MAIN STREET DRAINAGE IMPROVEMENTS - Project No. 1 - TSPLOST 2023 - Athens-Clarke County
Project No. 1

  MAIN STREET
   DRAINAGE
IMPROVEMENTS
    TSPLOST 2023
MAIN STREET DRAINAGE IMPROVEMENTS - Project No. 1 - TSPLOST 2023 - Athens-Clarke County
Project Goals

• Replace failing and undersized storm drain and culverts
  along portions of Main Street
• Replace existing curb and gutter and pavement to
  provide adequate curb height to intercept run-off from
  street
• Add new inlets to prevent flooding of Main Street and
  nearby residences

                                                          Improves equitability of
                                                           capital improvement
                                                           throughout the community
                               TSPLOST 2023
                     Main Street Drainage Improvements                                2
MAIN STREET DRAINAGE IMPROVEMENTS - Project No. 1 - TSPLOST 2023 - Athens-Clarke County
Project Location

                         TSPLOST 2023
                                                   3
               Main Street Drainage Improvements
MAIN STREET DRAINAGE IMPROVEMENTS - Project No. 1 - TSPLOST 2023 - Athens-Clarke County
Failing Stormwater Pipes
Existing Vitrified Clay Pipes (VCP) storm drain pipes
were originally installed under Main Street over 50
years ago. These clay pipes have served beyond their
expected life-span and began to crack and fail along
the length of the culverts and lead to the formation of
sinkholes. These pipes are also undersized and can
not safely convey runoff from Main Street.
VCP storm drain is no longer an acceptable storm
drain pipe material. New storm drains would be
constructed of Reinforced Concrete Pipe (RCP) and
modern material with a superior service life.

       Protects existing
        Transportation Infrastructure
        Investments

                                                TSPLOST 2023
                                      Main Street Drainage Improvements   4
MAIN STREET DRAINAGE IMPROVEMENTS - Project No. 1 - TSPLOST 2023 - Athens-Clarke County
Private Property
                                    Flooding and
                                    Erosion
                                    Catastrophic failure of the Vitrified Clay
                                    Pipes (VCP) storm drain pipes under
                                    Main Street cause erosion and flooding
                                    to adjacent properties. when the street
                                    was originally constructed over 50 years
                                    ago.
                                    The proposed improvements would
                                    prevent future flooding and erosion.
                                    Appropriate Best Management
                                    Practices (BMPs) would be utilized to
                                    manage outfall velocities and reduce
                                    potential erosion and flooding
                                    problems on adjacent properties.

                                      Improves equitability of
                                       capital improvement
                                       throughout the community
          TSPLOST 2023
Main Street Drainage Improvements                                    5
Street Flooding
Because of inadequate drain inlets and limited curb reveal,
the Main Street floods. The flooding and standing water
cause vehicles to splash water on to users of the adjacent
FireFly Trail and sidewalks.
The Firefly Trail and adjacent sidewalks serve as the Safe
Routes to School for Winterville Elementary. Out of fear of
being splashed by passing vehicles, pedestrians are fearful
of using these facilities when wet.
The flooding of the street and standing water limit the life
span of the existing pavement and subgrade causing
premature failure of the pavement system.

             Reduces Pavement
              Maintenance deficit

                                                    TSPLOST 2023
                                          Main Street Drainage Improvements   6
In what specific ways will this project “Close the Equity Gap” in
Athens-Clarke County, by improving the Equitability of Capital
Improvements throughout the entire community?

• The City of Winterville has received limited investment of TSPLOST
  dollars in the past TSPLOST projects.
• The City of Winterville is growing in population, and has become a
  place for citizens looking for a more affordable and less urban
  housing opportunities.

                                   TSPLOST 2023
                                                                       7
                         Main Street Drainage Improvements
How will this project address one or more of the Mayor and
     Commission approved Strategic Commitments and Project
     Selection Criteria?

• Promotes the Goal of Improving Equitability if Capital Improvements throughout the Community by
  investing infrastructure funds in the City of Winterville, outside the urban core of the Athens-Clarke County
  community
• Protects the community’s existing transportation infrastructure investments. The existing storm drain
  network below Main Street is a mix of clay pipe, older concrete piping, and a combination of older materials
  that have begun to fail. Athens-Clarke County Department of Transportation and Public Works, Streets and
  Drainage Division continues to make small repairs and patches to the failing system, but a comprehensive
  approach is required to remedy the continued need for repetitive maintenance. The existing asphalt has been
  overlaid to the point that the curb reveal is so low that runoff from the street can no longer be captured,
  leading to standing water infiltrating the asphalt and subgrade there by damaging the asphalt pavement
  further.
• Reduces pavement management deficit. The existing asphalt has been overlaid to the point that the curb
  reveal is so low that runoff from the street can no longer be captured, leading to standing water infiltrating the
  asphalt and subgrade there by damaging the asphalt pavement further. A comprehensive solution to address
  drainage and potential to improve the subgrade below Main Street would limit repetitive overlay, or future
  milling and overlay of the roadway.

                                                      TSPLOST 2023
                                                                                                              8
                                            Main Street Drainage Improvements
How will this project address one or more of the Mayor and
      Commission approved Strategic Commitments and Project
      Selection Criteria?

• Promotes increased access to existing public facilities. Reduces the potential runoff to be splashed on to
  users of the Firefly Trail Use of the Firefly Trail after rain invents is discouraged by users because of the standing
  water along Main Street and the risk of trail users being splashed by water by passing vehicles. The trail
  network not only serves as a recreational facility but is also used as a Safe Route To School for Winterville
  Elementary. Standing water discourages pedestrians on either side of the street for fear of being splashed by
  standing water.

                                                       TSPLOST 2023
                                                                                                                9
                                             Main Street Drainage Improvements
What aspects of this project will focus on improving the “Triple
Bottom Line” (Impact on Economic Prosperity, Social Well‐being,
and the Environment)?

Economic Prosperity            Social Well-Being                    Environment
• Provides maintenance of      • Reduces flooding of                • Reduces flooding of
  existing infrastructure by     Main Street, adjacent                adjacent properties
  replacing failing
                                 sidewalks and reduces
  stormwater pipes                                                  • Reduces potential for
                                 splashing of stormwater
• Reduces future operating                                            catastrophic failure and
                                 onto Firefly Trail users
  cost by improving drainage                                          environmental damages
  and decreasing the need                                             for failed storm drains
  for continuous
  maintenance and repair

                                          TSPLOST 2023
                                                                                             10
                                Main Street Drainage Improvements
Thank you

                                          Q&A

          TSPLOST 2023
                                                11
Main Street Drainage Improvements