UKRAINIAN PORTS FORUM 2021 (UPF 2021) 27 MAY 2021 UKRAINIAN PORTS FORUM 2021 (UPF 2021) DRAFT AGENDA* MAY 27, 2021 DRAFT AGENDA* MAY 27, 2021 08:30 – 09:30 Registration of the participants. Coffee time IMPLEMENTATION OF SILENT PILING 09:30 – 10:00 Opening ceremony Opening speech: Volodymyr Zelenskyi, the President of Ukraine (TBC) 08:30 – 09:30 Registration of the participants. Coffee time 09:30 – 10:00 Opening ceremony IN NEWLY INDEPENDENT STATES Yuliia Svyrydenko, Deputy Head of the Office of the PresidentOpening Denys Shmyhal, the Prime Minister of Ukraine (TBC) of Ukrainespeech: Volodymyr Zelenskyi, the President of Ukraine (TBC) Yuliia Svyrydenko, Deputy Head of the Office of the President of Ukraine 10:00 – 11:15 Session 1. Development of port infrastructure as a driver of economic growth in Ukraine Moderator: Serhii Vovk, Director of CFTS Denys Shmyhal, the Prime Minister of Ukraine (TBC) Participants of the discussion: 10:00 – 11:15 Session 1. Development of port infrastructure as a driver of economic growth in Ukraine Yuliia Svyrydenko, Deputy Head of the Office of the PresidentModerator: of Ukraine Serhii Vovk, Director of CFTS 15 YEARS OF EXPERIENCE Yurii Kisiel, Head of the Verkhovna Rada of Ukraine Committee for transport and infrastructure Vladyslav Kryklii, Minister of infrastructure of Ukraine Serhii Hrynevetskyi, the Governor of Odesa Region Participants of the discussion: Andriy Gaidutskiy, Head of USPA Supervisory board Yuliia Svyrydenko, Deputy Head of the Office of the President of Ukraine Matti Maasikas, Head of the Delegation of the European Union in Ukraine Yurii Kisiel, Head of the Verkhovna Rada of Ukraine Committee for transport and infrastructure Liubov Nepop, President of the Danube Commission, Extraordinary and Plenipotentiary Ambassador of Vladyslav Kryklii, Minister of infrastructure of Ukraine Ukraine in Hungary, Representative of Ukraine to the Danube Commission Serhii Hrynevetskyi, the Governor of Odesa Region Topics for discussion: Andriy Gaidutskiy, Head of USPA Supervisory board Port infrastructure of Ukraine: current situation and development Maasikas, Head of the Delegation of the European Union in Ukraine Mattiprospects Corporatization of the USPA Liubov Nepop, President of the Danube Commission, Extraordinary and Plenipotentiary Ambassador of The role of USPA in the implementation of the Ukrainian Seaports Development Strategy until 2038 Ukraine in Hungary, Representative of Ukraine to the Danube Commission Roadmap on legislative and regulatory changes Main development trends in the Black Sea region: navigation safety and international cooperation Topics for discussion: 11:15-11:45 Coffee-break Port infrastructure of Ukraine: current situation and development prospects 11:45 – 13:00 Session 2. Options for financing projects in the port Corporatization sector of the USPA Moderator: Taras Boichuk – Head of Office SPILNO The role of USPA in the implementation of the Ukrainian Seaports Development Strategy until 2038 Participants of the discussion: Roadmap on legislative and regulatory changes
IMPLEMENTATION OF SILENT PILING IN NEWLY INDEPENDENT STATES 15 YEARS OF EXPERIENCE Alex Pougovkine Beqa Gurgenidze MSc. MBA Eng. MSc. Nord Metallica Nederland, Erti Co. Ltd, The Netherlands Republic of Georgia
PILE PENETRATION METHOD Different Effects by Various Installation Methods Percussion Vibration Pre-drilling Press-in Noise Noise Pressure Vibration Vibration Pocket Bulb Formation Ground Ground Disturbance Disturbance
Eurocode 3 | Maximum Acceptable Vibrations Peak Particle Velocity (mm/s) Percussion Method Residential Area 5mm/s
MAXIMISATION OF LAND USE Steel Sheet Pile Wall In-situ Concrete Pile Wall Z Pile
APPLICABLE PILE PROFILE Section Modulus Moment of Inertia 800cm3/m – 27,000cm3/m 20,000cm4/m – 2,000,000cm4/m U Sheet Pile Z Sheet Pile Tubular Pile
PRESS-IN (STANDARD MODE)
PRESS-IN WITH WATER JETTING
SUPER CRUSH SYSTEM
SUPER CRUSH SYSTEM
PENETRATION TECHNOLOGIES Case1; U Sheet Pile (600mm Wide) vs SPT N Applicable to;- Super Crush Mode Cobbles, Boulders, Mass concrete, Rock etc… Pile Depth 20m 15m 13m 10m Standard Mode Water Jetting Mode 5m 10 20 30 40 50 500 Max. SPT N Value
PENETRATION TECHNOLOGIES Case2; Z Sheet Pile vs SPT N Applicable to;- Double Pile Cobbles, Boulders, Super Crush Mass concrete, Rock etc… Pile Depth 20m Single Pile 15m 10m Water Jetting 5m Standard Mode Mode 10 20 30 40 50 500 Max. SPT N Value
PENETRATION TECHNOLOGIES Case3; Tubular Pile vs SPT N Applicable to;- Cobbles, Boulders, Super Crush Mode Mass concrete, Rock etc… 30m Pile Depth 20m Water Jetting Mode or 15m Gyropress Method 10m Standard Mode 5m 15 50 500 Max. SPT N Value
ADVANTAGES OF PRESS-IN METHOD INTEGRATION WITH THE EARTH Large Working Force Silent Piler Small / Compact Machine Reaction Base Piling without Vibration & Noise Use of Static Load Reaction Minimize Working Space Piles Systemized Operation THE EARTH Stable Press-in Operation Firm Grip on Completed Piles
COMPARISON OF PRESS-IN METHOD & CONVENTIONAL METHOD Road Widening Dense Residential Area Sloping Embankment Heavy Daily Traffic Sloping Embankment Hodogaya Bypass JAPAN
COMPARISON OF PRESS-IN METHOD & CONVENTIONAL METHOD Press-in Method Conventional Approach Hodogaya Bypass JAPAN
COMPARISON OF PRESS-IN METHOD & CONVENTIONAL METHOD Road Widening Hodogaya Bypass JAPAN
River Improvement Works After Completion Press-in Method Conventional Approach Kandagawa-River JAPAN
Conventional Methods Press-inConventional Press-in Method MethodApproach • Initially Cheap • Initially More Expensive • Noise & Vibration • No Noise & Vibration • Damage & Repairs • No Risks of Damage • Complaints • No Complaints • Temporary Works • Min. Temporary Works • Less Safe • Safe Ultimately Ultimately EXPENSIVE More ECONOMICAL
The entire building and basement of BBC Broadcasting House were reconstructed.
In order to minimize the temporary move period, the piling works needed 16m Deep to be carried out Excavation prior to its demolition works.
Case Study: Batumi Sea Port Althoug the far-going plans had to be shelved (Corona, etc.), some important improvements could be made, at little cost with high efficiency.
Batumi Sea Port
Batumi Sea Port
Batumi Sea Port: refurbishment of the berths
Batumi Sea Port: refurbishment of the berths
Batumi Sea Port: refurbishment of the berths
Batumi Sea Port: refurbishment of the berths
Batumi Sea Port: refurbishment of the berths
Batumi Sea Port: Chemical Bulk Terminal
Batumi Sea Port: Chemical Bulk Terminal
Case Study: Saburtalo City Mall The area of the shopping centre more than doubbled, plus an office tower was built, without discruption in the shopping centre’s work
Case Stydy: Saburtalo City Mall Vazha Pshavela ave.70, Tbilisi
Case Stydy: Saburtalo City Mall Vazha Pshavela ave.70, Tbilisi
Saburtalo City Mall - Existing mall: 17,000 m2 - Newly developed area: 57,000 m2 - Office tower
Saburtalo City Mall
Saburtalo City Mall
Saburtalo City Mall
Saburtalo City Mall
Case Stydy: Saburtalo City Mall Vazha Pshavela ave.70, Tbilisi
Saburtalo City Mall
Conclusions The use of silent piling is essential when: • Working in fragile environments • Working in potentially hazardous environmens (chemical plants, power plants,etc.) • Working close to active motor- or railways • Working on slopes • Working in shallow waters
Questions?
Questions? info@nordmetallica.com info@shpunt.ge
Apartment Building with underground parking, Paliashvili 87, Tbilisi
Underground Parking, Gudiashvili 2, Tbilisi
Underground Parking, Gudiashvili 2, Tbilisi
Questions?
Questions? info@nordmetallica.com info@shpunt.ge
Silent Piling
APPLICATION OF SILENT PILING IN URBAN AREA Saint-Petersburg Sheet Piling Works BBC, Central London Sheet Piling Works in Residential Area in Commercial Area
References : Grasweg, Amsterdam
References : Grasweg, Amsterdam
Apartment Building with underground parking, Paliashvili 87, Tbilisi
Underground Parking, Gudiashvili 2, Tbilisi
Underground Parking, Gudiashvili 2, Tbilisi
References : Dam project, Saint-Petersburg
Steel-Intensive Basement Water Tightness Seal Welds & Slab Connections
THE PENETRATION TECHNOLOGY Press-in Mechanism: Initial Piling
THE PRESS-IN PRINCIPLES Press-in a Pile using Static Load Pressure Bulb