MULTI LIFT SOLUTIONS FOR JD SPORT - Bespoke Retail Solutions - iKONIC Lifts
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
COMPLETE BESPOKE LIFT SOLUTIONS FOR MULTI INTERNATIONAL CHAIN i K ON I C L I F TS Sophisticated Lift Thinking Bespoke Retail Solutions MULTI LIFT SOLUTIONS FOR JD SPORT Total Project Time: Our People: Installation Time: 6 Months Sales Manager 8 Weeks Project Manager 8 x Engineers
OUR CLIENT JD SPORTS JD sports is the fashion, multichannel being rolled out across the retailer’s network retailer of branded sports and casual wear of stores, as seen in the Newcastle flagship. with over 700 stores in 19 territories. Our client was undertaking the refurbishment of Group acquisitions manager at JD Sports, a three-storey building on the busy Argyle Warren Thompson, said: Street in Glasgow city centre, creating a flag ship store with retail over two floors. “We are excited to nearly double the size of our store and bring the latest fit out and Set to retain its exiting location and expand concept to Silverburn. The additional space into the neighbouring unit to create a new will enable us to offer a wider range of flagship spanning 12,830 square foot over products to our loyal customers and realise two floors. Designed by JD Sports’ in-house the full potential of this location.” team and incorporates the store design www.ikoniclifts.co.uk | info@ikoniclifts.co.uk | 0203 376 6440
IKONIC CHALLENGE SOPHISTICATED LIFT THINKING Being a flag ship store we had many elements being powder coated black and yellow to to provide with the removal of an existing match the JD colours. Due to the location 13-person hydraulic passenger lift and the of the store on a busy retail street deliveries supply of: were very challenging and had to be done • new 8-person passenger, in the very early hours, the escalators had • 2No. escalators to be split into two pieces and the shop front • and a bank of 4No. dumbwaiters. removed so they could be safety moved into the building and due to the structural Working alongside the JD project team and integrity of the shop floor we had to provide the designers we came up with a perfect special spreader plates so the escalators scheme that perfectly reflected the JD could be safely positioned on the shop floor. branding. Another challenge we faced was with the The escalators and the dumbwaiters were passenger lift, as this was only for customer part of the focal point as you entered the use the lift didn’t serve the basement store with the escalators going down to level, (stock room), we overcame this by level - 1 and the dumbwaiters installed into incorporating a suspended pit floor. a glass shaft with the moving components www.ikoniclifts.co.uk | info@ikoniclifts.co.uk | 0203 376 6440
IKONIC SOLUTION SOPHISTICATED LIFT THINKING The product iKONIC chose was particularly Incorporating JD’s colours, we had the appealing to the client due to it being 8 moving components powder coated black person and travelling at 1 m/s. the lift was and yellow with matt black landing doors. finished with framed glass fire rated doors Clear Perspex dividing screens were also and a counterweight safety gear due to the fitted to divide the lifts while keeping the suspended pit. vision of being a glass structure. Working alongside the electrical contractor’s neon The dumbwaiters were chosen due to their lights were installed on the from face of the reliability and iKONIC using them on various structure. other JD projects across the UK and Europe. We also provided two escalators that served During the design phase it was decided that the -1 level, installed either side of the show the dumbwaiters would be used as a focal piece dumbwaiters they were finished in point in the store, being used to carry stock stainless steel with glass balustrades which from the basement level 4No. dumbwaiters helped to create a very appealing entrance were used to create a square that were to the store. installed in a steel structure clad in glass. The installations were carried out by our factory trained engineers. www.ikoniclifts.co.uk | info@ikoniclifts.co.uk | 0203 376 6440
IKONIC RESULTS SOPHISTICATED LIFT THINKING iKONIC Jupiter passenger lift, 100kg the atmosphere which complimented the dumbwaiters and the escalators installation environment well and aided the company’s was completed and handed over to the vision for their own customers experience, client on time for the buildings completion and brand awareness. and building control inspection. Ensuring the store opened on schedual. Since iKONIC have provided solutions to tight deadlines for the JD team in multiple The lift has now given easy access to all locations across Europe including London floors making the store very accessible to all, since 2007. incorporating the branding and achieved ISO 9001 ISO 14001 OHSAS 18001 4558 www.ikoniclifts.co.uk | info@ikoniclifts.co.uk | 0203 376 6440
You can also read