9 SF 2 FLOOR AREA STAIR FLOOR PLAN LEGEND 2 96 SF HALLWAY VESTIBULE CLO STORAGE Gym Renovations: 148 1 140 147 161 163 STAIR 74 SF 62 SF 25 SF 165 54 SF 9 SF 2 VESTIBULE 34 SF CHURCH AREA SCHOOL AREA # OF CLASSROOMS EXISTING TO REMAIN 2 2 2 164 CLO 92 SF CLO C CLO 1. Refinish floor EXISTING TO BE REMOVED 151 2 166 152 LOWER LEVEL - 11,642 SF 5 OFFICE 13 SF 16 SF 1 5 SF 1 1 OFFICE 136 CLO CLO VESTIBULE NEW PARTITIONS 137 SF 141 142 143 VESTIBULE 144 14 SF 17 SF 44 SF 149 MAIN LEVEL 2,355 SF 9,328 SF 6 260 SF 2 65 SF FLOOR AREA 2. New bleachers 2 2 2 OFFICE 2 150 2 STAIR 96 SF UPPER LEVEL 1,915 SF 475 SF 0 148 1 2 54 SF CHURCH AREA SCHOOL AREA # OF CLASSROOMS TOTAL 4,270 SF 21,445SF 11 LOWER LEVEL MAIN LEVEL 3. New Lights - 2,355 SF 11,642 SF 9,328 SF 5 6 OFFICE 144 260 SF *TOTAL AREA DOES NOT INCLUDE THE ATTICS ON THE UPPER LEVEL UPPER LEVEL TOTAL 4. Renovate locker rooms 1,915 SF 4,270 SF 475 SF 21,445SF 0 11 2 *TOTAL AREA DOES NOT INCLUDE THE ATTICS ON THE UPPER LEVEL 1 LOWER LEVEL 3/16" = 1'-0" 2 2.4 3 3.2 4 4.2 5 6 7 8 8.4 9 1 LOWER LEVEL 3/16" = 1'-0" 2 2.4 3 3.2 4 4.2 5 6 7 8 8.4 9
NORTH CAMPUS Main Level Lower Level Fulfilling His Vision After years of prayer, we believe the At the same time that God was Lord has answered and made our revealing His plan for Rock Spring, path clear. Now we must earnestly He also orchestrated a 99-year pursue it. As the first step in this extension of our lease with time-sensitive endeavor we have Morningside Baptist Church. With secured $3.8 million to purchase this the expansion across the street and property and acquire 29,000 square the security of this lease extension, feet of teaching, learning, reflecting, our current building will become praying, and convening space. our dedicated lower school. Included in our campaign plans This prudent real estate investment are approximately $600,000 in will enable a timely launch of enhancements to the gymnasium our upper school. With an and restrooms, along with an additional investment of $1.9 million outdoor nature classroom for in renovations, our middle and high greater hands-on, experiential school students will be in their new learning opportunities. home by the beginning of the 2021- 22 school year. The new upper school will feature: 11 bright and spacious classrooms Administrative Offices (1,000 sqft) Science Lab (800 sqft) Beautiful gothic sanctuary Reading Room Library Art Studio (400 sqft) Serene courtyard garden Music Room (400 sqft) Two elevators for ADA compliance Student Activity Center (3,200 sqft) 47 additional parking spaces Dining Hall (2,000 sqft) Ample space for study and Full commercial kitchen (500 sqft) socialization Student Activity Center Sanctuary
Cornerstone CAPITAL CAMPAIGN PROJECT BUDGET COST Purchase Rock Spring Presbyterian Church Property $3,800,000 The 29,000 square foot Facilities Include the Beautiful Gothic Sanctuary, 11 Classrooms, and the New Student Activity Center Prepare Rock Spring Facilities to Welcome $1,900,000 Students in August 2021 $1,600,000 Renovations Including New Paint and Flooring, Construction of a New Science Lab and Library, and Campus Security Furniture, Fixtures, and Equipment $50,000 Professional Fees and Contingencies $250,000 Renovate Lower School Facilities at $600,000 Morningside Baptist Church Gymnasium Upgrades $333,000 Restroom Renovations $150,000 Creation of New Outdoor Nature Classroom $117,000 TOTAL $6,300,000 The above projects represent Phase I of our comprehensive Master Plan. The long-term Master Plan vision includes significant enhancements to the Morningside Baptist Church building, the addition of the West Wing, the completion of the Quad, and a new gymnasium and Fine Arts Center.
Advancing His Kingdom God’s ways are higher, and His timing is always perfect. We believe He has led us to this moment. Now, we humbly and prayerfully invite you to dream with your Heritage family as we grow into all we are destined to be so that we may guide our children to become all they are destined to be. “ And we know that God causes all things to work together for good to those who love God, to those who are called according to his purpose. This is a foundational moment in Romans 8:28 our school’s history. Each of us can have a place in helping to build this legacy, and I invite you to join with me and my family in support of our Cornerstone Capital Campaign. — Mark Pighini, Campaign Chair
Matthew H. Skinner, President matt.skinner@heritageprep.org (404) 815-7711 Heritage Preparatory School 1700 Piedmont Avenue Atlanta, GA 30324 www.heritageprep.org
You can also read