RESIDENTIAL JURONG EAST COURT Public Housing Development comprising of 2 blocks of 16-storey apartment buildings and 2 blocks of 12-storey apartment buildings making a total of 867 units. The units are of 1 to 3 rooms and have access to lifts at every storey. The development scheme is composed of a R.C. frame structure, which includes the RC precast beams and RC precast walls, and together with cast in situ columns, lift walls and storey shelter walls. The structure is supported by the reinforced concrete bored piles. CLIENT: Housing and Development Board PROJECT VALUE: S$82.8M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2014
GREENWICH V CITYLIGHTS THE MEZZO CONDOMINIUM Greenwich V is an integrated The project involved one block of The Mezzo is a 28-storey commercial commercial and residential 41-storey and three blocks of 42-storey and residential development comprising development. It comprises of 7 blocks condominium housing development of 6-storey commercial and carpark of 5-storey residential condominium and consists of basement, multi storey podium block and 28-storey residential with basement carparks, swimming car parks, swimming pool, communal tower block. pool and communal facilities together facilities and retention conservation with 2-storey commercial buildings with houses. The structural framing for the podium shops/supermarkets. consists of mainly RC slab and beam The framing of the superstructure is system, and the framing for the tower The structural system is the conventional a combination of RC flat slab with consists of mainly flat slab system. The RC beam and slab system for the perimeter beams and RC beam/ slab transfer floor is at the 7th storey to superstructure and flat slab system for system. The structure is founded on meet the architectural requirements. the basement. The structure is founded cast-in-situ reinforced concrete bored The structure is founded on cast-in-situ on precast RC driven/jack-in piles. piles. reinforced concrete bored piles. CLIENT: Far East Square Pte Ltd CLIENT: Woodsvale Land Pte Ltd CLIENT: SB (Ruby) Development Pte Ltd PROJECT VALUE: S$80M PROJECT VALUE: S$95M PROJECT VALUE: S$35M ECAS’ ROLE: Consulting Services ECAS’ ROLE: Accredited Checking ECAS’ ROLE: Consulting Services COMPLETION DATE: 2013 COMPLETION DATE: 2007 COMPLETION DATE: 2011 www.ecas.com.sg
RESIDENTIAL ALBA CONDOMINIUM Alba is a luxurious condomoinium located in Carinhill Rise. The building is a Y-shaped, 18-storey residential development comprising of 50 units with basement car parks, swimming pool and recreational facilities. The framing of the superstructure for the development consists mainly of RC slab and beam system, and the framing for the basement consists mainly flat slab system. The transfer floor is at the 1st storey and 2nd storey to meet the architectural requirements. The structure is founded on cast-in-situ reinforced concrete bored piles. CLIENT: Far East Organization Centre Pte Ltd PROJECT VALUE: S$60M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2015
LUMOS CONDOMINIUM HILLTOPS CONDOMINIUM TREVISTA CONDOMINIUM Lumos is a 35-storey residential The Hilltops condominium project The Trevista condominium is a 39-storey apartment with basement car parks, consisted of 2 blocks of 24-storey residential development with two swimming pool and recreational residential buildings with basement car basement car parks, swimming pool and facilities. parks, swimming pool and communal communal facilities. facilities. The structural framing for the The framing of the superstructure for development consists of RC beam The framing of the superstructure for the development consists mainly of and slab system for superstructure of the development consists mainly of RC flat slab system, and the basement the podium and flat slab system for RC flat slab system with RC Columns. framing consist of flat slab system. The basement slab. Flat Slab with perimeter The structure is founded on cast-in-situ transfer structure is at the 1st storey to beams were adopted for typical floor reinforced concrete bored piles. meet the architectural requirements. of the tower block. The structure is The structure is founded on cast-in-situ founded on cast-in-situ reinforced reinforced concrete bored piles for the concrete bored piles. main residential towers whereas the podium is supported on spun piles. CLIENT: SC Global Developments CLIENT: Build Home Pte Ltd. PROJECT VALUE: S$158M ECAS’ ROLE: Accredited Checking CLIENT: Choice Homes Gamma Pte Ltd PROJECT VALUE: S$66.7M COMPLETION DATE: 2011 PROJECT VALUE: S$150M ECAS’ ROLE: Consulting Services ECAS’ ROLE: Accredited Checking COMPLETION DATE: 2011 COMPLETION DATE: 2013 www.ecas.com.sg
RESIDENTIAL SEASTRAND CONDOMINIUM Erection of 9 blocks of 11 or 12-storey residential building (total of 473 units) in Pasir Ris. Carparks, substation at partial of 1st & 2nd floor: Cast in-situ reinforced concrete beams and slab system supported by rows of reinforced concrete columns. One way slab are proposed at middle portion of the drive way area to provide space for M&E requirement. Environmental Deck at 3rd floor including landscape & swimming pool and deck: Cast in-situ reinforced concrete beams and slab system. Transfer beams are provided to transfer the loading from the load bearing/shear wall above to the columns below. Appropriate waterproofing system is provided to the architect’s specifications. Floor slab of third story of the apartment blocks are raised up from the transfer beam level to provide space for M&E requirements, i.e. floor drains & Sunken tubs. Apartment Blocks Partial of 1st to 3rd floor, 4th to Roof: Cast in situ reinforced concrete flat plate with reinforced concrete perimeter edge beams supported by rows of reinforced concrete walls and columns. Generally, the slab soffit is flat throughout for ease of construction with limited beam at the M&E opening areas. CLIENT: F.E. Lakeside Pte Ltd PROJECT VALUE: S$63M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2014
VIDA CONDOMINIUM ALBA CONDOMINIUM GREENWICH V 20-storey residential apartment with a Alba is a luxurious condomoinium Greenwich V is an integrated total of 137 units. Includes a 5-storey located in Carinhill Rise. The building commercial and residential basement carpark, swimming pool and is a Y-shaped, 18-storey residential development. It comprises of 7 blocks recreational facilities. development comprising of 50 units of 5-storey residential condominium with basement car parks, swimming with basement carparks, swimming The structural system for 20-storey pool and recreational facilities. pool and communal facilities together residential flat is partially flat slab with 2-storey commercial buildings with system, from 1st to roof storey with The framing of the superstructure for shops/supermarkets. peripheral beam as well as the the development consists mainly of RC conventional beam/slab system at multi- slab and beam system, and the framing The structural system is the conventional story carpark and landscape area. The for the basement consists mainly flat RC beam and slab system for the basement system comprised of flat slab slab system. The transfer floor is at the superstructure and flat slab system for system together with pilecap casted at 1st storey and 2nd storey to meet the the basement. The structure is founded the same level. The structure is founded architectural requirements. The structure on precast RC driven/jack-in piles. on concrete bored-piles. is founded on cast-in-situ reinforced concrete bored piles. CLIENT: Far East Square Pte Ltd CLIENT: Wan-Li Development Pte Ltd PROJECT VALUE: S$80M CLIENT: Far East Organization Centre PROJECT VALUE: S$30M Pte Ltd ECAS’ ROLE: Consulting Services ECAS’ ROLE: Consulting Services PROJECT VALUE: S$60M COMPLETION DATE: 2013 COMPLETION DATE: 2009 ECAS’ ROLE: Consulting Services COMPLETION DATE: 2015 www.ecas.com.sg
RESIDENTIAL GREENWICH V Greenwich V is an integrated commercial and residential development. It comprises of 7 blocks of 5-storey residential condominium with basement carparks, swimming pool and communal facilities together with 2-storey commercial buildings with shops/supermarkets. The structural system is the conventional RC beam and slab system for the superstructure and flat slab system for the basement. The structure is founded on precast RC driven/jack-in piles. CLIENT: Far East Square Pte Ltd PROJECT VALUE: S$80M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2013
VIDA CONDOMINIUM ALBA CONDOMINIUM SEASTRAND CONDOMINIUM 20-storey residential apartment with a Alba is a luxurious condomoinium Erection of 9 blocks of 11 or 12-storey total of 137 units. Includes a 5-storey located in Carinhill Rise. The building residential building (total of 473 units) in basement carpark, swimming pool and is a Y-shaped, 18-storey residential Pasir Ris. recreational facilities. development comprising of 50 units Carparks, substation at partial of 1st & with basement car parks, swimming 2nd floor: Cast in-situ reinforced concrete The structural system for 20-storey pool and recreational facilities. beams and slab system supported by residential flat is partially flat slab rows of reinforced concrete columns. system, from 1st to roof storey with The framing of the superstructure for One way slab are proposed at middle peripheral beam as well as the the development consists mainly of RC portion of the drive way area to provide conventional beam/slab system at multi- slab and beam system, and the framing space for M&E requirement. story carpark and landscape area. The for the basement consists mainly flat Environmental Deck at 3rd floor basement system comprised of flat slab slab system. The transfer floor is at the including landscape & swimming system together with pilecap casted at 1st storey and 2nd storey to meet the pool and deck: Cast in-situ reinforced the same level. The structure is founded architectural requirements. The structure concrete beams and slab system. on concrete bored-piles. is founded on cast-in-situ reinforced Transfer beams are provided to transfer concrete bored piles. the loading from the load bearing/ CLIENT: Wan-Li Development Pte Ltd shear wall above to the columns CLIENT: Far East Organization Centre below. Appropriate waterproofing PROJECT VALUE: S$30M Pte Ltd system is provided to the architect’s ECAS’ ROLE: Consulting Services PROJECT VALUE: S$60M specifications. Apartment Blocks Partial of 1st to COMPLETION DATE: 2009 ECAS’ ROLE: Consulting Services 3rd floor, 4th to Roof: Cast in situ reinforced concrete flat plate with COMPLETION DATE: 2015 reinforced concrete perimeter edge beams supported by rows of reinforced concrete walls and columns. Generally, the slab soffit is flat throughout for ease of construction with limited beam at the M&E opening areas. CLIENT: F.E. Lakeside Pte Ltd PROJECT VALUE: S$63M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2014 www.ecas.com.sg
COMMERCIAL AND HOSPITALITY SEACARE HOTEL AND OFFICE The Seacare Hotel project involved erection of a 16-storey (103 rooms) hotel block and additions and alterations works to the existing 9-storey office tower. Transfer trusses were proposed at the 13th storey to cater for the loads from the upper storey of the hotel building and support the transfer floors. All columns and beams are steel structures in order to reduce the self-weight of the building above the 13th storey. Seacare Hotel was the recipient of the the Merit Award for “The Innovative, Efficient and Productive Use of Steel Structures in the Build Environment” in the category of Commercial or Retail Structures at the 2014 Structural Steel Excellence Awards. CLIENT: Seacare Co-operative Ltd PROJECT VALUE: S$17M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2012 AWARD: Structural Steel Excellence Award 2014
SILOSO BEACH RESORT HOTEL KAI SCOTTS SQUARE Siloso Beach resort is a rustic eco- Kai Hotel is a heritage hotel in the 34/43-storey building with a 3-storey hotel on Sentosa Island. The project heart of Bugis. ECAS was appointed commercial podium and 25/34-storey consists of 2 blocks of 3-storey buildings C&S Consultant for the addition and residential flats with basement shops & ancillary single storey buildings alteration to a 2-storey conservation and carpark, swimming pool and involving the addition of 1-storey to a block with attic and addition of a new communal facilities. The foundation 3-storey building and 12 nos. of single 5-storey rear extension. The building adopted for the project is cast-in-situ storey villas. The Resort is built within conserves the shophouse exterior bored pile with pilecap. nature giving a feeling of relaxation. while the interiors are nicely fitted for a comfortable hotel. The framing of the superstructure The foundation adopted for the project predominantly consists of cas-in-situ is RC driven pile with pilecap. CBP wall The hotel has been awarded with the RC shear walls and RC columns. The and RC retaining wall are involved in BCA Green Mark Award (Gold) due to structural floor system on the podium this project. The super structural system its structural conservation and energy floors consists of conventional beams adopted is conventional cast in-situ efficiency. and slabs as well as post-tensioned reinforced concrete beams and one-way beams and slabs for long span floor slab system. Glass skylight canopy is on Picture credits: Hotel Kai website located at shops and the carparks roof level of Block A. area on 1st to 6th storey, 7th to 8th storey at podium and 11th storey Picture credits: Siloso Beach Hotel website floors at block-1. 10th storey at block-2 CLIENT: Sinves Investment Consultancy consists of transfer beams/plates with Pte Ltd conventional beams and slabs to form ECAS’ ROLE: Consulting Services whole building main transfer structural CLIENT: Siloso Beach Resort Pte Ltd system. PROJECT VALUE: S$12M COMPLETION DATE: 2013 Picture credits: Scotts Square website ECAS’ ROLE: Consulting Services COMPLETION DATE: 2006 CLIENT: Wheelock Properties (Singapore) Limited PROJECT VALUE: S$200M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2010 www.ecas.com.sg
COMMERCIAL AND HOSPITALITY SCOTTS SQUARE 34/43-storey building with a 3-storey commercial podium and 25/34-storey residential flats with basement shops and carpark, swimming pool and communal facilities. The foundation adopted for the project is cast-in-situ bored pile with pilecap. The framing of the superstructure predominantly consists of cas-in- situ RC shear walls and RC columns. The structural floor system on the podium floors consists of conventional beams and slabs as well as post-tensioned beams and slabs for long span floor located at shops and the carparks area on 1st to 6th storey, 7th to 8th storey at podium and 11th storey floors at block-1. 10th storey at block-2 consists of transfer beams/plates with conventional beams and slabs to form whole building main transfer structural system. From 12th storey and above, the structural floor system predominantly consists of conventional perimeter beams and flat slab system, and partial transfer structure located at the 3rd to 4th storey of podium and 36th storey of block-2. CLIENT: Wheelock Properties (Singapore) Limited PROJECT VALUE: S$200M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2010
SILOSO BEACH RESORT HOTEL KAI SEACARE HOTEL AND OFFICE Siloso Beach resort is a rustic eco- Kai Hotel is a heritage hotel in the The Seacare Hotel project involved hotel on Sentosa Island. The project heart of Bugis. ECAS was appointed erection of a 16-storey (103 rooms) hotel consists of 2 blocks of 3-storey buildings C&S Consultant for the addition and block and additions and alterations & ancillary single storey buildings alteration to a 2-storey conservation works to the existing 9-storey office involving the addition of 1-storey to a block with attic and addition of a new tower. Transfer trusses were proposed 3-storey building and 12 nos. of single 5-storey rear extension. The building at the 13th storey to cater for the storey villas. The Resort is built within conserves the shophouse exterior loads from the upper storey of the nature giving a feeling of relaxation. while the interiors are nicely fitted for a hotel building and support the transfer comfortable hotel. floors. All columns and beams are steel The foundation adopted for the project structures in order to reduce the self- is RC driven pile with pilecap. CBP wall The hotel has been awarded with the weight of the building above the 13th and RC retaining wall are involved in BCA Green Mark Award (Gold) due to storey. this project. The super structural system its structural conservation and energy adopted is conventional cast in-situ efficiency. Seacare Hotel was the recipient of the reinforced concrete beams and one-way the Merit Award for “The Innovative, slab system. Glass skylight canopy is on Picture credits: Hotel Kai website Efficient and Productive Use of Steel roof level of Block A. Structures in the Build Environment” in the category of Commercial or Retail Picture credits: Siloso Beach Hotel website Structures at the 2014 Structural Steel CLIENT: Sinves Investment Consultancy Excellence Awards. Pte Ltd ECAS’ ROLE: Consulting Services CLIENT: Siloso Beach Resort Pte Ltd CLIENT: Seacare Co-operative Ltd PROJECT VALUE: S$12M COMPLETION DATE: 2013 PROJECT VALUE: S$17M ECAS’ ROLE: Consulting Services ECAS’ ROLE: Consulting Services COMPLETION DATE: 2006 COMPLETION DATE: 2012 AWARD: Structural Steel Excellence Award 2014 www.ecas.com.sg
COMMERCIAL AND HOSPITALITY SILOSO BEACH RESORT Siloso Beach resort is a rustic eco-hotel on Sentosa Island. The project consists of 2 blocks of 3-storey buildings & ancillary single storey buildings involving the addition of 1-storey to a 3-storey building and 12 nos. of single storey villas. The Resort is built within nature giving a feeling of relaxation. The foundation adopted for the project is RC driven pile with pilecap. CBP wall and RC retaining wall are involved in this project. The super structural system adopted is conventional cast in-situ reinforced concrete beams and one-way slab system. Glass skylight canopy is on roof level of Block A. Picture credits: Siloso Beach Hotel website CLIENT: Siloso Beach Resort Pte Ltd PROJECT VALUE: S$12M ECAS’ ROLE: Consulting Services COMPLETION DATE: 2006
GREENWICH V POMO PARADIZ THE MEZZO Greenwich V is an integrated A&A to basement, 1st to 6th storey of The Mezzo is a 28-storey commercial commercial and residential existing shopping cum office complex at and residential development comprising development. It comprises of 7 blocks 1 Selegie Road (Paradiz Centre). of 6-storey commercial and carpark of 5-storey residential condominium podium block and 28-storey residential with basement carparks, swimming The structural system of the existing tower block. pool and communal facilities together building is mainly RC system and the with 2-storey commercial buildings with building is resting on a raft foundation. The structural framing for the podium shops/supermarkets. For the new A&A works, conventional consists of mainly RC slab and beam reinforced concrete (RC) slab and beam system, and the framing for the tower The structural system is the conventional system, steel columns and beams with consists of mainly flat slab system. The RC beam and slab system for the composite slab are adopted. New transfer floor is at the 7th storey to superstructure and flat slab system for micro piles are introduced at the new meet the architectural requirements. the basement. The structure is founded passenger lift area. The structure is founded on cast-in-situ on precast RC driven/jack-in piles. reinforced concrete bored piles. CLIENT: Far East Square Pte Ltd CLIENT: Paradiz Investment Pte Ltd CLIENT: SB (Ruby) Development Pte Ltd PROJECT VALUE: S$80M PROJECT VALUE: S$14.5M PROJECT VALUE: S$35M ECAS’ ROLE: Consulting Services ECAS’ ROLE: Consulting Services ECAS’ ROLE: Consulting Services COMPLETION DATE: 2013 COMPLETION DATE: 2009 COMPLETION DATE: 2011 www.ecas.com.sg