Circuit Reliability Review
Shaver Lake

                             2020
Circuit Reliability Review 2020 - Southern California ...
Who We Are

• Southern California Edison (SCE) is
  an Edison International company
• One of the nation’s largest electric
  utilities
• More than 130 years of history
• Headquartered in Rosemead,
  California
• Regulated by the California Public
  Utilities Commission (CPUC) and
  the Federal Energy Regulatory
  Commission (FERC)
• 50,000 square miles of SCE service
  area across Central, Coastal, and
  Southern California
• 15 million residents in service
  territory
• 5 million customer accounts in 445
  cities and communities

                                         2
Circuit Reliability Review 2020 - Southern California ...
Our Grid

 To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity
 system.

       50,000 Square Miles

           4,600 Circuits

         1.5 Million Poles

  119,000 Miles of Transmission
      and Distribution Lines

       730,000 Transformers

                                                                                                3
Circuit Reliability Review 2020 - Southern California ...
Strengthening and Modernizing the Grid

    SCE plans to spend more than $5B each                 2019 Capital Investments
     year to maintain, improve, and harden
               its infrastructure.                         179 miles of underground cable
                                                                      replaced
•    Infrastructure reliability – updating underground
     cables, poles, switches, and transformers             502 miles of overhead conductor
•    Wildfire mitigation – hardening infrastructure,          replaced for public safety
     bolstering situational awareness capabilities, and
     enhancing operational practices
                                                           16.4k distribution poles replaced
•    Transmission – connecting renewables, installing
     new substations, and updating lines
                                                           4.3k transmission poles replaced
•    Grid readiness – updating the grid for impacts
     from new technologies
                                                              71 underground structure
•    Long-term energy policy – supporting energy
     storage, electric vehicles, and renewables                    replacements

     SCE’s investments support safe, reliable, affordable, and clean energy for our customers

                                                                                                4
Circuit Reliability Review 2020 - Southern California ...
Meeting California’s Climate Change Goals

                 PATHWAY 2045
    SCE’S vision to help California achieve a carbon neutral future

    Carbon neutrality is achieved through deep decarbonization of
       electricity, transportation and building electrification,
                    and the use of low-carbon fuels

                                                                      5
Circuit Reliability Review 2020 - Southern California ...
Addressing Wildfire Risk

                           • SCE filed its second Wildfire
                             Mitigation Plan in February 2020

                           • It builds on the progress made
                             in 2019 to reduce the risk of fire
                             ignitions caused by utility
                             infrastructure

                           • SCE crews will continue to work
                             to install hi-tech wildfire
                             mitigation tools and
                             technologies to make
                             communities safer, more
                             resilient, and to help reduce the
                             number of Public Safety Power
                             Shutoffs (PSPS)

                                                                  6
Circuit Reliability Review 2020 - Southern California ...
Public Safety Power Shutoffs (PSPS)
  •    De-energizing power lines to prevent ignitions
  •    Used during elevated fire conditions
  •    Primarily impacts circuits in high fire risk areas
  •    Use of multiple methods to notify people in affected areas before, during and after a de-energization event

             4-7 DAYS              3 DAYS                2 DAYS             1 DAY AHEAD              POWER                 POWER
             AHEAD                 AHEAD                 AHEAD                                      SHUTOFF             RESTORATION

            Forecast              SCE Incident         SCE Incident        2nd Notification      3rd Notification   4th Notification
          Weather & Fire          Management           Management               PSPS              Power Shutoff     Power Restored
           Conditions            Team on Alert        Team Activated          Possible                              After Inspection

                                    County             1st Notification
                               Operational Areas     PSPS Possible sent
                                 informed of          to agencies and
                                   potential             customers
                                  activation

                                   PLANNING AND MONITORING                                                     OUTAGE

*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.                                 7
Circuit Reliability Review 2020 - Southern California ...
Reliability Overview

                       8
Circuit Reliability Review 2020 - Southern California ...
What is Reliability?

   • In simplest terms:
           Having dependable electricity when you
           need it.
   • Outages:
           • Maintenance outages (aka planned
             outages)
           • Repair outages (aka unplanned outages)
                  • Sustained Outage = An outage lasting > 5
                    minutes
                  • Momentary Outage = An outage lasting ≤
                    5 minutes

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system
SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a
daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally
expected (such as severe weather).
Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize
the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary
and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

                                                                                                                                                9
Circuit Reliability Review 2020 - Southern California ...
How Do We Measure Reliability?

      SAIDI       SAIFI      MAIFI   CAIDI

                                             10
Communities in the SHAVER LAKE District   CityList1

BIG CREEK
DINKEY CREEK
FRESNO COUNTY
HUNTINGTON LAKE
MAMMOTH POOL
REDINGER LAKE
SHAVER LAKE
TAMARACK RIDGE

                                                      11
*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.
**In the columns showing “Rank,” lower numbers indicate poorer performance.

                                                                                                                                                            12
Overview of Shaver Lake                                                                                                  CircuitList1

There are 2 circuits that serve Shaver Lake                                                                                      1
Circuit Type      Customers           Circuit Type   Customers       Circuit Type   Customers       Circuit Type   Customers
PERIMETER(12KV)               1,250                              -                              -                                -
ROSEBUD(12KV)                   818                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -
                                  -                              -                              -                                -

Grand Total                   2,068

                                                                                                                                        13
BarChart

                   Reliability History of Circuits Serving Shaver Lake (No Exclusions)

                             2016             2017           2018             2019
                 3500.0
                                          3197.8
                 3000.0
               2500.0
    SAIDI
   (average 2000.0
  minutes of 1500.0                                                        1449.0
  sustained 1000.0
interruptions)            530.8
                500.0             134.5            139.7           136.8            178.0      Shaver Lake
                                                           132.5
                    0.0
                   10.0
                                           9.1
                                                                                               SCE SYSTEMWIDE
                    8.0
                                                                            6.5
      SAIFI
                    6.0
    (average               4.9
 frequency of       4.0                                    3.1
   sustained
interruptions)      2.0           1.1              1.2             0.9              1.0
                                                                                            **“Exclusions” are days which
                    0.0
                                                                                            utilities are allowed to
                                                                                            remove from their metrics
                   10.0                                                     9.4
                                                                                            because the outages on
                                                           7.4
                    8.0
                                           6.8                                              those days were caused by
     MAIFI                                                                                  acts of nature.
    (average        6.0
                          4.4
 frequency of
                    4.0                                                                     **Data is as of 02/14/2020, data
  momentary
interruptions)                    1.6              1.8                                      can be slightly different due to
                    2.0                                            1.4              1.4
                                                                                            outage data validation process
                    0.0

                                                                                                                               14
SAIDIChart
                                        Causes of Repair Outages in Shaver Lake
                                                                           2019

                                                                                     Contributions to SAIDI by Outage Cause
                                                Vegetation /Animal          3rd Party    PSPS
                                                       0.1%                   0.0%       0.0%
  Equipment Failure
   e.g., in-service failure of transformer,
   switch, or conductors                                             Weather /Fire
 Vegetation/Animal                                                  /Earthquake
   e.g., tree branch, rodent, or bird                                   12.5%
   causing a short circuit between
   conductors
  Other
   e.g., patrolled but no cause found,
   PSPS                                                                                                        Equipment Failure
  Operations                                                                                                       46.8%

  e.g., urgent maintenance w/o 3-day
  notice
  3rd Party
  e.g., balloon, car hit pole, dig-in            Other
                                                 39.5%
  PSPS
   e.g., Public Safety Power Shutoff                                                                          3rd Party
                                                                                                              Equipment Failure
                                                                                                              Operation
                                                                                                              Other
                                                                                                              Vegetation /Animal
                                                                                        Operation             Weather /Fire /Earthquake
                                                                                          1.1%                PSPS

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

                                                                                                                                          15
SAIFIChart
                                           Causes of Repair Outages in Shaver Lake
                                                                           2019

                                                                                                 Contributions to SAIFI by Outage Cause

                                                                                     3rd Party     PSPS
                                                                                       0.0%        0.0%

                                                                                                                                      3rd Party
          Equipment Failure                                                                                                          Equipment Failure
           e.g., in-service failure of transformer,                  Weather /Fire                                                    Operation
         switch, or conductors                                       /Earthquake                                                      Other
                                                                        27.6%                         Equipment Failure
         Vegetation/Animal                                                                                                           Vegetation /Animal
                                                                                                           35.9%
           e.g., tree branch, rodent, or bird                                                                                         Weather /Fire /Earthquake
           causing a short circuit between                                                                                            PSPS
           conductors
          Other
           e.g., patrolled but no cause found
          Operations
          e.g., urgent maintenance w/o 3-day
          notice
          3rd Party
          e.g., balloon, car hit pole, dig-in
          PSPS                                                                  Other
                                                                                 35.4%
          e.g., Public Safety Power Shutoff                                                                               Operation
                                                                                                                            1.0%

                                            Vegetation /Animal
                                                  0.1%

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

                                                                                                                                                                   16
17
18
Back-up Slides

Reliability Histories of Circuits Serving Shaver Lake

                           Updated through Dec 2019

                                                        19
Average Reliability of 2 Circuits Serving Shaver Lake
                                                                                                                                                                                                                              CitySummary

                                                             2016                  2017                 2018               1st Qtr 2019               2nd Qtr 2019              3rd Qtr 2019               4th Qtr 2019                2019
                                                     SAIDI   SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI        SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI
2 Circuits Serving Shaver Lake -- Total Customers:
2,068                                                530.8    4.9   4.4   3197.8    9.1   6.8   132.5    3.1   7.4   707.2     3.9        5.8   109.9      1.6       3.2   1.8      0.0         -    630.1     1.0    0.4     1449.0    6.5   9.4
 3rd Party                                            1%      8%     -     0%       0%     -      -       -     -      -        -          -      -         -         -    25%      12%         -      -        -         -     0%      0%     -
 Equipment Failure                                   40%     18%    28%    3%       5%    36%   33%     43%    13%   83%       44%        1%      -         -         -    75%      88%         -    15%       62%        -    47%     36%    1%
 Operation                                            1%      7%    3%     2%       5%     -      -       -     -     2%       1%          -     3%        2%         -     -        -          -      -        -         -     1%      1%     -
 Other                                                5%     20%    41%    82%     16%    38%    3%     16%    60%    2%       18%    82%       17%       77%    70%        -        -          -    85%       38%   100%      40%     35%    79%
 Vegetation/Animal                                     -       -     -      -        -     -      -       -     -     0%       0%          -      -         -         -     -        -          -      -        -         -     0%      0%     -
 Weather/Fire/Earthquake                             54%     47%    28%    13%     74%    26%   63%     41%    26%   13%       37%    17%       80%       22%    30%        -        -          -      -        -         -    12%     28%    21%
 PSPS                                                  -       -     -      -        -     -      -       -     -      -        -          -      -         -         -     -        -          -      -        -         -      -       -     -

SCE SYSTEMWIDE                                       134.5    1.1   1.6   139.7     1.2   1.8   136.8    0.9   1.4   28.1      0.3        0.4   18.9       0.2       0.4   31.8     0.2        0.3   99.3      0.3    0.3      178.0    1.0   1.4
  Notes:

  No outages are excluded from the metrics.

  Outage Causes:
          Other: e.g., patrolled but no cause could be found
          Operations: e.g., urgent maintenance w/o 3-day notice to customers
          3rd Party: e.g., balloons, car hit pole, dig-in
          Vegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductors
          PSPS: e.g., Public Safety Power Shutoff

  SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

  SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

  MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

                                                                                                                                                                                                                                                    20
Reliability Histories for Individual Circuits Serving Shaver Lake - 1 of 1
                                             2016                  2017                  2018               1st Qtr 2019               2nd Qtr 2019              3rd Qtr 2019             4th Qtr 2019                2019
                                     SAIDI   SAIFI MAIFI SAIDI     SAIFI MAIFI   SAIDI   SAIFI MAIFI SAIDI     SAIFI MAIFI SAIDI           SAIFI MAIFI SAIDI        SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI               SAIFI MAIFI

PERIMETER(12KV) - Customers: 1,250   452.2    4.0   5.3   4982.1   11.1   7.7    87.5     2.0   8.4   942.6     4.4        6.5   21.4       1.0       2.8    -        -         -   152.0     1.0        -   1116.0    6.5   9.3
    3rd Party                          -       -     -     0%       0%     -       -       -     -      -        -     CircuitHistory
                                                                                                                         -     -     -                 -     -        -         -     -        -         -     -        -     -
    Equipment Failure                52%     25%    29%    3%       7%    51%    52%     50%    12%   88%       50%    12%     -     -                 -     -        -         -   100% 100%            -    88%     50%    1%
    Operation                         0%      0%     -     1%       6%     -       -       -     -      -        -          -    27%        4%         -     -        -         -     -        -         -    1%       1%     -
    Other                             7%     25%    33%    86%     16%    36%     8%     40%    58%    3%       23%    83%       73%       96%    64%        -        -         -     -        -         -    4%      31%    77%
    Vegetation/Animal                  -       -     -      -        -     -       -       -     -     0%       0%          -      -         -         -     -        -         -     -        -         -    0%       0%     -
    Weather/Fire/Earthquake          41%     50%    38%    9%      71%    13%    40%     11%    30%    9%       27%    15%         -         -    36%        -        -         -     -        -         -    8%      18%    21%
    PSPS                               -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
ROSEBUD(12KV) - Customers: 818       653.6    6.3   3.0   387.6     6.0   5.2    203.9    4.9   5.8   338.5     3.1        4.7   248.6      2.5       3.9   4.6      0.0        -   1379.1    1.0    1.0     1970.7    6.6   9.6
    3rd Party                         2%     16%     -      -        -     -       -       -     -      -        -          -      -         -         -    25%      12%        -     -        -         -    0%       0%     -
    Equipment Failure                26%     11%    24%     -        -     -     21%     39%    17%   59%       30%         -      -         -         -    75%      88%        -     -        -         -    10%     14%     -
    Operation                         2%     14%    13%    12%      2%     -       -       -     -     9%       3%          -      -         -         -     -        -         -     -        -         -    2%       2%     -
    Other                             2%     16%    63%    6%      17%    43%      -       -    65%    2%       7%     79%        9%       64%    77%        -        -         -   100% 100% 100%            71%     42%    81%
    Vegetation/Animal                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    Weather/Fire/Earthquake          68%     43%     -     82%     82%    57%    79%     61%    17%   30%       60%    21%       91%       36%    23%        -        -         -     -        -         -    17%     42%    19%
    PSPS                               -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
-                                      -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
-                                      -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -
    -                                  -       -     -      -        -     -       -       -     -      -        -          -      -         -         -     -        -         -     -        -         -     -        -     -

                                                                                                                                                                                                                                    21