IONIANIntroduction IONIAN is a new submarine and terrestrial fiber optic system connecting Athens and Thessaloniki to Milan and Rome. It addresses the need for very large wholesale capacity (wavelength, spectrum, dark fiber) between Western Europe and Greece through a new system on a completely diverse route IONIAN is neutral: we sell fiber infrastructure and transmission capacity wholesale. We do not address the retail market and we do not compete with our customers IONIAN is independent: it belongs to IslaLink, a reputed Spanish Submarine Operator with strong expertise in developing, building and operating submarine cables In operation since 2001, IslaLink has deployed submarine systems connecting the Balearic Islands, the Canary Islands, Morocco and Algeria
IONIAN is promoted by ISLALINK. Since 2001, ISLALINK has developed systems connecting the Balearics, the Canaries, Morocco and Algeria Deployed and operated by IslaLink Marseilles OranLink 2011 Deployed by IslaLink Consortium Project Developed by IslaLink BalaLink 2001 Valencia Mallorca Ibiza 2021 ORVAL 2019 Sevilla Annaba 2011 CanaLink Oran Loukkos 2012 Asilah La Palma Gran Canaria Tenerife
Milan IONIAN Overall system configuration Rome Bari Thessaloniki IONIAN has been designed to be the most advanced and reliable infrastructure for the Greek international wholesale Preveza market: Crotone 320 km ➔ Submarine cable fully diverse from existing routes and through deep waters (1.000 m) ➔ The Italian backbone will connect Crotone to Milan and Athens Rome with fully diverse routes (total 3.200 km) 4 ➔ The Greek backbone will connect Preveza to Athens and Thessaloniki with fully diverse routes (total 1.400 km)
IONIAN Submarine cable 322km 24 fibre pairs 33km 250km surface lay 39km buried deep waters (>1.000m) buried Line rate Number of Total capacity per fibre Italy Landing Point Greece Landing Point Distance (Km) Spacing (GHz) 1 (Gbps)1 Channels1 pair1 Crotone Preveza 322 300 93.31 51 15.3 Tbps ▪ Landing points: Crotone, Italy - Preveza, Greece ▪ The submarine segment is 322km long, with 24 fibre pairs and unrepeatered ▪ Open Submarine Cable: open to all transmission equipment suppliers ▪ ~78% will lie within deep waters (>1,000m), elsewhere buried for protection from fishing, anchoring… ▪ Protected with single and double armour in higher risk areas ▪ Cable lay estimated to take around 3 weeks Note: 1: This is a specific transmission configuration, the system is open to any supplier and other configurations can be used
IONIAN Submarine cable 322km 24 fibre pairs 33km 250km surface lay 39km buried deep waters (>1.000m) buried Double Armoured cable (DA) Single Armoured Cable (SA) Teliri Cable Ship (Elettra) Lightweight Protected Cable (LWP) Cable load operation Alpha 9 R.O.V.
Excavator IONIAN Submarine cable • Operating wd 100m • Maximum trench depth 5m 322km • Sea bed nature: any 24 fibre pairs 33km 250km surface lay 39km buried deep waters (>1.000m) buried Cutting chain • Operating wd 100m • Maximum trench depth 2m • Sea bed nature: Mud, Sand Jetting machine • Operating wd 100m • Maximum trench depth 2m • Sea bed nature: Mud, Sand, soft soil Shore-end operation
IONIAN Project timeline 2020 October 2020 Landing points selected - completed Permit Feasibility Study – completed 2021 January Desktop Study, Route Engineering – completed May Financial closing – completed May Supply Contract signed - completed May – June Marine Survey July PIPs application October 2021 Cable Manufacturing May 2022 Landing Infrastructure Construction 2022 October 2022 Cable Main Lay and Post-lay Inspection and Burial November 2022 System Commissioning and Final Test November 2022 System Ready for Service
IONIAN Services IONIAN is a repeaterless and technology independent high fiber count system. Increasing capacity per fiber pair along with technology evolution starting with more than 8 Tbps at RFS date. A repeaterless submarine cable ensures a very long system lifetime (exceeding 25 years) Service End Points Contract Duration 10 G Wavelength Athens - IRU / 1- 15 years Thessaloniki Lease /Milan – Rome 100 G Wavelength Athens - IRU / 1 – 15 years Thessaloniki Lease /Milan – Rome Spectrum Athens - IRU 10+ years Thessaloniki /Milan – Rome Dark Fiber Crotone – IRU 10+ years Preveza 25 years System lifetime