Basic information. Goals and objectives of the project

The intelligent transport system is a complex of interconnected automated systems, that solve the tasks of
managing traffic, monitoring and controlling the operation of all types of transport and informing all road
users.

The main goal of ITS is to increase the capacity of streets, create a comfortable environment for movement,
increase safety and improve the ecological situation.
For Astana, ITS was selected with a full adaptive control mode, providing for synchronized adjustment of the
operation mode of traffic lights every 3 seconds, based on the collection, analysis and processing of the
current traffic situation data obtained by means of traffic detection.

Main Tasks
1.   Uniform distribution of the load on the road network
2.   Optimization of control of traffic lights
3.   Reducing the road accidents (reducing conflict points)
4.   Reducing environmental stress
5.   Improving the accuracy of public transport schedules
6.   Increased demand for public transport

                                                                                                   2
New Transport System of Astana. ITS - Kazakhstan
Intelligent Transport System ITS

                                                   Infrastructure composition of the system

                                             Traffic light     Radar detectors     Video detectors   Information board
                                               objects

                                          Effect of ITS implementation:
                                          1. Traffic speed increased by 18%;
                                          2. Throughput increased by 40%;
                                          3. Average journey time reduced by 20%.

                                          Current situation:
                                          Of the 475 traffic light objects (hereinafter - TLO) in the city, 110 are
                                          currently covered.

                                          Plans for 2019-2021:
                                          By the end of 2019, 31 TLO will be additionally covered (in total, will
                                          be 141 TLO with ITS).
    I stage (by 2014 )
                                          As part of the development of 3th stages, another 118 TLO will be
    II stage (by 2018)                    connected to the ITS system (that is, until the end of 2021, the ITS
    III stage (by the end of 2021)        system will cover 259 TLO).
     as part of road construction

3
New Transport System of Astana. ITS - Kazakhstan
ITS project consists of several subsystems
   System of adaptive control of traffic lights. Controlled crossroads are equipped with special
    equipment for detection of traffic flows and connection with central software installed on the
    servers of the traffic control center. Main purpose of the adaptive control of traffic lights is
    optimization of traffic for reduction of traffic delays. During the management of traffic
    signalization, traffic flow is registered in all directions of crossroad including adjacent
    crossroads.

   Driver informing system. Installation of information boards and variable information signs.

   Traffic control system of public transport. Equipping city buses with onboard traffic control,
    video surveillance and passenger counting equipment as well as TFT and Led monitors.

   Passenger informing system. Installation of information boards at stopping points of public
    transport, development of mobile applications for smart phones and website with
    opportunity to choose a necessary route.

   System of video surveillance of crossroads. Equipping 30 crossroads with mobile and fixed
    cameras for visual analysis of traffic situation and making proposals for improvement of traffic
    management.
New Transport System of Astana. ITS - Kazakhstan
Electronic System of Fare Payment

The main objectives of electronic system of fare payment

                    To provide a flexible tariff policy to improve attractiveness of public transport;
                    To implement a unified ticket system for all means of public transport in the
                     capital;
                    To generate an accurate statistics on passenger flow distribution;
                    To arrange the route network effectively.

                Advantages for public transport passengers

        •   Convenience: no need for keeping cash and coins to pay;
        •   Reduction of cash thefts;
        •   Expansion in the number of travel ticket points of sale and the types of travel tickets;
        •   Opportunity to recover customized cards;
        •   Flexible tariff policy providing cheaper fare for long-term travel tickets.
New Transport System of Astana. ITS - Kazakhstan
Dedicated Bus Lane for Bus Traffic
Introduction of this project will facilitate solving such problems as:

   downtime of public transport in traffic
    congestions;
   delays in public transport schedules;
   failure to comply with traffic intervals and
    running schedule;
   complex public transport management in
    traffic flow;
   lack of traffic priority.
   to regulate running times;
   to reduce schedule violations;
   to improve the discipline of bus drivers;
   to improve road safety;
   to increase an average bus speed by 20%.
New Transport System of Astana. ITS - Kazakhstan
Transportation Traffic Control Centre

    Main purpose is to monitor and oversee operation of the drivers in real time

Implementation of the Traffic Control System will solve the problems as follows:

     delay of the bus causing congestion of buses;
     violation of the time interval of buses causing competition between bus
      drivers;
New Transport System of Astana. ITS - Kazakhstan
Light Rail Transport (LRT)

     The main objectives of the projects are following:
       to establish a new modern urban transport system
        with high carrying capacity;
       to reduce negative consequences of high level of
        car ownership;
       to reduce traffic jams and congestions.
       improvement of passenger service level;
       increase in share of public transport;
       reduction of passenger travel time;
       increase of average speed of vehicles;
       reduction of the level of car ownership;
       obtaining a tool for adequate city development
        planning.
New Transport System of Astana. ITS - Kazakhstan
Smart Bus Stops

   This project was started 4 years ago;
   Temperature control. Heated bus stop
    in winter and with air conditioning in
    summer ;
   Available free Wi-Fi inside;
   Installed video camera;
   There are traffic patterns on the wall.