Table of contents   01   The infrastructure of the Port of Saranda

                         Analysis of the market and demand for
                    02   cruise services in the Port of Saranda

                         Evaluation of the tourist attractions in
                    03   Saranda

                    04   Future marketing plans

                    05   Album of photos
The Port of Saranda February, 2020
Modern PowerPoint Presentation

Graphic
Infographic
Designed
                                 SilverSea cruise
                                 One of the cruises that is anchored in
                                 the cruise quay in 2017, which has given
                                 a positive impact to the port and the
                                 whole city
The Port of Saranda February, 2020
The infrastructure of our Port

 Quay for small                                          Passenger and
                             Quay for                  tourist processing                  Facilities
 ferries
                             cruise ships.                  terminal                       (square)
 and yachts.
This quay is used for      This 180m long and 9m      The passenger terminal        The facilities are well adapted
anchoring yachts and       deep quay is used for      is a 2-storey building,       for the processing of tourists
passenger lines Saranda-   anchoring large cruise     where on the first floor it   and      passengers,      having
Corfu and vice versa.      ships. This quay is of a   is operated by the border     reception tents equipped with
This quay is 50m long      new investment which       police and on the second      parking lots, car parking which
and 9 m deep.              has increased both the     floor are the reception       is free of charge, taxi station,
                           performance and the        facilities for tourists and   bus station, public cage, tourist
                           processing capabilities    passengers                    signage and the circulation of
                           of our Company                                           passenger vehicles, etc.
The Port of Saranda February, 2020
Some facts about 2019
           “SeaPort” s.a Saranda has the main activity of
           passenger and freight service. The port of Saranda,
           which serves as a passenger, has an area of 20,000
           m2. Saranda Maritime Port in the last 5 years has
           turned into the main Port of processing data in
           welcoming or farewell of tourists in/from our country.

                              ➢ Total ferries total 292
                              ➢ Touristic boats in LOA quays
                                up to 100 ml 247
                              ➢ Cruise ships in LOA quay
                                over 100 m 1
                              ➢ Cruiser ferries on road (LOA
                                over 200 ml) 44
The Port of Saranda February, 2020
Cruise Ship activities in the Port of Saranda
                                                                                 In total = 0
                                                             In total = 45       Cruise ships in
                                         In total = 42                           LOA quay = 0
                                                             Cruise ships in
                     In total = 60       Cruise ships in     LOA quay = 1
 In total = 38       Cruise ships in     LOA quay = 7                            Cruise ferries on
 Cruise ships in     LOA quay = 8                            Cruise ferries on   road = 0
 LOA quay = 23                           Cruise ferries on   road = 44
                     Cruise ferries on   road = 35
 Cruise ferries on   road = 52
 road = 15

     2016                  2017               2018                  2019                 2020
The Port of Saranda February, 2020
Infographic presentation
25                                         60

       23
                                           50
20

                                           40
15

                                           30
                                                       52
10
                                                                     44
                                           20
              8                                               35
                     7
 5
                                           10
                                                 15
                            1      0
 0                                          0                                0
      2016   2017   2018   2019   2020          2016   2017   2018   2019   2020

     Cruise ships in LOA quay            80%    Cruise ferries on road
The Port of Saranda February, 2020
Passengers processing
               2016     2017     2018     2019     2020

   Total       22 785   99 880   74 801   90 623    0

Adults (+12)   20 965   91 890   68 816   83 373    0

Minors (-12)   1820     7990     5985     7250      0
The Port of Saranda February, 2020
Infographic presentation
120000
                                                           The number of processed
100000
                  99880                                    passengers in the port has
                  91890
                                                           increased by 270% from
                                           90623
                                           83373
 80000                             74801
                                   68816
                                                           2016 to 2019.
                                                           2020 has been not a good
 60000
                                                           year, due to the Covid-19 and
 40000                                                     there were only jachts that
         22785
         20965                                             arrived in the Port for board
 20000
                  7990             5985    7250            supplies (foods,water,fuel)
         1820                                        0
     0
         2016     2017             2018    2019     2020

         TOTAL            MINORS           ADULTS
The Port of Saranda February, 2020
Taxes and Fees

      Passenger fee           Cruise ship fee

3.5
Cruise Passanger
       Demographics

Age                Nationality
Our Calendar for 2021
Predictions
                                 2021
Cruise on road                   45
Cruise in quay                   31
Passangers                       70 000

2021’s calendar
     Many maritime and travel agencies have booked cruise line arrival dates in the Port of
     Saranda, but it all depends on the performance of Covid-19 in the region, Europe and all
     around the world. But we should say that the Port of Saranda is ready to welcome the
     tourists and takes care of their health
Actual problems
                                                                  Entry and exit to the Port is
                                                                  done only in one direction
                                                                  and this direction is
                                                                  insufficient for the current
                                                                  and expected flow
                                   The lack of a Yacht Marine
                                   makes it impossible for
                                   them to stay for a long time
Existing quay with a length of
                                   and get the services
180 m do not create the
                                   required by them
possibility of anchoring cruises
with a length of more than 180
m and do not meet the modern
standards
                                                                                                                        The lack of an ecological
                                                                                                                        system    with   minimal
                                                                                                                        pollution
                                                                                          The current terminal is in
                                                                                          a small area in relation to
                                                                                          the number of tourists
                                                                                          who have entered the
                                                                                          Port in recent years and
                                                                                          those who will enter in
                                                                                          the coming years
Out projects in the near future!
❑ Extension of the current quay for anchoring cruises and yachts
  which arrive for fuel supply, food, charter from 180m to 500m,

❑ The necessary of building a new Marine Yacht for all-year
  parking and for all others services that yachts require. (this is
  projected to have a capacity of 150-180 yachts). This will be
  possible with the construction of 5 platforms.
❑ Equipping with electric vehicles to enable the transport of
  passengers from the quays to the terminal. (10 buses 100%
  electric and 5 minivan 100% electric)

❑ Construction of a new and modern terminal with environmentally
  friendly and sustainable technology, which will include
  technically and hygienically suitable facilities which will be
  equipped with accredited certificates for maintaining the health of
  every tourist who wants to arrive at the Port.

❑ Modernization of tourist information points by building a special
  area for receiving information through an accessible digital screen
  with touch, which will display the facilities, tourist points, health
  services, bars and restaurants of the area and and free internet
  access for these cases.
Out projects in the near future!

❑ Improving Port Security and equipping it with high-resolution px
  digital cameras, radios, zero-carbon electric vehicles, drones and
  other elements of effective surveillance

❑ Equipping with the necessary tools against fire and installation of
  intelligent fire protection system to eliminate in record time the
  consequences

❑ Installation of a system of energy benefit from solar panels in
  service of all the infrastructure of the Port.

❑ Construction of a castle in the Butrint area so that its arrival by
  tourists is faster and more often, (a castle built with the
  requirements and regulations of UNESCO for protected areas and
  archeological parks)
Expected impacts:
❑Socio-economic impact
❑Pro environmental and climate impact
❑Development of the cross border aspect and with a comparative advantage with the ports of the region
❑Employment growth
❑Development of the economic zone through mobility and electromobility
❑Development of tourisim areas
Our team objectives
                         Upgrade the Port in the nodal point of the short sea shipping and
                         motorways of the sea, into the 3- seas Initiative, Adriatic and
                         Ionian and Mediterranean regions

                                                             Entry into new markets,
                                                             employment growth and
                                                             development of touristic
                                                             areas

Increase the capacity of passengers arriving at the Port
TOP SIGHTS OF
SARANDA
❑ Butrint National Park
❑ Blue Eye
❑Lekursi Castle
❑Synagogue Basilica
❑St. George's Monastery
❑The Monastery of 40 Saints
❑Ksamili
❑A day trip in Gjirokastra
Ksamil
Butrint National
           Park

                                             Synagogue
                   Lekursi Castle
                                             Basilica
How to go to these attractions

  ❑By bus
  ❑By taxi
  ❑Renting a car
  ❑Renting a motorcycle
  ❑By boat
Maritime and
                               For all their services
tourist                        you can contact them
agencies                       on social media
❑Albania Holidays Sipa Tours
❑Terini Travel Agency
❑Finikas Lines
❑Joy Cruise
❑Agim Zholi
❑Marin Yacht Agency
❑ADS
❑Evolution Albania
❑Albania Yachting
❑Gabby Travel & Tours
❑Anna Sea Tours
❑Saranda Summer Tours
❑Our own Expeditions
❑Shkendia Travel&Cruises
❑ARBA SARANDA
❑Samer & Misa
❑Landways International
Healthcare for tourists
               ❑ Wearing a mask is a must for all the staff
                 and for all the turists that will arrive this
                 year

               ❑ Temperature screening of the crew, and all
                 other passengers on board

               ❑ Each surfaces, especially common touch
                 areas, will be cleaned with a product which
                 is highly effective against bacteria and
                 viruses

               ❑ Hand sanitiser will be provided for all
                 passagers in order to to keep hands clean

               ❑ The terminal and the others areas where
                 tourist will stop during their staying in the
                 Port will be disinfected every day

               ❑ Installation of disinfection tunnels
Disinfection Process                      You can simply impress

Management                                your audience and add
                                             a unique zing and
                                               appeal to your
                                          Presentations. Easy to
                                           change colors, photos
                                          and Text. Get a modern
                                                PowerPoint
                                             Presentation that is
                                            beautifully designed.
                                          You can simply impress
                                          your audience and add
                                             a unique zing and
                                               appeal to your
                                               Presentations.

  You can simply impress your audience
   and add a unique zing and appeal to
   your Presentations. Easy to change
  colors, photos and Text. Get a modern
     PowerPoint Presentation that is
           beautifully designed.
Expected impacts:
Thank you
THE PORT OF SARANDA
You can also read