Suncoast Technical College SY2015-2016 to SY2017-2018 STRATEGIC PLAN

Page created by Antonio Lowe
 
CONTINUE READING
Suncoast Technical College
                         SY2015-2016 to SY2017-2018 STRATEGIC PLAN

INTRODUCTION
Suncoast Technical College actively participates in the annual School Board of Sarasota County improvement planning process as well as its
own three-year strategic planning process. The current three-year planning process was initiated during the 2007-08 school year, and is
developed annually by the school administration and reviewed by the school’s Shared Decision Making Team and the School Advisory
Council. This current plan encompasses our school and districts annual School Improvement Plan.
Currently Suncoast Technical College is the only technical college in Sarasota County and has been in operation for over 45 years. We offer
technical and adult education programs (ESOL/ABE/GED/AHS) to high school students, dual enrolled high school students, and adult
students. Our locations include the main campus (Beneva Rd. Sarasota), North Port Extension (Price Blvd. North Port), Venice Extension
(Bahama St. Venice), Fire Science Extension (Sarasota), and Newtown Extension (Sarasota). These programs are delivered via traditional,
and alternative instructional methods, and lead to industry certification or licensure and qualification for entry-level employment in a variety
of technical fields. In addition, Suncoast Technical College partners with a number of local employers to provide specific training through its
Continuing Workforce Education programs, along with fee-based short-term courses to enable licensure renewal in a number of technical
occupations.

MISSION
The Suncoast Technical College provides quality technical education to meet workforce development and community needs.

VISION
We believe each individual has varied abilities and talents, and it is Suncoast Technical College’s goal to help each reach his/her highest
potential. It is the responsibility of the staff to assist in the identification of these abilities and talents, to offer learning experiences to help
guide the student toward gainful entry level employment and personal satisfaction, to develop the student’s employability skills and work
ethic, to enhance existing employment skills, and to establish learning situations in which the student can experience success in all phases of
the learning process.

                                                                            1
I. School Improvement Plan Objectives          Time Frame Person Responsible Strategies/Activities                   Target

A. To increase classroom management            2015-2016    All teachers,      PLC discussions on classroom          Maintain / decrease in
   effectiveness by maintaining and/or                      administration     management skills.                    referrals.
   decreasing the number of discipline         2016-2017    Same as above      Same as above                         Same as above
   referrals.
                                               2017-2018    Same as above      Same as above                         Same as above

B. Maintaining 90% of instructors              2015-2016    Teaching staff     Identify relevant industry            90% will have certification
   possessing the industry certification or                                    certifications. Survey staff to see
   licensure relevant to their instructional                                   what certifications they hold.
   areas. All students will have received      2016-2017    Same as above      Same as above                         90% will have certification
   instruction on the commonly accepted
   industry certification or licensure         2017-2018    Same as above      Same as above                         90% will have certification
   relevant to their chosen occupational
   area.
C. Standards of customer service and           2015-2016    All staff          Review climate survey with staff      Improve customer service
   satisfaction will meet or exceed the                                        and implement changes based on        correlate on annual climate
   district average as recorded by the                                         the survey.                           survey
   communication correlate on the annual       2016-2017    All staff          Same as above                         Same as above
   climate survey instrument.
                                               2017-2018    All Staff          Same as above                         Same as above

                                                                        2
I. School Improvement Plan Objectives
                                             Time Frame Person Responsible Strategies/Activities                   Target
(Cont.)
D. Standards of internal and external        2015-2016    Administration      Review climate survey with staff     Improve communication
  communication will meet or exceed the                                       and implement changes as             correlate on annual survey
  district average as recorded by the                                         needed.
  communication correlate on the annual      2016-2017    All staff           Same as above                        Same as above
  climate survey instrument.
                                             2017-2018    All staff           Same as above                        Same as above

E. To improve absence statistics by          2015-2016    All Staff           Review, update, and enforce all      2% decrease in number of
   decreasing the number of students with                                     attendance policies. Introduce       students absent 10+ days
   10 or more absences by 2% per year.                                        incentives as possible.
                                             2016-2017    All staff           Same as above                        Same as above

                                             2017-2018    All staff           Same as above                        Same as above

F. By the year 2017-2018, 95% of             2015-2016    Adult Instructors   Review adult student TABE            75% pass rate
   postsecondary adult vocational (PSAV)                                      scores while infusing basic skills
   students completing a technical program                                    into content lessons as needed.
   will master basic academic skills as      2016-2017    Adult Instructors   Same as above                        85% pass rate
   measured by the Test of Adult Basic
   Education (TABE) as prescribed by         2017-2018    Adult Instructors   Same as above                        95% pass rate
   curriculum frameworks.

I. School Improvement Plan Objectives
                                             Time Frame Person Responsible Strategies/Activities                   Target
(Cont.)
G. By the year 2017-2018, 95% of             2015-2016    Adult Instructors   Link curriculum to Ready to          75% pass rate of PSAV
  postsecondary adult vocational (PSAV)                                       Work standards. Develop lesson       students
  students completing a technical program                                     plans that coordinate with Ready
  will master basic academic skills as                                        to Work.
  measured by success on the Florida         2016-2017    Same as above       Same as above                        85% pass rate
  Ready to Work credentialing program.

                                                                       3
2017-2018    Same as above        Same as above                        100% pass rate

H. By the year 2017-2018, 95% of senior       2015-2016    High School          Link curriculum to Ready to          95% of high school seniors
  secondary technical and career education                 Instructors          Work standards. Develop lesson
  students will master basic academic                                           plans that coordinate with Ready
  skills as measured by success on the                                          to Work.
  Florida Ready to Work credentialing         2016-2017    Same as above        Same as above                        Same as above
  program.
                                              2017-2018    Same as above        Same as above                        Same as above

I. By the year 2017-2018, 75% of              2015-2016    All Instructors      Utilize district training and        75% of instructors
   instructors will demonstrate proficiency                                     professional development
   and curriculum integration of ActivPanel   2016-2017    Same as above        Same as above                        Same as above
   screens and lesson planning.
                                              2017-2018    Same as above        Same as above                        Same as above

II. School Professional
                                              Time Frame   Person Responsible   Strategies/Activities                Target
    Development Plan Objectives
A. To improve the quality of                  2015-2016    All Instructors      Continue to train staff in current   Improved instruction as
   instruction and associated technology*                                       teaching methodologies and           observed by lesson planning
   in all classrooms                                                            technologies.                        and classroom observations
                                              2016-2017    All Instructors      Same as above                        Same as above
   *Includes traditional, distance
   education, and other alternative           2017-2018    All                  Same as above                        Same as above
   teaching methodologies.

                                                                         4
III. Physical Plant Objectives             Time Frame   Person Responsible      Strategies/Activities              Target

A. Suncoast Technical College North Port   2015-2016    Director, architects,   Begin construction on Phase 1      Building construction on
Branch phase 1: To complete construction                construction staff      and continue Phase 2 of the        schedule
and assess off-site needs                                                       construction plan
                                           2016-2017    All Staff               Move into completed Phase 1        Move completed by August
                                                                                and begin Phase 2 construction     of 2017
                                           2017-2018    All Staff               Continuing assessment of off-      Successful needs
                                                                                site need and operations           assessment of off-site
                                                                                                                   operations

B. Suncoast Technical College Alta Vista 2015-2016      Administration          Begin planning: facility space,    New extension location
Extension: To open an accredited extension                                      equipment purchases, and           ready for initial COE
campus                                                                          staffing                           approval application

                                           2016-2017    All Staff               Receive initial COE approval,      New extension campus
                                                                                begin offering classes, and        successfully accredited and
                                                                                receive final approval             running classes

                                           2017-2018    All Staff               Continued assessment Alta Vista    Extension campus continues
                                                                                student population needs, adding   running classes
                                                                                classes as appropriate

C. Suncoast Technical College PGT          2016-2017    All Staff               Enter agreement with PGT,          New extension location
Extension: To open an accredited extension                                      prepare classroom and receive      ready for initial COE
campus                                                                          initial COE approval and begin     approval application
                                                                                offering classes
                                           2017-2018    All Staff               Continued assessment Alta Vista    New extension campus
                                                                                student population needs, adding   successfully accredited and
                                                                                classes as appropriate             running classes

                                                                      5
IV. Fiscal Plan Objectives            Time Frame   Person Responsible   Strategies/Activities              Target

A. Institute a 5% hold-back on        2015-2016    Director             5% hold-back                       Holdback successful
   each year’s budget
                                      2016-2017    Director             5% hold back                       Holdback successful

                                      2017-2018    Director             5% hold back                       Holdback successful

IV. Fiscal Plan Objectives            Time Frame   Person Responsible   Strategies/Activities            Target

B. To maintain a 10% contingency      2015-2016    Director             10% Balance                      Successful reserve balance
   and reserve balance
                                      2016-2017    Director             10% balance                      Successful reserve balance

                                      2017-2018    Director             10% balance                      Successful reserve balance

V. New Program/Current Program
                                      Time Frame   Person Responsible   Strategies/Activities            Target
Objectives
A. To fully implement a new Student   2015-2016    Administration,      Institute and standardize a      Process, timeline, and training
Information System (FOCUS)                         Staff,               process and timeline for staff   in place
                                                                        training and ongoing support
                                      2016-2017    Same as above        provide ongoing support and      SIS is fully implemented and
                                                                        training                         all staff trained

                                                               6
2017-2018   Same as above     Same as above                  SIS is fully implemented and
                                                                                                            all staff trained

B. To implement the Community Based            2015-2016   Administration,   Institute and standardize a    Graduate 20 students from
Career Academy (CBCA) in three                             Staff             process for enrollment,        CBCA and their districted high
locations: south, central, and north county.                                 instruction, and on-the-job    school and place them in
                                                                             placement for construction     construction jobs
                                                                             (central county)
                                               2016-2017   Same as above     Same as above, adding          Graduate 30 students from
                                                                             manufacturing (south county)   CBCA and their districted high
                                                                             at PGT                         school and place them in
                                                                                                            construction and
                                                                                                            manufacturing jobs
                                               2017-2018   Same as above     Same as above, adding          Graduate 40 students from
                                                                             hospitality (north county)     CBCA and their districted high
                                                                                                            school and place them in
                                                                                                            construction, manufacturing,
                                                                                                            and hospitality jobs

                                                                       7