El Metro Transit FY 2020-2021 - To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
El Metro Transit FY 2020-2021 To provide a safe, reliable, cost effective, and efficient public transportation system that meets the changing needs of our growing community.
Transit System FTE’s 1,953,998 1,962,354 1,919,000 1,913,050 183.1 182.1 184.1 185.9 FY 17 - 18 FY 18 - 19 FY 19 - 20 Proposed 20 - 21 FTE's Miles Traveled
Transit Proposed FY 20-21 Maintenance & Transit Center Operations:$16,886,512 $733,910 Cares Act Reserve: $5,280,032 $229,345, 1% $83,622, 1% $2,235,769, Personnel 13% Personnel Materials and 200, 0% Supplies $2,483,281, $312,656 Materials and 15% Contractual Services 358,454, Supplies , 43% 49% Contractual $11,854,495, Other Charges (Cares Services 70% Act) $62,600 , Other Intergovernmental 8% Transfers
Fixed Route Bus Service − 47 buses & 1 Trolley − 23 routes Throughout Laredo − C1 Mines Road Circulator − Approximately 1,249 bus stops El Lift Paratransit − 8 Champion, 9 Ford, 3 MV-1 vans − Provides shared origin to destination public transportation for eligible individuals with disabilities who are unable to use our fixed route services. Transit Center Parking Facility − 4 floors of Parking with 412 spaces available. − Main transfer point to all El Metro bus routes. − Long term parking contracts (305).
State of Good Repair FY 2020-2021 Type of Improvement Est. Proj. 19-20 20-21 Bus Preventive Maintenance 738 954 El Lift Preventive Maintenance 390 425 Number of Facility / Equipment Preventive Maintenance Inspections Completed 7,824 10,320 Bus Stop New Canopies Installed or Refurbished 99 56 Bike & Ride Plazas installed 15 21 New Benches 133 67 Bus Stop Amenities (Bike Racks,Trash Receptacles, Solar lights, Map holders) 110 136
2,748,267 2,575,000 2,517,500 1,387,261 1,400,000 FY 17 - 18 FY 18 - 19 F Y 1 9 - 2 0 TA RG E T F Y 1 9 - 2 0 EST. F Y. 2 0 - 2 1 PROJ. - 8.40% 2.28% - 46.13% 1%
ACTUAL ESTIMATE PROJECTED 18 - 19 19 – 20 20-21 Number of miles 1,704,477 1,703,500 1,704,000 Number of hours 149,048 149,250 149,300 Total operating revenue $3,700,098 $1,845,298 $1,900,000 Total operating expenditures $8,233,383 $8,828,566 $9,043,092 Number of passengers per total mile 1.48 0.81 0.82 Number of passengers per hour 16.89 9.29 9.38
45,071 45,116 45,084 31,000 30,000 FY 17 - 18 FY 18 - 19 F Y 1 9 - 2 0 TA RG E T F Y 1 9 - 2 0 EST. F Y. 2 0 - 2 1 PROJ. 0.10% -0.07% - 33.46% 3.33%
El Lift Performance ACTUAL ESTIMATE PROJECTED 18 – 19 19 – 20 20 – 21 Number of miles 257,877 209,550 215,000 Number of hours 23,899 24,000 24,100 Total operating revenue $61,871 $45,180 $45,200 Total operating expenditures $1,767,458 $1,822,586 $1,764,133 Number of passengers per total mile 0.17 0.14 0.14 Number of passengers per hour 1.89 1.25 1.29
Request Estimated Cost Approved North Circulator Service Purchase of two (2) $125,000 / Circulator LowFloor Vans @$250,000 NorthCirculator Bus Operators (2) OneFull Time FTE $70,000 One Part Time FTE $34,000 PT @$104,000 Downtown Circulator Bus Operators (2) OneFull Time FTE $70,000 One Part Time FTE $34,000 PT Van Purchased with District 8 Priority Funds @$104,000 South Circulator Service Purchase of two (2) $125,000 Circulator LowFloor Vans @$250,000 South Circulator Bus Operators (2) OneFull Time FTE $70,000 One Part Time FTE $34,000 PT @$104,000 North - West Transit Hub North 2.5 Acresof land South Transit Hub Currently using Target Parking Lot South 3.5 Acresof land. Transfer Hub will better enable Circulator (s) South Hub shall connect Connectivity for Mines Road residents, employees and with El Aguila. students with express routes downtown and other fixed routes in the area,
Transit Capital Projects & Fleet Updates El Metro ADA Bus Stops and Bicycle Plazas Enhancement Project Phase I will kickoff building 17 existing bus stops with new canopies, boarding pads, route schedule holders, trash receptacles, solar lighting, benches, bike racks and repair stations. MPO Funded Transportation Set-Aside Grant $250,000.00 investment. El Metro will be replacing the Compressed Natural Gas station with a new state-of-the art CNG plant funded by the Federal Transit Administration in the amount of $2.3 Million dollars. The Metropolitan Planning Organization and El Metro will be developing a new Comprehensive Operational Analysis to evaluate the current bus and van services and provide recommendations for better service efficiency and cost effectiveness. MPO Funded planning study. This FY20-21 El Metro will take delivery of: One Diesel-Hybrid Bus 35 foot (bonds), One CNG Heavy Duty Bus 35 foot (Bonds), and one twenty passenger Light Duty Bus for Downtown Circulator (District Priority Funds); in addition five (5) addition paratransit vans will be in-service for El Lift (FTA 5310 Funded). El Metro shall initiate the procurement process for the updated design of print for the new El Metro Operations and Administration Facility. Federal Transit Administration (FTA) initial funding of $9.8 million dollars. Ongoing projects include: Ticket Vending Machines at the Transit Center, Wi-Fi hardware at 100% installed, bus stop improvements as planned. COVID-19 Update: Employees received guidance and industry best practices for the prevention infection. Ongoing cleaning and sanitizing buses, vans and facilities as per FTA and CDC recommendations. Close communication with Health Department for positive cases control.