Linking flood impact forecasting and satellite rapid mapping in Europe
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Linking flood impact forecasting and satellite rapid mapping in Europe Francesco Dottori, Milan Kalas, Peter Salamon, Annett Wania, Ines Rivero (EC JRC) Copernicus EU Copernicus EU Copernicus EU www.copernicus.eu
Copernicus Programme Emergency Management • It is the European Union's Earth Observation Programme, • It offers information services based on satellite Earth Observation, models, and in situ (non-space) data • Copernicus Emergency Management Service (EMS) provides information (with a global reach) for emergency preparedness, response and recovery activities in relation to natural and man-made disasters.
Copernicus EMS - EFAS Emergency Management European Flood Awareness System Objective: Provide complementary, added value flood early warning & monitoring products to improve the preparedness and emergency response of national stakeholders (e.g. hydrometeorological services) Products: different forecasting & monitoring products (ensemble river flood forecasts, flash flood forecasts, impacts etc.) Available through web interface or OGC web services (WMS-T & SOS)
Copernicus EMS - Rapid Mapping (RM) Emergency Management • Mapping information of disaster events for emergency response • Fast delineation of flood extent from satellite imagery • 24/7/365 on-demand service Image data provision Crisis Mapping Authorised Service ERCC Service Request Criteria check activation User Service Provider SFTP EMS Portal Product specification & Satellite image ordering Service Production delivery Map delivery 4
Linking Early Warning and Rapid Mapping Emergency Management Motivation • Reduce time for image acquisition (66% of RM workflow) • Optimise acquisition time with respect to event time • improve timeliness of map production through pre-alerting of potential RM activations for flood events (pre-tasking of satellites) How? 5
Linking Early Warning and Rapid Mapping Emergency Management Flow forecast Identify river reaches potentially affected and local flood magnitude for any event forecasted by EFAS
Linking Early Warning and Rapid Mapping Emergency Rapid flood Management Flow forecast mapping Identify river reaches Calculate flood-prone potentially affected and local areas (using flood magnitude for any catalogues of flood event forecasted by EFAS maps and protection levels) and derive forecast-based inundation maps
Linking Early Warning and Rapid Mapping Emergency Rapid flood Management Flow forecast mapping Identify river reaches Calculate flood-prone potentially affected and local areas (using flood magnitude for any catalogues of flood event forecasted by EFAS maps and protection levels) and derive forecast-based inundation maps Impact assessment Combine hazard maps with exposure (pop. – landuse) and vulnerability information (damage functions) to evaluate affected population and urban areas, and economic damage
Linking Early Warning and Rapid Mapping Emergency Rapid flood Management Flow forecast mapping Identify river reaches Calculate flood-prone potentially affected and local areas (using flood magnitude for any catalogues of flood event forecasted by EFAS maps and protection levels) and derive forecast-based inundation maps Impact assessment Satellite pre-tasking Areas with high potential Combine hazard maps with impact are identified and exposure (pop. – landuse) and used to pre-task and vulnerability information prioritize acquisition and (damage functions) to processing of satellite evaluate affected population images for monitoring flood and urban areas, and events economic damage
Linking EFAS and RM: Procedure Emergency Management – Pre-tasking maximum 24 hours before the predicted event – Service available only for authorized users (Emergency Response Coord. Centre (ERCC – EFAS partners…) Rapid Mapping availability (incl. EFAS EFAS partner activation procedure) Alert (expected time, peak, affected area) Pre-tasking ERCC activity Rapid Mapping Rapid Mapping Authorised User Satellite Map tasking production Scheduled image acquisition time & area 10 Legend: Actor Tasks User
Linking EFAS and RM: Procedure Emergency Management Development and status • 2015-2016: Development of the procedure for test cases (e.g. Balkan floods 2014, Ebro floods February 2015) • 2016: Testing in pre-operational mode(France floods 2016, Romania 2016) • 2017: Finalization of the procedure • 2017- Now: notifications for RM pre-activation sent for 5 river flood events with 3 requested RM activations (France flood 2018, Albania, Spain) 11
France Floods June 2016 Emergency Management From end of May until beginning of June 2016 Mainly affecting Seine and Loire river basins Estimated total cost of 1.3 billion euro and 172,000 people having declared damages 12
France Floods June 2016 Emergency Management Areas of Interest for pre-tasking of satellite images EFAS impact forecast (30th May) Image pre-tasking (30th May) 13
France Floods June 2016 Emergency Comparison of AOIs: Management EFAS impact forecast (30th May) Image pre-tasking (30th May) RM user defined AOIs (1st June) • Very good correspondence between pre- tasked AoIs, user request and affected areas.... • ....but image acquisition was delayed by communication problems 14
France Floods January 2018 Emergency Management Mainly affecting Seine river basin and the Paris area (as in 2016 floods, but with lower impacts) 1. First image (Sentinel-1) acquired on 22/6. 2. Radarsat images requested on 22nd and acquired on the 23rd. 3. First map produced on the 24th at 00:56 Sentinel-1 Radarsat-2 Expected peak Activation start EFAS warning SPERF acquisition acquisition 22/01/2018 22/01/2018 23/01/2018 23/01/2018 23/01/2018 22/01/2018 09:47 10:45 17:27 12:00 19:17 05:49 15
France Floods January2018 Emergency Management Proposed pre-tasking was actually requested by French authorized users Flood monitoring with RM requested also for areas downstream of Paris 16
Procedure Emergency Management Outlook • Positive results from the EFAS-RM integration: significant time gain is possible • Raise awareness on user side about time gaps between request for mapping and actually possible image acquisitions • Connects EFAS and Mapping communities improved decision tools for emergency response • Expansion to the global scale (GloFAS-RM) 17
Questions & Comments? Emergency Management
You can also read