TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection

Page created by Ricky Olson
 
CONTINUE READING
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
WWW.PLUMBINGCONNECTION.COM.AU   SPRING 2020

 TOWARD
 NET ZERO
  CONSERVING WATER
STARTS WITH PLUMBING

                                         INSIDE:
                                  HVAC & COVID-19
                                    JETTER SAFETY
                                Plumbing for Gold
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
CHOOSE KEMBLA AND SHOW
YOUR SUPPORT FOR AUSTRALIAN
MANUFACTURED COPPER TUBE.
AUSTRALIA’S ONLY COPPER TUBE MANUFACTURER. ESTABLISHED IN 1916.
To find out more go to: www.kembla.com.au
Phone: 1800 804 631 Email: sales@kembla.com.au
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
IN AUSTRALIA.
WE DO PROPER
COPPER.
CHOOSE KEMBLA COPPER TUBE.
1. KEMBLA IS A FOUNDING PIECE
OF AUSTRALIA’S PROUD HISTORY
Established in 1916 for one reason.
To ensure Australia could convert its
rich copper resources to finished product –
with no reliance on offshore supply.

2. KEMBLA IS AUSTRALIA’S ONLY
COPPER TUBE MANUFACTURER
Ask for the Kembla brand and you are
supporting Australian manufacturing and the
many industries big and small that service it.
Kembla also supports industry associations
that support, educate and train you.

3. KEMBLA COPPER IS SOURCED
FROM AUSTRALIAN MINES
87% of copper tube sold by Kembla is still
made in Port Kembla, NSW Australia
using LME A Grade copper cathode from
Australian mines.

4. KEMBLA HAS OVER 100 YEARS
OF INDUSTRY KNOWLEDGE
Generational knowledge and long serving
employees – over 100 years of material
knowledge and a love affair with
Australia’s renowned plumbing industry,
practices and Australian plumbers.

5. PARTNERS TO AUSTRALIA’S FAVOURITE
PLUMBING & HVAC-R MERCHANTS
Stocked and supplied by Australia’s most
respected Plumbing and HVAC-R distributors,
renowned for the highest quality products.
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
CONTENTS

    COVER STORY

    10 TOWARD NET ZERO
       The plumbing industry plays a huge
       role in conserving water not just for
       now, but for future generations too.

                                                                                                            10
                                               FEATURES

                                               14 MAKING SITE DRAINAGE A CUP           42 PLUMBING FOR GOLD
                                                  OF TEA                                    Plumber Russell Nash’s new
                                                  It might sound like ‘black magic’         found success with gold

                              14
                                                  but a new product is making the           prospecting landed him a spot
                                                  process of clay-plugging under            on the Aussie Gold Hunters TV
                                                  slabs a walk in the park. Anna            series, screened locally and
                                                  Hayes found out more.                     internationally.

                                               30 PROFESSIONAL DEVELOPMENT
                                                  FOR PROFESSIONAL PLUMBERS            REGULARS
                                                  The plumbing industry has
                                                  historically been behind the eight   06   Editorial
                                                  ball when it comes to continuing     08   Industry news
                                                  professional development, but
                                                                                       22   Box Gutters
                                                  that’s about to change.

                             32
                                                                                       26   Training off the page
                                               32 ARE ALL WATER SUPPLY OPTIONS         64   Products
                                                  ON THE TABLE?
                                                  WSAA has created a report
                                                                                       81   Trade stuff
                                                  looking at why purified recycled
                                                  drinking water is sometimes
                                                  stigmatised and not considered a
                                                  viable alternative.

                                               36 HVAC AND COVID-19
                                                  There is considerable interest in
                                                  the role that HVAC may play in

                            42
                                                  the transmission of COVID-19.                 70 TOOLS
                                                  A.G. Coombs provide an overview
                                                  on the relationship between viral             72 HEALTH
                                                  transmission and HVAC systems.
                                                                                                76 TRANSPORT

4   PLUMBING CONNEC T ION   Spring 2020
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
ATM500

                                                                                                                             AS/NZS 4032.1
                                                                                                                                Lic1593

COMPACT SIZE                                                                                                  WALL BRACKET
Only 90mm x 90mm footprint.                                                                     Mounting bracket for a convenient
Fast and economical to install and service.                                                            and compliant installation
Small enough to conceal for a neat, clean and professional finish.

Low Lead Content (Less than 0.25% actual)
                                                                                                           THERMAL FLUSH
                                                                               Sanitising function - No recommissioning required
12lpm Max Flow @300kPa Pressure Drop, 2lpm Min. Flow
Suitable for Hot Water from 50°C (See installation instructions for details)         *package does not include isolation valves or inlet hoses

To find out more information about the Aquablend® Mini TMV visit enware.com.au
www.enware.com.au | 1300 369 273 | info@enware.com.au
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
EDITORIAL

    TAKING IT A
    DAY AT A TIME                                                                                www.plumbingconnection.com.au

    S
             ocial distancing. Mobile          ∫ If a client has a tendency to look        GENERAL MANAGER
                                                                                           Jeremy Sweet
             testing. Stimulus packages.         over your shoulder while you work,        jeremysweet@build.com.au
             New normal. These are all           politely ask them to maintain a safe
                                                                                           EDITOR
    words we’ve been flooded with over            distance, and assure them that            Justin Felix
    preceding months.                            they are welcome to inspect the           03 9542 9024
                                                                                           justinfelix@build.com.au
       It’s a strange time for all during        work once you have finished up.
    the COVID-19 pandemic. We’re living        ∫ If you’re not feeling 100%, just          EDITORIAL CONSULTANT
                                                                                           Jeff Patchell
    through uncertain times and the              reschedule any appointments and           jeff patchell@build.com.au
    message from government bodies               be upfront about it. Clients would
                                                                                           STAFF WRITERS
    changes on a daily basis.                    be more at ease knowing you aren’t        Anna Hayes, Sean Carroll
       While some industries have had to         going to compromise their health          GRAPHIC DESIGNER
    shutdown indefinitely, I suppose one          and safety during this time.              Sam Elliott
    silver lining for our industry is the      ∫ The supply chain, in some                 ADVERTISING TRAFFIC MANAGER
    fact it’s essential. The work you all do     instances, has been aff ected and          Tracey Glanville
    keeps the country moving forward.            you may find it harder to source           SUBSCRIPTION MANAGER
       Despite some restrictions being           some necessary materials. Before          Brigitta Novosell
                                                                                           03 9542 9005
    lifted at the time of writing, there’s       commencing new jobs, make
    no doubt the next six to 12 months           sure you have enough tools and            CONTRIBUTORS
                                                                                           Terry Nguyen, Paul Cott, Ken Sutherland, Jon
    will be hard going for everyone in the       materials to fulfil your obligations.      Palfrey, David Micallef
    community and keeping you and your           It’s also important to contact any
                                                                                           ADVERTISING
    client’s safe and healthy should be a        subcontractors that you may need          Angelo Sticca                          03 9542 9011
    priority.                                    to conduct work with to find out           angelosticca@build.com.au

       So while this edition of Plumbing         about their situation.                    TO SUBSCRIBE                     1800 623 214
                                                                                           Australia                        03 9542 9000
    Connection is loaded with interesting      ∫ Look after yourself and your
                                                                                           New Zealand                    +61 3 9542 9000
    topics, I thought it would be timely to      employees. If you become ill or           Fax (with credit card details)   03 9542 9090
    share some short tips we’ve learnt           you’re concerned that you or
    from our network regarding some              your employees are unwell, the
    precautions you can take on your             Government has a helpline available
    upcoming jobs.                               to advise the best course of action.
    ∫ As you can appreciate, homeowners        ∫ Lastly, be polite and patient.                    www.facebook.com/tradieconnection
       are wary of who they let into their       In trying times such as these,
       homes during this uncertain time.         it’s important to be polite and                   www.linkedin.com/in/plumbing-connection/
       If your client is willing and able,       patient. Understand that some
                                                                                                   www.twitter.com/PlumbingCXNMag
       a video call may be enough to             clients may need to cancel jobs
       determine the extent of the work          due to uncertainty over their own         By mail, please write to the address below
       that needs to be done, which you          employment conditions.                    PUBLISHED BY:
       can then provide a quote on.                                                        Lanella Media Pty Ltd
                                                                                           2/18-22 Lexia Place,
    ∫ Tests have shown that the virus            Take it a day at a time and together
                                                                                           Mulgrave, VIC 3170
       can live on surfaces for hours, if      we’ll get through this.                     AUSTRALIA
                                                                                           ISSN 1034-3075
       not days. As cash gets passed from
       hand to hand, it’s good practice to     Until next time,
                                                                                           Disclaimer: The opinions expressed in this magazine do
       avoid cash transactions.                                                            not necessarily reflect those of the publisher. Although
    ∫ As a society we have become                                                          all materials are checked for accuracy, no liability is
                                                                                           assumed by the publisher for any losses due to the use
       accustomed to greeting people           Enjoy the read                              of material in this magazine. Copyright 2020 by Lanella
                                                                                           Media. All rights reserved. No part of this publication
       with a handshake. That’s no longer                                                  may be reproduced, stored in a retrieval system or
       the case during this time, so a                                                     transmitted in any form or by any means (electronic,
                                                                                           mechanical, photocopying, recording or otherwise)
       simple hello is acceptable.                                          Justin Felix   without the prior permission of Lanella Media.

6    PLUMBING CONNEC T ION   Spring 2020
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
Australian
   ingenuity with
    Italian quality
    you can trust

With press-fit connections built into the valve, Australian plumbers can now enjoy the benefits of safer, faster, flame-free installation
and fewer joints which press-fit connections provide. Available for both water and gas with press-fit, female and male connections and
numerous handle options to suit a wide range of applications.
Manufactured to Zetco’s high standards in Italy, the range passes rigorous design and testing processes to ensure that every valve is of
premium quality. Ask for Zetco Press-fit valves at major plumbing retailers. Zetco Valves. Best range. Best quality. Best brand.

1300 659 639 www.zetco.com.au
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
INDUSTRY NEWS

    NEW CPD TO BUILD INDUSTRY                 TRADIE FINANCIALS AROUND                   financial impact of COVID-19 is set
    UNDERSTANDING                             COVID-19                                   to hurt trade contractors who rely on
    The ABCB has announced new NCC            Delays in crucial supply chains and        building and construction contracts
    Continuing Professional Development       financial uncertainty is causing            to keep their businesses and families
    (CPD) courses set to launch soon.         lengthy hold-ups on building projects      afloat,” he says.
       NCC CPD courses will be launching      which puts tradies at risk of job losses      Anthony likens it to past events
    in mid-late 2020, giving building and     and non-payments as COVID-19 takes         where tradies were hit hard like the
    plumbing practitioners an opportunity     its hold on the building industry.         Queensland floods in 2019 where
    to undertake online, self-paced and          “With delays of three-to-four           one of his clients was left unpaid
    aff ordable training to advance their      weeks on many supplies coming from         $181,000. On top of the bushfires at
    knowledge of the NCC.                     countries struck-down by COVID-19,         the start of the year, it’s likely that a
       As one of the ABCB’s initial           there are an increasing number of          lot of tradies will go under.
    responses to the Building Confidence       commercial building projects in               Since the pandemic began, Anthony
    Report, NCC CPD courses are being         slow-down and uncertainty over             says that many tradies have called his
    developed in partnership with             some projects even going ahead,”           office wanting advice on how to chase
    industry, government and subject          Contractors Debt Recovery managing         down non-payments in case they’re
    matter experts to ensure that course      director Anthony Igra explains.            unable to work.
    topics are relevant and of highest           “This is placing a huge strain on          “Many of these payments are up to a
    priority for practitioners.               construction contractors, many             year old but contractors haven’t chased
       What are the benefi ts of NCC CPD?      of whom are small-to-medium-               them down because they don’t want to
    ∫ The NCC CPD courses will help           businesses or sole-traders who pay         incur expensive legal fees. That’s where
       reinforce your NCC knowledge and       for supplies up front, and are left out    the Security of Payment Act comes in.
       support your future success.           of pocket with mortgages to pay and        It’s effective and affordable but many
    ∫ Completing CPD adds value to            families to feed. The likelihood is that   just don’t know about it,” he says.
       you, your staff and clients by          many contracts will be terminated and         Through that act, Anthony and his
       demonstrating your commitment to       many contractors just won’t get paid,”     team were able to uncover more than
       achieving compliant outcomes.             Anthony mentions that over $3           $6 million in unpaid work which let his
    ∫ The courses are aff ordable, online      billion of construction work was           clients pay bills and get on with their
       and delivered using a mix of video     left unpaid last year due to building      trade.
       and audio learning tools.              companies simply refusing to pay              “The most important piece of advice
    ∫ Best of all, you can complete a         or purposely going into voluntary          I can give to tradesmen right now, is to
       course from almost anywhere, at a      liquidation to avoid paying up and then    make sure you chase the monies owed
       pace that suits you.                   phoenixing, restarting the business        to you and chase it hard and early. In
       Who are the courses for?               under a new name.                          these uncertain times, not only is cash
       Course are being developed for the        “With major income losses such          king, but cash today is more important
    following practitioner groups:            as this during a ‘normal’ year, the        than ever.”
    ∫ Compliance practitioners including
       building surveyors and inspectors;
    ∫ Design and engineering                  DIGITAL CHECK-INS TO BRING THE                He mentions that the construction
       practitioners including architects,    CONSTRUCTION INDUSTRY BACK                 industry can only return to full
       designers, draftspersons,              Desperate to return to work in its         capacity if builders and developers
       specialists and engineers (including   full capacity, construction and            feel confident in quickly tracing
       fire and hydraulic); and                property development companies             impacted workers if there’s another
    ∫ Construct and install practitioners     are embracing a digital solution for       outbreak.
       including builders, plumbers, fire      its on-site workers to replace time-          “1breadcrumb was developed with
       protection practitioners, and site/    consuming paperwork check-ins.             built-in GEO-fencing, allowing for
       project managers.                      To solve this issue, 1breadcrumb           construction companies to easily and
       When will courses be available?        has been developed as a one-touch          securely manage an automatic check
       The first suite of courses will         solution to the pandemic.                  in process while ensuring the privacy
    be released from mid-late 2020               “Businesses need to be able to          of on-site workers.”
    onwards. Practitioners can find out        access information about who has              1breadcrumb allows people
    more and subscribe for updates on         been on site, for how long, and who        diagnosed with coronavirus to quickly
    course availability at cpd.abcb.gov.      they interacted with – in case of a        and easily check their history to see
    au/info.                                  secondary outbreak,” 1breadcrumb           where they’ve been and contact those
                                              founder Paul Wilson says.                  businesses or the authorities.

8    PLUMBING CONNEC T ION   Spring 2020
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
have you seen our new
 website AND app Yet?
 www.samios.net.au
TOWARD NET ZERO CONSERVING WATER STARTS WITH PLUMBING - INSIDE: Plumbing Connection
COVER STORY
                                                          CONSERVATION

     TOWARD
     NET ZERO
    THE PLUMBING INDUSTRY
     PLAYS A HUGE ROLE IN
  CONSERVING WATER NOT JUST
   FOR NOW, BUT FOR FUTURE
  GENERATIONS TOO. PLUMBING
     CONNECTION REPORTS.

I
      t’s been an unprecedented start        generations may not enjoy the same           have resulted from non-water
      to 2020 and as the world comes to      privilege that we have.                      conscious mass urbanisation, carbon
      grips with what has been nothing         “Water and climate change are              emissions and other factors impacting
short of catastrophic, perhaps a silver      directly linked. As our planet warms,        our climate.
lining is the wakeup                                             weather patterns            “A clear indication is the fact that
call for people to                                               will keep shifting,      water levels are dropping at record
appreciate things                                                bringing drought         speeds and heights in our dams.”
we so easily take for                                            in some areas and           So, what is the short definition of net
granted.                        “A clear indication delivering more                       zero water?
   The first thing that                 is the fact that rainfall to others.                  “A net zero water building/precinct
springs to mind in the               water levels are Water itself requires               is aimed at minimising total water
                                                                                          consumption, maximise alternative
midst of the COVID-19
pandemic is the like
                               dropping at record energy                 to deliver,
                                                                 so excess use also       water sources, returning water back
of essential (and even         speeds and heights compounds our                           to the natural cycle and offsetting any
non-essential) items                    in our dams.” energy problems,”                   potable water use sourced externally,
at the supermarket                                               TAGRO Building           via engineered water balance and
being available                                                  Services Consultants     implementing innovative approaches and
whenever we need                                                 director Michael         net zero water strategies,” Michael says.
them. As it turns out,                                           Labib says.                 And our industry has a massive role
that’s a privilege. Not a right. But what      With Australia experiencing constant       to play in ensuring the above becomes
about even bigger things, like access        cycles of drought, water scarcity is real.   possible. In fact everyone plays a
to potable water. Because there is a           “Precipitation patterns are shifting       role. According to Michael, at its most
possibility that if we don’t act now, future due to disturbed water cycles which          basic, everyone should aim to

10   PLUMBING CONNEC T ION   Spring 2020
From small clips to 375mm Large bore DWV. We’ve come a long way!
              Plastec and it’s brands have grown to be one of the largest & favourite
              ƉƌŽĚƵĐƚŽīĞƌŝŶŐƐĨŽƌƚƌĂĚĞƐůŽŽŬŝŶŐĨŽƌŝŶŶŽǀĂƟǀĞƐŽůƵƟŽŶƐ to all their
              plumbing needs.
                    WůĂƐƚĞĐ͛ƐĞdžƉĂŶƐŝǀĞĚŝƐƚƌŝďƵƟŽŶƉŽŝŶƚƐŽŶƚŚĞ^ƵŶƐŚŝŶĞŽĂƐƚ͕DĞůďŽƵƌŶĞ͕
                    Perth
                        . and soon to be Sydney, have all channel market segments covered

                       tŝƚŚĂĐŽŵďŝŶĞĚϯϳϱнLJĞĂƌƐŽĨƉůƵŵďŝŶŐĂŶĚƐĂůĞƐŝŶďŽƚŚĞdžƉĞƌƟƐĞĂŶĚ
                       experience, the Plastec team look forward to providing you with all the
                       help you need.

     DOMESTIC I COMMERCIAL I CIVIL
CLIPS,BRACKETS & TEST PLUGS I DWV I PAN CONNECTORS I FLEXIBLE JOINTS I PUSHTEC
   STORMWATER I RAINWATER I WASTE CONNECTORS I PLUG & WASTES I FLOORWASTES
LEAK CONTROL SYSTEMS I FLOOR FLANGES, TRITEC & COVERPLATES I TRAPS & ACCESSORIES
                                                                     ACCESSOR

           “INNOVATION for every INSTALLATION”
                      Contact Details- 07 5413 4444
                         www.plastec.com.au
COVER STORY
                                                       CONSERVATION

                                                                                       BASIC STRATEGIES FOR IMPLEMENTING
                                                                                       NET ZERO WATER:
                                                                                       1. Demand reduction and maintain
                                                                                          water tightness
                                                                                       ∫ Specify the most efficient fi xtures
                                                                                          and equipment available
                                                                                       ∫ Install water leak detection systems
                                                                                       ∫ Consider the likes of waterless urinals
                                                                                          and water smart vacuum systems
                                                                                          over pumping

                                                                                       2. Using alternative water sources
                                                                                       ∫ Harvest rainwater, stormwater or
                                                                                          subsoil water
                                                                                       ∫ A ir conditioning condensate
Compare the pair by Borris Boschman, ESD consultant of Integral Group.
                                                                                       3. Wastewater recycling
                                                                                       ∫ Greywater treatment and reuse
                                                                                       ∫ Blackwater treatment and reuse

                                                                                       4. Return water to its original source
                                                                                       ∫ Another option for returning water
                                                                                          to the original water source is
                                                                                          through green infrastructure (also
                                                                                          called low-impact development).
                                                                                          Green infrastructure uses landscape
                                                                                          features that retain stormwater
                                                                                          onsite. Also via slow infiltration using
                                                                                          underground infiltration crates in
                                                                                          order to return water back to its
                                                                                          natural cycle.

A net zero building concept by Borris Boschman, ESD consultant of Integral Group.         More complex strategies can also be
                                                                                       tailored to each development factoring
                                                                                       in geographical location, demographics,
                                                                                       local climate and engineered water
                                                                                       balance.
                                                                                          The image above symbolises the
                                                                                       water cycle, and how ‘non water
                                                                                       conscious’ can cause mass urbanisation
                                                                                       impact precipitation patterns.
                                                                                          “When we build cities and precincts
                                                                                       that are solid, meaning ‘non-permeable’,
                                                                                       and force the runoff away from their
                                                                                       locations, we change vaporisation, air
                                                                                       and ground water content which in
                                                                                       turn has a direct impact on the thermal
                                                                                       comfort of inhabitants. It also has a
                                                                                       direct impact on rain patterns, whereby
Dam levels across the country continue to drop at alarming rates.                      drought occurs in some areas and flood
                                                                                       in others,” Michael explains.
                                                                                          The diff erence between a water
‘demand reduction and maintain water       systems have been aiming to achieve         conscious precinct and urbanised non
tightness’.                                this since their inception. And these are   water conscious precinct is that one can
   From a plumbing perspective,            the first recommendations Michael puts       be water cycle friendly while the other
suppliers of high water rating fi xtures,   forward when advising or assessing new      creates what is now being called an
6-star WELS and leak detection             projects.                                   urban heat island.

12   PLUMBING CONNEC T ION   Spring 2020
COVER STORY
                                                                                                 CONSERVATION

        Barangaroo, New South Wales is one                                                                                                           to be market leaders. At the same time,
     such water wise precinct. In fact, the                                                                                                          others are not that keen because it
     precinct is capable of exporting more                                                                                                           hasn’t become mandatory as of yet.
     recycled water than the amount of                                                                                                               Everyone will start screaming out for
     drinking water it uses.                                                                                                                         it when it does though. They’ll all be
        The use of water efficient appliances,                                                                                                         looking for suppliers and plumbers etc.
     using captured rainwater and treated                                                                                                               “The thing to remember is you won’t
     water for toilet flushing, irrigation,                                                                                                           only be saving water, but you’ll also be
     wash down and fire suppression are                                                                                                               doing something that shows you care
     major features of the entire Barangaroo                                                                                                         about the environment,” he says.
     development.                                                                                                                                       For those ahead of the game
        The wastewater recycling system is                                                                                                           procurement will also become easier
     capable of processing one million litres                                How recycled water can be used.                                         when new projects come to be and
     of wastewater each day.                                                                                                                         experienced designers, plumbers and
        While it may be considered next level,                                                                                                       consultants are preferred.
     it should provide food for thought for                                  zero water and they’re being proactive                                     So where will you be placed?
     the rest of the industry when designing                                 by asking us to come in and present to
     and planning new buildings and                                          them and their teams,” Michael says.
     precincts.                                                                On the flipside though, there are
                                                                             currently very few jobs implementing
                                                                                                                                                       Michael G. Labib
     THE TIME IS NOW                                                         net zero initiatives.                                                     NER, RPEQ & member of HCAA
     “We’ve seen water becoming more and                                       “It’s up to developers and builders                                     Director, Tagro Pty Ltd
                                                                                                                                                       michael@tagro.com.au
     more scarce and this cycle will continue                                to decide if they want to do something                                    LinkedIn: www.linkedin.com/
     to happen. Some clients (developers and                                 unique and game changing. They need                                       in/michael-g-labib
     architects) are really interested in net                                to think about whether or not they want

Looking to cut costs?
Connect with us and save on
your Public Liability and Tool cover.

                                             NOW EARN QANTAS POINTS
                                             for every dollar spent on a new small
                                             business insurance policy*

                 Compare FREE multiple                                                      Insure your business & receive                                                        Save yourself
                 quotes online in minutes                                                   your documents instantly                                                              time and money

Compare with Australia’s Small Business Insurance Specialist                                                                                    bizcover.com.au                               1300 805 821
Membership and Qantas Points are subject to Qantas Business Rewards Terms and Conditions. BizCover customers will earn 1 Qantas Point for every $1 spent on all new business insurance policies, up to a maximum

will be credited to the Members’ Business Rewards account within 100 days of purchase. A customer is only eligible to receive points if they have purchased directly through BizCover (not through a referral or white
label partner) and not used any discount or promotional code in making the purchase.                                                                                    w w w.plumbingconnec tion.com.au 1 3
The information provided is general only and should not be relied upon as advice. No guarantees are provided as to pricing for individual risks. BizCover™ Pty Ltd (ABN 68 127 707 975; AFSL 501769). © 2020 BizCover. BC1455
DRAINAGE REGULATIONS

BENTONITE BISCUIT MAKES SITE
DRAINAGE A CUP OF TEA
It might sound like ‘black magic’ but a new product is making the process of clay-plugging under slabs
a walk in the park. Anna Hayes found out more.

A
         proposed amendment to                The goal here is to prevent moisture        product manager with Plastec Australia,
         the next edition of AS3500         from travelling through the plumbing          which has come up with a simple clay
         Plumbing and drainage will         trench under the slab. This, coupled with     plug solution. He explains that slabs can
focus on the installation of articulated    highly and extremely reactive soils, can      be designed to be structurally strong
joints in plumbing, when building on a      cause numerous structural problems            and handle extreme movement.
reactive or unstable soil site, and how     with slabs breaking and houses cracking         “However, a plumbing and drainage
the practice of installing a clay-plug      up, the frequency of which was drawing        system without the proper articulation
barrier ties into that.                     the attention of insurance companies          and design requirements, such as
   The draft will provide clear             and the legal fraternity who have             clay plugs, can become a victim to
articulation, installation examples, and    begun to look more closely at building        the stresses of ground movement,
guidance based on AS2870 Residential        standards.                                    and therefore pose a huge risk to the
slabs and footings in which this topic is                                                 integrity of the structure.
featured.                                   THE ISSUE                                       “In some regions, local regulators
   As an existing requirement of footings   Bodies like the QBCC, the VBA and             have long been asking for clay plugs
and foundation in AS2870, the practice      HEDRA have been vocal on the subject of       to be installed. The plumber has been
of installing a clay plug has not been in   plumbing and drainage as per AS2870.          doing it somewhat haphazardly and
a plumbing standard before now and,         But the absence of this practice from a       ineff ectively, sometimes even using the
as a result, as been a bit of an unknown    plumbing standard has been the cause          clay found onsite.”
quantity for plumbers, drainers and         of much of the consternation over
building contractors.                       whose responsibility the clay plug is.        A SIMPLE, COST EFFECTIVE SOLUTION
   AS2870 reads: “Where plumbing and           While it exists in a building standard,    In response to this issue, Queensland-
drainage pass under the footing, there      it is, essentially, a plumber’s job as part   based Plastec Australia has developed
shall be a clay plug barrier to stop the    of the drainage installation.                 a product called the Clay Biscuit which
ingress of water under the slab.”              Chris Ferguson is the specialist           makes the process of installing a clay

The new solution comes in two parts. The clay plug comes in a 25kg bag. The biscuit part is a stiff ened cardboard box that,
when assembled, is the right size for most typical residential trenches.

14   PLUMBING CONNEC T ION   Spring 2020
30
                                    YEARS

Go with the brand Australian Plumbers trust.
t Built to last                       t No flow restrictor required
t No power required                   t Pilot and Hydro models available
t No battery replacement required
www.bosch-climate.com.au
DRAINAGE REGULATIONS

                                                                                       you heard of a clay plug and why aren’t
                                                                                       you using one? I think the more that
                                                                                       plumbers and builders know about the
                                                                                       risk mitigation practices that should be
                                                                                       adhered to, the better the industry will
                                                                                       be for it.”
                                                                                           Education, Chris adds, is key to this
                                                                                       whole process, pointing out that Plastec
                                                                                       does presentations to TAFE institutes
                                                                                       all over the country, based purely on
                                                                                       the information that should be in the
                                                                                       plumber’s standard AS3500. He stresses
                                                                                       the need for building designers, plumbers
                                                                                       and builders to come together to ensure
                                                                                       an effective solution, adding that even
                                                                                       homeowners should be well informed
                                                                                       as overwatering and storm water runoff
                                                                                       close to the edges of the slabs can also
                                                                                       exacerbate a problem.
The standard requires two slabs stretching horizontally from the vertical slab.            “It’s funny because when TAFE
                                                                                       students go back to their respective
                                                                                       employers and tell them about the
plug simpler and cost effective. Chris          The cardboard breaks down over time,    clay plug, you might have a plumber
says that the push for compliance on        leaving the bentonite material in situ to  who’s been in the job 30 years and he’s
clay plugs has stemmed from regulation      do its job.                                scratching his head and saying ‘What
bodies, pointing out that across several       The requirements of the standard are    sort of black magic are you talking?’
states it has been on regulator’s radars    to install one vertical box at the face    Most TAFEs have us booked regularly to
for quite a while.                          of the slab, with two more stretching      talk about it.”
   So how does the Clay Biscuit work?       horizontally from the slab as well. The        On the paperwork front, the signs
   Chris explains that the clay type is     rest of the trench is filled up with site   are good that the clay plug will make
very important.                             infill. The way Plastec offers the product   it into the normative text of AS3500
   “It’s a specific type of clay called      also cuts down on                                               in the future, with
bentonite clay which is extremely good      waste.                                                          a working group
at holding onto moisture and that’s            “I used to see guys                                          currently finalising a
what the plug is all about – stopping       buying a lot more of                                            draft submission to
moisture moving from point A to B via       the clay than was                    The cardboard go before WS14.
the plumber’s trench.”                      required, and they              breaks down over                   “It is going into
   He adds: “The area in question at the    were just filling a                                              the appendix so
                                                                              time, leaving the
base of the trench is sand and gravel       whole section of                                                that’s a step in the
and when moisture passes down into          the trench up. So
                                                                          bentonite     material right direction. That
that bedding area it can basically be       by providing the             in situ to do its job. appendix focuses on
used as a tunnel to track moisture back     biscuit and the bag,                                            what we call reactive
in and under the slab. The subsequent       it’s concentrating                                              soil because, in
heave is what’s causing all of the          the product at the                                              Australia, we have
structural damage.”                         critical location,                                              a lot of clay soils
   The new solution comes in two parts.     making it cheaper and simpler as well      and we’re building on these types of
   The clay plug comes in a 25kg bag, the   as more effective from an installation      unstable clays more and more now.”
biscuit part is a stiffened cardboard box    perspective.”                                  Another factor is, of course, the
that, when assembled, is the right size                                                climate where the country tends to
for most typical residential trenches. It   THE INDUSTRY RESPONSE                      go through cycles of years of drought
can be cut down to suit the height of the   Plastec recently attended a NSW Master     followed by a huge amount of rain.
trench.                                     Builders Expo where part of its display        “That is not good for some of the
   “The plumber simply cuts a hole inside   focused on clay plugs and the Clay         ground we’re building these housing
the boxes, pushes his pipe work through     Biscuit.                                   estates on. There are a few factors
and then fills the boxes with the clay. It’s    “There was definitely a lot of builders  at play here but the thing is: there are
very simple. One biscuit takes two bags     walking away, concerned enough to ask      regulations in writing, dealing with it
of clay to fill.”                            the questions of their plumber – have      from a plumbing perspective.”

16   PLUMBING CONNEC T ION   Spring 2020
Rheem Training.
Helping plumbers
upgrade their most
valuable tool.
Knowledge.

• Quick, easy 30-minute online courses for licensed plumbers only.
÷$FFHVVIDXOWðQGLQJWLSVFRPPRQSUREOHPVDQGGLDJQRVWLFV
• Covers operation, components and water heater installation.
• Undertake courses any time and place that suits you.

Register at rheem.com.au/training

COMES
 COMES ONON  STEADY,
          STEADY,       HOT
                  HOT AND     AND STRONG.
                          STRONG.                             INSTALL A

                                                                          AUSTRALIA’S NO. 1
DRAIN CLEANING SAFETY

JETTING YOUR WAY TO SAFETY
Jetters and mechanical drain cleaners can be quite dangerous for plumbing professionals without
the appropriate safety measures. Sean Carroll looks into what can be done from both plumbers
themselves and manufacturers.

I
       t’s no secret that jetters and mechanical drain cleaners
       can be dangerous. Unfortunately, it’s a necessary job and
       many plumbers have been injured as a result.
   When writing this article, Plumbing Connection heard some
of the horror stories that can befall plumbing professionals
with one plumber mentioning that: “plumbers need to make
sure they get any safety training that’s out there, don’t be
complacent. It’s not just about getting your guys on site.
People need to understand how to safely use the equipment.”
   Another point raised is that there needs to be a greater level
of public awareness. People need to know what can and can’t
be flushed down the toilet.
   It’s understandable when certain people need to use wipes
instead of toilet paper. But it needs to be common knowledge
that these wipes aren’t flushable and need to be treated as
waste and disposed of accordingly.
   This is even more important now with the COVID-19
pandemic and people having to find alternatives to toilet
paper. Put it in the bin, have a bag next to the toilet or
whatever is needed.
   One innovation to combat the risk of jetters is a safety
plate. There are various interpretations and designs, but most
sit at the entrance of the fixture and act as a barrier if the
hose was to come back the way it came and stops it before it
can hit the operator.
   On top of this, there is already an abundance of safety
measures plumbers can take with their products; it’s just a
matter of actually doing it.
   The main thing is to be aware that it’s a deadly piece
of equipment and if you’re not sure, don’t use it or talk to          The safety plate by Aussie Pumps in operation.
your boss or one of your co-workers before you do, one
professional plumber says. One job doesn’t matter, your life is
way more important than getting a drain cleared.                      and operator manuals on top of the range of videos on our
   Aussie Pumps owner Warwick Lorenz is a manufacturer of             website,” Warwick says.
various products for the plumbing industry: “For us, we have a           Every jetter that Aussie Pumps sells comes with an
joke around here where we say: we’re safety fanatics because          attached safety plate as well as a pair of safety goggles, free
we can’t afford to lose any customers.”                                of charge.
                                 Aussie Pumps offers a range of           “We have new product development meetings here once a
                                  mechanical drain cleaners,          month where we look at these sorts of factors and how we can
                                    jetters and other pumps up        be safer, how we can make our customers happier and make
                                       to 7,000 psi among other       sure they get the job done faster,” Warwick continues.
                                       products.                         He likens the jetter issue to an episode of Mad Men, where
                                          “All of our products        the fictional advertising agency, Sterling Cooper & Partners
                                       come with free safety          was tasked with creating an ad campaign for the tobacco
                                        plates, emergency stops       industry. The brief was to tell people that smoking doesn’t
                                                                      cause any health issues.
                                                                         “The punk kid in the agency gets up and says ‘well what the
                                           The jetter safety plate,   hell, driving your car is dangerous but you still do it, right? So
                                           provided by Aussie Pumps   if you’re a man, you smoke your cigarette and what the hell?’

18   PLUMBING CONNEC T ION   Spring 2020
“The president of the cigarette company says: ‘are you
crazy? You think we’re selling machine guns?’
   “Well that’s a bit like what we’re doing with drain cleaners.
Drain cleaners are like driving your car right? People who make
cars make them as safe as possible, we make drain cleaners
as safe as possible but there is still an inevitable risk.”
   Warwick mentions that using jetters is infinitely safer,
cleaner, efficient and cost-eff ective than mechanical drain
cleaning devices.
   Victorian plumber Lachy Williams recently bought an Aussie
Pumps machine from Reece. When Warwick rang him up and
asked him what he thought of it compared to the mechanical
drain cleaners he had been using for years, he says: “I should
                                                                                             THINK SMARTER.
have done it years ago. Jetters have more capability, infinitely
faster, a lot safer and, the plumber doesn’t get filthy in the
                                                                                        Lowara’s Smart Pump Range.
process of clearing the blocked drains.”
   Dan echoes this sentiment: “You’re never going to solve this
issue, but there’s a lot that can be done to limit the chance of
something bad happening.”
   Warwick also references AS/NZS 4233.1:2013, the relevant
standard in this area, which aims to protect the operators
of these cleaning devices. It breaks the machines into two
classes: class A and B.
   Class A machines can only be operated with sufficient
training but the latest standard ensures that class B
machines, which make up 90% of the range, now have more
stringent safety requirements.
   All operators of class B must now be certified and
recertification is essential every two years. It also mandates                        IES2   IE5

foot valves on these devices and ‘safe operator’ PPE is
required. With every class B machine Aussie Pumps supplies,
it provides a free hose restraint as well.
                                                                                    Lowara
   These standards, alongside safety innovations are                                e-SM Series - Simply Smart Pumps
continuously working on the safety of jetters and mechanical                        Intelligent pumping - a complete system
drain cleaners.
   The ball is now in the end users’ court, the tools are there,                    • Best in class hydraulic performance for moving water
it’s now a matter of adopting them.                                                 • Latest in technology - ultra-premium efficiency permanent
                                                                                      magnet motor
                                                                                    • Significantly reducing energy use - Smart, embedded
 AS/NZS 4233.1:2013 HIGH PRESSURE WATER JETTING SYSTEMS SAFE
 OPERATION AND MAINTENANCE                                                            variable speed drive with a simple easy to use interface, that
                                                                                      matches the system performance to the demand
 This Standard provides requirements and guidance for the operation
 and maintenance of water jetting equipment. It separates devices                   • Low operating costs and quiet operation
 into two classes with pressure cleaners and drain cleaning jetters                 • Plug & Play for easy install and retrofitting
 that have capacities of up to 5,600 bar L/min in a class A category and
                                                                                    • Ideal for tight installations - on average 14% smaller in size
 bigger machines (everything over 5,600 bar L/min) classed in the B
 category.
    Operators of class A machines should be trained in how to use them              Suitable for:
 safely including jetters operating at 4,000psi with 15, 16 or even 18 L/                • Residential                 • Water Supply Systems
 min flow.                                                                                • Light-industrial            • Irrigation Systems
    However, 90% of all drain cleaning high-pressure machines comes                      • Commercial                  • Booster Systems
 under the class B codification which has more stringent safety
 requirements. Operators of these machines must be certified, and
 they require recertification every two years.                                         Contact your local plumbing supplies store
    Foot valves to control the pressure to the sewer hose are mandated
 for use with class B machines, while the use of ‘safe operator’ PPE
                                                                                     and ask about the Lowara Smart Pump range
 clothing is also required.                                                                from Brown Brothers Engineers.
    Currently, certified class B machine training programs are designed
 around ultrahigh-pressure blasting or drain cleaning equipment which
 is defined as machines over 10,000psi but can be as high as 50,000,
 60,000 or even 100,000psi.

                                                                                                     www.brownbros.com.au
                                                                                                            w w w.plumbingconnec tion.com.au   19
                                                                            06/20

                                                                                                  DELIVERING PUMPING SOLUTIONS
LEGAL MATTERS - PAUL COTT

BUILDING SURVEYORS AND YOU
In many instances, tradespeople who don’t always deal directly with a building surveyor on site, may
be surprised at the lack of knowledge as to what the role of a building surveyor actually is and, on the
contrary, what it isn’t. Paul Cott clears the confusion.

I
       t appears as though the role of a
       building surveyor is hard for people
       to define. Building surveyors do
have a role to play in both residential
and commercial projects. Basically, if a
building permit is needed for the works,
then a building surveyor will be required.
   I’ve noticed a tendency to
automatically blame the building
surveyor whenever there are defects
and/or incomplete work on a domestic
building project. Many tradies seem
to assume that the role of a building
surveyor is to pick up all defects and
if any are discovered that the builder
doesn’t point out to the owner then the
building surveyor is at fault.
   From that, the automatic chain of
reasoning tends to go as follows, ‘let’s
join the building surveyor to the legal
action’. It is often fallacious reasoning.
   A building surveyor has, as its
overarching role, that of ensuring
compliance of the building works
and plans with the Act, regulations,
standards and codes. However they are
chiefl y doing so from the perspective of
ensuring the building is safe, accessible
(more and more) and (more and more)
energy efficient.
   It is the building surveyor’s role to
issue occupancy permits, certificates
of final inspection and building permits.        One common instance where a               such as an architect) can appoint a
It is of course part of those purposes,       building surveyor and tradesperson          building surveyor.
for the building surveyor to conduct          interact is during the period where             This means that they are acting for,
inspection; sometimes multiple                advice to design and/or construction        on behalf of, and are responsible to that
inspections on a site.                        of the particular project is required.      extent, to the owner. In reality though,
   There is a distinction which is worth      Surveyors can also give directions to       it is quite often the case that an owner
mentioning in that building surveyors         workers and tradespeople in regards to      will ask the builder as to who they
are divided up into Municipal Building        safety on, standards and compliance         recommend be appointed and so the
Surveyors (MBS) and Private or                with the law and regulations.               reason why the law was changed so that
Registered Building Surveyors (RBS).            In the end, tradespeople on site have     the owner now, rather than the builder,
MBSs are employed by work for local           their own health and safety protected to    appoints the building surveyor (perceived
councils whereas BSs are privately            an extent by the actions of, and the role   or real conflicts of interest for the builder
operated surveyors who are usually            of a building surveyor.                     to so appoint) are in that sense bypassed.
(depending on which State you are in)           Tradespeople in Victoria (and this is a       Before this article concludes, it is
registered building practitioners and so      trend in other states) need to remember     timely to discuss the draft code of
are regulated by the Building Act and         always that only an owner or an agent       conduct for building surveyors currently
similar legislation.                          (basically other professional advisor       being discussed in Victoria and which

20   PLUMBING CONNEC T ION   Spring 2020
other States are watching with an                   It may however be that this is not            In conclusion, tradespeople while at
     interest to see what develops out of it          the case as many of the code principles       times perhaps are tempted to regard
     with a view to possible implementation           are those which already apply to how          building surveyors as inter meddlers,
     there too.                                       building surveyors must act.                  that just create more work and hassle
         The draft code has now closed in               Broadly, the code reinforces                on the job, should in fact bear in mind
     respect of public consultation and input         that building surveyors must act              the key role they play in the commercial
     into it, having closed on 10 March 2020.         consistently with public health and           and residential building space.
     At the time of writing, an analysis of the       safety, with integrity, honesty and be           They are, just like many of the
     feedback provided (which was plentiful,          impartial. Also they must now perform         tradespeople reading this article,
     apparently) is being undertaken and              competently, be independent, not act          meant to be registered under, and are
     there is expected to be a final version of        where there is a conflict of interest,         regulated by, the same local regulatory
     it in place in June of 2020.                     maintain records and documents,               body (the VBA by way of example, in
         One may well wonder why a draft              communicate properly, and address             Victoria). In addition, they are in a sense
     code of conduct was ever even required           non-compliance issues (which is               similar to umpires in team sports, not
     in the first place, given that building           obviously, as stated above, a key part of     in fact a necessary evil but the absence
     surveyors are already subject to a range         their role).                                  of which the game could not be played
     of accountability mechanisms. Many                 Perhaps one of the most useful parts        at all.
     will have a strong view as to that, but          of the code are the various practical
     tradespeople reading this article will just      examples of real scenarios littered
     probably wonder how it affects them. The          throughout, with recommended ways of           Paul Cott LLB (Hons), Grad
     answer is probably not a great deal. One         acting in those scenarios in accordance        Dip Legal Practice, LLM
     possibility (but it is early days obviously)     with the code set out. Time will tell how      is a Principal Lawyer with
                                                                                                     Law on Lydiard focusing on
     may be that there is tighter regulation          or if the code, when in place, aff ects
                                                                                                     building and construction
     and increased oversight on site by               tradespeople’s lives in their day to day       litigation.
     building surveyors as a result.                  work on projects.

                                                                                                                 Shore Hire offers one of
                                                                                                                 Australia’s most trusted and
                                                                                                                 complete shoring, propping,
                                                                                                                 traffic, pipe testing, and laser
                                                                                                                 hire fleets. We provide
                                                                                                                 industry-leading temporary
                                                                                                                 works solutions, expert advice,
                                                                                                                 and innovative products.

                                                                                                                 Contact us today to discuss
                                                                                                                 your next project.

                                                                                                                 Visit shorehire.com.au
                                                                                                                 Call us on 1300 SHORE HIRE

                                                                                                                       SYDNEY • BRISBANE • MELBOURNE
                                                                                                                          WOLLONGONG • NEWCASTLE
                                                                                                                           ACT • SUNSHINE COAST
Shoring              Propping               Traffic               Lasers               Pipeline Testing
                                                                                                               w w w.plumbingconnec tion.com.au   21
BOX GUTTERS - KEN SUTHERLAND

BOX GUTTER DISASTERS
Believe it or not, they are still out there. However, as Ken
Sutherland explains, the problems are easy to avoid by following
a few simple rules. You do not want to end up at a lawyer’s picnic.

T
        here’s no getting away from it.             It turns out, that if the gutter slope is
        Architects are still designing           between 1 in 40 and 1 in 200 as in the
        them, and the lawyers are still          Plumbing Code, and the flow doesn’t
loving it.                                       change, the depth of water at the outlet
   I had a user on my web site who had           doesn’t change either, regardless of the
just built a $3m house, and had water            slope (even with a backfall). This depth
running down the walls and saturating            is known as the ‘critical depth’.              Very creative, but breaks every rule in
the carpet. Naturally, he wanted the                To calculate the upstream depth,            the book.
                 problem fi xed, and he           the formula uses this depth as a start,
                  was looking for someone        then works backwards up the gutter in
                   to sue if it wasn’t.          very small increments calculating the            So, if you see a box gutter without a
                      So it’s best not to be     increase in the water surface level all the    sump that is the full width of the gutter,
                    in the firing line, or the    way to the upstream end of the gutter.         you know it doesn’t comply.
                     first cab off the rank.          The water surface level increases             Next is bends. Bends are not allowed.
                         The Plumbing Code       all the way upstream. When you think           Flow around bends create waves. The
                       is not the easiest        about it, this makes sense, because            calculation for this is too complicated
                        document in the          water always flows downhill. This is the        for the Code. So, if you see a box gutter
                         world to figure out.     same as saying that water always flows          with a bend, (or no sump) it doesn’t
                         Especially when it      from a higher water level to a lower           comply either.
                    comes to roof gutters.       water level. Therefore, the water level at       The overflow must be designed for
      But not all is lost. If you design and     the upstream end is always higher than         a completely blocked downpipe. This
build to the Plumbing Code you are as            the downstream end.                            means that it must be designed for the
protected as you are going to get.                                                              full design flow of the box gutter.
   Box gutters fail for three reasons:                                                            You don’t have to check with the code,
1. Faulty design                                                                                or be a rocket scientist, to realise that
2. Faulty construction                                                                          this one shown below could be a problem.
3. Lack of maintenance                                                                            We know how wide and deep the
                                                                                                gutter is, so that will give
  We don’t have to worry too much                                                               you an idea of how big the
about lack of maintenance. However, we                                                          overflow must be.
should make it as easy as possible to                                                             Furthermore, all
maintain.                                                                                       overflows must be located
  The main thing to consider is how                                                             at the sump, or rainwater
a box gutter is designed. The flow                Another problem is the overflow. All            head. Anywhere else will
increases all the way along the gutter           gutters must have overflow provisions.          not comply.
and the water surface forms what is                                                               Overflows must also
called a ‘backwater’ curve.                                                                     be positioned so that
                                                    So, for flat grades, the upstream            overflowing does not
                                                 end is the deepest. This means that            occur during the design
                         Critical
                                                 the designed box gutter depth is at the        flow. Which, incidentally, is equivalent to
                     0.7*
                          depth      Backwater   upstream end. The gutter itself gets           a once in 100-year storm.
                                       curve
                   Critical                      deeper towards the outfall due to the
                    depth
                                                 slope.
                                                    However, the major implication of
                           Yc                    all of this, is that to calculate the box       Ken Sutherland CPEng.
                                                                                                 For more details and free
                                                 gutter depth, the gutter must have              design programs visit
                                                 a free outfall. That is, it must have a         www.roof-gutter-design.
                                                                                                 com.au
                                                 sump, or a rainwater head the full width
                                                 of the gutter.

22   PLUMBING CONNEC T ION      Spring 2020
APPRENTICE CORNER - JAMES TINSLAY

THE LONG ROAD AHEAD
James Tinslay explores what COVID-19 means for education and training of young people in
Australia.

B
         y the time this column is
         published I hope we will be
         over the worst of the COVID-19
pandemic which unfortunately chose to
live in me for a few weeks.
   We were all used to absorbing the
latest news from not only Australia but
worldwide that initially shocked us but
gradually became the new normal.
   From a business and community
perspective, if one can see the deaths
as a tragic outcome, the financial
and unemployment outcomes will be
staggering.
   In particular, in a post-COVID-19
environment, and indeed the current
environment, what does this mean
for education and training of young
people and what can we learn from
previous recessions and surges in
unemployment?                               COVID-19 may affect apprenticeship requirements and numbers for years to come.
   Research has shown that changes
in the number of new apprentices take
between six and 18 months to flow            small but it compounds with those          in the electrical apprenticeship pipeline
through into total apprentice numbers.      who lost their job and did not return to   may drop to a trickle.
As our apprenticeship is notionally         complete their training.                      While wage subsidies such as
four years in length, the pipeline of          During the 1992 recession there         JobKeeper are appreciated, these
apprentices moving through the system       was a 5% increase in unemployment          measures only help current apprentices
will be felt for many years to come.        and this resulted in a distressing 25%     and don’t allow new apprentices to
   Unlike many sectors where                drop in apprentice numbers. This does      move into the system.
apprentices are employed, such as the       not augur well for the current situation      Also, subsidies will only last for six
badly affected hospitality industry,         where early forecasts are between a 7%     months although there are calls to have
the electrical contracting industry is      increase in unemployment to almost         it extended with some extreme views
deemed as an essential business for the     12%.                                       calling for it to be kept in place for the
purposes of the pandemic environment.          Following on from that, there are no    long-term.
   Australia was very fortunate to have     guarantees of a speedy return to normal       If these extreme views were
a government that has introduced            employment conditions which would be       implemented, our children’s children
a generous JobKeeper allowance              necessary to maintain apprenticeship       would still be paying off Australia’s debt,
which has enabled many employers            numbers.                                   but that is another issue.
including group training employers, to         A snapshot was provided by the Global      Predictions of gloom are somewhat
continue to employ their apprentices.       Apprenticeship Network which showed        banal but there is never a good time to
However, when general unemployment          that in Australia there were some 470      see a reduction in apprentice start-ups.
increases, there is always a downturn in    apprenticeships advertised in April this
apprenticeship numbers.                     year, two-thirds fewer than advertised
   During the GFC, Australia’s              in the same period in 2019.
                                                                                        James Tinslay is a consultant
unemployment rate didn’t rise too              The ABS also released figures which       and engineer with some 40
much. It lifted less than two percentage    show an 18.5% drop in employment            years of industry experience.
                                                                                        He is an ex-CEO of NECA and
points, in fact, from a little over 4% to   of people 20 years of age in one            a director of NECA Electrical
just under 6% but there was a 6% drop       month although many of these will be        Apprenticeships.
in apprenticeship starts. This may seem     hospitality workers. The incoming flow

24   PLUMBING CONNEC T ION   Spring 2020
w w w.plumbingconnec tion.com.au   25
TRAINING OFF THE PAGE - JON PALFREY

HEAT EXCHANGE IN PLUMBING
Jon Palfrey explores the numerous methods of being able to take heat from another source and
FRQYHUWLWLQWRXVDEOHHQHUJ\WRLQWHUPGHOLYHUWR'+:¿[WXUHVHWF

T
        o take a heat source and
        transfer it into a stored body
        of energy is becoming a more
common objective with the supply of
heated water to domestic temperature
levels as well as for air conditioning
heating purposes.
   Traditionally a direct energy source
has been used. An example is a
burner flame transferring heat via a
combustion chamber or a submerged
electrical heating element that has a
radiant heat transfer capability into a
body of stored water.
   More and more designers and
plumbers are being directed by their
clients as to their expectations of
energy reduction whether as an
environmental/sustainability decision
or from an operating cost reduction
perspective.
   The expectation of creating and using   Solar PV fields are becoming a popular choice with designers and installers looking
heat in various ways is now becoming       for maximum efficiency, durability and a more cost effective energy yield solution.
more of a directive in mainstream
plumbing.
   Providing the same outcome of           being used in residential applications     for available energy that can be used
transferring heat energy from one          where energy gain is desired as well       and converted into other forms and
source to another is a design strategy     as gathering and holding the energy        services.
in commercial fields but is now also        and to use it in a multifunctional way        Roof space for solar collectors is an
                                           to reduce mains supply contribution        option for new and existing buildings
                                           and associated costs and maintenance       to be served via the ability to exchange
                                           requirements.                              heat from solar thermal water or liquid
                                              Solar PV panels that can be directly    or as a direct power energy source
                                           connected into vertical heating            and provide a DC current into vertical
                                           elements that are used in Rotex tanks      heating elements.
                                           that provide heat exchange via a series       Air that can be exchanged via a
                                           of stainless steel coils can provide a     compressor in new commercial heat
                                           DC supply input and therefore remove       pumps is also becoming a popular
                                           the need for an inverter to change the     method of delivering DHW.
                                           power supply to AC.                           The Energy Smart Water PV Solar
                                              Waste heat can also be used in the      Hot Water system has been approved
                                           form of taking usable heat from a plant    for sale in Australia since March 2018,
                                           such as an air conditioning system         although the MYPV photovoltaic water
                                           by using a super de-heater plate heat      heating technology has been available in
                                           exchanger that acts as a transfer point    Europe for more than five years.
                                           and with water reticulated through the        Due to the heat exchange technology
                                           HX the ensuing energy can be gained        the temperature of the tank water
                                           and then held in a storage tank.           is not depleted like that of a storage
Heat exchange in DHW plumbing using           An energy envelope within a building    water system. The Rotex tank also has
PHX and stainless steel coils.             is now being factored into the potential   exceptional heat retention.

26   PLUMBING CONNEC T ION   Spring 2020
Australia’s Trusted Family of Plumbing Solutions

                CIVIL

                                             TM

     Austworld’s extensive range of high-end valves, tapware and fittings are specifically designed to
     save plumbers time and conserve resources while staying ahead of new trends and technology
                                across the water, gas and solar industry.

QUEENSLAND [HEAD OFFICE]    VICTORIA   SOUTH AUSTRALIA    NEW SOUTH WALES      WESTERN AUSTRALIA    TASMANIA

1300 780 430                           info@austworld.com.au                           austworld.com.au
TRAINING OFF THE PAGE - JON PALFREY

  One combined system with domestic
hot water and hydronic heating is             SOLAR PV FIELD USING ROTEX ENERGY MANAGEMENT MYPV MODULE
available which will optimise space with
a small minimal footprint.

INDEPENDENT ENERGY COLLECTION
& USE
An ever-increasing demand from
homeowners and project designers shows
trending towards an energy gathering
mode in homes where independent living                                                             INVERTER

and independent energy for services is
being captured off grid.
   Solar PV collectors are providing end
users with DC current which can be used                                                                                                MAINS GRID
in a multifunctional Rotex tank that can
accommodate and transform heated                                                                                UTILITY METER
stored water into energy use for domestic                                                      ELECTRICAL LOADS
water heating, floor coil or radiator panels
and pool and spa heating.
   Often with an additional energy
source, if the amount of PV gathered
does not meet the complete heat                            ROTEX AND SOLAR PV WITH GAS ENERGY ADDITION
load required, heat pumps come into
                                                                                                                      Dedicated 2kW PV array (direct to
their own thanks to their ability to                                                                                          water heating)
boost using high COP output and high                                                   SC20 control box
temperatures to maintain heat loads in
the cooler southern states.                                          Hot outlet to fi xtures
                                                                     and/or space heating
   An energy system that can                                   Cold inlet from mains
accommodate off grid supply as well                            and building return line

as serve multiple fi xtures is finding is
being sought after where the customer/           ROTEX insulated, unpressurised
consumer expectation is focused on                            hot water storage

combining services for living with                  ROTEX corrugated stainless
comfort and the ownership of energy to                 steel heat exchange coil                                                    Backup AC supply
drive their heating requirements.
   Ownership of a family’s energy that                                                                          2kW backup AC heating element

comes at minimal cost and is available                                                                          2kW DC heating element
                                                                                                                (direct from solar PV)
24/7 through the Rotex thermal battery
                                                                      Circulation
is being identified as a flexible system                 Alternative       pump
of choice.                                              gas boost

   Solar PV collectors, a cable and a
Rotex tank complete with a MYPV
element and control module is all that
is required to be in a position of energy        Growing vegies, collecting water and                     very aff ordable installation with return
collection, ownership and use.                now the demand for energy gathering                         on investment outcomes proving the
   Key building industry people are           and independent use are all developing                      initial cost is reduced once the system
responding to the need for off grid            expectations from home owners who                           is commissioned and activated.
power production and are driven by a          recognise the need and opportunity to                          Yours in hot water …
client based expectation of the latest        live a sustainable existence.
technology being used to reduce                  Plumbed as a standard water heater
reliance on transmission supplied             as per AS/NZS 3500.4 and with no need
                                                                                                           Jon Palfrey is the Thermanl
energy and the expectation to use roof        to install insulated copper flow and                          Energy Solutions/Rotex
space and gather what’s available for         return lines, pumps, sensor cables, air                      Commercial Manager. He
                                                                                                           conducts training to industry
dwelling services, particularly domestic      eliminators and other standard solar                         groups relating to all things
water heating, hydronic heating and           water heating components, a Rotex                            water heating.
pool and spa heating requirements.            storage vessel and solar PV can be a

28   PLUMBING CONNEC T ION   Spring 2020
You can also read