BUXTON SELF-STORAGE Buxton, Maine TOWN OF BUXTON SITE PLAN APPLICATION January 2021 Prepared for Patriot Holdings 4023 Dean Martin Drive Las Vegas, NV 89103 Prepared by Atlantic Resource Consultants, LLC 541 US Route One, Suite 21 Freeport, Maine 04032
Project Description The proposed project is a self-storage business located at 488 Narragansett Trail in Buxton, Maine. The subject site is identified as Map 6 Lot 44A from the Town of Buxton Assessing Tax Maps, and is zoned as Business Commercial (BC). The site is approximately 10.68 acres and its current use is vacant residence that has been demolished. Article 8.2.B 8.2.B.1 – “The proposed use will not adversely affect the value of adjacent properties…” The proposed use is appropriate for the BC zone and will constructed in a manner that will not adversely affect adjacent property values, as well as be a significant improvement from the abandoned existing residential property. 8.2.B.2 – “Access to the site from existing and proposed roads is safe and adequate.” The proposed access to the site is located with over 600’ linear feet of site distance which exceeds MDOT guidelines for site distance in a 45 MPH zone. By closing one of the two existing curb cuts, confusion on turning and entering is eliminated. 8.2.B.3 – “Any proposed development is in conformance with all flood hazard protection regulations” The proposed development is not within a known flood hazard, as evidenced by the attached FEMA Flood Map. 8.2.B.4 – “Adequate provision for the disposal of all waste water and solid waste has been made.” The proposed site will be serviced by a new subsurface waste water disposal site (see attached HHE-200 prepared by Longview Partners, LLC) and will have solid waste hauled off by a private contractor (or by the owner). 8.2.B.5 – “Adequate provision for the transportation, storage and disposal of any hazardous materials has been made.” There will be no storage of hazardous materials on-site. 8.2.B.6 – “A stormwater drainage system capable of handling a 25-year storm without adverse impact on adjacent properties has been designed” A proposed subsurface stormwater detention and treatment filter has been designed to mitigate the stormwater runoff impacts associated with the development. The stormwater management system has been designed in accordance with the MDEP Chapter 500 rules and regulations, which requires a MDEP Stormwater Permit approval.
8.2.B.7 – “An erosion and sedimentation control plan has been prepared by a qualified professional source.” Means and methods of controlling erosion and sedimentation, both during and after construction, will be provided, both in MDEP review of the Stormwater Permit, and have been accounted for in the design drawings. 8.2.B.8 – “There is adequate water supply to meet the demands of the proposed use and for fire protection purposes.” A well has been proposed to serve the business office, which will be sufficient to handle the demand of the employees. The storage units will not have water service. 8.2.B.9 – “That all performance standards in this Ordinance, applicable to the proposed use will be met.” The proposed design meets the performance standards of the Ordinance. Article 10 – Performance Standards 10.1 – Access to Lots Access to the site occurs along the approximately 400’ of frontage and is 30’ wide driveway opening with sufficient site distance for Narraganset Trail traffic. 10.2 – Dust, Fumes, Vapors, and Gases Not applicable. There will be no creation of dust, fumes, vapors, or gasses as a result of the proposed development. 10.3 – Erosion Control See above. 10.4 – Explosive Materials Not applicable. There will be no explosive materials stored on site as a result of the proposed development. 10.5 – Construction in Flood Hazard Areas Not applicable. The site does not lie within a flood hazard. 10.6 – Noise There will be common traffic noise associated with the site. All heavy construction activities will be performed between the hours of 7AM and 8PM.
10.7 – Off-Street Parking and Loading Site parking and loading has been met with the creation of 4 (1 handicap) spaces for the office (1 space per every 500’ or warehouse space) and ample parking and loading associated with the drive isles associated with the storage buildings. 10.8 – Preservation of Landscape The landscape will be preserved by the use of retaining walls to reduce grading impacts. A landscaped front entrance will be provided to blend into the existing natural conditions and provide buffering between the development and the Narragansett Trail frontage. 10.9 – Refuse Disposal The management will maintain the site and assure proper waste disposal by hauling refuse away directly. 10.10 – Setbacks and Screenings The proposed site complies with all front, side and rear setbacks and will provide a landscaped buffer along the Narragansett Trail frontage. 10.11 – Signs One free-standing sign is anticipated to be placed (see drawing sheet C-101) near the entrance. All signs will conform with the Town of Buxton Ordinances and will be subject to Code Enforcement review prior to installation. 10.12 – Soil Suitability A medium intensity soil survey provided by the Natural Resource Conservation Service is included along with an HHE-200 form for the proposed on-site septic system. 10.13 – Stormwater Management A Stormwater Management Report is included as part of the State of Maine MDEP Stormwater Permit 10.14 – Water Quality No activity shall locate, store, discharge or permit the discharge of any treated, untreated, or inadequately treated liquid, gaseous, or solid materials of such nature, quality, obnoxiousness, toxicity, or temperature that run-oof, seep, percolate, or wash into surface groundwater so as to contaminate, pollute, or harm such waters or cause nuisances such as objectionable shore deposits, floating, or submerged debris, oil or scum, color, odor, taste or unsightliness, or be harmful to human, animal, plant or aquatic life. An infiltration pond is proposed as part of the project and will minimize and sediment or pollutants leaving the site. 10.15 – Archeological/Historic Sites There are no known historic sites within the project boundaries. 10.16 – Lighting There are no proposed exterior lights save for doorway and parking lighting mounted on the building. The building mounted wall pack shall be a full cut-off fixture.
10.17 – Fire Protection The project will meet all State and Federal fire protection requirements. Attachment A – Application Form Attachment B – Deed & P&S Attachment C - Abutters Attachment D – FEMA Flood Map Attachment E – Soils Attachment F – HHE-200 Form Attachment G – Stormwater Attachment H – Plan Set
6 44A BC 10.68 ac 17144 279 Vacant Residential - Demolished Commercial Self-Storage Patriot Holdings 4023 Dean Martin Drive Las Vegas, NV 89103 Jason Vafiades, PE Atlantic Resource Consultants, LLC - 541 US Route One, Suite 21, Freeport, ME 04032 - 207-869-9050 From intersection of Route 22 Rout 4/202, head northwest on Route 4/202, site is approximately .3 miles on the left. X X State of Maine Department of Environmental Protection Stormwater Permit On-site Subsurface WWDS Well X
ATTACHMENT B
DocuSign Envelope ID: 27FE6E13-6F8F-4F72-9545-7166E7656ED7 EDC319ED-9120-4BE7-8AC1-0B27F96A7D95 AMENDMENT TO CONTRACT FOR THE SALE OF COMMERCIAL REAL ESTATE Patriot Holdings, LLC (“Purchaser”) and S&D Development LLC (“Seller”) entered into a Contract for the Sale of Commercial Real Estate (“the Contract”) with an effective date of October 27, 2020 for property located at 488 Narragansett Trail, Buxton, ME . Purchaser and Seller agree to amend the Contract as follows: 1. Paragraph #5 DEED: the closing date for this property to take place upon obtaining Planning Board Approval for the construction of a self storage facility on the property on or before February 25, 2021. Except as amended above, the Contract shall remain in full force and effect, and Purchaser and Seller hereby ratify and confirm the Contract, as amended by this Amendment. This Amendment may be signed on any number of identical counterparts, including telefax copies, with the same binding effect as if all of the signatures were on one instrument. Seen and agreed to this 23rd day of December, 2020 ______________________________________ SELLER: owner/manager BY: Tom Soule 12/23/2020 ______________________________________ PURCHASER: manager BY: Jeremiah Boucher
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
Hydrologic Soil Group—York County, Maine 70° 31' 43'' W 70° 31' 14'' W (Buxton Self Storage) 376700 376800 376900 377000 377100 377200 377300 43° 37' 21'' N 43° 37' 21'' N 4831000 4831000 4830900 4830900 4830800 4830800 4830700 4830700 4830600 4830600 4830500 4830500 4830400 4830400 4830300 4830300 43° 36' 53'' N 43° 36' 53'' N 376700 376800 376900 377000 377100 377200 70° 31' 43'' W 70° 31' 14'' W Map Scale: 1:4,240 if printed on A portrait (8.5" x 11") sheet. Meters N 0 50 100 200 300 Feet 0 200 400 800 1200 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 19N WGS84 Natural Resources Web Soil Survey 6/18/2016 Conservation Service National Cooperative Soil Survey Page 1 of 4
Hydrologic Soil Group—York County, Maine (Buxton Self Storage) MAP LEGEND MAP INFORMATION Area of Interest (AOI) C The soil surveys that comprise your AOI were mapped at 1:20,000. Area of Interest (AOI) C/D Warning: Soil Map may not be valid at this scale. Soils D Soil Rating Polygons Enlargement of maps beyond the scale of mapping can cause A Not rated or not available misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting Water Features A/D soils that could have been shown at a more detailed scale. Streams and Canals B Transportation Please rely on the bar scale on each map sheet for map B/D measurements. Rails C Interstate Highways Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov C/D US Routes Coordinate System: Web Mercator (EPSG:3857) D Major Roads Maps from the Web Soil Survey are based on the Web Mercator Not rated or not available projection, which preserves direction and shape but distorts Local Roads distance and area. A projection that preserves area, such as the Soil Rating Lines Background Albers equal-area conic projection, should be used if more accurate A calculations of distance or area are required. Aerial Photography A/D This product is generated from the USDA-NRCS certified data as of B the version date(s) listed below. B/D Soil Survey Area: York County, Maine Survey Area Data: Version 14, Sep 11, 2015 C Soil map units are labeled (as space allows) for map scales 1:50,000 C/D or larger. D Date(s) aerial images were photographed: Jun 20, 2010—Jul 18, Not rated or not available 2010 Soil Rating Points The orthophoto or other base map on which the soil lines were A compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting A/D of map unit boundaries may be evident. B B/D Natural Resources Web Soil Survey 6/18/2016 Conservation Service National Cooperative Soil Survey Page 2 of 4
Hydrologic Soil Group—York County, Maine Buxton Self Storage Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — York County, Maine (ME031) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI HeB Hermon fine sandy loam, A 8.4 17.1% 3 to 8 percent slopes Ra Raynham silt loam C/D 5.7 11.7% Sc Scantic silt loam, 0 to 3 D 20.2 41.1% percent slopes SeB Scio silt loam, 3 to 8 C 11.8 24.1% percent slopes SkB Skerry fine sandy loam, 0 C 2.9 6.0% to 8 percent slopes Totals for Area of Interest 49.1 100.0% Natural Resources Web Soil Survey 6/18/2016 Conservation Service National Cooperative Soil Survey Page 3 of 4
Hydrologic Soil Group—York County, Maine Buxton Self Storage Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Natural Resources Web Soil Survey 6/18/2016 Conservation Service National Cooperative Soil Survey Page 4 of 4
ATTACHMENT F
Town: Buxton Applicant: S & D Development Location: 488 Narragansett Trail DISPOSAL SYSTEM INSTALLATION NOTES 1. The State of Maine Subsurface Wastewater Disposal Rules (10-144 Chapter 241 the Rules) are incorporated by reference and made a part of this application. These shall be consulted by the owner/applicant, the system installer and/or building contractor for further construction details and material specifications. The system installer shall contact Longview Partners, LLC (207-693-8799) if there are any questions concerning materials, procedures or the design. The system installer and/or building contractor installing the system shall be solely responsible for compliance with the Rules and with all State and municipal laws and ordinances pertaining to the permitting, construction, and inspection of subsurface wastewater disposal systems. 2. This application is intended to represent facts pertinent to the Rules only. It shall be the responsibility of the owner/applicant, system installer and/or building contractor to determine compliance with and to obtain other permits under all applicable local, State and/or Federal laws and regulations before installing the system or considering the property on which the system is to be installed a “buildable” lot. It is recommended that a wetland scientist be consulted regarding wetland regulations, should wet areas exist. Prior to commencement of construction/installation, the Local Plumbing Inspector or Code Enforcement Officer shall inform the owner/applicant and Longview Partners, LLC or any local ordinances which are more restrictive than the Rules in order that the design may be amended. All designs are subject to review by local, State and/or Federal authorities. Longview Partners, LLC’s liability shall be limited to revisions required by regulatory agencies and based on laws or regulations in effect at the time of preparation of this application. 3. All information shown on this application relating to property lines, well locations, subsurface structures, and underground facilities (such as utility lines, drains, septic systems, water lines, etc.) are based upon information provided by the owner/applicant and has been relied upon by Longview Partners, LLC in preparing this application. The owner/applicant shall review this application prior to the start of construction and confirm this information. Well locations on abutting properties not readily visible above-grade (such as well points) should be confirmed by the owner/applicant prior to system installation to assure minimum setbacks. 4. Installation of a garbage (grinder) disposal is not recommended. If one is installed, an additional 1,000 gallon septic tank shall be connected in series to the proposed septic tank or a septic tank outlet filter shall be installed in the tank outlet. Risers and covers should be installed over the septic tank cleanout and outlet per the Rules for easy maintenance of the filter. 5. The septic tank should be pumped within 2 years of installation and subsequently as recommended by the pump service. In no event should the septic tank be pumped less often than every 3 years. The system use shall avoid introducing kitchen grease or fats into the system. Chemicals such as septic tank cleaners and/or chlorine (such as from water treatment units) and controlled or hazardous substances shall not be disposed of in this system. Additives such as yeast or enzymes are discouraged, since they have not been proven to extend system life or performance. 6. All septic tanks, pump stations and additional treatment tanks shall be installed to prevent ground water and surface water infiltration. Risers and covers should be properly installed to provide access while preventing surface water intrusion within 6” of a finished ground surface. Vehicular traffic over disposal system is prohibited unless specifically designed with H-20 rated components. Longview Partners, LLC Longviewpartners213@gmail.com
Town: Buxton Applicant: S & D Development Location: 488 Narragansett Trail DISPOSAL SYSTEM INSTALLATION NOTES 7. The daily wastewater flow, number of bedrooms, or use of structure shall not exceed the design criteria indicated on this application without a re-evaluation of the system as proposed. 8. The general minimum setbacks between a well (public or private)and septic system serving a single family residence are 100-300 feet, unless the local municipality has a more stringent requirement or a liner seal is installed in the well. A well installed by an abutter within the minimum setback distances prior to the issuance of a permit for the proposed disposal system may void this design. 9. When a gravity flow is anticipated, before construction/installation begins, the system installer or building contractor shall review the elevation of all points given in this application and the elevation of the existing and/or proposed building drain and septic tank inverts for compatibility to minimum pipe pitch requirements. 10. When an effluent pump is required, pump stations should be sized per manufacturer’s specifications to meet lift requirements and friction/head loss. Provisions shall be made to make certain that surface and ground water does not enter the septic tank or pump station, by sealing/grouting all seams and connections, and by placement of a riser and cover at or above grade. An alarm device warning of a pump failure shall be installed. Bottom-feed distribution box is specified to prevent freezing. Insulate distribution boxes per the Rules. 11. On all systems, remove the vegetation, organic duff and roots, and old fill material from under the disposal area and any fill extension. Additional fill beyond indicated on the plan may be necessary to replace organic matter and/or stumps. On sites where the proposed disposal area is to be installed in natural soil, scarify the bottom and sides of the excavated disposal area with a rake. Do not use wheeled equipment on the scarified soil surface. For systems installed in fill, scarify the native soil by roto-tilling or scarifying with teeth of backhoe to a depth of at least 8 inches over the entire disposal field and fill extension are to prevent glazing and to promote fill bonding. Place fill in loose layers no deeper than 8 inches and compact before placing more fill (this ensures that voids and loose pockets are eliminated to minimize the chance of leakage or different settling). Do not use wheeled equipment on the scarified soil are until after 12 inches of fill is in place. Keep equipment off of proprietary leaching devices. Divert surface water away from the disposal area by ditching or shallow landscape swales. 12. Unless noted otherwise, fill shall be gravelly coarse sand, which contains no more than 5% fines (silt and clay). Crushed stone shall be clean and free of any rock dust from the crushing process. Refer to the Rules for more specific information regarding fill and stone. 13. Seed all filled and disturbed surfaces with perennial grass seed, with 4 inches minimum soil or soil amendment mix suitable for growing, then mulch with hay or equivalent material to prevent erosion. Alternatively, bark or permanent landscape mulch may be used to cover the system. Woody trees or shrubs are not permitted on the disposal field or fill extensions. 14. If an advanced wastewater treatment unit is part of this design, the system shall be operated and maintained per manufacturer’s specifications. Longview Partners, LLC Longviewpartners213@gmail.com
ATTACHMENT G
BUXTON SELF-STORAGE BUXTON, MAINE STORMWATER MANAGEMENT REPORT January 2021 Prepared for: Patriot Holdings 4023 Dean Martin Drive Las Vegas, NV 89103 Prepared by:
21-003 Buxton Self-Storage Buxton, Maine January 2021 TABLE OF CONTENTS INTRODUCTION AND BACKGROUND ...............................................................................................................................2 Site History ....................................................................................................................................................................................2 Stormwater Management ...........................................................................................................................................................2 EXISTING CONDITIONS..............................................................................................................................................................3 Receiving Waters ............................................................................................................ Error! Bookmark not defined. Historical Flooding ......................................................................................................... Error! Bookmark not defined. Alterations to Natural Drainageways ........................................................................ Error! Bookmark not defined. PROJECT DESCRIPTION ...............................................................................................................................................................3 Stormwater Management ............................................................................................. Error! Bookmark not defined. METHODOLOGY AND MODELING ASSUMPTIONS .........................................................................................................4 PROPOSED BMPS ............................................................................................................................................................................5 STORMWATER QUANTITY ANALYSIS...................................................................................................................................5 Pre-development Conditions.....................................................................................................................................................5 Post-Development Conditions ..................................................................................................................................................5 Water Quantity Analysis Summary ..........................................................................................................................................6 STORMWATER QUALITY ANALYSIS .......................................................................................................................................6 STORMWATER MAINTENANCE PLAN ..................................................................................................................................7 CONCLUSIONS ...............................................................................................................................................................................7 Limitations ......................................................................................................................................................................................7 FIGURES ..............................................................................................................................................................................................0 ATTACHMENT A -STORMWATER QUALITY CALCULATIONS....................................................................................1 ATTACHMENT B -HYDROCAD RUNOFF AND ROUTING CALCULATIONS .........................................................2 ATTACHMENT B (i) -PRE-DEVELOPMENT MODEL RESULTS .........................................................................................3 ATTACHMENT B (ii) -POST-DEVELOPMENT MODEL RESULTS ....................................................................................4 ATTACHMENT C - STORMWATER MAINTENANCE MANUAL ....................................................................................5 19-055 1
21-003 Buxton Self-Storage Buxton, Maine January 2021 INTRODUCTION AND BACKGROUND Buxton Self Storage is a proposed self-storage facility on an approximately 10.68 acre parcel of land located off of Route 202/4 (Narragansett Trail) in Buxton, Maine. The existing parcel has a series of abandoned residential buildings and ancillary driveways and other residential development (lawn and landscape). Based on postdated (2004) aerial photos (provided by Google Earth), the existing development existed as depicted on the Boundary Survey and as shown on the Pre Development Drainage Plan (sheet D-100). Total historic development is approximately 14,138 sf (0.325 ac) of impervious coverage and 21,520 sf (0.494 ac) of lawn and other pervious development. Total existing development is 0.325 ac impervious and 0.819 ac of developed area. The proposed project includes the removal of all the existing residential development and the construction of a 2-story business office (with associated parking and landscaping) as well as a series of single-story storage buildings and access isles. See sheet D-101 for a representation of the post development site plan. Total impervious creation as the result of this project is 2.911 acres of which 2.586 ac of new impervious (after 2005). Total disturbance in the post development condition is 3.106 (2.911 ac of impervious and 0.195 ac of landscape). This report discusses the Site’s hydrological conditions and quantifies the stormwater runoff generated in the existing and proposed conditions. DATA COLLECTION AND ASSUMPTIONS Site Data was gathered from field observations as well as AutoCAD files and drawings provided by Middle Branch, LLC, Professional Land Surveyors. Soil information was provided by the National Resource Conservation’s Web Soils Mapper. Wetland delineations were performed by James Logan of Longview Partners, LLC. Calculations were performed to create a HydroCAD stormwater model, which is based on the United States Department of Agriculture’s (USDA) Technical Release 20 (TR-20) and Technical Release 55 (TR-55) hydraulic programs. Curve numbers (CN’s) assigned to differing land cover and soil types were taken from tables within the HydroCAD software, which are from the SCS TR-55 manual, revised 1986. 24-hour rainfall depths were taken from the ‘Stormwater Management for Maine: Volume III BMP’s Technical Design Manual, January 2006”. Time of concentrations were calculated with the HydroCAD software using the TR-55 methodologies including direct entry. Off-site existing watershed subcatchments are shown on attached Exhibit D-1, “Off Site Drainage Area”. Modeling assumptions made for both conditions are summarized in the attached HydroCAD output. STORMWATER MANAGEMENT New stormwater Best Management Practices BMPs have been designed to capture and treat runoff from the new improvements associated with this project. These include roof drip line filters and a subsurface sand filter 19-055 2
21-003 Buxton Self-Storage Buxton, Maine January 2021 with chambers. The new BMP’s will provide detention and water quality treatment for runoff from new impervious and developed areas associated with new development. A small portion of the proposed development will direct runoff to the existing roadside ditch. The new stormwater management system will maintain the existing drainage patterns at the site, while protecting water quality and ensuring that there is no increase in peak runoff from the property during design storm conditions. This stormwater management analysis has been prepared in accordance with the Maine Department of Environmental Protection (MDEP) Chapter 500 Regulations for Basic, General and Flooding Standards in order to ensure that the planned development will not result in a degradation of water quality or any other significant impacts to locations downstream of the development site as a result of stormwater runoff. EXISTING SITE CONDITIONS The Site is an existing residential lot with a series of residential structures, lawn and other undisturbed land areas. The undisturbed portions of the site are a mixture of woods and shrubs. The site consists of shallow to moderate slopes (ranging from 1 to 15%). There is a large swath of wetland complex (associated with the culvert crossing to the northeast of the site along Narragansett Trail). On site soils a range of Scantics, Skerrys and Raynhams. An off-site drainage area of approximately 28 acres runs through the property boundaries. The off-site drainage area is a mixture of Narragansett Trail Right of Way, existing and abandoned apple orchard (to the immediate southwest of the site) and undeveloped woodland/shrubland. The site has been hydrologically evaluated in one large subcatchment which generally slopes and drains to the northeast, through the site, via overland flow. There is one primary point of analysis (Wetland complex associated with the culvert crossing in Narragansett Trail). Site drainage boundaries and limits were derived from LIDAR and USGS topography as well as field verification. PROJECT DESCRIPTION Proposed site alterations include the construction of the proposed self-storage facility, resulting in approximately 2.423 acres of impervious area and 2.987 acres of total developed area. Land cover changes include converting the existing residential development and undeveloped shrubland/woodland into pavement, building and landscape areas. A minor amount of wetland fill is proposed (less than 4300 square feet). The proposed conditions will result in no change of drainage patterns from the existing conditions, with time of concentration unaltered. 19-055 3
21-003 Buxton Self-Storage Buxton, Maine January 2021 METHODOLOGY AND MODELING ASSUMPTIONS Runoff and routing calculations have been performed for the watershed areas affected by the proposed development under pre-development and post-development conditions scenarios. Time of concentration and runoff curve number calculations have been performed using the method described in Natural Resource Conservation Service (NRCS) Technical Release 55 (TR-55) – Urban Hydrology for Small Watersheds. The TR- 20 based HydroCAD modeling software has been utilized to perform the more complex runoff and routing calculations, some of which are beyond the scope of the TR-55 method. Time of concentration calculations have been amended where the value given by the TR-55 method is less than six minutes (0.1hr). In these cases, a standard minimum value of six minutes has been used to keep this parameter within the acceptable working range of the model and prevent computational errors. Design rainfall events have been modeled using the SCS Type III Hydrograph for 24-hour duration storms. The rainfall depth for each return period is taken from Maine Department of environmental Protection Chapter 500 Stormwater Management, Appendix H (Cumberland County). The rainfall depth values for standard design storm frequencies are shown in the table below. TABLE 1 - 24-Hr Rainfall Depths for Cumberland County at Design Storm Frequencies Maine Chapter 500: Stormwater Management, Appendix H Frequency 2-Year 10-Year 25-Year 100-Year Rainfall 3.1 in 4.6 in 5.8 in 8.1 in Depth Soil types in the area of the site have been identified using the Natural Resource Conservation Service (NRCS) Web Soil Survey. The existing topography of the site was determined by field survey and utilizing lidar contours. The existing vegetative cover was identified by site inspection. The following table includes a list of the surficial soil types that were identified within the proposed development area on the project site, along with their associated Hydrologic Soil Group (HSG). TABLE 2 – SOIL TYPES Soil Type Hydrologic Soil Group Hermon – HeB A Raynham – Ra C/D Scantic - Sc D Scio – SeB C Skerry - SkB C 19-055 4
21-003 Buxton Self-Storage Buxton, Maine January 2021 Under pre-development conditions the site is represented by one subcatchment that drain to the one point of analysis in the southwestern corner. Under the post-development conditions scenario, the site is divided into three smaller subcatchment areas to model the impact of localized storage within the system. The overall routing configuration remains similar to pre- developed conditions. In this way, a direct comparison can be made of pre-development and post-development runoff values at the Analysis Point. PROPOSED BMPS New Stormwater Best Management Practices (BMPs) have been designed to effectively capture, detain and treat runoff from the new impervious area associated with the new development at the site, before allowing it to discharge in a non-erosive manner to downstream areas. The new BMP proposed for this project is as follows: Underdrained Soil Filters – A small pond that contains several layers of media. A sand filter media provides treatment for this runoff. Once through the soil media, the runoff is collected in a perforated underdrain pipe system and discharged downstream. The filter structure provides for the slow release of smaller storm events, minimizing stream channel erosion, and cooling of the discharge. Subsurface Sand FIlter – This BMP consists of a stormwater chamber system located over a subsurface sand filter. Stormwater rises in the chambers and is filtered vertically out of the open bottom chambers through the sand filter. Once through the sand filter runoff is collected in a perforated underdrain pipe and discharged downstream. This BMP is designed to accept and treat runoff from both the new impervious area of the site but also runoff from a portion of the new landscaped areas of the site. The filter structure provides for the slow release of smaller storm events, minimizing stream channel erosion, and cooling of the discharge. STORMWATER QUANTITY ANALYSIS Pre-development Conditions The overall model for the site is represented by one subcatchment area. Full details of the pre-development subcatchment areas, cover conditions and time of concentration flow paths are described in detail in the supporting HydroCAD documentation included in this report. A Predevelopment Conditions Watershed Plan is included in this report. Post-Development Conditions In the post-development condition, the overall site is divided into three watershed areas that drains to the same point of analusis. Full details of the post-development subcatchment areas, cover conditions and time of concentration flow paths are described in detail in the supporting HydroCAD documentation included in this report. A Post-Development Conditions Watershed Plan is included as part of this report. 19-055 5
21-003 Buxton Self-Storage Buxton, Maine January 2021 WATER QUALITY AND QUANTITY Water Quality and Quantity mitigation will be achieved through the installation of two Maine DEP Stormwater Best Management Practices (BMP) devices: one underdrained soil filter and one subsurface storage filters. The two treatment filters have been sized to store and treat 1” of runoff from the impervious surfaces while at the same time, detaining stormwater for the 25 year storm event per the Town of Buxton ordinances. A summary of peak flows can be found in Table 1 below: Peak Rates of Runoff POA 2-Year 10-Year 25-Year 100-Year Pre Post Pre Post Pre Post Pre Post AP-1 9.98 10.79 24.79 24.63 33.04 32.26 46.00 44.21 Due to the construction of the BMP storage filters, the peak flows for the 10, 25 and 100 year storm events have been reduced to in the post development conditions. Although nearly 2.5 acres of additional impervious is proposed, the filters detain and the water to mitigate any potential increases in stormwater runoff as the result of the proposed development. Regarding Stormwater Quality, Maine Chapter 500 rules require the site meet the Basic and General Standards of the Maine Stormwater Law, which includes provisions to treat at least 95% of the newly created impervious area and at least 80% of the total developed areas (which includes the impervious and landscape development). Total site treatment levels will meet the required target treatment with 95% of the impervious areas and 89% of the disturbed areas being treated by the stormwater BMPs. All construction will be in accordance with the most current Maine Erosion and Sedimentation Control Best Management Practices. These measures include temporary and permanent seeding, sediment barriers, and stabilized construction entrance. These measures are described on the enclosed Drawing C-300, “Erosion & Sedimentation Control Notes & Details.” STORMWATER QUALITY ANALYSIS Water Quality Treatment Measures 19-055 6
21-003 Buxton Self-Storage Buxton, Maine January 2021 The project has been designed in accordance with the current Stormwater Law (Chapter 500) standards, which require water quality treatment for 95% of new impervious areas and 80% of new developed areas. The project will create approximately 99,000 s.f. of new impervious surface area. The subsurface sand filter has been sized to treat 63,187 s.f. of impervious area tributary to the basin. The underdrained soil filter has been sized to treat 39,342 s.f. of impervious area and 4,000 s.f. of lawn area. Water quality treatment will be provided by a subsurface sand filter and underdrained soil filter, designed in accordance with the latest version of the Maine Department of Environmental Protection BMPs Technical Design Manual, to achieve the required stormwater quality treatment percentages. STORMWATER MAINTENANCE PLAN The owner will own and maintain the stormwater system, which includes the underdrain soil filter and the subsurface sand filter. A Stormwater Management Inspection and Maintenance Manual has been prepared specifically for the project and is included in this report. CONCLUSIONS This project will use long-term and short-term erosion control measures that will mitigate environmental impacts from stormwater, including addressing the Town of Buxton Stormwater Standards. This project will have no significant adverse impacts on downstream properties as a result of stormwater. FIGURES AND ATTACHMENTS 1. Attachment A Stormwater Quality Calculations 2. Attachment B TR-20 Computations (HydroCAD) i. Pre-development Model ii. Post-development Model 3. Attachment C Stormwater Operations and Maintenance Manual 19-055 7
21-003 Buxton Self-Storage Buxton, Maine January 2021 ATTACHMENT A -STORMWATER QUALITY CALCULATIONS 1
STORMWATER TREATMENT SUMMARY Square Feet Acres Total Area 3,960,492 90.9 Predeveloped Site Summary Square Feet Acres Developed Area 14,114 0.32 Impervious Area 14,114 0.32 Proposed Site Summary Percentage of Square Feet Acres Total Area Developed Area 136,597 3.1 3.4% Impervious Area 113,010 2.6 2.9% Proposed Treatment Summary Impervious Area Treated Developed Area Treated Percent of Total Percent of Total Square Feet Square Feet Impervious Developed Subsurface Sand Filter #1 63,187 64% 63,187 46% Underdrained Soil Filter #1 39,342 35% 39,342 29% TOTAL 102,529 99% 39,342 75% Stormwater Treatment Summary 1
Subsurface Sand Filter #1 Sizing Units Impervious Area 63,187 Square Feet Landscaped Area 0 Square Feet Water Quality Volume Required 5,266 Cubic Feet Surface Area Required 3,159 Square Feet Ponding Depth for Water Quality Volume ~18 Inches Pre-Treatment Capacity Required1 1.52 Cubic Feet Per Second Flow Rate Per Cultec Units Cubic Feet Per Second Provided Flow Rate Cubic Feet Per Second
Grassed Underdrained Soil Filter #1 Sizing Units Impervious Area 39,342 Square Feet Landscaped Area 4,000 Square Feet Storage Volume Required 3,412 Cubic Feet Surface Area Required 2,047 Square Feet Ponding Depth for Water Quality Volume ~18 Inches Filter Media Thickness 18 Inches Filter Media Void Ratio 30% Bed Surface Area 1,143 Square Feet Storage in Filter Media 514 Cubic Feet Total Water Quality Storage Volume 2,229 Cubic Feet
21-003 Buxton Self-Storage Buxton, Maine January 2021 ATTACHMENT B -HYDROCAD RUNOFF AND ROUTING CALCULATIONS 2
21-003 Buxton Self-Storage Buxton, Maine January 2021 ATTACHMENT B (I) -PRE-DEVELOPMENT MODEL RESULTS 3
1 Existing Site and Off Site Contributing Area POA1 Wetland Complex Subcat Reach Pond Link Routing Diagram for Existing Conditions Prepared by Full Version, Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC
Existing Conditions Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 0.494 74 >75% Grass cover, Good, HSG C (1) 5.701 73 Brush, Good, HSG D (Wetlands) (1) 0.107 98 Existing Building (1) 0.217 98 Existing Driveway (1) 18.500 72 OFFSITE Woods/grass comb., Good, HSGC (1) 4.044 72 Woods/grass comb., Good, HSG C (1) 29.063 73 TOTAL AREA
Existing Conditions Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 3 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchm (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.494 0.000 0.000 0.494 >75% Grass cover, Good 0.000 0.000 0.000 5.701 0.000 5.701 Brush, Good 0.000 0.000 0.000 0.000 0.107 0.107 Existing Building 0.000 0.000 0.000 0.000 0.217 0.217 Existing Driveway 0.000 0.000 0.000 0.000 18.500 18.500 OFFSITE Woods/grass comb., Good 0.000 0.000 4.044 0.000 0.000 4.044 Woods/grass comb., Good 0.000 0.000 4.538 5.701 18.824 29.063 TOTAL AREA
Existing Conditions Type III 24-hr 2 Year Rainfall=3.00" Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1: Existing Site and Off Site Contributing Area Runoff = 9.98 cfs @ 12.95 hrs, Volume= 1.828 af, Depth> 0.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2 Year Rainfall=3.00" Area (ac) CN Description * 0.107 98 Existing Building * 0.217 98 Existing Driveway 0.494 74 >75% Grass cover, Good, HSG C * 5.701 73 Brush, Good, HSG D (Wetlands) 4.044 72 Woods/grass comb., Good, HSG C * 18.500 72 OFFSITE Woods/grass comb., Good, HSGC 29.063 73 Weighted Average 28.739 98.89% Pervious Area 0.324 1.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 50 0.0200 0.07 Sheet Flow, A to B Woods: Light underbrush n= 0.400 P2= 3.10" 7.5 450 0.0400 1.00 Shallow Concentrated Flow, B to C Woodland Kv= 5.0 fps 44.8 950 0.0050 0.35 Shallow Concentrated Flow, C to D Woodland Kv= 5.0 fps 64.8 1,450 Total Summary for Reach POA1: Wetland Complex Inflow Area = 29.063 ac, 1.11% Impervious, Inflow Depth > 0.75" for 2 Year event Inflow = 9.98 cfs @ 12.95 hrs, Volume= 1.828 af Outflow = 9.98 cfs @ 12.95 hrs, Volume= 1.828 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Existing Conditions Type III 24-hr 10 Year Rainfall=4.60" Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1: Existing Site and Off Site Contributing Area Runoff = 24.79 cfs @ 12.90 hrs, Volume= 4.300 af, Depth> 1.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 10 Year Rainfall=4.60" Area (ac) CN Description * 0.107 98 Existing Building * 0.217 98 Existing Driveway 0.494 74 >75% Grass cover, Good, HSG C * 5.701 73 Brush, Good, HSG D (Wetlands) 4.044 72 Woods/grass comb., Good, HSG C * 18.500 72 OFFSITE Woods/grass comb., Good, HSGC 29.063 73 Weighted Average 28.739 98.89% Pervious Area 0.324 1.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 50 0.0200 0.07 Sheet Flow, A to B Woods: Light underbrush n= 0.400 P2= 3.10" 7.5 450 0.0400 1.00 Shallow Concentrated Flow, B to C Woodland Kv= 5.0 fps 44.8 950 0.0050 0.35 Shallow Concentrated Flow, C to D Woodland Kv= 5.0 fps 64.8 1,450 Total Summary for Reach POA1: Wetland Complex Inflow Area = 29.063 ac, 1.11% Impervious, Inflow Depth > 1.78" for 10 Year event Inflow = 24.79 cfs @ 12.90 hrs, Volume= 4.300 af Outflow = 24.79 cfs @ 12.90 hrs, Volume= 4.300 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Existing Conditions Type III 24-hr 25 Year Rainfall=5.40" Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1: Existing Site and Off Site Contributing Area Runoff = 33.04 cfs @ 12.89 hrs, Volume= 5.703 af, Depth> 2.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 25 Year Rainfall=5.40" Area (ac) CN Description * 0.107 98 Existing Building * 0.217 98 Existing Driveway 0.494 74 >75% Grass cover, Good, HSG C * 5.701 73 Brush, Good, HSG D (Wetlands) 4.044 72 Woods/grass comb., Good, HSG C * 18.500 72 OFFSITE Woods/grass comb., Good, HSGC 29.063 73 Weighted Average 28.739 98.89% Pervious Area 0.324 1.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 50 0.0200 0.07 Sheet Flow, A to B Woods: Light underbrush n= 0.400 P2= 3.10" 7.5 450 0.0400 1.00 Shallow Concentrated Flow, B to C Woodland Kv= 5.0 fps 44.8 950 0.0050 0.35 Shallow Concentrated Flow, C to D Woodland Kv= 5.0 fps 64.8 1,450 Total Summary for Reach POA1: Wetland Complex Inflow Area = 29.063 ac, 1.11% Impervious, Inflow Depth > 2.35" for 25 Year event Inflow = 33.04 cfs @ 12.89 hrs, Volume= 5.703 af Outflow = 33.04 cfs @ 12.89 hrs, Volume= 5.703 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Existing Conditions Type III 24-hr 100 Year Rainfall=6.60" Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1: Existing Site and Off Site Contributing Area Runoff = 46.00 cfs @ 12.89 hrs, Volume= 7.938 af, Depth> 3.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 100 Year Rainfall=6.60" Area (ac) CN Description * 0.107 98 Existing Building * 0.217 98 Existing Driveway 0.494 74 >75% Grass cover, Good, HSG C * 5.701 73 Brush, Good, HSG D (Wetlands) 4.044 72 Woods/grass comb., Good, HSG C * 18.500 72 OFFSITE Woods/grass comb., Good, HSGC 29.063 73 Weighted Average 28.739 98.89% Pervious Area 0.324 1.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 50 0.0200 0.07 Sheet Flow, A to B Woods: Light underbrush n= 0.400 P2= 3.10" 7.5 450 0.0400 1.00 Shallow Concentrated Flow, B to C Woodland Kv= 5.0 fps 44.8 950 0.0050 0.35 Shallow Concentrated Flow, C to D Woodland Kv= 5.0 fps 64.8 1,450 Total Summary for Reach POA1: Wetland Complex Inflow Area = 29.063 ac, 1.11% Impervious, Inflow Depth > 3.28" for 100 Year event Inflow = 46.00 cfs @ 12.89 hrs, Volume= 7.938 af Outflow = 46.00 cfs @ 12.89 hrs, Volume= 7.938 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
21-003 Buxton Self-Storage Buxton, Maine January 2021 ATTACHMENT B (II) -POST-DEVELOPMENT MODEL RESULTS 4
10 11 12 Untreated Proposed Site Phase 1 Self Storage Phase 2 Self Storage and Off Site Contributing Area 11P 12P Subsurface UDSF #1 Underdrained Storage Filter #1 POA1 Wetland Complex Subcat Reach Pond Link Routing Diagram for Proposed Conditions Prepared by Full Version, Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC
Proposed Conditions Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 5.701 73 Brush, Good, HSG D (Wetlands) (10) 2.354 98 New Pavement and Building (11, 12) 18.500 72 OFFSITE Woods/grass comb., Good, HSGC (10) 0.341 98 Proposed Building & Untreated Driveways (10) 0.493 74 Proposed Untreated Landscape (10) 1.452 72 Woods/grass comb., Good, HSG C (10) 28.841 75 TOTAL AREA
Proposed Conditions Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 3 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subc (acres) (acres) (acres) (acres) (acres) (acres) Cover Numb 0.000 0.000 0.000 5.701 0.000 5.701 Brush, Good 0.000 0.000 0.000 0.000 2.354 2.354 New Pavement and Building 0.000 0.000 0.000 0.000 18.500 18.500 OFFSITE Woods/grass comb., Good 0.000 0.000 0.000 0.000 0.341 0.341 Proposed Building & Untreated Driveways 0.000 0.000 0.000 0.000 0.493 0.493 Proposed Untreated Landscape 0.000 0.000 1.452 0.000 0.000 1.452 Woods/grass comb., Good 0.000 0.000 1.452 5.701 21.688 28.841 TOTAL AREA
Proposed Conditions Type III 24-hr 2 Year Rainfall=3.00" Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 10: Untreated Proposed Site and Off Site Contributing Area Runoff = 9.14 cfs @ 12.95 hrs, Volume= 1.667 af, Depth> 0.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2 Year Rainfall=3.00" Area (sf) CN Description * 14,846 98 Proposed Building & Untreated Driveways * 21,485 74 Proposed Untreated Landscape * 248,336 73 Brush, Good, HSG D (Wetlands) 63,257 72 Woods/grass comb., Good, HSG C * 805,860 72 OFFSITE Woods/grass comb., Good, HSGC 1,153,784 73 Weighted Average 1,138,938 98.71% Pervious Area 14,846 1.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 50 0.0200 0.07 Sheet Flow, A to B Woods: Light underbrush n= 0.400 P2= 3.10" 7.0 420 0.0400 1.00 Shallow Concentrated Flow, B to C Woodland Kv= 5.0 fps 44.8 950 0.0050 0.35 Shallow Concentrated Flow, C to D Woodland Kv= 5.0 fps 64.3 1,420 Total Summary for Subcatchment 11: Phase 1 Self Storage Runoff = 4.24 cfs @ 12.07 hrs, Volume= 0.313 af, Depth> 2.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2 Year Rainfall=3.00" Area (sf) CN Description * 63,187 98 New Pavement and Building 63,187 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment 12: Phase 2 Self Storage Runoff = 2.64 cfs @ 12.07 hrs, Volume= 0.195 af, Depth> 2.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type III 24-hr 2 Year Rainfall=3.00"
Proposed Conditions Type III 24-hr 2 Year Rainfall=3.00" Prepared by Full Version Printed 1/11/2021 HydroCAD® 10.00-24 s/n 08018 © 2018 HydroCAD Software Solutions LLC Page 5 Area (sf) CN Description * 39,342 98 New Pavement and Building 39,342 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Reach POA1: Wetland Complex Inflow Area = 28.841 ac, 9.34% Impervious, Inflow Depth > 0.90" for 2 Year event Inflow = 10.79 cfs @ 12.93 hrs, Volume= 2.161 af Outflow = 10.79 cfs @ 12.93 hrs, Volume= 2.161 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Summary for Pond 11P: Subsurface Underdrained Storage Filter #1 Inflow Area = 1.451 ac,100.00% Impervious, Inflow Depth > 2.59" for 2 Year event Inflow = 4.24 cfs @ 12.07 hrs, Volume= 0.313 af Outflow = 4.00 cfs @ 12.10 hrs, Volume= 0.312 af, Atten= 6%, Lag= 1.9 min Primary = 4.00 cfs @ 12.10 hrs, Volume= 0.312 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs / 3 Peak Elev= 92.32' @ 12.10 hrs Surf.Area= 4,544 sf Storage= 1,103 cf Plug-Flow detention time= 5.3 min calculated for 0.311 af (99% of inflow) Center-of-Mass det. time= 3.2 min ( 741.7 - 738.5 ) Volume Invert Avail.Storage Storage Description #1 91.25' 1,396 cf Cultec R-180 x 63 Inside #2 Effective Size= 33.6"W x 20.0"H => 3.44 sf x 6.33'L = 21.8 cf Overall Size= 36.0"W x 20.5"H x 7.33'L with 1.00' Overlap Row Length Adjustment= +1.00' x 3.44 sf x 7 rows #2 90.75' 57 cf 24.50'W x 161.25'L x 3.38'H Prismatoid Z=1.0 15,527 cf Overall - 1,396 cf Embedded = 14,131 cf x 0.4% Voids 1,452 cf Total Available Storage Device Routing Invert Outlet Devices #1 Primary 86.58' 15.0" Round CMP_Round 15" L= 50.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 86.58' / 85.00' S= 0.0316 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.23 sf #2 Device 1 86.58' 4.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 91.94' 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=3.96 cfs @ 12.10 hrs HW=92.32' (Free Discharge) 1=CMP_Round 15" (Passes 3.96 cfs of 10.55 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.99 cfs @ 11.36 fps) 3=Sharp-Crested Rectangular Weir (Weir Controls 2.97 cfs @ 2.01 fps)