Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO

Page created by Monica Allen
 
CONTINUE READING
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
Perfect Flight
               George Rhodes
Assistant Director Safety and Flight Ops ATM
           Africa And Middle East

                            ACAO-ICAO EUR/NAT and MID
                                 ASBU Symposium

                                 Marrakech, Morocco,
                                10-13 December 2018)
                     1
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
1950       2018

       2
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
Economic development worldwide is getting a significant
boost by increasing connections between cities from air
transport. This wider economic benefit is being generated by
the flow of goods, people, capital, technology and ideas –
and falling air transport costs.

The number of unique city-pair connections is forecast to
have exceed 21,000 this year, more than double the
connectivity by air twenty years ago. The price of air
transport for users continues to fall, after adjusting for
inflation. Compared to twenty years ago real transport costs
have more than halved

Air transport is vital for manufactures trade, particularly
trade in components which is a major part of cross border
trade today. We forecast that the value of international trade
shipped by air this year will be $6.9 trillion. Tourists
travelling by air in 2018 are forecast to spend $794 billion

 3
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
4
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
IATA User Requirements for Air Traffic Services
                 (URATS)

 https://www.iata.org/whatwedo/ops-infra/air-traffic-
  management/Documents/Requirements-URATS-CNS-
  technology_Edition%203_2017.pdf

                                 5
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
4 Pillar Strategy
1.   Technology
2.   Operations
3.   Infrastructure
4.   Economic Measures

                         6
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
Lets look at a “Perfect flight”

                  7
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
What makes a perfect flight ?
 Addressing traffic flows from end-to-end
 Efficient ground movements (for aircraft and passengers)
 Optimised flight profile:
      unrestricted climb
      fuel efficient airspeeds
      optimum cruise levels
      uninterrupted descent profiles
 Maximising aircraft capabilities/Minimising ATC intervention
 Predictable departure and landing (all weather ops)

                                    8
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
Some facts

             From gate to gate

             9
Perfect Flight George Rhodes Assistant Director Safety and Flight Ops ATM Africa And Middle East - ICAO
Factsheet
At the gate:                    It takes fuel to carry fuel!

 Unnecessary fuel on board
  means unnecessary
  additional aircraft weight
 Data link Departure
  clearance
 Shortest taxi route to
  runway with rolling line up
 Runway direction matched
  to departure direction, if
  possible

                                 10
Taxi-out                                            Accurate taxi estimates by
                                                   ATC permits pilot to plan for...
                                                       APU start-up / shut-down
                                                       Engine start-up
                                                    ATC “keeps them moving”
                                                       Slow taxi speeds cost time
                                                    During taxi, ATC updates on
                                                   take-off sequence
Factsheet                                             Allows pilots to complete pre-
Aircraft engines are designed for flying              take off check lists in good time -
 Each 1 min taxi burns 3-10kg fuel                   reducing runway occupancy
 A340 can save 140kg fuel by taxiing for 8
min on 1 engine.

                                              11
Approaching the runway
 Rolling take-off avoids      Factsheet
spooling up engines while      Fuel consumption at take-off and missed
holding in take-off position   approach is about three times higher
                               than in arrival
 Allowing smaller aircraft
with intersection take-offs
saves fuel for all

                                12
Take-off
   Optimum climb-out
    speed
   Pilot:
      “NEW YORK TOWER,
       CLEANAIR 242 REQUESTS
       300 KTS CLIMB SPEED”
   Controller:                 Factsheet
      CLEANAIR 242, NO SPEED   Need for speed
       RESTRICTION               A 20kt speed increase for A340 from 280kt
                                to 300kt will result in a 135kg saving.
                                 Time: A 1 minute savings per movement
                                also improves airport throughput.

                                13
Factsheet
Standard Instrument Departure                             An RNAV SID design can
 Optimally designed                                      deliver 7 nautical miles or more
  (RNP/RNAV) Standard                                     by avoiding ground-based flight
                                                          tracks
  Instrument Departure (SID)
  eliminates time & distance                              Built up areas can be easily
                                                          avoided
  required to over-fly
  conventional ground based
  radio-navigational aids        Conventional Procedure       RNAV/RNP Procedure

 Flight can avoid noise
  sensitive areas
 Flown by computers with high
  precision of track and time
  keeping accuracy

                                  14
Climbing to                         Factsheet
                                     Airspace is a finite resource
  Cruise Altitude                     Approx 40% North Atlantic flights do not receive
                                     requested clearance
 Where it is practical and           Globally, approx 30% airspace belongs to military
  consistent with safety,             Most air-routes developed over 50 years ago have
  Controllers should consider        changed little
  cancelling SID restrictions as
  soon as possible after take off
 At many airports, it is
  permissible to allow aircraft to
  accelerate to optimum climb
  speed as soon as clear of
  traffic.
 Civil/Military cooperation plays
  an important role in saving fuel

                                        15
Enroute
 After 4 hours flying, the aircraft
  is 24,000kg lighter and needs to
  climb to a higher optimum
  altitude
 Pilot requests climb clearance                     4 hours

  via data link
 Clearance to climb is received
  via data link within 2 minutes            Factsheet
 Best case scenario - ATC,                 Optimum Routes altitudes
  seeing no conflicting flights,
                                            Reroutes and altitudes impact time and
  authorises the pilot to “cruise
                                            fuel
  climb” at his own discretion

                                       16
Factsheet
En-Route
                               Flexible Routing, User Preferred
 ATC where possible           Routes,
  should allow airlines to fly
  the efficient routes based  Routes change by day, month,
  on the best winds.             season, flight direction etc.
 Fixed airways, limited        Flying fixed routes is no longer
  entry/exit points generates    efficient
  inefficiencies in flight
  planning

                              17
Holding - (if required)
 Approaching destination, ATC
  realises delayed arrival if
  aircraft continues at its present
  speed.
 ATC advises pilot (as far out as
  possible) and gives clearance to
  slow down while the aircraft is
  still at a fuel efficient cruising   Factsheet
  altitude.                            Aircraft transitioning from enroute environment towards an airport
                                       tend to converge, generating a ‘’funnel’’ effect
 ATC further realises slowing         Linear Holding cruise & hold in altitude.
  down is insufficient and               A 15min hold on an A340 at FL350 instead of FL150 saves 128kg.
  instructs pilot to enter a hold –    Accommodate flexible clean speed configurations where possible

  but at a fuel efficient cruising
  level.

                                             18
Descent                                   Factsheet
                                               Continuous descent arrival / approach represents :
     ( about 120nm from destination)            10% less fuel
 Continuous Descent                            40% less noise
                                                150 - 640kg less CO2
     While still at cruising level ATC
       clears pilot to descend at pilot’s
       discretion
    “Pilot’s discretion descend and
       maintain 3,000 feet”
     This clearance allows the pilot to
       reduce thrust to flight-idle setting.
       The flight management computer is
       allowed to optimize and manage:
           Speed (cost index)
           Rate of descent
           Gate management
           Accurate time predictions at
              gate (connecting pax.)

                                                  19
Landing                           Factsheet
                                   One go-around for A340 costs approx.4000kg in
                                  fuel and an additional 15 minutes of air-time.

 An arrival procedure that
avoids noise sensitive areas
is flown, with a constant glide
towards the runway.
 ATC is conscious of the
implications of a go-around
 The landing runway chosen
is the closest to the
passenger terminal and
minimizes taxi time

                                       20
Taxi-in
 Vacate runway via high
speed taxiway is included in
landing clearance
 Advance gate information
allows the pilot to plan for
fuel savings techniques
such as partial main engine
shutdown prior to arrival on
stand

                               21
BUT!

22
kg of fuel

                                                                                                            0
                                                                                                                      500
                                                                                                                                  1000
                                                                                                                                         1500
                                                                                                                                                   2000
                                                                                                                                                                    2500
                                                                                                                                                                                       3000
                                                                                                                                                                                                    3500
                                                                                                                                                                                                           4000
                                                                               On
                                                                                  t    he
                                                                                                ga
                                                                                                     te

                                                                                                                           390
                                                                         Ta
                                                                           x i-
                                                                                     ou
                                                         Ex                               t ro
                                                           ten                                   ute
                                                                      de

                                                                                                                           420
                                                                           du
                                                                                se
                                                                                   o       fA
                                                                                             PU

• Based on an A340-500 – 6 hours flight
                                                                                                                38
                                                                        En
                                                                           g   ine
                                                                                      -o
                                                                                           ut
                                                              No                                tax
                                                                      n-r                              i

                                                                                                                 140
                                                                            oll
                                                                               i ng
                                                       Ta                              tak
                                                         ke                                     e-o
                                                              -of
                                                                  f                                    ff

                                                                                                                 135
                                                                        wr
                                                                          on
                                                                                gd
                                                                                       ire
                                                                                             cti
                                                                  Co                            o    n
                                                                        nv

                                                                                                                           418
                                                                          en
                                                                                tio
                                                                                      na
                                                             Te                            lS
                                                               rm                            ID

                                                                                                                      273
                                                                        ina
                                                                               lM
                                                                                     ov
                                                                                                                                                                      Total 3,758 kg

                                                                                          em
                                                                                            en
                                                                                                                                                   CO2 = 11,988kg

                                                                                      t

                                                                                                                 150
                                                                   Cr

                                          23
                                                                     ui s
                                                                         eA
                                                                                                                                                                                          PENALTY

                                                                             lti t
                                                              La                   ud
                                                                                      e

                                           penalties
                                                                 ter
                                                                                                                                 698

                                                                    al
                                                                       Se
                                                                          pa
                                                             Sp              rat
                                                                ee                 ion
                                                                                                                 150

                                                                   dM
                                                                       an
                                                                          ag
                                                                            em
                                                                                   en
                                                                                      t
                                                                                                                       343

                                                       Ho                             De
                                                            ld-                            sc
                                                                  Sp                         en
                                                                     e   ed                            t
                                                                                                                 135

                                                                            R       es
                                                                                      tric
                                                            Ho                            ti o
                                                                  ld-                             ns
                                                                        Le
                                                                                                                 130

                                                                           v   el
                                                                                    Pe
                                                                                       n
                                                                                                                                                                                                                  The consequences on our perfect flight are…

                                                                                           alt
                                                                                                 i es
                                                                                                                                                                                                                                                                With Current Operational Constraints

                                                                                                                 128

                                                                                       Ta
                                                                                         x i-
                                                                                                  in
                                                                                                                     210

                                                                            To
                                                                              tal
                                                                                       Pe
                                                                                          n      alt
                                                                                                     y
                                                                                                                                                                                                           3758
Y
                                                                                                                                                                                                LT
                                                                                                                                                                                            NA
                                                                                                                                                                                     PE
With Current Operational Constraints

                                                                                                                                                                                L
                                                                                                                                                                          TA
                                                                                                                                                                      TO
                                       The consequences on our perfect flight are…

                                                                                                                                                                              in
                                                                                                                                                                         xi -
                                                                                                                                                                      Ta            n   d            ties
                                                                                                                                                                               ou                 al
                                                                                                                                                                           ar                pen              ns
                                                                                                                                                                        o-              el               ti o
                                                                                                                                                                      G               v             ri c
                                                                                                                                                                                  e               st
                                                                                                                                                                             -L                re
                                                                                                                                                                         ld               ed
                                                                                                                                                                      Ho           pe
                                                                                                                                                                             -S
                                                                                                                                                                          ld                              t
                                                                                                                                                                      Ho t                           en
                                                                                                                                                                               en               em
                                                                                                                                                                          sc                ag
                                                                                            PENALTY with a ‘go-around’

                                                                                                                                                                      De               an            n
                                                                                                                                                                                  m               io
                                                                                                                                                                               d               at
                                                                                                                                                                         ee                 ar
                                                                                                                                                                      Sp               ep
                                                                                                                                                                                 lS
                                                                                                                                                                            ra                 e
                                                                                                                                                                         te                ud            t
                                                                                                                                                                      La          a   lt it         en
                                                                                                                                                                               e                em
                                                                                                                                                                         uis                ov

                                                                                                                                                                                                   24
                                                                                                                                                                      Cr              lM           D
                                                                                                                                                                               ina              SI             n
                                                                                                                                                                         rm                 al             t io
                                                                                                                                                                      Te                  n           ec
                                                                                                                                                                                    tio           dir
                                                                                                                                          CO2 = 24,748kg
                                                                                                                                                                               en              g
                                                                                                                                                                          nv                 n
                                                                                                                         Total 7,758 kg

                                                                                                                                                                                          ro
                                                                                                                                                                      Co f w                          ff
                                                                                                                                                                                 f                 -o
                                                                                                                                                                              -o               ke
                                                                                                                                                                         ke                 ta
                                                                                                                                                                      Ta                 g
                                                                                                                                                                                  ll in
                                                                                                                                                                              ro               xi
                                                                                                                                                                          n-                ta            U
                                                                                                                                                                      No               ut           AP
                                                                                                                                                                                  -o            of
                                                                                                                                                                             ne
                                                                                                                                                                         gi               us
                                                                                                                                                                                             e
                                                                                                                                                                      En
                                                                                                                                                                                 ed
                                                                                                                                                                            nd               te
                                                                                                                                                                         te
                                                                                                                                                                      Ex                 ou
                                                                                                                                                                                   tr
                                                                                                                                                                               ou
                                                                                                                                                                         xi -
                                                                                                                                                                      Ta gate
                                                                                                                                                                                e

                                                                                                                                                                                                               • Based on an A340-500 – 6 hours flight
                                                                                                                                                                              th
                                                                                                                                                                          n
                                                                                                                                                                      O

                                                                                                                                                                  0
                                                                                     8000

                                                                                                     7000
                                                                                                   g 6000

                                                                                                                                          o 5000

                                                                                                                                            4000

                                                                                                                                          u 3000
                                                                                                                                            2000

                                                                                                                                                           1000
                                                                                                   K

                                                                                                                                          F

                                                                                                                                          e
                                                                                                                                          f

                                                                                                                                          l
The perfect flight can be flown today!
With the available infrastructure

   Best Practices in Air Traffic Services
      Efficient Ground Movements
      Clean Airspeed Departures
      Flying at Optimum Altitude
      Random Routes (wherever possible)
      National Airspace Management Plans (civil / military)
      Pilot Discretion Descents
      Holding of Aircraft - alternate solutions

                     25
Embrace Technology
            ATC/Airline cooperation in embracing the
             new technology can lead to huge saving
             for LH and ULH routings.
            Utilize systems such as
               CPDLC for Oceanic airspace
               Performance Based Navigations (PBN)
                capabilities (En-route &Terminal).
               Automatic Dependent Surveillance–
                Broadcast (ADS-B)
               Automatic Dependent Surveillance–
                Contract (ADSC)
               etc.

                   26
Flight Efficiency Plan

1. Airspace design.
2. PBN
3. Route shortening, flight plan
   quality improvements.
4. TMAs, CDAs.
5. Airport ops, Collaborative
   Decision Making.
6. Awareness raising on ATM fuel
   performance management.

                            27
The Way Forward
    Much can be done with existing capabilities
      ICAO Aviation System Block Upgrades (ASBU)
      Enables global interoperability
      Develops clear solutions
     Establishes a transition plan
     Need for a Collaborative Approach
     Planning for implementation
       Must Involve all stakeholders

                              28
Summary
 Much can be done today
 Consider the procedures on offer
 What can be done
   All the time
   Some of the time
 Any saving is a benefit
 The savings are accumulative

                       29
“PERFECT FLIGHT”
 from vision to reality

           30
You can also read