El Metro Transit FY 2020-2021

    To provide a safe, reliable, cost effective, and
efficient public transportation system that meets the
     changing needs of our growing community.
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
Transit System FTE’s

        1,953,998           1,962,354                                            1,919,000
                                                            1,913,050

183.1               182.1                           184.1                185.9

  FY 17 - 18          FY 18 - 19                      FY 19 - 20        Proposed 20 - 21
                                   FTE's   Miles Traveled
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
Transit Proposed FY 20-21
             Maintenance &                                                          Transit Center
         Operations:$16,886,512                                                        $733,910
      Cares Act Reserve: $5,280,032
              $229,345, 1%
                             $83,622, 1%

   $2,235,769,                             Personnel
       13%
                                                                                                     Personnel
                                           Materials and                     200, 0%
                                           Supplies
$2,483,281,                                                                            $312,656      Materials and
    15%
                                           Contractual Services   358,454,                           Supplies
                                                                                        , 43%
                                                                    49%                              Contractual
                        $11,854,495,       Other Charges (Cares                                      Services
                            70%            Act)
                                                                              $62,600 ,              Other
                                           Intergovernmental                    8%
                                           Transfers
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
Fixed Route Bus Service
   −   47 buses & 1 Trolley
   −   23 routes Throughout Laredo
   −   C1 Mines Road Circulator
   −   Approximately 1,249 bus stops
       El Lift Paratransit
   − 8 Champion, 9 Ford, 3 MV-1 vans
   − Provides shared origin to destination public
     transportation for eligible individuals with disabilities
     who are unable to use our fixed route services.

   Transit Center Parking Facility
− 4 floors of Parking with 412 spaces available.
− Main transfer point to all El Metro bus routes.
− Long term parking contracts (305).
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
State of Good Repair FY 2020-2021
                                 Type of Improvement                            Est.   Proj.
                                                                               19-20   20-21
Bus Preventive Maintenance                                                     738      954
El Lift Preventive Maintenance                                                 390      425

Number of Facility / Equipment Preventive Maintenance Inspections Completed    7,824   10,320

Bus Stop New Canopies Installed or Refurbished                                  99      56
Bike & Ride Plazas installed                                                    15      21
New Benches                                                                    133      67

Bus Stop Amenities (Bike Racks,Trash Receptacles, Solar lights, Map holders)   110      136
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
2,748,267

                            2,575,000
              2,517,500

                                                      1,387,261            1,400,000

FY 17 - 18   FY 18 - 19   F Y 1 9 - 2 0 TA RG E T   F Y 1 9 - 2 0 EST.   F Y. 2 0 - 2 1 PROJ.
                - 8.40%          2.28%                      - 46.13%              1%
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
ACTUAL      ESTIMATE     PROJECTED
                                        18 - 19     19 – 20       20-21

Number of miles                       1,704,477    1,703,500    1,704,000

Number of hours                        149,048      149,250      149,300

Total operating revenue               $3,700,098   $1,845,298   $1,900,000

Total operating expenditures
                                      $8,233,383   $8,828,566   $9,043,092
Number of passengers per total mile      1.48         0.81         0.82

Number of passengers per hour           16.89         9.29         9.38
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
45,071         45,116          45,084

                                                                             31,000
                                                       30,000

  FY 17 - 18    FY 18 - 19   F Y 1 9 - 2 0 TA RG E T   F Y 1 9 - 2 0 EST.   F Y. 2 0 - 2 1 PROJ.
               0.10%              -0.07%               - 33.46%                3.33%
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
El Lift Performance

                                       ACTUAL       ESTIMATE    PROJECTED
                                       18 – 19       19 – 20      20 – 21

Number of miles                        257,877      209,550      215,000

Number of hours                        23,899       24,000       24,100

Total operating revenue                $61,871      $45,180      $45,200

Total operating expenditures
                                      $1,767,458   $1,822,586   $1,764,133
Number of passengers per total mile      0.17         0.14         0.14

Number of passengers per hour            1.89         1.25         1.29
El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
Request              Estimated Cost Approved
North Circulator Service                                    Purchase of two (2)       $125,000 /
                                                         Circulator LowFloor Vans     @$250,000
NorthCirculator Bus Operators (2)                           OneFull Time FTE           $70,000
                                                            One Part Time FTE         $34,000 PT
                                                                                      @$104,000
Downtown Circulator Bus Operators (2)                       OneFull Time FTE           $70,000
                                                            One Part Time FTE         $34,000 PT
Van Purchased with District 8 Priority Funds
                                                                                      @$104,000
South Circulator Service                                    Purchase of two (2)        $125,000
                                                         Circulator LowFloor Vans     @$250,000
South Circulator Bus Operators (2)                          OneFull Time FTE           $70,000
                                                            One Part Time FTE         $34,000 PT
                                                                                      @$104,000
North - West Transit Hub                                North 2.5 Acresof land
South Transit Hub
Currently using Target Parking Lot                      South 3.5 Acresof land.
Transfer Hub will better enable Circulator (s)          South Hub shall connect
Connectivity for Mines Road residents, employees and    with El Aguila.
students with express routes downtown and other fixed
routes in the area,
Transit Capital Projects & Fleet Updates
   El Metro ADA Bus Stops and Bicycle Plazas Enhancement Project Phase I will kickoff building 17
    existing bus stops with new canopies, boarding pads, route schedule holders, trash receptacles,
    solar lighting, benches, bike racks and repair stations. MPO Funded Transportation Set-Aside Grant
    $250,000.00 investment.
   El Metro will be replacing the Compressed Natural Gas station with a new state-of-the art CNG plant
    funded by the Federal Transit Administration in the amount of $2.3 Million dollars.
   The Metropolitan Planning Organization and El Metro will be developing a new Comprehensive
    Operational Analysis to evaluate the current bus and van services and provide recommendations for
    better service efficiency and cost effectiveness. MPO Funded planning study.
   This FY20-21 El Metro will take delivery of: One Diesel-Hybrid Bus 35 foot (bonds), One CNG Heavy
    Duty Bus 35 foot (Bonds), and one twenty passenger Light Duty Bus for Downtown Circulator (District
    Priority Funds); in addition five (5) addition paratransit vans will be in-service for El Lift (FTA 5310
    Funded).
   El Metro shall initiate the procurement process for the updated design of print for the new El Metro
    Operations and Administration Facility. Federal Transit Administration (FTA) initial funding of $9.8
    million dollars.
   Ongoing projects include: Ticket Vending Machines at the Transit Center, Wi-Fi hardware at 100%
    installed, bus stop improvements as planned.
   COVID-19 Update:
          Employees received guidance and industry best practices for the prevention infection.
          Ongoing cleaning and sanitizing buses, vans and facilities as per FTA and CDC
           recommendations.
          Close communication with Health Department for positive cases control.
In behalf of all Transit users: Thank You