Early Childhood Centre - For Lease - 405 Lower Queen Street | Richmond - Berryfields Crossing
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Location overview Location overview Location detail Picton 146km The development Nelson 14km Demographics Key features Motueka 6 Floor plan Nelson Airport 9km Perspectives Elevations A Elevations B Lease process The developer The architect Motueka Richmond West 33km Stoke Development Outline specification 6km 60 Enquire 6 Richmond 1km Nelson 6 Christchurch Christchurch 400km 02 Richmond CBD Berryfields Crossing For Lease
Location detail Location overview Location detail McShane Road McShane Road The development Demographics Stage 5 Future Stages Stage 1 2022 2023 2021 Stage 3 Key features Waimea Plains Floor plan Lifestyle Village Appleby Highway Completed Lower Queen Street Perspectives Stage 4 re ek 2021 kC Future Stages rc Elevations A Central Bo 2025 Stage 2 Park Future Elevations B Café, Bar & Store Development 2021 Lease process Waimea Plains Lifestyle Village The developer The architect Be rr yfi ek el Outline specification Cre d The Fields 60 B or c k Dr iv e Completed Enquire Ber ry fi eld Dri ve Applebyfield Estate Appleby Fields Consortium Completed Completed 2021 / 2022 Oakdale Grove Completed Appleby Highway Lower Queen Street RW Partnership Ltd 2021 / 2022 03 Berryfields Crossing For Lease
The development Location overview Gibbons / GP Investments as Location detail developer and landlord is proposing to develop an Early Childhood The development Centre with a maximum capacity Demographics of 80 children as a part of a wider Future Development Key features mixed-use centre that will be known as Berryfields Crossing. Floor plan Perspectives Upon completion, Berryfields will contain a great complementary mix of food and Service Elevations A beverage, professional services, health and Station beauty, retail, childhood, and entertainment Elevations B Professional Services uses to service the immediate and local 1300m2 Lease process catchment. The developer The ECC will form an important part of COM / Berryfields Crossing. It will be completed The architect LFR Lower Queen Street following the opening of the cinemas, 1000m2 Outline specification and the 1st F & B offerings including the tenancies in front of the cinema and the café Café Village Green Enquire & Bar / restaurant / bar. The balance of the centre 360m2 is intended to be completed over the next UNDER CONTRACT 2 - 3 years. Food & Bev Quick Service Retail 321m2 The developer will provide a turn key and fully completed building including Commercial LFR perimeter fencing as per the specifications Early 750m2 attached. Childhood Centre 450m2 The successful operator will be responsible for naming the centre, providing all required appliances (note 14 of the specification summary), providing any outdoor play equipment, interior furniture, and obtaining 04 required licences from all regulatory bodies to operate the ECC. Berr y fie ld Drive Berryfields Crossing The construction of the ECC is estimated to For Lease Plan indicative only. Subject to change without notice. be completed late 2022.
Demographics Location overview Location detail The development Catchment household & spend projections Demographics - Statistics NZ & Property Economics* Key features Floor plan Perspectives 2020 2038 Elevations A Elevations B Primary Secondary Total Primary Secondary Total Lease process The developer Households 6,930 25,540 32,470 8,610 31,630 40,240 The architect Outline specification Enquire Population 19,100 62,540 81,640 20,970 74,890 95,860 Spend $276M $813M $1,089M $352M $1,118M $1,470M 05 Berryfields Crossing *Property Economics Catchment and Spend Report, July 2021. Available on request. For Lease
Key features Location overview Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Premium Prime 330+ Lease process premises Location Car Parks Brand new Corner site with Approximately The developer construction. multiple access. 330 car parks. The architect Outline specification Enquire Late 2022 Successful Retail Growing residential Completion Precinct catchment 06 ECC completion Master planned Service the growing due late 2022. mixed-use centre. catchment of residents. Berryfields Crossing For Lease
Floor plan Location overview Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Lease process The developer The architect Outline specification Enquire 07 Berryfields Crossing For Lease
Perspectives Location overview Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Lease process The developer The architect Outline specification Enquire 08 Berryfields Crossing Perspective indicative only. For Lease
Elevations A Location overview Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Lease process The developer The architect Outline specification Enquire 09 Berryfields Crossing These elevations are indicative only – subject to change without notice. Whilst all care has been taken in the preparation, no responsibility is accepted For Lease for the accuracy of the whole or any part and interested persons are advised to make their own enquiries and satisfy themselves in all aspects.
Elevations B Location overview Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Lease process The developer The architect Outline specification Enquire 10 Berryfields Crossing These elevations are indicative only – subject to change without notice. Whilst all care has been taken in the preparation, no responsibility is accepted For Lease for the accuracy of the whole or any part and interested persons are advised to make their own enquiries and satisfy themselves in all aspects.
Lease process Location overview Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Lease process The developer The architect Outline specification Enquire Method of lease Due diligence information The property is offered The following documents are available For Lease by Negotiation. on request: Enquiries > Detailed plans. 11 All enquiries, requests for information > OPEX Budget. Berryfields Crossing in relation to this opportunity are to be > Building specifications. For Lease directed to Colliers. Perspective indicative only.
The developer Location overview Portfolio Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Upper Queen Street, Richmond Lease process The developer The architect Outline specification Enquire About Gibbons Property Investments Stoneridge on Lunn, Auckland Gibbons is a family business with a portfolio that Established in Nelson, Gibbons is a family is diversified across three key sectors – bulk retail, business grown from humble beginnings industrial and commercial, including: and upholds a proud legacy. > Large format retail centres They have built their company on multi-generational > Industrial estates relationships and a deep commitment to people, > Warehouse and distribution centres customers, and community, with the drive to give back. > Commercial office buildings 12 Gibbons are a leader in their industry with a nationally recognised name. They look after a significant diverse > Residential and sub-divisions > Storage facilities Berryfields Crossing blue-chip investment portfolio, delivering property For Lease solutions to many national tenants. 34 Vanguard Street, Nelson
The architect Location overview Location detail The development Demographics Key features Floor plan Perspectives Elevations A Elevations B Lease process The developer The architect Outline specification Enquire Collingridge & Smith Architects (UK) To date they have designed over 100 early childhood They have a strong reputation within this industry of centres, many considered world class, winning multiple quality, reliability and creating value in our projects. Ltd. is an award winning international awards and featured in publications around the world. They have a sound understanding of how the early architectural practice delivering unique, childhood industry operates from a developer and innovative and sustainable architecture. Their design for the Te Mirumiru early childhood centre operator perspective and they design centres for many in Kawakawa received numerous international and leading NZ brands including New Shoots, Kinder 13 Early Childhood Centres national awards, culminating in 2014 with the World care, Peacocks, Chrysalis Group, House of Wonders, Green Building Councils Leadership in Sustainable Lollipops, etc. Over the last 14 years CASA have built a particular Design Award, the only building that year across the Berryfields Crossing strength in designing early childhood environments as entire Asia Pacific region to receive such a title. For Lease part of local communities.
Outline specification Location overview 1.0 General description 4.4 Roof: H1.2 SG8 timber trusses 1.1 The project consists of the design, construction and completion of new 4.5 Retaining walls: Timber TBC if necessary. Location detail childcare facilities, Berryfields, Richmond NZ as described on the plans. 5.0 Roof The development 1.2 All work is to be completed to a high standard of workmanship in a tradesman 5.1 Type: Profiled pre-finished steel. Demographics like manner in accordance with the NZ Building Code, relevant Acceptable Solutions including NZS 3604 and to the satisfaction of the Territorial Authority. 6.0 Exterior and wall cladding Key features 6.1 Cladding type: Cedar cladding or equivalent on Cavibatts on Thermakraft 1.3 The client reserves the right to amend this specification at any point during the Floor plan design and build process for an equivalent product. Watergate 6.2 Cladding finish: Prefinished in factory Perspectives 2.0 Design 2.1 Architectural services including all consent documentation will be completed 7.0 Windows and external doors Elevations A by the architect at an agreed fee with the client. 7.1 Joinery: APL Commercial sliding aluminium doors, awning and fixed Elevations B panels. PC or anodised tbc. Allow for either. 2.2 Engineering design, drawings, calculations and certificates will be completed Lease process by structural / services engineers at an agreed fee with the client. 7.2 Glazing: Viridian Clear min 6.4mm Energy tech single or 6/12/6 Double 2.3 Consenting, inspections and issue of Code Compliance Certificate will be glazed, toughened as required for pane size and position. The developer Thickness may vary depending on final wind loadings to completed by the Local Authority at cost to be provided to client. These works The architect are separate to the building costs. NZS 4223. 7.4 Entry Door: Automatic sliding glass door with Dorma gear. Outline specification 3.0 Preliminary and general 3.1 Providing all temporary on site services as required to carry out the building 8.0 Internal walls and finishes Enquire works. 8.1 Linings: Generally: 10mm gib board linings stopped to level 4 finish. 3.2 Clearing site at commencement and removal of all rubbish on completion. Resene low sheen acrylic paint, ECNZ standard. 3.3 Bulk excavation to levels and grades as shown on the drawings. 8.2 Skirting: 60x10 square edge pine with matt paint finish. 3.4 Trenching for, laying and connecting mains for all incoming services. 8.3 Tiling: Rectangular white tiles from tile warehouse – see areas below. 4.0 Structure 8.4 Insulation: Batts / Eco-fleece as appropriate – R2.6 min wall, R5 min roof 4.1 Foundations: Strip foundations or piling as necessary to geotech engineers 8.5 Shower enclosure: Rectangular white tiles over DPM. report 8.6 Splash backs: Rectangular white tiles , behind art sinks, sinks in wc’s, 4.2 Ground Slab: 100mm thick reinforced concrete OR Ribraft on polythene laundry, kitchen DPM on sand blindng and compacted hardfill to SE design. 9.0 Interior doors Depth of fill varies depending on natural ground level below. 9.1 Type: Full and half height hollow core flush pre-hung with low 14 4.3 Walls: Main solid external walls: H1.2 140 x 45 treated timber frame sheen acrylic paint finish – Hume or similar. with wrap, cavity and cladding. Glazed walls: APL commercial 9.2 Frames: 18mm pine with low sheen acrylic paint finish. suite - min 6.4mm Energy Tech single glazing or 6/12/6 Double Berryfields Crossing glazing fixed, sliding and awnings. 9.3 Hardware: Assa Abbloy satin chrome lever furniture to interior doors. For Lease
Location overview Privacy sets to bathrooms and wc’s. Pinpad and mag lock to 12.7 Centre manager: ‘Melteca’ or equal on 16mm MR MDF full cupboards front door in addition to deadbolt. 12.8 Art areas ‘Melteca’ or equal on 16mm MR MDF over head storage Location detail 10.0 Floor finishes cupboards complete with shelves. SS benchtop and sink The development 10. Carpet: Selected commercial nylon cut pile carpet to sleep rooms, 13.0 Plumbing and sanitaryware Demographics 50% classrooms, admin areas (not kitchen). 13.1 Waste pipes: N ew wastes, soil pipes and vents in pvc. No pipe work to be 10.2 Vinyl: Timber finish R10 such as Forbo Forest FX To all areas apart exposed. Key features from those noted for carpet – principally circulation routes, 13.2 Water supply: Underground pipe work to Watercare spec. Within structure Floor plan 50% classrooms, bathrooms, store rooms, art rooms, shower, in polypropylene or similar to engineers final spec. Hot water entry, kitchen. Perspectives pipe work to be insulated. 10.3 Entry mat: Advance Floors Coral Tread entry mat – 1.8 x 1.8m 13.4 Hot water cylinder: Rheem 310l heat pump or solar heated cylinder, mains Elevations A 11.0 Ceilings pressure with 3kW element and thermostat. Elevations B 11.1 Generally: 13mm GIB board on timber / rondo battens stopped to level 13.5 Toilets: Child – Caroma Junior x 4 p-trap pan with junior seat and Lease process 4 finish. 60% classroom ceilings to be acoustic panels stuck trident cistern, white. to GIB. Low sheen acrylic paint finish. Accessible – Caroma Care 100 Suite white P-trap and cistern. The developer 11.2 Bathrooms: 13mm GIB Aqualine board on timber / rondo battens stopped 13.6 Hand basins: General handwash: Imperial Ware standard white vc basins The architect to level 4 finish. (square or round) surface mounted, by Heirloom. SS trough 400 Outline specification 11.3 Insulation: R5 min batts or Ecofleece or similar to all ceilings below roof. x 1200 or 1800 by McDonald Industries. 12.0 Fixtures and fittings 13.7 Showers: Clearlite Shub shower tray. Slide shower set by Hansgrohe. Enquire 12.1 Generally: ‘Melteca’ on 16mm MDF cabinets fitted to kitchen, infant 13.8 Tapware: Delabie push taps, wall mounted to childrens handwashing. bathrooms, laundry, stores, nappy change. Finish to all doors, Selected mixer by Hansgrohe to adult only areas. drawers fronts and seen panels in selected melteca timber 13.9 Hose taps: 4 brass wall mounted hose taps. effect finish. Selected stainless steel handles. 13.11 Kitchen Sinks: Double Franke integrated stainless steel. Commercial hose tap 12.2 Kitchen: Stainless steel bench tops with integrated sinks. Selected by Hansgrohe stainless steel handles. 14.0 Appliances - To be supplied by tenant 12.3 Laundry: ‘Melteca’ or equal on 16mm MR MDF over head storage cupboards complete with shelves. SS benchtop and sink 15.0 Electrical and communications 12.4 Bathrooms: SS troughs to children’s bathrooms – mounted into cabinetry 15.1 Mains supply: Underground main to new meter board. 12.5 Nappy change: ‘Melteca’ or equal on 16mm MDF cabinetry. Corian or SS bench 15.2 Light fittings: Combination pendants and recessed LED fittings. Car park top with nappy bin and integrated 600 x 450 ss sink. Under lighting on sensors. 15 bench cabinets with shelves and doors, all melteca timber effect finish. 15.3 Power: Minimum of four double socket outlets per room. External power outlet to courtyards / play areas 1 per area. Berryfields Crossing 12.6 Staff: ‘Melteca’ or equal on 16mm MR MDF over head storage 15.4 Telephone: Patch panel in office store room. Jack point in each classroom, For Lease cupboards complete with shelves. SS benchtop and sink staff, reception, office.
Location overview 15.5 Television: Confirm if client requires this. 18.05 Car Seat Store: 1.8m2 15.6 Security System: Electronic access control system including pin pad on front 18.06 Lobby: 19.6m2 Location detail door and infrared sensors in rooms (8). The development 18.07 WC / Change: 6.9m2 15.7 Ventilation: Ducted ceiling extract fans to bathrooms, sleep rooms and Demographics laundry. Air supply to sleep rooms. 18.08 Art Store / Kitchenette: 7.6m2 15.8 Heating Commercial Heatpump system to engineers design – single 18.09 Reception: 8.6m2 Key features large outdoor unit with multiple indoor heads. 18.10 Office: 9m2 Floor plan 16.0 Drainage 18.11 Kitchen: 18m2 Perspectives 16.1 Public Drainage: new connection to sewer 18.12 Sleep 03: 5.5m2 Elevations A 16.2 Private Drainage: new connection to sewer 17.0 Site works 18.13 Sleep 04: 5.5m2 Elevations B 17.1 Driveway/carparks: 25mm tar seal or 100mm concrete depending on ground 18.14 Non contact / staff: 21.6m2 Lease process conditions to new car parks 18.15 Room 03: 69.4m2 The developer 17.2 Pathways Concrete with round exposed aggregate laid to falls 18.16 Laundry: 9.6m2 The architect 17.3 Outdoor To be supplied by tenant playground: 18.17 Staff / visitor WC: 3.6m2 Outline specification 17.4 Fences: 1.8m high moduline black steel open railings or timber 18.18 Staff WC/ Shower: 4.2m2 Enquire acoustic fence to whole perimeter of playground. 18.19 Art Store: 5.9m2 18.0 Room area schedule 18.20 Washdown: 1.9m2 18.01 Room 01: 31.2m2 18.21 02 WC: 11.5m2 18.02 Room 02: 45.9m2 18.22 Room 04: 82.5m2 18.03 Sleep: 01 6m2 18.04 Sleep: 02 6m2 16 Berryfields Crossing For Lease
Enquire Location overview This information memorandum provides Location detail preliminary information to assist interested parties with their assessment of the property. The development All enquiries are to be directed to Colliers: Demographics Key features Geoff Faulkner Floor plan Manager | Director Perspectives 027 2136 266 Elevations A 03 545 6920 Elevations B geoff@colliersnsn.co.nz Lease process The developer Leroy Wolland The architect National Director - Retail Outline specification 021 537 697 Enquire 09 356 8941 leroy.wolland@colliers.com 17 Disclaimer: This Information Memorandum has been prepared solely for information purposes in order to assist interested parties in making an initial evaluation of the property and does not constitute advice nor purport to contain all of the information that a prospective occupier may require. In all cases interested parties must conduct their own investigation and analysis of the property and the data set out in this Information Memorandum to satisfy themselves in all respects and not rely on the information in this Information Memorandum to make their decision. This Information Memorandum has been prepared in good faith and with due care by Colliers, but neither Colliers nor the Developer accept responsibility hereunder for the accuracy of any part of the information contained in this Information Memorandum. Therefore the Berryfields Crossing recipient/s of this Information Memorandum to the extent that they rely on the information contained herein do so entirely at their own risk. The Developer and Colliers (and its brokers) expressly disclaim all liability for representations, express or implied, contained in, or for omissions from, this Information Memorandum or any other written or oral communication given to any prospective purchaser in the course of their For Lease evaluation and/or offer. This Information Memorandum does not constitute an offer to lease or otherwise. Images and plans are indicative only and subject to change without notice.
You can also read