Internal Painting Project - Internal Areas: $1,700.00 - Robertson's Remedial & Painting

Page created by Dean Jensen
 
CONTINUE READING
Internal Painting Project - Internal Areas: ,700.00 - Robertson's Remedial & Painting
Quote No: Q34377-1

1st October 2020

To:      Sass & Bide Store                                     C/: Ticked Off
         Shop 2219, Level 2, Macquarie Shopping                    Attention: Aydan
         Centre, / Cnr Herring & Waterloo Road                     Email: support@tickedoff.net
         NORTH RYDE
         NSW, 2113
                                   Internal Painting Project
                                       Internal Areas: $1,700.00

Note: All pricing stated above excludes GST
HBCF Insurance is included for all residential projects over $20,000 in value inclusive of GST

Prepared By: Drew Byrne
Email:       drew@rpd.net.au
Phone:       0499 660 021
Our quotation is valid for a period of 6 months from date of issue.
Page 1
Internal Painting Project - Internal Areas: ,700.00 - Robertson's Remedial & Painting
Scope of Works & Specification
Following site establishment and surface preparation as listed below, the below areas have been allowed for in our
quotation:

All surfaces will be prepared by sanding and/or scrapping to remove any loose paint back to a sound edge. all
nominated surfaces will receive a minimum of 2 finish coats of Premium Products.

Internal Scope
Internal Touch Ups
Prepare and repaint walls of 4 changeroom, wall at entrances to changerooms, left side of door frame of storeroom,
100mm from floor up along walls of both sides and rear wall to cover where vacuuming has left marks
Surface                        Product
Interior Walls                 Spot prime to bare areas and finish in 2 coats of Dulux low sheen Wash and Wear or
                               equivalent

Page 2
Exclusions

The following items are excluded from our quotation:

All areas not listed in our scope of works.

Additional Comments
The project has been priced to be painted in the existing colour scheme, which we have been advised is Dulux Vivid
white.
Allowance has been made for the works to be done outside of normal business hours.

Price Breakdown
The following pricing schedule is inclusive of all labour, materials and access equipment for all works nominated within
our scope of works as listed above:

Area                                                                                                      Value
Internal Touch Ups                                                                                              $1,700.00
                                                                                                 Total          $1,700.00
                                                                                                  GST             $170.00
                                                                                          Total + GST           $1,870.00

HBCF Insurance is included for all projects over $20,000 in value inclusive of GST

Our quotation is valid for a period of 6 months from date of issue.

Page 3
About Us
Robertson's has built an enviable reputation across the industry for consistently delivering high quality, award
winning painting and building services across Sydney and the wider NSW region.

At the heart of Robertson's is our qualified, multi-award winning team of experienced painters, builders and project
managers who have the expertise and experience to deliver a great outcome for your project. We have a dedicated and
well trained office support team always on hand for all inquiries.

Proudly family owned and operated for over 50 years, we are dedicated to our customers and we pride ourselves on our
professional and committed attitude.

• Member of Master Builders Association
• Member of Master Painters Association
• Public Liability Insurance $20M.
• Workers Compensation Fund
• Home Building Compensation Fund: up to $14M & $4M individual
• CM3 registered and qualified
• Australian Standard AS/NZS ISO 9001:2008 compliant
• Institute Strata Title Management supply member
Colour Consultation Services - Robertson's will provide colour samples on request and can assist customers with
colour schemes. For a more involved and detailed service we can refer you to one of our partner colour consultant
professionals - our sales team can advise you of the options or alternatively refer to robertsons.com.au for more
information and links.
Certificate of Completion - Robertson's will issue information on completion which covers the colours and paint
finishes used.
Robertson's Maintenance Programmes - are available to ensure longevity of your project - we can tailor a programme
specifically to your individual needs and budget.

Warranty
• 5 year warranty on Robertson's workmanship
• 10 year manufacturer's warranty on products and materials
Warranty does not apply to the following:

Coating failure due to water penetration or ingress.
Coating failure due to pre-existing rust damage.
Coating failure due to settlement cracking or other movement.
Coating failure due to pre-existing timber rot.
Coating failure due to pre-existing paint delaminating.
Damage resulting from general wear and tear.

Page 4
Terms and Conditions
• Robertson's quotes are valid for a period of 6 months from the date of issue - unless otherwise stated on the quote.
• All paint colours and finishes are to be confirmed in writing prior to commencement. Changes to colours or finishes
post commencement may incur additional charges.
• Robertson's work hours are generally from 7.00am to 4.00pm Monday to Saturday unless otherwise noted.
• Robertson's quotes are based on work being done during our normal business hours unless otherwise noted.
Additional charges will apply if work is to be carried out after these business hours.
• The customer is expected to provide free of charge to Robertson's electrical power, running water and toilet facilities
(where applicable) at the work site for the duration of the project.
• Pre-existing materials such as lead paints or asbestos particle materials will be subject to additional costs to prepare
or remove as appropriate unless otherwise stated in quote.
• Payment terms shall be as agreed and noted to in the works contract. Payment terms for all other projects are 14
days from the date of the invoice unless otherwise noted. For projects $5,000 and above late payment will be subject to
an initial 5% penalty and interest charges of 3% per calendar month.
• If the client defaults payment of any invoice when due the client will be responsible for all costs incurred by
Robertson's in pursuing the debt including legal costs.
• Robertson's may suspend or terminate the supply of goods if the client is at any time in breach of any obligation
including payment terms. Robertson's will not be liable to the client for any damage or loss incurred as a result.
• Robertson's will not be subject to liquidated damages unless specifically stated in the quote. Liquidated damages
shall be limited to 1% of the net price per week or to an overall 5% of the net price and shall only then be applied where
an act or omission of Robertson's directly causes such damages.
• Should any new laws or regulations be introduced by any level of government resulting in new changes being
introduced our invoices will be adjusted accordingly for any increases or decreases in cost associated with these
charges.
• Payments cannot be withheld for reasons relating to defects or related issues if the client or client representative fails
to notify Robertson's within 14 days of final invoice.

Page 5
You can also read