2019-2023 Financial Plan
     Consultation
2019-2023 Financial Plan Consultation - Tofino
Investment In Our Infrastructure
The draft 2019-2023 Financial          Category of District       Annual Investment
Plan includes a five year                    Assets              Required to Replace
investment plan to get to the                                    all Assets at the End
optimal level of investment by                                   of their Service Life
2023. The investment is
collected on tax bills and is         Road                                    $277,100
referred to as the Capital and        Buildings                               $180,000
Infrastructure Levy (C&I Levy).       Fleet and Equipment                     $412,200
The investment plan is as
follows:                              Storm                                   $237,600
Year 2019: $1,243,122                 Water                                   $461,550
Year 2020: $1,421,779                 Wastewater                              $389,300
Year 2021: $1,600,436
                                      * Optimal                             $1,957,750
Year 2022: $1,779,093
Year 2023: $1,957,750                 Investment Level -
                                      based on current
                                      asset inventory
     *Based on the Asset Management Investment Plan prepared by Urban Systems – December
2019-2023 Financial Plan Consultation - Tofino
Draft 2018 Municipal Tax Calculation
2018 Municipal Taxation Excluding Levy:        $3,154,530
2% Tax Increase                                   $63,090
Non-Market Change                                 $89,928
Debt (estimates ¼ borrowing for WWTP on Sept      $74,702
1, 19)
2019 Municipal Taxation Excluding Levy:*       $3,382,250
Capital and Infrastructure Levy (C&I Levy)     $1,243,122
Total 2019 Municipal Taxation:                 $4,625,372
2019-2023 Financial Plan Consultation - Tofino
Allocation of Taxation Revenue
           4% 3%                  Administration

     9%                           Public Works
                      17%         Public Spaces, C&V
4%                                Fire Department

                                  Planning
     5%
                                  Council
     7%
                            26%   Recreation

                                  Bylaw
      7%
                                  Budget Shortfall
           7%
                11%               Emergency Planning

                                  Daycare
2019-2023 Financial Plan Consultation - Tofino
Affordable Housing
• Council is considering a loan authorization bylaw to guarantee
  a loan for the Tofino Housing Corporation in the amount of
  $353,780:
   –   Demand loan from BC Housing
   –   Up to a 5 year term
   –   0% interest
   –   Funds will be used towards the affordable housing project on DL114
• This will require a 2.1% tax increase or $70,756 in year 2019
  which will remain in effect for no more than 5 years or until
  the guarantee falls away
• Council has chosen not to seek approval of electors for this
  loan guarantee. The annual debt servicing costs are within
  the approval free zone which means Council can choose
  whether to obtain approval of electors or not.
2019-2023 Financial Plan Consultation - Tofino
2019-2023 Financial Plan Consultation - Tofino
CAPITAL PROJECTS: 2019-2023
                             Ahkmahksis               Maltby
                                Dam                     Lift
           Water                                      Station
           Supply
           Intake                  Ahkmahksis
                                      WTP
                                    Generator

               BAY ST   Lynn Rd
   OLSEN                Lift Stn

 FIRST                                            Forcemain
   ST                                              Twinning
 DOCK
                                      Mackenzie
                                      Beach Rd
                        WWTP
 GIBSON
              ARNET

                                                                7
2019-2023 Financial Plan Consultation - Tofino
CAPITAL PROJECTS: Graphed by
         Year/Sector

                               8
2019-2023 Financial Plan Consultation - Tofino
CAPITAL PROJECTS 2019
Project Name              Budget             Why?
Bay St Water Treatment    $800,000           To bring water treatment to standard and make
                          (2019/2020)        chlorination works safer for operation
Water Supply Intake       $60,000 (2019)     To increase intake capacity or reduce turbidity
Improvement
Maltby Lift Station       $415,000 (2019)    To upgrade the aging lift station
Twinning of Forcemain     $2,084,00 (2019)   To increase the capacity of the sanitary forcemain that
(Maltby to Lynn)                             collects Ty Histanis, Pacific Rim Hwy, Treefrog, Jensen’s
                                             Bay up to Lynn Road intersection
Wastewater Treatment      $60,000,000        To start treating our wastewater in accordance with
Plant                     (2019, 2020,       provincial and federal standards.
                          2021(?))
Mackenzie Beach Road      $ 336,000          To pave existing gravel road that gets heavy use in
Improvement                                  summer period.
West Gibson St            $326,000           To create vehicle access at First and Gibson, extend MUP
                          (2019/2020)
First St Dock             $150,000           To carry out structural repairs as per structural
Improvements                                 assessment
Olsen Road Storm Main     $340,000           To eliminate steep drainage corridor going through
                                             developed private properties                          9
2019-2023 Financial Plan Consultation - Tofino
Upcoming Paving Projects:
Arnet Road                             Mackenzie Beach Road Paving:
Paving (First St                       WHY? To pave a local road
to Community                           under heavy use during the
Hall):                                 summer season. To reduce
WHY? To pave                           source of sediment into
                                       Mackenzie Creek.
the road from
First to                               WHEN? 2019
Community                              HOW MUCH? $336,000
Hall. To take
advantage of
the WWTP                               West Gibson St Paving (First St
pipe                                   to Third):
construction                           WHY? To create vehicle access
works along                            at First and Gibson. To extend
this same area.                        MUP. To take advantage of the
WHEN? 2020*                            construction works in that area
                                       constructing pipes for WWTP.
HOW MUCH?
                                       WHEN? 2020*
$95,000
                                       HOW MUCH? $326,000
                                       * Depending on construction
                                       timeline of WWTP components
West Gibson St:                                        Arnet Rd:

   •       2 paved lanes
   •       Curbs
                                                       •   2 paved lanes
   •       MUP on the West side (bottom of page)
                                                       •   Gravel shoulders

Mackenzie Beach Road

       •    2 paved lanes
       •    Gravel shoulders
       •    2 road constrictions similar to Hellesen
Feedback on Upcoming Paving Projects:
Project                                                 Your Feedback
Arnet Road Paving (First St to Community Hall):         Do you support the proposed paving
WHY? To pave the road from First to Community Hall.     project?
To take advantage of the WWTP pipe construction         YES      NO       PARTLY
works along this same area.
                                                        Do you have comments on the proposed
WHEN? 2020*
HOW MUCH? $95,000                                       road scheme, scheduling, or impact?
West Gibson St Improvement (First St to Third):
WHY? To create vehicle access at First and Gibson. To   Do you support the proposed paving
extend MUP. Open a second route to/from Hospital. To    project?
take advantage of the construction works in that area
                                                        YES      NO       PARTLY
constructing pipes for WWTP.
WHEN? 2020*                                             Do you have comments on the proposed
HOW MUCH? $326,000                                      road scheme, scheduling, or impact?
* Depending on construction timeline of WWTP
components.
Mackenzie Beach Road Paving:                            Do you support the proposed paving
WHY? To pave a local road under heavy use during the    project?
summer season. To reduce source of sediment into        YES      NO        PARTLY
Mackenzie Creek.
                                                        Do you have comments on the proposed
WHEN? 2019
HOW MUCH? $336,000                                      road scheme, scheduling, or impact?
Multi Use Path (MUP) Priorities
In 2018 a condition assessment of the MUP was completed.
Based on their condition alone, the sections most in need of
upgrading are:

                          Please let us know which of these sections
                          are the highest community priority and why.
                          (USE DOTS AND STICKY NOTES PROVIDED)
Multi Use Path (MUP) Priorities
                            Sharp Rd. to Jamie’s Rainforest Inn

                                                                           Jamie’s Rainforest Inn to Tree Frog Lane

  Abraham Dr. to
  100 m N of Hellesen Dr.

               Hellesen Dr.
               to Sharp Rd.

                                                                                     Please let us know which
                                                                                     of these sections are the
                                                                  Chesterman Beach Rd. to
                                                                                     highest community priority
                                                                  Clayoquot Cedar House
                                                                                     and why.
                                                                                     (USE DOTS AND STICKY
                                                                                     NOTES PROVIDED)
RMI Project Priorities
Tofino's previous Resort Development Strategy (2015-2018) supported
the following projects. Please indicate your level of agreement for
continuing to support each project with future RMI funds.
                            Yes, let's continue to   Yes, let's continue to   No, the program is
                            invest funding to        support this             pretty good and we
                            improve this program.    program, but we          should put the
                                                     should mostly            money elsewhere
                                                     support other            now.
                                                     initiatives.
  Downtown
  vitalization
  Water access, beach
  and trail
  improvements
  Cultural Infrastructure

  Festivals and events
  support
  Seasonal shuttle
  service

                            Please let us know your priorities.
                            (USE DOTS AND STICKY NOTES PROVIDED)
Indoor Recreation Facility

•   2015 Feasibility Study
•   2018 Site Plan
•   Strategic Plan
•   Five year plan
•   Resolution No. 455/18
    – “That staff develop a grant application for an Indoor
      Recreation Facility….”
• Grant application (73.33% grant)
Indoor Recreation Facility
• Designed for a regional population (TFN and Tofino)
   – 20 years
• Can accommodate 700 persons
   – Potlach
   – Tournaments
   – Community Events                  “One of the greatest dignities of
                                       humankind is that each
• Disaster resilient                   successive generation is
                                       invested in the welfare of each
   – ESS                               new generation.”
   – EOC
                        INPUT                      Fred Rogers
                       WANTED!
Tofino Volunteer Fire Department
                                                STRUCTURE FIRE
                                 FALSE ALARMS        7%
                                      13%
                                                         OUTDOOR BURNING
                                                               3%
                  DUTY OFFICER
                      1%                                     Motor Vehicle Incident
                                                                     11%
                                                HYDRO
29 Volunteer members                             8%

2082 Combined
Firefighter Training                                             HAZMAT
Hours in 2018

208 Total Calls                                         FOREST FIRE
                             FIRST RESPONDER
                                                            1%
                                    51%
New Campbell St.Loading Zone
       6am – 10am
Business Licencing
• Number of Business Licences Issued:
   – Specific to tourist accommodations

      Year                           Number of STR BLs

      2004                           29

      2010                           52

      2015                           131

      2016                           127

      2017                           236

      2018                           283
Bylaw Enforcement

Action           2013     2014      2015     2016    2017    2018
Warning            110       638      431    335     182*     224
Ticket
Ticket             165       455      669    1,133   1,326    560

Contravention     2013    2014     2015     2016     2017    2018

Alcohol             312   2,550     3,022   2,798    2,142   1036
Camping             347     698     1,383   1,054    756     503
Parking             446     934     1,078   1,059    1,168   961
All Categories    1,252   4,562     5,820   6,787    4,092   3,433
Bylaw Enforcement
Much of what we do is driven by our community
and we would greatly appreciate your feedback
and suggestions.

1. How do you see enforcement priorities?
2. What are your areas of concern?
3. Are there things you feel are being missed?
COMMUNICATIONS
This year, the District of Tofino will begin using Mailchimp (an Email Service),
Boosted Facebook Posts, and more Direct Mail.

                  How Do You Get District News?
                     How Can We Improve?
COUNCIL BUDGET
2018     2019      2020        2021       2022       2023
 236,301 287,758     269,441    273,877    284,823    295,582
Components of the Council Budget:
• Insurance - Liability insurance for all Councillors
• Benefits - EI, CPP, WCB, etc.
• Indemnities - Meetings at New Remuneration Rate
• Promo - Volunteer Awards, Council Open Houses
• Grants - Includes Council/Arts and Culture
• Expenses - Travel, Strategic Planning, Lap Tops, Service
  Awards, Legal Advice, USS Scholarship, etc.
#BYOBag #StrawsSUCK
Tofino and Ucluelet have partnered
    with Surfrider Pacific Rim to
 regulate single-use items, starting
     with plastic straws & bags.

      What Do you Think?
CANNABIS RETAIL
                               HOW WILL IT WORK?
                                              Staff Review            21 day Public
  30 day preferred          Applicants
                                             Applications for        Comment/First
   intake period             Submit
                                           Completion and Post       Nations Referral
       begins             Documentation
                                               on Website                Period

Council resolves                             Staff Review
  that up to 3                               Applications           Public and First
                      Council Receives
    TUPs be                                against Council          Nations Provide
                        Staff Report
 considered for                           Policy and compile          Comments
    approval                                  Comments

                                                                 Council receives
Successful and
                     Staff Draft TUPs /                               Public
 Unsuccessful                             Public Comment
                      Notify Public per                            Comments;
  Applicants                               Period per LGA
                     LGA requirements                             issues/denies
   notified
                                                                      TUPs.
Service Level and Standards Review
• The District will be undertaking a Service Level and
  Standards review in 2019.
• A Service Level Review will examine:
   – The services the District currently offers
   – How much time and effort goes into delivering the service
• A Service Standards Review will examine:
   – How consistent the District is at carrying out services
   – The timeliness, accuracy and appropriateness of services
   – For example: If Business Licenses will be processed within
     5 business days, what resources does the District require
     to do so?
How are we doing?
•   The District currently offers the
    following services:                   • What services are
     – Bylaw                                missing?
     – Childcare
     – Planning
     – Building Inspection
     – Emergency Planning
     – Recreation
     – Public Works, Utilities and
                                          • Are there services the
         Facilities                         District should not
     – Fire Protection                      provide?
     – Cultural and Visitor Initiatives
         and Infrastructure
     – Parks and Trails
     – Infrastructure Management
     – Financial Management
     – Corporate Services