LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...

Page created by Christopher Cox
 
CONTINUE READING
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
November 2020      Vol 28 No 10

                                                               Sivili Enjeneereng

LOCAL INVOLVEMENT   INTERSECTION TRAFFIC   THE WORLD ACCORDING
IN AWARD-WINNING    ENGINEERING – LAST     TO SAICE: FOCUS ON
SYDNEY METRO        PART: DESIGN OF        SAICE LOCAL AND GLOBAL
NORTHWEST PROJECT   TRAFFIC SIGNALS        NETWORKING
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
Becoming Keller

• Franki Geotechnical (Pty) Ltd.
• Frankipile (Namibia) (Pty) Ltd.
• Frankipile (Mauritius) International Ltd.
• Frankipile Moçambique Lda.
• Frankipile International Projects Ltd
  Tanzania Branch
• Frankipile International Projects Ltd.
  Uganda Branch

         As from the 1st January 2021, Geotechnical construction companies Franki
       Africa and Keller Middle East will be joining together as one integrated business
                       unit called Middle East Africa, branded as Keller.

                                  global strength and local focus

             011 062 7600       info.za@keller.com   www.franki.com   www.keller.com
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
FR O M T H E PR E S I D E N T ’ S D E S K

The academic year that was –
embracing the future with hope
INTRODUCTION                                   almost every facet of society.” Humanity’s        its stakeholders and the broader society. It
The Grade 12 learners of 2020 will go          way of life has certainly changed and will        talks to what is good and right for the self
down in history as the learners who had        continue to do so in the coming years –           and the other. CS Lewis says, “Integrity is
faced a particularly difficult academic        the so-called “new normal”.                       doing the right thing, even when no one is
year. With numerous stops and goes                 Also, in his book Closing the Gap,            watching.” We need to instil this culture
during the year there was an element of        Professor Tshilidzi Marwala (UJ Vice-             and values in our young ones for a better
doubt a few months ago as to whether           Chancellor) emphasises that, “… across            and inclusive future.
they would be ready for the exams.             the globe progress has been defined by the
Having a Grade 12 learner at home made         ability of humans to adapt to change …            IN CLOSING
one appreciate the dynamics of shifting        [but] here in Africa we have largely missed        Abdullar Verachia also reminds us that
things around to ensure that the year does     the call and as a result have fallen behind        we cannot be stuck in an environment
not get wasted. As they take their final       on the last three industrial revolutions. We       where our memories are stronger than
NSC/IEB exams during this exam season,         cannot therefore afford to miss the call           our vision, but our vision better be rooted
we wish them all the strength, wisdom          again with the 4th Industrial Revolution.”         in the discernible realities that now
and energy they need to succeed. These             It is in this context that more and            confront us. The business community in
final exams have been combined with the        more learners at our schools should be             South Africa has a great deal to contribute
June exams (postponed earlier in the year      doing Maths, Science and IT to prepare             as it takes a proactive role in managing
due to the pandemic), leading to a total       themselves for the knowledge-driven                internally, as well as markets and the
number of 1 058 699 learners writing the       digital economy of the future. It is widely        broader environments, and most of all,
exams, making it the biggest public exam       acknowledged that one of the pillars of a          adopting the philosophy that South Africa
the department has ever administered.          flourishing economy is quality education,          belongs to all who live in it.
The cocktail of factors (technological         a fact that should be borne in mind in a               2020 has indeed been an interesting
challenges within schools; lack of re-         country where the Grade 12 pass rates in           global experiment that forced humanity
sources, facilities and ethics; funding con-   Maths and Science are very low. The 2019           to review its habits and its conduct, and
straints; unionised labour, etc) has made      pass rate of only 20% of the learners doing        how business is done. We therefore need
it difficult for the department to execute     maths and science passing with marks               to examine our personal and collective
its mandate, but focus is needed now to        higher than 50% indicates that more                decisions and chart a more sustainable
go through the milestone of marking and        work still has to be done before we can            path that brings more hope for our future.
releasing exam results timeously.              compete globally.                                      I would like to wish the class of 2020
                                                   It is further disturbing to still have         all the success with their exams and may
EMBRACING THE FUTURE                           learners who try to cheat the system (it was       the results in February 2021 be pleasing
The year has also accelerated the use of       reported that some learners had access to          to their eyes and become a
technology, not only at schools, but also      leaked Maths and Physical Science papers           catalyst to turbo-charge
in our work environments. The world is         beforehand). This of course is not in their        a bright future and
still reeling from living through the un-      own best interest. Ethical conduct should          socio-economic
precedented prevalence of the pandemic.        be taught early in the lives of learners as       ­development across
In his book Disruption Amplified: Reset,       it becomes a lifelong pillar of professional       our country.
Rewire and Reimagine, Abdullah Verachia        behaviour in every sphere of life. The
postulates that, “… whether we like it or      Institute of Directors SA defines ethics (in-      Fana Marutla
not we have been pushed en masse into          tegrity and responsibility) as ethical values
a discontinuous, disruptive digital world      applied to decision-making, conduct and            SAICE President 2020
                                                                                                  fmarutla@gibb.co.za
on the back of fast-paced shifts impacting     the relationship between the organisation,

“… across the globe progress has been defined by the ability of humans to adapt
to change … [but] here in Africa we have largely missed the call and as a result
have fallen behind on the last three industrial revolutions. We cannot therefore
afford to miss the call again with the 4th Industrial Revolution.”
Civil Engineering November 2020                                                                                                            1
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
November 2020      Vol 28 No 10

                                                                   Sivili Enjeneereng

    LOCAL INVOLVEMENT   INTERSECTION TRAFFIC   THE WORLD ACCORDING
    IN AWARD-WINNING    ENGINEERING – LAST     TO SAICE: FOCUS ON
    SYDNEY METRO        PART: DESIGN OF        SAICE LOCAL AND GLOBAL
    NORTHWEST PROJECT   TRAFFIC SIGNALS        NETWORKING

                                                                                                 oN THE cOVER                                                                                                                                                                                                                                                                     P6
Sivili Enjeneereng = Sesotho

ON THE COVER
To support the multi-storey structural loads
of a new building at the Innovation Hub
in Pretoria, Stefanutti Stocks Geotechnical                                                      ­	Stefanutti Stocks Geotechnical owns a comprehensive fleet of state-of-the-art equipment suited
installed load-bearing perimeter piles with                                                         to operate in even the most demanding and adverse ground conditions on the continent
gunite arches between the piles for the
double-storey basement. The company’s
approach is to always deliver the very best
solution for the prevailing ground conditions.                                                    FROM THE PRESIDENT’S DESK
                                                                                                  The academic year that was – embracing the future with hope �������������������������������������������������������������������������������������������������������������������������������� 1

                                      South African
                                      Institution of
                                      Civil Engineering
                                                                                                  CEO’S CORNER
                                                        November 2020             Vol 28 No 10    Adopting a transdisciplinary methodology to address complex infrastructure problems���������������������������������������������������� 5

                                                               Sivili Enjeneereng
                                                                                                  ON THE COVER
Published by SAICE
Block 19, Thornhill Office Park,
Bekker Street, Vorna Valley, Midrand                                                              Africa’s premier geotechnical contractor���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� 6
Private Bag X200, Halfway House, 1685
Tel +27 11 805 5947/8 | Fax +27 11 805 5971
http://www.saice.org.za | civilinfo@saice.org.za
CHIEF EXECUTIVE OFFICER
Vishaal Lutchman PrEng PMP
vishaal@saice.org.za | Tel: +27 11 805 5947/8
                                                                                                  PROFILE
                                                                                                  My 45 years (almost) in consulting engineering������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������ 8
Editor
Verelene de Koker
verelene@saice.org.za
Tel +27 11 805 5947/8 | Cell +27 83 378 3996
Editorial Panel
Marco van Dijk (chairman), Irvin Luker (vice-chairman),
Fana Marutla (president), Vishaal Lutchman (CEO),
Andile Gqaji, Jeffrey Mahachi, Avi Menon,
                                                                                                  CONSTRUCTION / GEOTECHNICAL ENGINEERING
Prisca Mhlongo, Jones Moloisane, Beate Scharfetter,
Verelene de Koker (editor), Sharon Mugeri (editor’s assistant),
Barbara Spence (advertising)                                                                      Local involvement in the award-winning Sydney Metro Northwest project ��������������������������������������������������������������������������������������� 13
                                                                                                  Award-winning Oxford Parks Phase 2��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������17
Annual subscription rate
R730.00 (VAT included)
Advertising
Barbara Spence, Avenue Advertising
barbara@avenue.co.za

                                                                                                  TRANSPORT ENGINEERING
Tel +27 11 463 7940 | Cell +27 82 881 3454
Design and reproduction
Marketing Support Services, Ashlea Gardens, Pretoria

                                                                                                  Intersection Traffic Engineering: Part 6 – Level of Service & Design of Traffic Signals����������������������������������������������������������� 22
Printing
Fishwicks, Pretoria
The South African Institution of Civil Engineering accepts
no responsibility for any statements made or opinions
expressed in this publication, and all information is
provided without prejudice. Consequently nobody
connected with the publication of the magazine, in
particular the proprietors, the publishers and the editors,
                                                                                                  FOCUS ON SAICE NETWORKING
will be liable for any loss or damage sustained by any
reader as a result of his or her action upon any statement or
opinion published in this magazine.                                                               The world according to SAICE
                                                                                                           Introduction ����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� 30
ISSN 1021-2000

                                                                                                           Quick finder ������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������ 31

                                                                                                  Civil Engineering November 2020
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
P17

              Statutory bodies and associated structures���������������������������������������������������������������������������������������������������������������������������������������������������������������� 33
              Discipline-specific bodies ������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������43
              International bodies ����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������56
              Tertiary institutions where civil engineering can be studied����������������������������������������������������������������������������������������������������������������60
              Additional acronyms and abbreviations relevant to the engineering environment ������������������������������������������������63

    IN BRIEF                                                                                                                                                                                                                                                               P13
    Tunnelling of the Polihali diversion tunnels progressing well �������������������������������������������������������������������������������������������������������� 64
    Rehabilitation of Durban Heights Reservoir 3 ��������������������������������������������������������������������������������������������������������������������������������������������������������� 64
    Groundwater brings relief to Karoo town������������������������������������������������������������������������������������������������������������������������������������������������������������������������66
    Coega Development Corporation Board appoints new CEO ����������������������������������������������������������������������������������������������������������������66
    SA’s wind energy market opens up for Zest WEG������������������������������������������������������������������������������������������������������������������������������������������������� 67

    SAICE AND PROFESSIONAL NEWS
    Obituary: Pieter van Rooyen (1965 – 2020)������������������������������������������������������������������������������������������������������������������������������������������������������������������68                                                         P64
    SAICE Training Calendar 2021�������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������69

    CARTOON
    Civillain by Jonah Ptak
              We’ve lost our marbles but gained a friend����������������������������������������������������������������������������������������������������������������������������������������������������������������73

    FUN QUIZ
    SAICE Know Your Sector Competition������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������72
                                                                                                                                                                                                                                                                           P67
      REMINDER: Websites and email addresses on adverts are LIVE, and so is our contents page. HAPPY CLICKING!                                                                                                                                                                    3
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
2
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
C E O ’ S CO R N E R

Adopting a transdisciplinary
methodology to address
complex infrastructure problems
This article serves to get us thinking of     As it pertains to this article, the topic    stalled in response to resistance from
new approaches to solve old problems.         relates to exploring inequality, with a      various stakeholders, which has halted
I elaborate in short on the following         focus on education and infrastructure        much-needed spending on roads in the
(which may be untested hypotheses,            as sub-goals, to address inequality in       country for a few years. Stakeholders,
observations and/or perceptions of our        the South African context. Because           unions and the taxi industry opposed the
industry).                                    of the complexity of the topic and           toll-road concept, yet many of the same
    The first is a disconnect between in-     the integrated nature of the solutions       union members and taxi commuters are
frastructure planning and infrastructure      required, a single-discipline approach       now unemployed because of economic
spend which has seen a steady decline in      may sacrifice the additional constructs of   contraction caused in part by lack of
the last decade. We have not been able        the problem and limit the solution, thus     spending on roads. All stakeholders
to effectively maintain our much-needed       creating blind spots, thereby defeating      may have valid points, but it can be
assets.                                       the initial objectives.                      argued that the objective of addressing
    Secondly, in our non-egalitarian               As it applies to the narrative          inequality was missed in this case.
society we have worsening inequality in       of inequality in South Africa, four              The need to focus on efficient
all forms despite our attempts at building    disciplines have served to connect           and effective initiatives cannot be
an inclusive economy for all. With all the    the topics, namely geopolitics, social       overemphasised, especially given the
skills and funding in the last decade we      dynamics, techno-economics, and earth        Covid-19 pandemic which allows us the
have not been able to address the safety      systems. The solution lies in ensuring       opportunity to rethink our stances on
and security of our most vulnerable.          that the dynamics between the four are       issues, open our minds, reconsider our
    You may agree that these are but a        appreciated and fully understood before      worldviews and influence those within
few of the many issues that prevent us        embarking on any initiative. Hence,          our circles to think and act as a col-
from feeling a sense of achievement when      a transdisciplinary methodology will         lective. No longer should one entity or
so many of our fellow South Africans          assist in exploring and scoping each         school of thought dominate another, as
have hardships that seem to have no end.      discipline and its interconnectedness,       it has become plain to see that constant
    As indicated in previous articles,        relationships, interactions and context      dissension has failed us all.
SAICE supports the notion of a free, just     with other disciplines, ultimately leading       In conclusion, this article serves to
and inclusive society that allows access to   to sustainable solutions while new           introduce the notion that we live in a
all South Africans. Therefore, each new       disciplines are created in the future.       complex world with various schools of
initiative allows for a rethink of the path   This contribution also dispels the notion    thought that need to be respected and
travelled by considering new approaches       that we need to simplify issues with         incorporated into solutions. We have to
to make good on that which we have not        a high level of granularity in order to      appreciate the complexity whilst working
been successful at. This article seeks to     solve them. It postulates that we live in    on goal-based solutions, as postulated
do just that by considering alternatives      an ever-increasing complex world, and        in a transdisciplinary methodology, for
to addressing our main infrastructure         we need to address the complexity for        example. It requires working together
objectives as indicated in our Economic       what it is to meet the stated objective      across disciplines. In next month’s
Reconstruction and Recovery Plan              whilst not looking to silo ourselves in      article I will explain further how we can
(ERRP), also referred to in our National      the process.                                 consider weaving the goal of addressing
Development Plan. For illustration, I              It is proposed that complexity be       inequality into infrastructure and educa-
choose to consider the inequality plight,     considered using a multiple-lens view,       tion to bring about meaningful improve-
as the consequences of not addressing         i.e. we need to look at it from various      ments to society, political ideologies,
inequality befall us all as South Africans.   perspectives or disciplines of study.        climate and technology.
    The transdisciplinary methodology         More profound complexity comes to
is an inquiry-based method to explore,        the fore in the relationships between         Vishaal Lutchman Pr Eng, PMP
describe a problem, and develop               the disciplines. Paradigms play out – for
                                                                                            vishaal@saice.org.za
solutions aligned to an overall goal.         example, toll-roads in South Africa have

Civil Engineering November 2020                                                                                                   5
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
O N T H E COV E R

 Africa’s premier
 geotechnical contractor
 CONTRACTING ACROSS A CONTINENT                DESIGN AND CONSTRUCT                           QQ geo-thermal installations
 Stefanutti Stocks Geotechnical boasts         “We specialise in designing and con-           QQ design and construction of various
 industry experience spanning more             structing sustainable deep pile founda-            types of piles
 than two decades, during which time           tions and lateral support solutions for        QQ lateral support
 the company has completed countless,          various industries, even in the most chal-     QQ rock anchoring
 and often challenging, projects for its       lenging geological environments,” says         QQ shotcrete
 clients across sub-Saharan Africa. This       the division’s commercial director Tiaan       QQ void fill
 geotechnical contractor, which is a divi-     Erasmus. “This capability allows us to         QQ grouting – including specialist con-
 sion of the multidisciplinary construction    offer our clients innovative, substantially        solidation, compaction and dolomitic
 group Stefanutti Stocks, offers the full      cost-effective and time-saving design-             terrain handling
 spectrum of geotechnical services to all      and-construct solutions.”                      QQ sinkhole remediation and repairs.
 sectors within the industry. These include        Stefanutti Stocks Geotechnical’s excel-    Stefanutti Stocks Geotechnical’s
 building (residential, office, industrial,    lence in execution encompasses the fol-        piling capabilities are supported by its
 etc), energy generation, industrial plants,   lowing geotechnical contracting services:      comprehensive fleet of state-of-the-art
 mining houses, transport infrastructure       QQ geotechnical investigations and re-         equipment, including crawler-mounted
 (freeways, roads, bridges, rail infrastruc-       ports, including diamond core drilling,    hydraulic piling rigs, percussion/rotary
 ture), and the construction of water              reverse circulation drilling, DPSH         drill rigs and investigation/exploration
 infrastructure.                                   testing and auger trial holes              rigs. This fleet is suited to work in even

                                                                                        Installation of Continuous Flight Auger (CFA) piles
                                                                                           for a new residential apartment block in Pretoria

 6                                                                                                           November 2020 Civil Engineering
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
the most demanding and adverse ground
conditions.

SHEQ MILESTONE
“We pride ourselves on executing
technically challenging, high-risk
projects in sensitive environments while
maintaining the highest standards of
SHEQ (adherence to safety, health and
environmental regulations and quality
control), to the extent that, at the end
of September 2020, the division marked
three years of being lost-time-injury-
free,” says Erasmus. “Our track record
of high-quality delivery and innovative
solutions has resulted in us being a valu-
able construction partner to our clients.”
                                             Aerial photographs taken after the slope failure in front
                                               of two luxury residential properties had been stabilised
LANDMARK PROJECTS
Some of the more recent landmark
projects undertaken by Stefanutti
Stocks Geotechnical include the lateral
support, bulk earthworks and dynamic
compaction for the Exxaro Head Office
in Centurion (a high-risk dolomite-
classified area), numerous deep pile
foundations for road and river bridges
in South Africa and Namibia, the design
and supply of deep foundations for the
Kazerne Transit-Oriented Development
in the well-known Gauteng-based
Newtown precinct, the construction
of emergency lateral support work to
a slope failure in front of two luxury
residential properties, and the instal-
lation of load-bearing perimeter piles
to the double-storey basement of a
new building in Pretoria’s Innovation
Hub (also pictured on the cover of
this edition).

THE VERY BEST SOLUTIONS
“Our work is often not visible once
a bridge, road or building has been
built on top of the foundations that we
construct,” says Erasmus. “However, our
approach is to always deliver the very
best solution for the prevailing ground
conditions, in order to ensure a lifetime
of safety for any structure.”

 Info

 Tiaan Erasmus
 Commercial Director
 Stefanutti Stocks Geotechnical
 +27 11 571 4300
 tiaan.erasmus@stefstocks.com
                                             The company owns a comprehensive fleet of state-
 www.stefstocks.com
                                              of-the-art equipment suited to operate in even the
 https://geotechnicalcontractor.co.za
                                                   most demanding and adverse ground conditions

Civil Engineering November 2020                                                                          7
LOCAL INVOLVEMENT IN AWARD-WINNING SYDNEY METRO NORTHWEST PROJECT INTERSECTION TRAFFIC ENGINEERING - LAST PART: DESIGN OF TRAFFIC SIGNALS - The ...
pR O FI L E

  My 45 years (almost) in
  consulting engineering
  Semi-retired SAICE member Carl Geldenhuys kindly set some time aside to share aspects of his interesting
  engineering life with us. His career spanned a period of considerable change in how things were (and are)
  done. The one thing that remained unchanged, though, is his passion for the profession, so herewith his story
  in his own words.

  7 APRIL 1971                                                                                 Draughtsman and my immediate boss,
  I walked into the offices of Henny,                                                          approached me and asked whether I would
  Aalbersberg and Reid in the SALU-                                                            be interested in working for a consulting
  building in Andries Street in Pretoria (the                                                  engineering firm.
  street is now called Thabo Sehume Street,                                                        I went for an interview the very
  and the building is now occupied by the                                                      next day and was interviewed by Pieter
  Master of the High Court).                                                                   Aalbersberg, my boss-to-be in the Pretoria
      I left Eskom (then Evkom) after a stunt                                                  office of Henny, Aalbersberg and Reid, to
  of five months as a young civil engineer                                                     be renamed later to Henny and Aalberberg,
  in the Braamfontein Head Office. I still                                                     and even later to Henny and Associates
  jokingly say: “I just could not take the                                                     (H and A). In April 2019 I was privileged to
  pace at Eskom anymore,” as I did virtually                                                   visit Pieter (then 85 years of age) in Sitges,
  nothing in those five months in the civil                                                    Spain (just south of Barcelona). What an
                                                      Carl Geldenhuys Pr Eng
  engineering drawing office. A few weeks        Director, Stugua Consulting (Pty) Ltd         experience that was to again chat to my
  earlier, Mr Charlie Trabucco, the Chief         stugua.consulting@telkomsa.net               first boss of almost 50 years ago!

                                                 Carl and wife Santjie (standing) in Spain last year where they met up with Carl’s boss of 50
                                                years ago – 85-year old Pieter (now Pedro) Aalbersberg and his wife Vergo (now Frances)

  8                                                                                                           November 2020 Civil Engineering
A peaceful street scene in Homs, Syria,
      captured on one of Carl’s trips abroad;
                     the city is in ruins today

    I got the job on that day in 1971.
Having to repay my study loan to Eskom,
I was offered a salary of R400 per month,
which was an increase of R75 on my salary
at Eskom, and which would enable me to
repay my study loan. Wow!!                        Carl at one of the lakes at Seven Rila Lakes in Bulgaria

THOSE YEARS                                       and adjudication were unheard of.                      During the years thereafter I
So, what was the civil engineering in-            Differences between parties were sorted            visited Namibia, Botswana, Lesotho,
dustry like in the 70s and 80s? Let me give       out over a cup of tea. I suppose the proce-        Swaziland, Mozambique, Zimbabwe,
you an example or two.                            dure will be called “mediation” these days.        Zambia, Malawi, Angola, Ethiopia, Israel,
    As a consulting company H and A was               In January 1993 Henny and                      Mauritius, Greece and Syria as consul-
heavily involved those days in the grain          Associates merged with Stewart Scott,              tant. The latter trip (to Syria) included a
silo and food processing industry. I clearly      as the latter was known then. At that              visit to Homs, a city in total ruins today.
recall receiving a telephone call from the        point in time I was the CEO of H and A,            I was also very close to visiting Kiev in
General Manager of a Cooperative on a             having been appointed as such at the age           the then USSR, but the fall of the Iron
Friday afternoon to inform me that the Co-        of 35 when Pieter Aalbersberg left the             Curtain prevented the project from pro-
op’s Board had approved the tender report         firm to emigrate to Spain, but being the           ceeding (and that after the South African
and that we can appoint the contractor. A         CEO was in fact just a title required by           contractor had already set up his office
quick phone call to the contractor to meet        the Companies Act. Board meetings were             in Kiev).
on site on Monday to peg out the site was         very informal and were more of an op-                  I also had the opportunity to work
followed on Tuesday morning by flying             portunity to meet with one’s colleagues            across the whole of South Africa cov-
dust as excavations commenced.                    from Johannesburg, Cape Town and                   ering all nine (previously four) provinces.
    A couple of months (and a few pay-            Pietermaritzburg.                                  I covered close to 1.5 million kilometres
ment certificates and payments to the                 I also recall the procedure if you needed      by car during all those years. Doing a
contractor) later I received a call from          to go on an overseas work trip. It entailed        900 km trip to a site and back in a day
the Co-op’s Financial Manager asking me           about four phone calls to your co-directors        was not a problem at all. During the
whether there was not perhaps supposed            and shareholders, and off you went.                mid-70s I was the Resident Engineer
to be a signed Agreement between the                                                                 (then called the Site Engineer) on a grain
Co-op and the contractor. “Oops!! Oom             TRAVELLING ALL OVER FOR WORK                       silo project at Alma between Nylstroom
Jan, it totally slipped my mind. I will draft     I had the wonderful opportunity to                 (now Modimolle) and Vaalwater, travel-
the Agreement immediately.”                       visit many countries during my career              ling there twice a week (a distance of
    That was what the industry was all            as consulting engineer. My first trip              about 370 km there and back) for my
about – total trust between the con-              overseas was in 1981 visiting Denmark,             site experience to enable me to register
tracting parties!                                 Sweden, Germany, Britain and the United            as a professional engineer. I was able to
    The word “claims” did not appear in           States to research the silo industry in            register professionally exactly three years
the industry’s dictionary, and arbitration        those countries.                                   and four months after graduating!

             Having spent 45 years of my life as a civil engineer in consulting                      LOOKING BACK
                                                                                                     Having spent 45 years of my life as a civil
                 engineering, I can physically look back at all the structures                       engineer in consulting engineering, I can
              that went up across the country, and across the world, during                          physically look back at all the structures
                                                                                                     that went up across the country, and
                that time. Just counting the grain silos in South Africa totals                      across the world, during that time. Just
                       75 installations, and a further 23 outside the country.                       counting the grain silos in South Africa

Civil Engineering November 2020                                                                                                                   9
Construction site in Addis Ababa,
                                                  Ethiopia (not much to report on OHS!)

                                                                                          Mill and grain silo in Port Louis Harbour,
                                                                                          Mauritius

                                                                                          Stewart Scott changed its name to
                                                                                          SSI Engineers and Environmental
                                                                                          Consultants, and later to SSI, a DHV
                                                                                          company when DHV obtained a
                                                                                          share in the company. When DHV
                                                                                          merged with Royal Haskoning in
                                                                                          the Netherlands, SSI became Royal
                                                                                          HaskoningDHV, thereby effectively
                                                                                          dropping its decades-long naming
                                                                                          history. That was the end of an era,
                                                                                          with an 80% Dutch shareholding.
                                                                                          became Royal HaskoningDHV, thereby
                                                                                          effectively dropping its decades-long
                                                                                          naming history (from its original name
                                                                                          Stewart, Sviridov and Oliver before
                                                                                          merging with Scott and de Waal to
                                                                                          become Stewart Scott in 1992). That
                                                                                          was the end of an era, with an 80%
                                                                                          Dutch shareholding.
                                                                                              In theory I spent my entire career
                                                                                          with the same company, and must name
                                                                                          my colleague and friend, Koos Mol, with
totals 75 installations, and a further 23    lot of design and detailing work “in-        whom I spent 43 of those 45 years, both of
outside the country. It was so sad to see    house”! I clearly recall visiting Mr Oxley   us retiring at the end of 2015 – a lifetime
one of them, along with a mill building,     or Mr Freylink at the old Transvaal          as colleagues!
being imploded in Waltloo, Pretoria.         Provincial Departments to have drawings          During 2010, at the age of 61, I
Although spectacular, it was a very          signed off. I usually did not sleep the      furthered my studies in Contract Law, as
emotional moment, especially considering     night before!                                the legal world always had some attrac-
that I was involved in virtually every           During my 23 years at the then           tion for me. This enabled me to practise
brick and cubic of concrete that went into   Stewart Scott, the industry went through     as adjudicator, arbitrator and mediator
that site.                                   many changes – some for the better, some     during my last five years at the company
    I suppose my older colleagues in the     for the worse.                               and is keeping me out of mischief to
consulting engineering industry will also        Stewart Scott changed its name           this day.
recall the project managers that we dealt    to SSI Engineers and Environmental               What would I do differently if I could
with at the Departments of Water Affairs     Consultants, and later to SSI, a DHV         have it all over again?
and Public Works, and the Provincial         company when DHV (a Dutch consulting             I would have completed my MSc thesis
Departments of Works and Roads, etc.         engineering company) obtained a share        after my Honours degree in 1972. I would
They were manned by highly competent         in the company. When DHV merged with         have furthered my studies towards an
professionals who were still doing a         Royal Haskoning in the Netherlands, SSI      LLB degree, and I would have grabbed the

10                                                                                                       November 2020 Civil Engineering
opportunity to spend two years working          Implotion of the mill and grain
in Calgary in Canada in 1978 when the           silo in Waltloo, Pretoria
opportunity was offered to me.
    I should perhaps also have considered
working for a contractor for a year or two.
just to be exposed to the “other side of the
fence.”
    Beyond that, I have no regrets at all. To
quote Edith Piaf:
           Non, je ne regrette rien!!

AND NOW? AFTER THOSE 45 YEARS?
With two children and five grandchildren
living abroad (London and Auckland) my
wife and I have been travelling extensively
since my retirement from consulting
engineering. We have had the privilege of
visiting most of the European countries,
including “off-the-beaten-track” countries
like Russia, Poland, Hungary, Slovenia,
Bulgaria and Romania.
    Our last trip (just before the Covid-19     the way, Bill Bryson is my number one         had given us. I also enjoy being involved
lockdown and catching one of the last           travel author, along with our own Dana        in pro-Deo work to thank God for all His
Qantas flights out of Sydney) was a five-       Snyman. Except for two of Bill’s books I      Grace during all these years.
week visit to New Zealand and Australia.        have all the books of these two gentlemen
The ten-day trip by car from Nelson on the      in my bookshelves, including William          LAST WORD
northern edge of the South Island of New        (before he was Bill) Bryson’s The Palace      On 21 October 2020 I had the privilege of
Zealand, right down to Milford Sound and        under the Alps.                               lunching with Frans Barnard, the ex-MD
via the west coast back to Christchurch             And of course, part of my time goes       of CMGM Glybeton (Group Five Civils)
was truly memory-making. The distance of        into building Lego with my three older        and Willie Meyburgh, the ex-CEO of
almost 3 000 km by car was perhaps a bit        grandsons – training them to also be          Stefanutti Stocks – two gentlemen who
too much for the 70-year oupa and his wife!     engineers one day. I have pretty much         I still respect highly as ex-contractors. I
    During September 2016, to the month         almost every Lego Technics set in my          often used to say that I would have given
50 years after passing my final UNISA           collection.                                   my cheque book to them (today my credit
violin examination, I started taking violin         As a retired professional I also firmly   card with its PIN number), asking them
lessons again. In addition to reading quite     believe that we should be involved some-      to just return it after completion of the
a lot (travel and current political affairs)    where on a pro-bono basis to partially give   project. To their names I can also add that
the violin gives me immense pleasure. By        back to the industry for what the industry    of Geoff Irons of GD Irons.

Civil Engineering November 2020                                                                                                      11

Quality Assurance Testing
Equipment for Driven Piles
•   High strain dynamic load testing and pile driving monitoring system (PDA)
•   Evaluation of load resistance behavior with the Static Load Tester (SLT)
•   Accurately calculate hammer stroke or hammer blows per minute (E-SAX)
•   Simulate static load tests with signal matching software (CAPWAP®)
Connecting earth, mankind
                                     and infrastructure for
                                     sustainable living
                                     We pride ourselves with our efforts and
                                     achievements, which have resulted in us making
                                     a sound contribution in-line with our founding
                                     objective of providing quality multi-faceted services.

GEOTECHNICAL SERVICES OFFERED
 Geotechnical investigations for civil engineering structures
 Borrow Pit investigations
 Road pavement layer investigations
 Rotary core drilling services
Head Office: 52 Bester Street Nelspruit 1200          @ms_civillab   MS Mabuya Civil Laboratory
Tel: 013 753 2370 E-mail: admin@msmabuya.co.za
MS Mabuya is a SANAS accredited laboratory       www.msmabuya.co.za
CO N S T R U C T I O N / G E OT E C H N I C A L E N G I N E E R I N G

Figure 1 The innovative design of the Sydney Metro
Northwest project reduced the use of raw construction
material and labour onsite in favour of prefabricated elements

Local involvement in the award‑winning
Sydney Metro Northwest project
OVERVIEW                                         “The Sydney Metro Northwest is not only
                                                                                                                 Marius Mostert Pr Eng
The Mott MacDonald, SMEC and KBR                 the first metro train system in Australia,                     Structural Discipline Lead
Joint Venture (JV) design team’s contribu-       but also Australia’s first fully automated                            SMEC South Africa
tion to the AU$7.3 billion (R88.9 billion)       passenger service.”                                           marius.mostert@smec.com
Sydney Metro Northwest project received              The project was delivered by the original
the 2020 Engineering News Record (ENR)           tender programme date at AU$300 mil-
Global Best Rail Project award. The JV           lion below the budget. This was achieved            The six-storey project office was
worked for the contractor (John Holland          through a comprehensive paid tender             situated in Macquarie Park, Sydney,
Leighton JV) who was contracted to the           design process of two competing design-         and housed the client, independent
Sydney Metro Northwest Rapid Transit.            and-build consortiums. The tender design        certifiers, the JV, architects and the
The JV delivered the detailed design for         was extremely comprehensive and provided        contractor. Most of the design packages
eight new metro stations, which included         a clear understanding of the entire scope       were done in Sydney by more than 200
three underground stations, three new            and schedule for the project that could be      professionals. Owing to the tight time
open-cut suburban stations and two new           managed throughout the six-year design-         frames, design packages were outsourced
elevated stations. It was also responsible for   and-build process. Furthermore, all the         to overseas design teams. SMEC South
train-stabling maintenance facilities, 36 km     designs were fully developed, coordinated,      Africa designed two of the open-cut sta-
of new metro track, overhead power systems       integrated and approved by the JV and           tions from its Johannesburg office, and
and precinct civil works and car parks.          independent certifiers before any work com-     the Mott MacDonald Singapore office
    The project, delivered by Transport          menced onsite. This resulted in minimal         designed the deep underground stations.
for New South Wales (TfNSW), is the              design changes during construction, which       The architects on the project, Hassell,
first stage of the Sydney Metro, Australia’s     allowed the construction to proceed within      provided support in the project office and
biggest public transport project. James          the tender programme schedule and cost,         from their Brisbane, Auckland and Hong
Phillis, CEO of SMEC Australia, says:            and to a high quality.                          Kong offices.

Civil Engineering November 2020                                                                                                             13
COORDINATION AND COMMUNICATION
                                                                            Coordination and communication are key
                                                                            on a project of this scale. Oracle Aconex
                                                                            was the chosen communication and docu-
                                                                            ment control software for the project, while
                                                                            Bentley’s ProjectWise was used to host the
                                                                            shared data files. The client provided both
                                                                            systems, which ensured the ownership of
                                                                            the project data from start to finish. The
                                                                            author, as SMEC South Africa’s Structural
                                                                            Discipline Lead, visited the project office
                                                                            every six to eight weeks for a duration of
                                                                            one to two weeks at a time to coordinate
Figure 2 Revit model of the                                                 the design with the project office. This
Bella Vista Station (June 2016)                                             was key to ensure the design coordination
                                                                            between the various disciplines. For the
                                  Figure 3 Photo of the completed Bella     remainder of the time, coordination was
                                      Vista concourse (September 2019)      done via Skype between the various design
                                                                            centres. The architects for the Bella Vista
                                                                            Station were situated in Hong Kong, while
                                                                            the architects for the Cherrybrook Station
                                                                            were based in Brisbane, Australia. The
                                                                            eight- to nine-hour time difference between
                                                                            the South African office and the Sydney
                                                                            project office required the South African
                                                                            team to start work earlier than usual to
                                                                            increase the overlap and communication
                                                                            window between the two teams.

                                                                            BUILDING INFORMATION MODELLING
                                                                            Building Information Modelling (BIM) was
                                                                            successfully applied to this major transport
                                                                            infrastructure project and contributed to
                                                                            minimising cost and schedule risk, while
                                                                            enhancing constructability. The client
                                                                            embraced the use of BIM and TfNSW/
                                                                            Sydney Metro provided high-level BIM
                                                                            requirements. Mott MacDonald developed
                                                                            the BIM specification for the Client (NRT/
                                                                            JHL) and hosted the Common Data
                                                                            Environment which all the designers used.
                                  Figure 4 Bespoke deep precast beams       The final deliverables for the project were
                                      being placed at Bella Vista Station   the fully integrated BIM models of all the
                                                                            stations, tunnels and tracks. The client
                                                                            would use the models for asset and facility
                                                                            management (7D BIM), while the con-
                                                                            tractor used the models during the design
                                                                            process for automated quantity takedowns
                                                                            (5D BIM) from the modelling parameters.
                                                                            Strict protocols were in place and each
                                                                            discipline had to share their models on
                                                                            a weekly basis. The BIM Manager cre-
                                                                            ated federated models every two weeks,
                                                                            which were followed by clash detection
                                                                            workshops. At this point, each discipline
                                                                            had to coordinate design changes and
                                                                            provide solutions to the clashes. All the
                                                                            design models were delivered to Level of
                                                                            Development (LOD) 300. The SMEC South

14                                                                                        November 2020 Civil Engineering
Figure 5 Precast concrete façade
                                                                                                            panels at the Cherrybrook Station

Africa team gained immense experience               the labour requirements onsite. Precast        Solid precast planks were placed on the
of BIM international best practice on this          concrete was used for the platforms, super-T   receiving nibs, rebar couplers installed into
project and look forward to utilising the           beams, retaining wall facing panels, façade    the precast beam, reinforcing placed and
knowledge on future projects.                       panels, floor slabs and bespoke items.         the wet stitch concrete poured to form the
                                                        A good example of the effective use of     bottom-floor slab. The same process was
INNOVATIVE DESIGN                                   precast concrete was the construction of       repeated for the second-floor slab.
The innovative design developed by the JV           two floors above the tunnel entrance at the         Figure 5 shows the precast concrete
reduced the use of raw construction material        Bella Vista Station. Access to the tunnels     façade panels installed to the Cherrybrook
and labour onsite in favour of prefabricated        could only be interrupted for 12-days to       Station during construction.
elements, which in turn increased the effi-         meet the programme requirements. Deep               Interesting design aspects included
ciency and sustainability of the project both       45-ton bespoke precast beams were placed       safety in design workshops and addressing
in construction and in future maintenance           over the tracks as shown in Figure 4. The      constructability issues during the design
operations. The Australians favour precast          members were stabilised with temporary         process with the contractor. The sta-
concrete for accuracy, speed and to reduce          props from the station trackside walls.        tions are designed for a 100-year design
                                                                                                   life and required specialist input. Such
                                                                                                   input varied from concrete mix design
                                                                                                   requirements for durability, to earthing
                                                                                                   and bonding requirements to mitigate
                                                                                                   stray currents in the track slabs. SMEC’s
                                                                                                   geotechnical engineers from the Sydney
                                                                                                   office provided detailed FEM analysis of
                                                                                                   the soil/structure interface to refine the
                                                                                                   rock pressures on the structure (Figure 6).

                                                                                                   IN SUMMARY
                                                                                                   SMEC South Africa is proud to have been
                                                                                                   part of this global award-winning project.
                                                                                                   Our team members not only gained
                                                                                                   immense international best practice ex-
                                                                                                   perience on the effective use of BIM and
                                                                                                   precast concrete, but were also exposed
                         (a)                                            (b)
                                                                                                   to world-class project management.
                                                                                                   Hence the SMEC South Africa team looks
Figure 6 F EM analysis of the rock-to-structure interface at Bella Vista Station: (a) absolute    forward to utilising the knowledge on
          horizontal displacement, (b) absolute vertical displacement                              future projects.

Civil Engineering November 2020                                                                                                             15
Always
                                                                               Visible

Improve your mining operation
with dynamic Ctrack Solutions.
Features
  Driver Identification & Driving     Fuel Level & Consumption            Onboard Weighing
  Behaviour Monitoring                Monitoring
                                                                          Breathalyser
  Engine Performance                  Iris Camera Solution
  Monitoring (RPM & Idling)           Front-Back-Side Facing Camera       Tip Sensor
                                      Option
  Collision Avoidance Sensors

                  www.ctrack.co.za | sales@ctrack.co.za | Call Centre: +27 (0)860 333 444
Building 5, which houses Arup and Sony, has a unique fitted curtain wall
installation with tree patterns reinforcing the urban green theme of Oxford Parks

Award-winning
Oxford Parks Phase 2
Meticulous coordination by Concor                with a Highly Commended Award                   configuration to optimise usage of this
on the Oxford Parks Phase 2 project in           in the AfriSam Innovation Award in              prime precinct.
Rosebank, Johannesburg, facilitated the          Sustainable Construction.                           The project includes Building 2 (Life
smooth and simultaneous construc-                    Oxford Parks is a focal point along         Healthcare’s new 10 000 m2 head office),
tion of five different buildings, which          Oxford Road in Rosebank and on comple-          Building 3 (a 4 000 m2 multi-tenanted
was one of the reasons Concor won                tion will house these five buildings on a       building housing inter alia Metier Private
in the Building Contractor category              master basement structure. The build-           Equity and G+D Currency Technology)
at Construction World’s Best Projects            ings are designed to complement each            and Building 5 (3 400 m2 offices for Arup
2020. The project was also acknowledged          other, fitting together in a jigsaw puzzle      and Sony Music).
                                                                                                     Construction of Building 5 started
                                                     Building 5 while still under construction   in February 2019. Initially designed as a
                                                               before the Covid-19 lockdown
                                                                                                 three-storey structure, these plans were
                                                                                                 modified to meet the requirements of the
                                                                                                 tenants, Arup and Sony. An additional
                                                                                                 slab was added to accommodate a private
                                                                                                 entertainment area, as well as recording
                                                                                                 studios on the fourth level.
                                                                                                     A number of energy-saving and
                                                                                                 sustainability features were incorporated
                                                                                                 on this project. A waste management
                                                                                                 system maximises recycling, while
                                                                                                 the buildings feature elements such as
                                                                                                 air-cooled systems to eliminate water
                                                                                                 usage, primary variable flow pumping,
                                                                                                 distributed digital control for central
                                                                                                 comfort monitoring, load control under
                                                                                                 standby conditions and linear diffusion
                                                                                                 to isolate the solar loads. Unique external

Civil Engineering November 2020                                                                                                         17
Building 2 (Lifecare’s new head office) features performance-glazed
                                                             façades that provide added benefits in terms of energy usage of the building

façades provide aesthetic interest to        care, the contractor could nevertheless         were achieved as per the contract, despite
the individual buildings and optimise        produce an upmarket and modern                  construction delays, thereby mitigating
energy usage.                                product while demonstrating care                additional costs.
   The Covid-19 lockdown added new           towards all parties on site. Concor has            Both Sony and Arup engineers have
challenges, but through Concor’s com-        also clearly confirmed its agility value by     taken occupation of Building 5 which was
mitment to its values, one of which is       ensuring that practical completion dates        completed on time. Tenants in Building 3

                                                                     Buildings 2 and 3 under construction
                                                                     before the Covid-19 lockdown

                            Building 3 and Parks Boulevard under
                       construction before the Covid-19 lockdown

                                                           The first level of Building 3 extends onto a cantilevered slab which forms a
                                                             portion of Parks Boulevard, the new spine road of the Oxford Parks precinct

18                                                                                                         November 2020 Civil Engineering
The Oxford Parks buildings were designed to complement each
     other and fit together in a jigsaw puzzle configuration, proportionately
                 occupying the site to optimise the usage of this prime precinct

     took official occupation on 1 September                          Progressive snagging ensured that
                                                                                                                                Info
     2020, a week earlier than the extended                       works were signed off as completed by
     practical completion date. Tenant instal-                    each trade, thus minimising the snag list
     lation in Building 2 started on 10 August                    considerably.                                                 Coral Fraser-Campbell
                                                                                                                                on behalf of Concor
     2020, with all other floor-level handovers                       Oxford Parks Phase 2 is certainly an                      communicate@coralynne.co.za
     on track and practical completion being                      impressive project to be added to the con-                    www.concor.co.za
     2 November 2020.                                             tractor’s portfolio of successful projects.

     Civil Engineering November 2020                                                                                                                         19

               AutoCAD®                                       RoadMate                                  RebarMate
      World-Leading CAD Software                      Urban & Rural Road Design    Reinforced Concrete Detailing & Scheduling

               WaterMate                                       ParkCAD                    Autodesk Civil 3D®
         Water Reticulation Design               Automated Parking Area Layouts            Site Development & Transportation

                  SurfMate             Architecture Engineering                                          AutoTURN
  Survey & Digital Terrain Modelling                                                 Vehicle Manoeuvre Simulation & Analysis
                                                 & Construction
               AeroTURN                                               Collection                        DatumMate
Aircraft Movement & Space Analysis                                                             Datum Conversion of Drawings
                                                               PipeMate
                                          Sewer & Stormwater Design and Analysis
LET’S IMAGINE, CREATE, ACHIEVE
   A SUSTAINABLE FUTURE

                                                                                         Egis, your partner in transport
                                                                                         infrastructure PPPs in South Africa
                                    4,400 KM                                             Egis is recognized as a world-class player in the
                          OF ROADS WORLDWIDE                                             public-private partnership market.
                            INCLUDING 535 KM
                                IN AFRICA                                                For over 30 years, Egis has developed unrivalled
                                                                                         global expertise in project development,
                                                                                         structuring, investment in motorways, bridges
                                                                                         and tunnels.
                                                                                         By adopting a whole life-cycle and partnering
     PARTICIPATION IN
                                                                                9,300    approach on projects, Egis creates enduring
                       10                                                  EMPLOYEES     social and economic benefits to both investors
         CONCESSIONS                                                       WORLDWIDE     and communities.
          AS OF 2020

www.egis-southafrica.co.za
Follow Egis on:                                Egis Operation South Africa (Pty) Ltd
                                               Nelson Mandela Square, West Tower, 2nd Floor
                                               Sandton, 2196
                                               Email: contact@egis-southafrica.co.za

Egis -SIE20_190 - © iStockphoto.com / Blue Planet Studio / Rawpixel / Drazen © Ollo
SHAPING THE MOBILITY
             OF THE FUTURE

                                           Working closely with its
    ROAD MOBILITY                          partners, Egis develops              URBAN MOBILITY
      SERVICES                             and operates innovative                 SERVICES
                                           solutions to:
                                           • Optimise traffic flows, while
                                             reducing journey times and
   Tolling inter-     Charge-Over-           improve road safety;               Rush Hour        Multi-modal Public
    operability         Distance                                                Avoidance        Transport solutions
     solution           solutions          • Strenghten the integration of       Program           and integration
                                             complex transport networks
                                             in our cities, by increasing
                                             operational     efficiencies,
   Free-Flow /       Speed monitoring        maintenance standards and a     On-street Parking          Smart
Electronic Tolling   and enforcement         range of value-added services   Management and            Parking
    solutions        Easytrip® solutions                                       Enforcement
                                             to commuters.
TRANSPORT ENGINEERING

          Dr John Sampson Pr Eng FSAAE FSAICE
          Consultant
          TTTAfrica
          sampsonj@tttafrica.co.za

 Intersection Traffic Engineering: Part 6
 Level of Service & Design of Traffic Signals
 This is the sixth and final part in a series of articles covering the   QQ Average Delay
 practical design of intersections. The first five articles in this      QQ Maximum Delay
 series appeared as follows:                                             QQ Total Delay
 1. October 2019 pp 49–55: Basics of intersection control devices        QQ Maximum Queue
     and traffic stages                                                  QQ Total Queue
 2. November 2019 pp 26–29: Traffic patterns and traffic counts          QQ Level of Service (based on V/C or delay).
 3. May 2020 pp 28–33: Capacity of priority control devices              If a movement is operating under heavy load, the volume-to-
 4. September 2020 pp 24–25: Capacity of traffic signals                 capacity ratio becomes important as you would not want any
 5. October 2020 pp 15–19: Delays and queues                             movement to exceed capacity. Under lighter loads, the delay is
 In this last part the following will be covered:                        more important as capacity is unlikely to be of concern. If block
 QQ Level of service                                                     lengths are short, the queue may be the most important factor.
 QQ Design of traffic signals                                                The HCM recommends average delay per vehicle as the
                                                                         preferred LoS measure. While in light flow conditions this is
 LEVEL OF SERVICE                                                        best, for reasons given above other LoS measures should also be
                                                                         considered.
 Level of Service range                                                      Having decided what measure should be used, the next deci-
 The Level of Service (LoS) is defined by the Highway Capacity           sion is what to optimise:
 Manual (HCM) (TRB 2000; 2010) and others as follows:                    QQ a movement
 QQ Priority control, average delay (secs/veh): A
is warranted. The average delay that will result in the warrant      measures and the times during which they are important are not
   being met depends on the approach volume. At 100 veh/hr on           considered, the optimal result will not be obtained.
   the side street, average delay/veh = 144 secs, at 200 = 72 secs,
   at 300 = 48 secs and at 400 = 36 secs, etc. Hence, delay LoS         DESIGN OF TRAFFIC SIGNALS
   cannot be used for warranting traffic signals.                       The formulae for capacity, delay, queues, Level of Service (LoS)
QQ A warrant of 3.0 veh would reduce the average delay/veh              and measures of effectiveness have been examined in this series.
   above to 108, 54, 36 and 27 secs, respectively. After extensive      In this final section of the series the way in which this knowledge
   experience in implementing the SARTSM warrant, the author            is combined to design a traffic signal staging and timing is
   can confirm that this would be a more realistic warrant based        described.
   on public and political opinion. However, a roundabout is
   becoming increasingly acceptable and would be a much better          Cycle times
   alternative to installing signals.                                   Cycle times are generally in the range of 50 seconds to 120 sec-
                                                                        onds, although cycle times can be shorter or longer in special
Performance index                                                       circumstances. In general, cycle times are specified in 10-second
In AutoJ, the user can weight any of the criteria above, i.e.           intervals, but it is possible for controllers to handle 5-second
V/C, delay, queues, movements, time periods or Levels of                intervals if necessary.
Service to suit the intersection. The weighting determines the              Cycle times are dependent on minimum greens and the
performance index.                                                      number of stages. These concepts are discussed below. In most
    In general, a higher weighting to delay favours priority control,   circumstances, however, cycle times should be kept as short as
particularly roundabouts, while a higher weight to V/C favours          possible to reduce delay. Longer cycle times may be justified
signals. A higher weighting to movement V/C favours multi-stage         to reduce the percentage of lost time where traffic volumes are
signals, while weighting intersection V/C highly favours 2-stage        high, and the need is to increase capacity, but this benefit is often
signals.                                                                overestimated because the small gain in less lost time is cancelled
    After much experimentation, the following weightings                out by longer gaps in the traffic flow.
are recommended to optimise overall control performance                     Cycle times are sometimes set based on system consider-
throughout the day and night (50% to V/C, 25% to delay, 25% to          ations, i.e. for synchronisation purposes all signals in the group
queue):                                                                 must have the same cycle time or an exact multiple thereof.
QQ 18% The V/C of the worst movement in the AM peak
QQ 4% The V/C of the worst movement in the off peak                     Minimum green, yellow and all-red times
QQ 18% The V/C of the worst movement in the PM peak
QQ 10% The intersection average V/C during the worst period             Minimum green
QQ 4% The average delay/veh in the AM peak                              In all cases, the minimum green time must at least be equal to the
QQ 7% The average delay/veh in the off peak                             time it takes for a pedestrian to safely cross. This is calculated as
QQ 4% The average delay/veh in the PM peak                              the width of the crossing (or the width to a median shelter island)
QQ 10% The average delay/veh of the worst movement in any               divided by the walking speed of a pedestrian, as per Table 1.
    period                                                              Typically, a speed of 1.2 m/sec is used.
QQ 6% The queue of the worst movement in the AM peak
QQ 3% The queue of the worst movement in the off peak                   Table 1 Typical walking speeds of pedestrians
QQ 6% The queue of the worst movement in the PM peak                             Category              (m/sec)                (km/h)
QQ 10% The total queue (total delay) in all periods.
                                                                         Slow (elderly)                  1.0                    3.6
The greatest weight is given to the intersection’s V/C performance
during peak hours as this is likely to be the most critical measure      Normal                          1.2                    4.3
determining the optimal control. A higher weighting is given
                                                                         Brisk                           1.5                    5.4
to off-peak than peak delay, as capacity is less important during
that period.
    The fact that pedestrians are not weighted does not mean they       An additional consideration, however, is that the green time
have not been considered. They feature in the capacity calcula-         must be long enough to give not only the first vehicle but also
tions, and the signal timings have minimums that always ensure          the next few following vehicles time to enter the intersection.
that pedestrians have adequate time to cross. If, however, a weight     The SA RTSM recommends a minimum of 11 seconds for
is put to pedestrian movements as part of the performance index,        the green disc, with an absolute minimum of 7 seconds. For
the effect will be to favour all-way stops because pedestrians have     flashing arrows, these times can be reduced to 7 and 4 seconds
priority on all approaches and no delay. For reasons stated earlier,    respectively.
this form of ICD cannot be recommended.
                                                                        Acceleration and deceleration rates
Conclusion                                                              Before determining the required yellow and all-red intervals,
Because the HCM recommends delay as the preferred measure,              typical acceleration and deceleration rates need to be established.
the other measures are regarded as less important, but delay is         Table 2 gives some typical values, as well as the distances and
only one measure of an intersection’s performance. It has been          times required to accelerate to, or stop from, 60 km/h on a flat
demonstrated in the above examples that, if a combination of            0% grade.

Civil Engineering November 2020                                                                                                          23