INTRODUCTION
Thank you for choosing Craft-Bilt Aluminum Railing.

The railing must be installed on a deck or slab built to applicable building codes. Proper post spacing,
fasteners and blocking should be used as per this guide and Craft-Bilt test reports. You are
responsible to obtain any required permits, to comply with local building codes, and any cost
associated with that compliance.

Please follow these instructions exactly and use all the components and fasteners as described.

Always wear eye protection and follow the safety instructions that came with your tools.

Craft-Bilt can provide a test report to demonstrate compliance with local building codes however you
are responsible to ensure that the system will comply in your area and to install your project in
compliance with those codes. Craft-Bilt is not responsible for acceptance or permit approval by your
local building department.

Cast aluminum post bases are powder coated for protection in most circumstances. For additional
protection from concrete slabs that are rough or more corrosive, or if you desire extra protection from
pressure treated wood, apply bituminous coating (roofing tar), ice & water shield, doublebond or
similar to bottom of post base.

RECEIVING YOUR SHIPMENT
DO NOT SIGN for the shipment until your have checked it for damage or shortage. Follow our
shipping instructions at craft-bilt.com/shipping-instructions

UNPACKING
Be careful not to scratch any parts when cutting away the wrapping.

TOOL LIST
      Power Tools:
      Cordless variable speed drill
      Cordless impact driver
      Miter saw with carbide tip blade for non-ferrous metal
      SDS hammer drill (for concrete slab)
      Impact wrench (for concrete slab)
      Sufficient length & gauge extension cords

      Impact Driver Bits:
       #2 Robertson
      T-40 Torx bit (for 2¼” & 3” posts on wood deck)          Craft-Bilt part #0386459
      T-30 Torx bit (for 5½” posts on wood deck)               Craft-Bilt part #0386453

      Drill Bits:
      ⅜” ANSI concrete bit (for 2¼” & 3” posts on concrete)    part #03-1318 (SDS), #03-1380 (smooth)
      ¼” Powers Wedge Bit (for 5½” posts on concrete)          part #03-1314 (SDS), #03-1372 (smooth)

      Hand Tools:
      white rubber mallet
      utility knife

                                                                                          Page 2 Jul 1 2019
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
Measurement Tools:
       25 foot tape measure
       2 foot level

       Miscellaneous:
       safety glasses
       lacquer thinner & white rags for cleaning up scuff marks on aluminum channels

       For installing LED Sconce lights:
       Grinder with thin wheel suitable for aluminum extrusions, i.e. “zip disc” (hack saw or strong aviation
       snips will also work)
       caulking gun
       silicone
       wire cutter/stripper

TERMINOLOGY
End posts are located at the corners of your deck, top & bottom of stairs and at the house wall.

Note: Instead of using an End Post at the house wall or a column,
you have the option of mounting our Structural Glass Post Add-On
Kit directly to the wall or column, refer to Parts List below.

Line Posts fill in the spaces between the End Posts.
Maximum post spacing is 72” on center for single family buildings up to three floors high. Contact
Craft-Bilt for other scenarios.

36” Railing – for decks less than 6 feet above grade the top of the handrail will be 36” (900mm)
above the deck.

All stairs, no matter what height above grade, will use 36” railing. We recommend handrail with
pickets for the stairs, please refer to separate installation guide.

42” Railing – for decks over 6 feet above grade the top of the Hand Rail will be 42” (1070mm) above
the deck.

PARTS LIST
                                2¼” Line Post / End Post

                                Includes: Post with connected base, Post Cap, Bracket Cover

                                                                            For 36” railing: Part #7711-37WH (SD, BL, ES)
                                                                            For 42” railing: Part #7713-43WH (SD, BL, ES)
                                3” Line Post / End Post

                                Includes: Post with connected base, Post Cap, Bracket Cover

                                                                            For 36” railing: Part #7712-36WH (SD, BL, ES)
                                                                            For 42” railing: Part #7712-42WH (SD, BL, ES)

                                                                                                      Page 3 Jul 1 2019
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
⅜ x 7” GRK Engineered Wood Screw

                             ⅜ x 4” Powers Wedge Bolt Masonry Screw

                             4 are required for each 2¼” or 3” post.

                             5½” Line Post / End Post

                             Includes: Post with connected base, Post Cap, Bracket Cover

                                                                            For 36” railing: Part #7906-38WH (SD, BL, ES)
                                                                            For 42” railing: Part #7906-44WH (SD, BL, ES)
                             5/16” x 6” Engineered Wood Screw

                             ¼” x 3” Powers Wedge Bolt Masonry Screw

                             6 are required for each 5½” post.

                             Structural Glass Post Add-On Kit 42''

                             Includes adapter channel, spline, top & bottom cap and screws
                             For 36" height, order the 42'' kit and trim 6'' from extrusions

                                                                                          Part #7752-42WH (SD, BL, ES)
                             22.5 Degree Post Adapter

                             Fits all posts, can also be mounted to a wall or column. Two can be stacked together to
                             form a 45 degree adapter. For 36" height, order the 42'' kit and trim 6'' from extrusions

                                                                                          Part #7781-02WH (SD, BL, ES)
                             Sconce Light

                             2¼” wide. Fits all Craft-Bilt railing posts. Use with our silicone filled wire connectors,
                             cable and transformer. See separate install guide.
                                                                                                #7755-02WH (SD, BL, ES)

The parts above are the main components, for a full list of parts refer to our catalog, available on
request.

Cleaning Up Gaps and Scratches
Most often any marks that appear as scratches can actually be removed using a clean white rag and
lacquer thinner. Touch up paint is available for actual scratches. You will make your cuts as tight as
possible, but if you need to fill any gaps Craft-Bilt has colour matched silicone (except black).

Installation Steps
The following pages provide the steps required to install Craft-Bilt railing. If your situation is not
covered please inquire, site specific engineering may be required.

                                                                                                      Page 4 Jul 1 2019
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
Place posts as per deduction
                                tables at the end of this guide

                                                             glass width
                                                   deduction from tables

 Create a layout of your deck

 If you plan to install the glass and posts at the same time it's important to have accurate
 measurements. Create a layout that includes exact deck dimensions, the post locations
 and glass sizes. Use the deduction tables at the end of this guide.

 Important: When fastening the posts to the deck they can shift a bit, so be careful that
 they remain in the desired location while fastening otherwise you will have difficulty fitting
 the glass.

 Tip: It is also an option to install the posts and Structural Glass Post Add-On Kit without
 the glass. After the posts are installed you can measure for the glass to be sure it fits.

                                      Title: Structural Glass         Project No.:   N/A
                                           Railing Installation       Date:          Jul 1, 2019
                                                                      Scale:         N.T.S.
                                                                      Drawn By:      N/A
                                      Desc: Typical Floor Plan
  25 Green Ct., Ajax, ON L1S 6W9                                      Page No.:      1
(800) 668-6430 sales@craft-bilt.com                                   Revision:      2
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
Fasten bottom cap with #10 flat
                                            head screws provided

                                                                                                                                  3¾"
                                            (do not fasten top caps yet)

Structural Glass Post Add-On kits accept ½" tempered glass. They
can be mounted to all of our posts (2¼", 3" and 5½") as well as a
house wall or column.

                                                                                                             31-3/8" or 37-3/8"
Check your lengths:
             Post heights                     Add-On Kit

                                                                                37½" or 43½"
             (not incl. post cap)             Channel Length
36" railing:        37½"                           31⅜"
42" railing:        43½"                           37⅜"

Attach Add-On Kit Channel to Posts
�     mark a line on your posts 2⅛" from the bottom
�     align bottom cap with your mark as shown
�     hold in place with Quick-Grip type clamps
�     fasten with supplied #10 self drilling screws
      (4 screws for 36" railing, 5 for 42" railing)

Note: Add-On kit is configured for 42" height railing. If your project
calls for 36" railing you will trim the channels by exactly 6".
                                                                                                                                  2-1/8"

                                       Title: Structural Glass      Project No.:               N/A
                                            Railing Installation    Date:                      Jul 1, 2019
                                                                    Scale:                     N.T.S.
                                                                    Drawn By:                  N/A
                                       Desc: Attaching Add-On Kit
   25 Green Ct., Ajax, ON L1S 6W9                                   Page No.:                  2
 (800) 668-6430 sales@craft-bilt.com
                                            to Posts
                                                                    Revision:                  2
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
4 - 3¼" x .120
                           smooth framing
                           nails or equiv. (typ.)
                                                                                      4 - 3/8" x 4"
                                                                                Wedge Bolt anchor
                                                                               by Powers Fasteners

                                                                                 1/2"
                                                                                                          1/2"

               Blocking for
               Wood Deck
                                                             2¼" & 3" Post                      2¼" & 3" Post
                              4 - 3/8" x 7" RSS         Connection to Wood Deck             Connection to Concrete
                              Engineered Screw
                                        by GRK                      4000psi (30Mpa)
                                                                       min. concrete
                                                                            strength

                                           6 - 5/16" x 6"
                                       Engineered Screw
  Apply PL-2000                                   by GRK                            6 - 1/4" x 3"
  construction adhesive                                                           concrete screw                 1 1/4"
  between blocking
                                                                                   1 1/4"                           1/4
  members and joists
                                                                                  1/4

                                                               5½" Post                           5½" Post
                                                        Connection to Wood Deck             Connection to Concrete

                                                        When mixing 2¼" or 3"
                                                        posts with 5½" posts,
                                                                                                 1-5/8"
                                                        note the the spacing
                                                        from the edge of the
                                                        deck is different.

Tip: Over tightening the post anchors can force the post off plumb, so tighten them just enough to hold it plumb.
After glass is installed, finish tightening if necessary.

                                         Title: Structural Glass           Project No.:     N/A
                                               Railing Installation        Date:            Jul 1, 2019
                                                                           Scale:           N.T.S.
                                                                           Drawn By:        N/A
                                         Desc: Fastening Posts to
   25 Green Ct., Ajax, ON L1S 6W9                                          Page No.:        3
 (800) 668-6430 sales@craft-bilt.com
                                               the Deck
                                                                           Revision:        2
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
Three self adhesive setting blocks
                                        are used for each channel.
                                        �      one near the top
                                        �      one near the bottom
                                        �      one on the bottom cap
                                        The glass must sit on a setting
                                        block. Do not allow glass to come
                                        into contact with hard surface.

                                                    Cut glazing splines to same length
                                                    as the channel. Notch the barb back
                                                    approx. ¾" at both ends, otherwise
                                                    it will interfere with the screws used
                                                    for the top and bottom end caps.

                                      Title: Structural Glass       Project No.:   N/A
                                           Railing Installation     Date:          Jul 1, 2019
                                                                    Scale:         N.T.S.
                                                                    Drawn By:      N/A
                                      Desc: Setting Blocks
  25 Green Ct., Ajax, ON L1S 6W9                                    Page No.:      4
(800) 668-6430 sales@craft-bilt.com                                 Revision:      2
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
Roll in the outer spline (the side closest to
                                                   the outside of the deck)

                                                                     With 2 people, carefully lower
                                                                     the glass into position. Wear
                                                                     appropriate safety equipment
                                                                     including safety glasses, glass
                                                                     handling gloves and suction
                                                                     cups.

                                                                     Roll in the inner spline.

                                      Title: Structural Glass        Project No.:   N/A
                                           Railing Installation      Date:          Jul 1, 2019
                                                                     Scale:         N.T.S.
                                                                     Drawn By:      N/A
                                      Desc: Mounting Glass
  25 Green Ct., Ajax, ON L1S 6W9                                     Page No.:      5
(800) 668-6430 sales@craft-bilt.com                                  Revision:      2
Craft-Bilt Structural Railing Installation - Structural Glass - (Also known as Frameless or Topless)
Post caps are press fit onto the post tube.
                                                        If caps are loose, flare the tube slightly
                                                        with a hammer, then press on.
                                                        Alternatively apply sealant inside the cap
                                                        to "glue" it to the post tube.

                                           Attach top caps with provided
                                           #10 flat head screws.

                                                       Square edge standard
                                    2" radius option

                                                              33-1/2" or 39-1/2"
                       36" or 42"

                                                                                               2-1/2"

                                                                   Post base cover
                                        Title: Structural Glass         Project No.:           N/A
                                               Railing Installation     Date:                  Jul 1, 2019
                                                                        Scale:                 N.T.S.
                                                                        Drawn By:              N/A
                                        Desc: Caps and Covers
  25 Green Ct., Ajax, ON L1S 6W9                                        Page No.:              6
(800) 668-6430 sales@craft-bilt.com                                                Revision:   2
Make sure painted
                           surface is facing up

        The 22.5 degree adapter is fastened to opposite sides of a post to
        accommodate a 45 degree corner.

        For 36" railing cut to 31 7/8"
        For 42" railing cut to 37 7/8"

        Fasten the 22.5 degree adapters to the posts using screws provided.

        Temporarily place the Structural Glass Post Add-On Kit into position to mark
        the holes. Drill clearance holes in the 22.5 degree adapter at these marks with
        a 5/32" drill bit. Now attach the Add-On kit with #10 flat head screws provided.

                                      Title: Structural Glass     Project No.:   N/A
                                           Railing Installation   Date:          Jul 1, 2019
                                                                  Scale:         N.T.S.
                                                                  Drawn By:      N/A
                                      Desc: 22.5 Degree Adapter
  25 Green Ct., Ajax, ON L1S 6W9                                  Page No.:      7
(800) 668-6430 sales@craft-bilt.com                               Revision:      2
Lines up with 2¼" or 3"                   Lines up with 5½"
                                                                    post at bottom of stairs.           post at bottom of stairs.
            1-1/4"

                                                                                                                                        5½" POST

                                                                                              1/4"                         7/8"
                                                                            1-1/4"

            7-1/8"                                            6-1/4"                                     1/8"                          1-1/4"

                                                                                                                                    3" POST

                                                                                                 1"

        4-3/4"                                             3-3/4"

                                                                         1/2"
                                                                                                                                    2¼" POST
1/2"
                                                                                             1-3/8"

       4-3/8"                                                 3"                                          1/2"
                                                                         1/2"

                     3/8"
                            Glass is always 3/8" from post face
                            1/8" for add-on kit extrusion
                            1/8" for setting blocks
                            1/8" gap

  END/CORNER POST                                      LINE POST                                 INSIDE CORNER/TOP OF STAIRS POST

Drawn By:     BJB  Part #:7752-42WH Structural Glass                                   Craft-Bilt Materials Ltd.
                          Post Add-On Kit                                          25 Green Ct, Ajax ON L1S 6W9
Scale:      n/a    Desc.: Glass Size Deductions                                                Canada
© 2018 - 2019 Craft-Bilt Materials Ltd. All rights reserved.                    (905) 619-1234 - fax (905) 619-2468
                                                                                         info@craft-bilt.com
22.5 Degree Wedge
                                                          Part #7781-02??

                                                          1/2" Glass Adapter
                                                          Part #7752-42WH

                                      2-3/16"                                                                                                  "
                                                                                                                                                     Use these
                                                                                                                                            3/8      dimensions to
                                                                                                                                          7-         locate the post
                                                                                                                                                     on the deck
                                                                                                              5-1/2"
                            3"
   3/8" gap

                                                                      Use these

                                                                                                                                                           6"
                                                                                                                                                         /1
                                                                      dimensions to

                                                                                                                                                       13
                                                 1-5/16"              determine

                                                                                                                                                     3-
                                                                      glass width

                                                                                                            3-11/16"
Use these
                                  "

dimensions to
                                16
                              9/

locate the post
                            2-

on the deck                                                 7/8"

                                                                                                                                                         8"
                                                                                                                                                       3/
                                                                                                                                                     3-
                       3/16" gap                                                                                                            3-1/4"
                                         "
                                       16
                                     9/

                                                Posts can move slightly as they are fastened to the deck, and decks are seldom a
                                   2-

                                                perfect 45 degrees, so if possible install the posts first and measure for glass after.

Drawn By:     BJB  Part #:7752-42WH Structural Glass                                   Craft-Bilt Materials Ltd.
                          Post Add-On Kit                                          25 Green Ct, Ajax ON L1S 6W9
Scale:      n/a    Desc.: Glass Size Deductions                                                Canada
© 2018 - 2019 Craft-Bilt Materials Ltd. All rights reserved.                    (905) 619-1234 - fax (905) 619-2468
                                                                                         info@craft-bilt.com
You can also read