BUNBURY OFFICE DEVELOPMENT Landscape Design Intent Issue H / 08.02.2021 BETTER ENVIRONMENTS PROJECT 20468 THROUGH UNIQUE DESIGN
1.0 SPECIFICATION NOTES SETOUT To all turfed / grassed areas – Soils for turf and lawn. Friable sandy loam textured CONCRETE It is the contractor’s responsibility to adequately setout the landscape works as material. Min. 2% organic matter. pH 5.5-6.5. OR site topsoil, ameliorated, tested and The whole of the materials, methods and techniques used in the construction shall documented. Use figured dimensions where documented. Do not scale off drawings. certified as complying with the requirements of AS 4419. be carried out in accordance with the relevant current Australian codes (including all amendments) as follows and as well as the recommendations or appropriate bulletins SERVICES Required topsoil depths: issued by the Cement and Concrete Association of Australia and the relevant building Service locations shown on the drawings are indicative only. The contractor shall • To planting areas - 300mm unless detailed otherwise regulations. accurately determine the location and level of all services within the site. • To tree pits and trenches - 1000mm unless detailed otherwise. • Turfed areas - 100mm unless detailed otherwise AS 1012 ‘Methods of testing concrete’ STANDARDS • Do not place topsoil under trees to be retained unless directed otherwise. AS 1379 ‘Specification and supply of concrete’ All work methods, site works, materials and workmanship shall be in accordance with AS 3972 ‘General purpose and blended cements’ the relevant government policies, guidelines and legislation and the standards of the Lightly consolidate topsoil in max. 150mm deep layers and grade evenly so that the AS 2758 ‘Aggregates and rocks for engineering purposes Part 1 Concrete aggregates’ Standards Association of Australia. finished surface is smooth, free from lumps of soil and roots at the required levels ready AS1141 ‘Methods for sampling and testing aggregates’ for planting. Provide minimum 1:50 falls for drainage to all turfed areas. Gradients in AS 1478 ‘Chemical admixtures for concrete mortar and grout’ PROTECTION OF EXISTING TREES TO BE RETAINED garden beds shall not exceed 1:3 without erosion control measures. In garden beds set AS 3600 ‘Concrete structures’ Trees to be retained shall be those shown on the drawings for retention. All trees to be topsoil levels 100mm below adjacent edges and surfaces to allow for full mulch depth. AS 3610 ‘Formwork for concrete’ retained within and bordering the extent of works shall be protected from damage. The AS/NZS 4671 ‘Steel reinforcing materials’ Contractor shall be responsible for installing and maintaining adequate and approved FERTILISER AND WATER CRYSTALS barricading or fencing around existing trees to be retained in accordance with the Planting areas: Place slow release pill type fertilizer such as ‘Agriform’ planting For exposed aggregate concrete finishes ensure aggregate shown is clean, evenly requirements of AS 4970 ‘Protection of trees on development sites’. tablets (20:4.3:4.1) or equal approved and water crystals such as ‘Earthcare Water distributed and well bonded to the concrete. Remove any concrete slurry and ensure no Crystals’ or equal approved around the root ball of all plants at the time of planting to acids or rubbish enter the garden beds or stormwater system. No materials, equipment, machinery, vehicles or temporary buildings shall be placed manufacturer’s recommendations. All concrete up to 1:14 grade shall have a slip-resistance rating of P4 and P5 for steeper within the tree protection zone. No cutting or filling shall be permitted. Excavation or grades in accordance with AS 4586 ‘Slip resistance classification of new pedestrian trenching within tree protection zone shall be carried out by hand. PLANT MATERIAL surface materials’. Any pruning (including root pruning) of trees to be retained shall be carried out by a All plants shall be vigorous, well established, hardened off, of good form consistent All pedestrian pavements shall have a maximum crossfall of 1:40 and a minimum crossfall qualified arborist in accordance with AS 4373 ‘Pruning of Amenity Trees’. with species or variety, not soft or forced, free from disease and insect pests, with of 1:75. large healthy root systems and no evidence of having been restricted or damaged. No Provide tactile indicators to AS1428.4:2002 – Design for access and mobility Tactile EXCAVATION substitution of species shall be made without the prior approval of the Superintendent. Indicators. Excavate over the site to give accurate levels and profiles as the basis for construction All trees supplied are to be certified to comply with AS2303 ‘Tree stock for landscape and surface treatments. The contractor shall accurately determine the location and level use’. FIXTURES of all services within the site prior to excavation. Bollard: PLANTING Product: Static IBR 200 Bollard with Stainless Steel Sleeve CULTIVATION Do not vary plant locations from those shown on the drawings unless otherwise directed Size: 219mm x 1200mmHT Following excavation and prior to placing topsoil cultivate all areas to receive planting, by the Superintendent. If it appears necessary to vary the locations or spacings of plants PAS Rating: V7500/(N2)/64/90:4.0/16.7 turfing or grassing to the following depths: to avoid service lines, apply for directions from the Superintendent on completion of set Supplier: Leda Security Garden areas – 150mm out and prior to planting. Do not plant in extreme weather conditions of extreme heat, Tree pits and trenches - 300mm wind, cold or rain. Bike Racks: Turf and grassed areas - 150mm. Product: Bicycle Hitch Rail Fixed with Stainless Steel Finish and Fixed Footing Do not disturb services. Cultivate by hand within the drip line of trees to be retained and Water plants and planting holes thoroughly before planting begins. Remove plants from Size: 340mm x 950mmHT within 300mm of paths or structures. Incorporate gypsum into cultivation at the rate of containers carefully to ensure minimum soil loss and root disturbance. Top prune trees Product Code: SKU BR475 0.25kg/m3 and other additives if required. only as directed. Position plants in the center of holes and set at such a level that after Supplier: Leda Security trimming and settlement, a normal and natural relationship of the plant with the ground SUBSURFACE DRAINAGE surface will be established. Incorporate fertiliser and water crystals as specified. Cigarette Disposal Unit: Install subsurface drains as shown on the drawings or as detailed. Connect all subsurface Product: Urban Smokers Bollard with Stainless Steel Finish drains to stormwater to engineer’s details. Backfill with topsoil as specified and firm to avoid air pockets. Water plants immediately Size: 150mm x 1200mm after planting and thereafter as required to maintain growth rates free of stress. Product Code: SKU SSR150FAS TOPSOIL Supplier: Leda Security Topsoil means soil which contains organic matter, supports plant life, is free form TREES unwanted matter such as stones over 25mm in diameter, clay lumps, weeds, weed Trees to be planted in landscape areas at least 1m width to ensure enough space for PRACTICAL COMPLETION propagules, tree roots, sticks, rubbish, material toxic to plant growth, pests, disease and landscape to grow and plants to be of any value Carry out any other work as specified or necessary for the satisfactory completion of the the like. One shade tree with a clean trunk to 2m with non-invasive roots is required for every 8 work and leave the job in a clean and tidy condition. car bays Standards: All topsoil shall comply with the requirements of AS 4419 ‘Soils for DEFECTS LIABILITY landscaping and garden use’. Topsoil may be: STAKING AND TYING A defects liability period of 12 months shall apply to all landscape hardworks including • Site topsoil that complies with AS 4419; or Stake and tie all trees that have a calliper less than 50mm. Use straight hardwood stakes irrigation, garden edges, pavements and the like. • A blend of site topsoil and imported topsoil that complies with AS 4419; or pointed at one end. Ties shall be hessian webbing placed two-thirds of the plant height • Imported topsoil that complies with AS 4419. above the ground. ESTABLISHMENT PERIOD An Establishment Period of 12 weeks from the date of Practical Completion shall apply The Contractor shall supply certification of compliance from a NATA accredited testing Trees > 2.5m high: Three 50 x 50 x 2400mm stakes per plant to all landscape areas including turf, trees and planting areas. Make sure the general laboratory to the Superintendent prior to the delivery of topsoil to the site. Trees 1.0 to 2.5m high: Two 40 x 40 x 1800mm stakes per plant appearance and presentation of the landscape and the quality of plant material at date Trees or shrubs < 1.0m high requiring support: One 38 x 38 x 1200mm stake per plant of practical completion is maintained for the planting establishment period. Prepare garden beds by removing all debris, stones and building materials arising from Remove stakes and ties at the end of the Establishment Period. Should the Contractor fail to carry out the Establishment Work as specified, the the works. Contaminated soils as a result of spillages of oil, fuel, cement or the like shall Superintendent may arrange for others to carry out the work and deduct the cost for be excavated and removed from the site. MULCH such work form monies due to the Contractor under the Contract. Standards: To AS4454 ‘Composts, soil conditioners and mulches’. Required topsoil types: Inspection: Seven (7) days prior to the end of the Establishment period the Contractor ‘A’ horizon topsoil - To top 300mm of all garden beds and tree pits. Landscape soil (on Mulch shall be well composted, free of deleterious matter, including weeds, soil, rocks and Superintendent shall carry out a joint inspection of the plant material to determine grade), Medium organic soil blend with 6.0-14.9% screened composted organic matter. and the like. Obtain mulch from approved suppliers. Do not place mulch in contact with what work needs to be undertaken before the end of the period. Hydraulic conductivity 15-30cm/h. pH 5.5 - 6.5. plant stems, spread evenly to the depth specified. ‘B’ horizon topsoil - Below 300mm depth. Landscape soil (on grade), Low organic soil FINAL COMPLETION blend with 3.0-5.9% composed organic matter. Hydraulic conductivity 30-80cm/h. pH IRRIGATION Following the satisfactory rectification of all defects and completion of all works 5.5 - 6.5. Where shown on the plans design and construct an automatic irrigation system. Water associated with Establishment and Maintenance a Certificate of Final Completion shall source to be a rainwater tank with mains backup. Refer to Hydraulic Engineer’s drawings. be issued to the Contractor. MODE BUNBURY OFFICE DEVELOPMENT Landsape Design Intent - Issue H — 08.02.2021
• These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. • Verify all dimensions on site prior to commencement of work. 44 BAYS • LEGEND • DO NOT scale off these drawings. Report any discrepancies to the architect before carrying out any work. 4 ACROD BAYS EXISTING AMENDMENTS TREES REV TO BE RETAINED DESCRIPTION AUTH CHK DATE 2.0 Site Plan - masterplan 1 For Coordination SC SL 28.01.21 PROPOSED TREES D B GARDEN BED WITH IRRIGATION REFER TO ARCHITECTURAL + SUBSOIL DRAINAGE AND CIVIL DOCUMENTATION FOR LEVELS DECORATIVE CONCRETE PAVEMENT TURF INSITU CONCRETE SEATING D H PLAZA AND PEDESTRIAN A THOROUGHFARES WITH A DECORATIVE CONCRETE FINISH PRINSEP STREET 44 BAYS BINS AND BOLLARDS THROUGHOUT 4 ACROD BAYS B B GARDEN BEDS WITH A PLANTING B PALETTE OF LOW MAINTENANCE, AREA OUTSIDE OF PROPERTY BOUNDARY IS INDICATIVE ONLY C F PREDOMINATELY WA NATIVE B SPECIES WITH SHADE TREES WHERE POSSIBLE MODULAR SEATING MADE FROM B C INSITU CONCRETE OR GRC THROUGHOUT HERITAGE BUILDING PROPOSED OFFICE ZEBRA CROSSING AS PER CITY OF D BUNBURY ACTION PLAN B HERITAGE BUILDING RAISED PEDESTRIAN CROSSING E WITH PAVED FINISH C F SHADE TREES TO CAR PARK B A STAIRS TO PLATFORM EDGE E A G WITH PATH NORFOLK ISLAND PINE (ARAUCARIA H HETEROPHLLA) TO BE RETAINED AND PROTECTED IN ACCORDANCE B WITH AS4970:2009 ‘PROTECTION OF TREES ON DEVELOPMENT SITES’. 20 BAYS B 7 SECURE BAYS 1 LOADING BAY 20 BAYS 7 SECURE BA 1 LOADING BA A F NOT FOR CONSTRUCTION STATUS NORTH 114 BAYS COORDINATION 0m 2.5 5 7.5 10 12.5 BRISBANE Plaza Level, Mosaic FUTURE DEVELOPMENT SITE 826 Ann St Fortitude Valley QLD 4006 T +61 7 3253 9900 SUBJECT TO SEPERATE DEVELOPMENT APPLICATION B bne@modedesign.com.au ABN: 65 112 807 931 INTERIM TREATMENT: TURF WITH OPPOURTUNITIES FOR CLIENT TEMPORARY LANDSCAPING OR TEMPORARY ACTIVATION PRIMEWEST SUBJ B NOT FOR CONSTRUCTION INTER TEMPO PROJECT BUNBURY OFFICE B STATUSDEVELOPMENT TYPICAL SECTION - “GREEN LINK” NO G COORDINATION LOT 20 (22) STEPHEN STREET, BUNBURY, WA, 6230 114 BAYS 1:250 @ A3 DRAWING TITLE NORTH DA - SITE PLAN STEPHEN STREET 0m 2.5 5 7.5 10 12.5 DRAWN BRISBANE CHECKED MODE BUNBURY OFFICE DEVELOPMENT Landsape DesignSC Intent - Issue ISSUE SL H — 08.02.2021 SCALEPlaza @ A1 Level, Mosaic 08/02/2021 10:14:46 AM 1 : 250 PROJECT No 826 STAGE DRAWING No Ann REVISION St 20468 DD Fortitude LD- 0110 Valley 1 QLD 4
44 BAYS 4 ACROD BAYS 3.0 Landscape Plan — plaza space • These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. • Verify all dimensions on site prior to commencement of work. • DO NOT scale off these drawings. PLAZA + FOOTPATH WITH A • Report any discrepancies to the architect before carrying out any work. DECORATIVE CONCRETE FINISH AMENDMENTS PRINSEP STREET B REV DESCRIPTION PAVEMENTS AUTH CHK DATE TO HAVE A MINIMUM P5 B RATING AND COMPLY WITH AS 1428.1 F A C B GARDEN BEDS WITH A PLANTING F PALETTE OF LOW MAINTENANCE, PREDOMINATELY WA NATIVE AREA OUTSIDE OF PROPERTY BOUNDARY IS INDICATIVE ONLY L SPECIES WITH SHADE TREES WHERE G B POSSIBLE INSITU CONCRETE MODULAR K C SEATING RUBBISH BINS RECESSED D INTO GARDEN E RAMP WITH MAX. 1:20 GRADE E PROPOSED OFFICE STREET TREES IN GARDEN BEDS F OR TREE GRATES DESGN CONSIDERATION TO G B BE GIVEN TO THE INTERFACE BETWEEN EXISTING AND NEW PAVING H BIKE RACKS AS PER SPECIFICATION NOTES I I BOLLARDS AS PER SPECIFICATION NOTES SMOKERS BOLLARD J AS PER SPECIFICATION NOTES C I A K ACCESS TO BOOSTER CABINETS A L PEDESTRIAN AWNING OVERHEAD C C D J REFER TO ARCHITECTURAL AND CIVIL DOCUMENTATION FOR LEVELS NOT FOR CONSTRUCTION H STATUS NORTH 0m 1 2 3 4 5 BRISBANE B Plaza Level, Mosaic 826 Ann St Fortitude Valley QLD 4006 T +61 7 3253 9900 bne@modedesign.com.au ABN: 65 112 807 931 CLIENT PRIMEWEST C PROJECT NOT FOR CONSTRUCTION BUNBURY OFFICE DEVELOPMENT LOT 20 (22) STEPHEN STREET, BUNBURY, WA, 6230 STATUS NOR COORDINATION DRAWING TITLE DA - PLAZA PLAN 114 BAYS 1:250 @ A3 NORTH DRAWN CHECKED Author ISSUE 0mChecker 2.5 SCALE @ A1 5 7.5 10 12.5 05/02/2021 2:45:52 PM 1 : 100 PROJECT No STAGE BRISBANEDRAWING No REVISION MODE BUNBURY OFFICE DEVELOPMENT 20468 DDDesign Landsape LD- 0111 Intent - Issue H —Level, 08.02.2021 Plaza Mosaic 826 Ann St Fortitude Valley QLD 40
4.0 General Character Imagery — ‘look + feel’ Clean trunked trees + groundcovers for clear sightlines Modular concrete seating Lush planting in undercroft areas Trees in plaza spaces for shade + amenity MODE BUNBURY OFFICE DEVELOPMENT Landsape Design Intent - Issue H — 08.02.2021
5.0 Planting Character — celebrating the native landscape MODE BUNBURY OFFICE DEVELOPMENT Landsape Design Intent - Issue H — 08.02.2021
6.1 Planting Palette — trees + shrubs Melaleuca quinquinervia ‘Paperbark’ Agonis flexuosa ‘Peppermint’ Araucaria hetrophylla Cupaniopsis anacardioides ‘Tuckeroo’ Acacia cognata ‘Limelight’ Acacia lasiocarpa ‘Prostrate’ Eremophila glabra ‘Dawes’ Banksia ashbyi ‘Drawf’ Hardenbergia violacea ‘Mini Meema’ Leucophyta brownii ‘Cushion Bush’ Kalanchoe orgyalis ‘Copper Spoons’ Westringia fruticosa ‘Low Horizon’ MODE BUNBURY OFFICE DEVELOPMENT Landsape Design Intent - Issue H — 08.02.2021
6.2 Planting Palette — strappy leaved + groundcovers Anigozanthos ‘Yellow’ Poa ‘Kingsdale’ Lomandra ‘Tanika’ Patersonia lanata Lomandra confertifolia ‘Mini Con’ Dianella tasmanica Dianella caerulea ‘Cassa Blue’ Anigozanthos ‘Red’ Eremphila glabra ‘Roseworthy’ Carpobrotus virescens Conostylis candicans Dampiera linearis Dichondra repens MODE BUNBURY OFFICE DEVELOPMENT Landsape Design Intent - Issue H — 08.02.2021
6.3 Planting Palette — shaded undercroft areas Asparagus meyerii ‘Foxtail Fern’ Aspidistra elatior ‘Cast Iron Plant’ Blechnum gibbum ‘Silver Lady Fern’ Liriope ‘Emerald Cascade’ Monstera deliciosa ‘Swiss Cheese Plant’ Rhaphis excelsa ‘Lady Palm’ Tabernaemontana corymbosa Viola hederacae ‘Native Violet’ Zamia interigfolia ‘Florida Arrowroot’ ‘Little Emerald’ MODE BUNBURY OFFICE DEVELOPMENT Landsape Design Intent - Issue H — 08.02.2021
AUSTRALIA BRISBANE GOLD COAST Plaza Level, Mosaic Suite 1, Ground Floor 826 Ann St 142 Bundall Rd Fortitude Valley QLD 4006 Bundall QLD 4217 PO Box 348 Australia Fortitude Valley QLD 4006 T+61 7 5510 3471 Australia gco@modedesign.com.au T +61 7 3253 9900 bne@modedesign.com.au SUNSHINE COAST Suite 2, 9 Capital Pl SYDNEY Birtinya QLD 4575 Level 5 PO Box 886 111-117 Devonshire St Buddina QLD 4575 Surry Hills NSW 2010 Australia Australia T+61 7 5437 8574 T+61 2 8396 9500 ssc@modedesign.com.au syd@modedesign.com.au NEW ZEALAND MELBOURNE Level 4, 31 King St AUCKLAND Melbourne VIC 3000 Level 3A, 23-25 Falcon St Australia Parnell, Auckland 1052 T+61 3 8614 6600 PO Box 37619, mel@modedesign.com.au Parnell, Auckland 1151 New Zealand DARWIN T +64 9377 6565 T213, Level 2, The Avenue akl@modedesign.co.nz 12 Salonika St New Zealand Parap NT 0820 Australia VIETNAM T+61 8 8941 5300 dwn@modedesign.com.au HO CHI MINH CITY 11 Bis Phan Ngu St PERTH Da Kao Ward Level 2, 56 William St District 1 Perth WA 6000 Ho Chi Minh City PO Box Z52222 Vietnam Perth WA 6000 T+84 28 6259 2468 Australia T+61 8 9213 9300 INDIA per@modedesign.com.au NEW DELHI (DDF Alliance) CAIRNS DDF Group Alliance Level 2, 26 Florence St 501, B-9, ITL Twin Towers, Cairns QLD 4870 Netaji Subhash Pl, Australia Pitampura, T+61 412 889 946 New Delhi-110034 cns@modedesign.com.au India T+91 11 47400500 F+91 11 47400555 info@ddfgroup.com www.modedesigncorp.com