DIKE REPAIRS AT LES CÈDRES GENERATING STATION - Hydro-Québec
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
DIKE REPAIRS AT LES CÈDRES GENERATING STATION INFORMATION Les Cèdres generating station was built in 1913 and 1914. BULLETIN An embankment dike was also built upstream of the powerhouse to create a headrace canal that would direct FALL 2016 water from the Fleuve Saint-Laurent into the powerhouse. A number of studies and inspections of this dike conducted by Hydro-Québec show water infiltration and seepage from the headrace canal. As a result, to ensure the long-term operability of the facilities, Hydro-Québec must repair the fill of the embankment dike of the Les Cèdres headrace canal. The purpose of this project is to improve the watertightness and stability of the dike and to minimize the risk of erosion of its foundation.
74°8' s 45°14' 74°4' 74°0' 45°16' 73°56' Boulevard Gérard-Cadieux ! A Île aux Vaches A Cours d'eau Leboeuf-Léger Sain t Bea -Étienn uha e rno -de- is, M Sealing work Zone 1 Spillway ! ( (decommissioned) Inverted filter Zone 2 Planned structure Above water Île à l'Ail Inverted filter S Under water (not visible) A Direction of flow 0 75 150 m Saint-Timothée basin ! ( Bike path MTM, Zone 8, NAD83 (CSRS) (winter low water) Document for information purposes only. For any other use, please contact Géomatique, Hydro-Québec Équipement et services partagés. PROJECT DESCRIPTION North side of the dike South side of the dike Hydro-Québec will perform Hydro-Québec will add an inverted filter over a sealing work over a distance distance of about 1,190 m in the Saint-Timothée of about 350 m (zone 1) to basin (zone 2) and about 120 m in the Pointe- reduce water infiltration into du-Buisson basin (zone 3). Composed of the embankment dike. This several layers of granular fill, the inverted filter involves partially excavating is designed to prevent particulate matter from the slope of the dike and migrating outside the embankment in case adding more than 100,000 m3 of infiltration and thus prevent erosion of the of a mix of till, granular material foundation of the dike. Building the inverted and rock. filter will involve preparing the foundation and adding about 70,000 m3 of granular The water level in the material and rock. Les Cèdres headrace canal will be maintained at its usual Hydro-Québec also plans to stabilize the level throughout the work. slope over a distance of about 175 m in the A containment curtain will be Saint-Timothée basin (zone 2) and about 125 m installed in the headrace canal in the Pointe-du-Buisson basin (zone 3). This will to confine particles suspended involve dumping about 10,000 m3 of granular during placement of the material and rock on the side of the dike. new material. The work on the south side of the dike will be performed when water levels are lowest in the Saint-Timothée and Pointe-du-Buisson basins, that is, between November and April. Vegetation control Hydro-Québec has to cut down some of the trees on the dike to get to the work areas. Since trees can weaken a dike, compromising its stability, Hydro-Québec will determine if other trees on the dike, outside the work area, also need to be felled. 2
Les Cèdres Les Cèdres 470 powerhouse 1263-1 Les Cèdres dam Fleuve Saint-Laurent 120 kV ) A 435(P 735 kV Sain Riviè Les Cèdres headrace canal Cle t- t,M 1434-1 re à la 7042 Chemin Grais 120 kV Chemin Gravity dam Les Cèdres dike Saint-D se Saint-F % ! ( ominiq Chemin éréol ue Chemin S ainrt-Em île Saveuse Slope stabilization Inverted filter Pointe-du-Buisson Ruisseau t-GrSlope stabilization Sain basin manuel 20 égo Saint- ire Zone 2 ! ( Antoin Zone 3 TNO aquatique e Cot 338 de la MRC de e du- au- Vaudreuil-Soulanges,NO Lac 45°18' Coteau- 74°8' Vaudreuil- 74°4' 45°20' Ruis 74°0' s ge seau du-Lac,V Fleu Canal Cham Vaudreuil- an ve Soulanges d Rivière des A e Sou b e ul langes Les rry Dorion,V Notre So Sain (MRC) Cèdres,M Outaouais t-Lau e Les Cèdres d rent al an l'Île-Juillet-2 30 338 Île Les Cèdres Pointe-des- Bienville dam dike uve Cascades Chemin du Fle ! 45°20' A Chemin du Île Pointe-des- Juillet ! Les Cèdres powerhouse Cascades,VL Île Cas des 45°16' Île de Salaberry Île De cad Île Pointe-du-Buisson Joybert e d'Aloigny l'Île-Juillet-1 dam Golf dam rles Cha 201 Sa int- Saint-Timothée dam 132 Beauharnois, Île a V Cha ux Bar ts Saint-Timothée sector 30 rag L'Anc st ien Ca e Oue 73°56' nal vi èr Salaberry-de- al Ri Can Valleyfield Infrastructure Boundary du Regional county 45°18' emin Hydropower generating Rang Sainte-Mar ie Est station Ch Rang Sainte-Marie Ouest municipality (RCM) Dam l Municipality na Ca 45°14' tit Boulevard Pie XII 530 Highway Beauharnois- 30 Pe Salaberry-de- Le Salaberry Be Can Valleyfield, V 132 Provincial highway 0 1 2 km au al (MRC) ha de 338 Secondary highway Stanislas- rn MTM, Zone 8, NAD83 (CSRS) ostka, M oi Local road 74°8' s 45°14' 74°4' 74°0' 0002c_buc1_tet_014_projet_161018.mxd 45°16' 73°56' Boulevard Gérard-Cadieux ! A Île aux Vaches A Cours d'eau Leboeuf-Léger Sain t Bea -Étienn uha e Les C rno -de- is, M Sealing work F Zone 1 Spillway ! ( (decommissioned) Inverted filter Zone 2 ! ( Planned structure Above water Île à l'Ail Inverted filter Slope stabi Under water (not visible) A Direction of flow 0 75 150 m Saint-Timothée basin 3
MAIN IMPACTS ANTICIPATED ENVIRONMENT DURING THE WORK As this project is subject to section 31.1 of the Increase in traffic Environment Quality Act, Hydro-Québec will file an environmental impact statement with During the work, traffic will increase along route 132 at the Ministère du Développement durable, Salaberry-de-Valleyfield, between exit 9 of highway 530 and de l’Environnement et de la Lutte contre les Saint-Timothée dam. About 20 trucks per hour will travel changements climatiques. A public hearing this road during the day during normal working hours to may be held by the Bureau d’audiences transport the required material. publiques sur l’environnement (BAPE). Hydro-Québec will take all necessary measures to ensure public safety. For example, flaggers will be employed, in particular near École Marie-Rose. Closure of portions of the bicycle network of the Îles-de-Saint-Timothée regional park During certain work periods, Hydro-Québec will have to close part of the bike path on Saint-Timothée dam and on the dike. Hydro-Québec will communicate regularly with park managers to let them know when the bike path will be closed. The work will not affect activities at Saint-Timothée beach. Natural habitats The work will affect aquatic habitats at the foot of the dike. Measures will be taken to minimize habitat loss, for certain fish species in particular. PUBLIC PARTICIPATION In cooperation with the host community, Hydro-Québec will implement a public participation process as part of the studies FOR MORE INFORMATION for the project. This will make it possible for the expectations and concerns expressed by the public and by key community INFO-PROJECT Line stakeholders to be taken into account so the project can be 1 877 653-1139 adapted to local realities. JONATHAN PETIT Advisor – Community Relations – Richelieu Direction – Affaires régionales et collectivités 705, boul. Clairevue Ouest, 1er étage Saint-Bruno-de-Montarville (Québec) TIME TABLE J3V 6B6 E-mail: petit.jonathan@hydro.qc.ca Public information meetings Fall 2016 – Winter 2016-2017 Permitting Winter 2016-2017 – Summer 2018 hydro.quebec/des-cedres Construction Fall 2018 – Spring 2020 100 % 2016E1249-A Ce document est également publié en français. This document is a translation of the original French text.
You can also read