Infrastructure Assessment Report Summerset Waikanae 32 Park Avenue, Waikanae, Wellington Summerset Villages (Waikanae) Limited 22/03/2021 For Resource Consent
Document Control Project Number P18-320 Project Name Summerset Waikanae Client Summerset Villages (Waikanae) Limited Date 22/03/2021 Version V2 Issue Status For Resource Consent Originator Wanderson Volpato – Engineer Reviewer Manu Miskell – Senior Engineer Approval Mark Cochran – Director Consultant details Woods (Woods and Partners Ltd) Level 2, Unit 4A, 48 Fitzgerald Ave, Christchurch 3011 PO Box 39102 Harewood, Christchurch 8545 E: info@woods.co.nz P: 03-378-1773 woods.co.nz Copyright and The concepts and information contained in this document are the property of Limitations Woods (Wood & Partners Consultants Ltd). Use or copying of this document in whole or in part without the written permission of Woods will constitute an infringement of copyright. This report has been prepared on behalf of and for the exclusive use of Woods client and is subject to and issued relating to the provisions of the agreement between Woods and its Client. Woods accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this document by any third party. www.woods.co.nz P18-320: 22/03/2021 : Page 2 of 20
Contents 1. Introduction 4 1.1. Proposal 4 1.2. Site Description 4 1.3. Site Geology 5 2. Earthworks 5 2.1. Proposed Earthworks Description 5 3. Infrastructure Assessment 6 3.1. Kāpiti Coast District Council District Plan 6 3.2. Roading 7 3.2.1. Roading Overview 7 3.2.2. Road Network 7 3.2.3. Geometric Design Parameters 8 3.2.4. Ferndale Drive Extension 8 3.3. Retaining Walls 9 3.4. Stormwater 9 3.5. Wastewater 10 3.5.1. Wastewater Network Overview 10 3.5.2. Proposed wastewater design 10 3.5.3. Ferndale Drive Future Residential 11 3.6. Water Supply 12 3.6.1. Water Supply Overview 12 3.6.2. Water Supply Domestic Demand 13 3.6.3. Fire Hydrant Supply 15 3.6.4. Effects on KCDC Water Supply Network 15 3.6.5. Analysis of Pressure in Peak Demand 15 3.6.6. Proposed Reticulation Layout 16 3.6.7. Assessment as required by Kāpiti Coast PDP Table 11B.3 16 3.7. Electrical and Communications 17 List of Appendices Appendix A Summerset Waikanae Village Master Plan Appendix B Woods Civil Engineering Drawings for Resource Consent – Refer to Separate Document Appendix C Stantec Water Modelling Reports www.woods.co.nz P18-320: 22/03/2021 : Page 3 of 20
1. Introduction Wood & Partners Consultants Ltd (Woods) have been engaged by Summerset Villages (Waikanae) Limited to provide an assessment of infrastructure requirements to service the proposed retirement village at 32 Park Avenue, Waikanae (Site). Woods has carried out an initial design to service the proposed Summerset Comprehensive Care Retirement Village (Village) that is reflected on the Drawings for Resource Consent provided in Appendix 1. The drawings are provided to illustrate the proposed concept to service the Village and to demonstrate that it can be adequately serviced to the requirements of Kāpiti Coast District Council (KCDC). Detailed engineering design will be provided to KCDC for approval with building consent applications following the resource consent process. As the civil infrastructure will remain a Summerset owned private asset, the design has been undertaken with consideration given to local standards (such as the Kāpiti Subdivision and Development Principles and Requirements) where possible. Where local standards cannot be met due to constraints of the Site or they are not directly applicable, the New Zealand Building Code has been used as minimum standard for design. 1.1. Proposal An 8ha portion of the Site is to be used for a retirement village comprising a mix of single and two storey villas and cottages and a central main building. The proposed Main Building would comprise of recreation, social, community, service and administration areas as well as housing assisted living suites, memory care suites and care beds. Maximum occupancy for the Village is estimated to be 401 residents, based on data obtained from Summerset. The population of residents has been estimated as 282 independent residents and 119 serviced, care and memory care residents. Figure 1 Proposed Summerset Waikanae Retirement Village 1.2. Site Description Summerset Waikanae is a proposed retirement village in Kāpiti occupying approximately 8ha of a 25.5 ha Site located at 32 Park Avenue, Waikanae about 2km northwest of Waikanae town centre. The Site consists of the following parcels SO 505441 Sections 17, 18, 19 & 20 and Lot 2 DP 27407 (28 Park Avenue). Lot 2 DP 27407 was purchased with the specific intention of using this as the main access point to the Village. The www.woods.co.nz P18-320: 22/03/2021 : Page 4 of 20
Site is bounded by the State Highway 1 (SH-1) to the north, the Waimeha Stream to the west, residential land to the south, and farmland to the east. The Site is largely undeveloped, apart from one residential dwelling and several outbuildings. The Site is presently vegetated with grass, blackberry, gorse, stands of native shrubs and trees and mature pine trees. The topography at the Site comprises rolling hills at elevations between 6.5m RL to approximately 35.0m RL, with low-lying relatively flat areas located in the west and southeast areas of the site. The Village covers only part of the Site and the balance land could potentially be used to accommodate future residential lots, however the potential future residential subdivision is not part of the Village resource consent application. For the purposes of ensuring common infrastructure is ‘future proofed’ it has been assumed that future residential development may consist of up to 5 lots off a right of way on Park Ave and up to 18 lots off the end of Ferndale Ave. In order to form the Village platforms, earthworks in areas outside of the platforms are required. These earthworks have been designed to ensure any potential future residential development on the balance land is efficient (by minimising rework) and minimises disruption to the Village. Therefore, approval to undertake bulk earthworks on the balance land, establishing lot platforms, and roads to subgrade level is sought under this application. Figure 2 Site Location Plan 1.3. Site Geology The published geological map indicates that the Site is underlain by Aeolian dune sand (Begg and Johnston, 2000). There are also areas of peat within low-lying interdune areas and beach/marine sands and gravels underlay the dunes. For further information refer to the BECA Geotechnical Investigation Reports. 2. Earthworks 2.1. Proposed Earthworks Description Summerset intends to use part of the Site as a retirement village over a bulk earth worked platform of approximately 8ha, which will comprise cuts up to 18m and fills up to 10m in height. The total earthworks volume will be approximately 300,000m3, which it is intended to balance onsite. BECA has been engaged to carry out geotechnical investigations for the Site and have concluded that the onsite soils, excluding any unsuitable materials are expected to be suitable for use as fill material. www.woods.co.nz P18-320: 22/03/2021 : Page 5 of 20
The earthworks methodology and the erosion and sediment control strategies are outlined under a separate document (Woods (2020), Earthworks and Sediment Control Plan, Summerset Waikanae). 3. Infrastructure Assessment 3.1. Kāpiti Coast District Council District Plan Chapter 11 of the Kāpiti Coast Proposed District Plan Appeals Version 2018 (PDP) stipulates the Policy, Standards and Rules for Infrastructure, Services and Associated Resource Use. Table 1 provides an assessment of the proposal against the relevant rules provided in PDP Table 11B.1 Permitted Activities. Table 1 Assessment of proposal against PDP Table 11B.1 Permitted Activities PDP Proposal Permitted PDP Standards Comment Complies Activities 1. All permitted 1. Development must be undertaken in accordance with Yes Infrastructure activities in the Council's Subdivision and Development Principles design has been all zones, and Requirements, 2012. carried out in including network accordance utilities. with these standards where relevant. Note freeboard to building floor levels have been set to Building Code requirements as discussed in section 3.4. 2. Any new and 1. All new or relocated residential No Rainwater tanks relocated residential buildings where potable public water supply is are not buildings on land available to a residential building must be fitted with proposed. The where potable one of the following: water demand public water a. rainwater storage tanks with a minimum requirements supply is available. capacity of 10,000 litres for the supply of non- will be met potable water for outdoor uses and indoor through an toilets; or alternative b. rainwater storage tanks with a minimum solution that capacity of 4,000 litres for the supply of non- will achieve the potable water for outdoor areas and indoor objective of this toilets, and a greywater re-use system for rule. Refer to outdoor irrigation. The greywater re-use Table 2. system shall re-use all water from bathrooms (excluding toilets) and laundry washing machines. 2. – 7. Standards refer to the Greywater and rainwater Not No Rainwater or system, as we are proposing an alternative system, applicable greywater these standards are not relevant to the proposal system proposed 3. Residential Not Not in Rural buildings in all Applicable Zone Rural Zones. As the activity does not comply with Permitted Activity 2 of PDP Table 11B.1. Table 2 provides an assessment against Table 11B.3 Restricted Discretionary Activity. www.woods.co.nz P18-320: 22/03/2021 : Page 6 of 20
Table 2 - Assessment of proposal against PDP Table 11B.3 Restricted Discretionary Activity PDP Restricted Proposal PDP Standards Comment Discretionary Complies Activities 1. Any new and 1. An assessment that demonstrates the Yes The proposal includes a relocated residential system proposed will permanently reduce new bore within the building that does not water demand associated with Site that will provide comply with any one or the household unit(s) by at least 30% water to all irrigation more of the permitted from Household 2007 summer average systems and outdoor activity standards water use. pipes. No outdoor taps under Rule 11B.1.2. will be connected to the 2. The provision of a non-potable supply for potable public water all outdoor uses associated with the supply. An assessment household unit, including garden irrigation. as required by Standard 1. is provided in section 3. Provision must be made to ensure that no 3.6. outdoor taps can be connected to the potable public water supply. 2. – 3. Are not Not applicable as proposal applicable is not a subdivision. to this proposal 3.2. Roading 3.2.1. Roading Overview The Village will be serviced by an internal network of private roads. The main access to the Village will be via the Village approach road at 28 Park Avenue which will provide a two-way access to the Village from the public road. A secondary access point will provide exit only for Village residents to Ferndale Drive. An extension to Ferndale Drive is proposed for this purpose. The extension will be constructed to public road standards to ensure the road can be vested as a road with future residential subdivision. 3.2.1.1. Basis of Design The following references and standards have been used in the roading design. − Summerset Master Plan Client Brief (Rev D, 2018) − Kāpiti Coast District Council - Subdivision and Development Principles and Requirements, 2012 (SDPR) − NZS 4404:2010 - Land Development and Subdivision Infrastructure 3.2.2. Road Network The road layout has been set by Summerset’s Master Plan, provided in Appendix A. The layout has been reviewed by Stantec transportation engineers who have confirmed the layout allows for appropriate vehicle tracking. Roads will vary in width dependant on their hierarchy and vehicle movements. The Village approach road will have a carriageway width of 7.0m, primary boulevard 6.5m, secondary streets a width of 5.5m and residential lanes a width of 4.5m, refer to Figure 3 road hierarchy plan. www.woods.co.nz P18-320: 22/03/2021 : Page 7 of 20
Figure 3 Road Hierarchy Plan (Source Kamo Marsh) 3.2.3. Geometric Design Parameters In order to allow for adequate drainage gradient, a minimum longitudinal gradient of 1 in 250 (0.4%) has been adopted, while a maximum gradient of 1 in 20 (5%) was provided within the Village to meet Summerset accessibility requirements. Cross falls will typically be between 2-3%. Stormwater runoff within the road corridors will be via street sumps which will discharge directly into the stormwater reticulation system. These sumps will be located in the kerb and channels adjacent to the formed carriageway as shown in the Combined Services Layout Plans provided in Appendix B. Road corridors will be used as overland flow paths to direct stormwater runoff should there be a blockage of the sump intakes. The typical road cross-sections for the Village are illustrated in the Civil Engineering Drawings provided in Appendix B. 3.2.4. Ferndale Drive Extension It is proposed to extend Ferndale Drive from the current extents of formation at the Site boundary to the north end of the Village. The road extension will be constructed to public road standards and will terminate in a cul-de-sac head adjacent to the Village. A private exit-only road connection will be constructed from the Village to the cul-de-sac. The Ferndale Drive road extension will initially remain privately owned by Summerset, however the intention is to vest this section of road in council with a future potential residential subdivision that will be subject to a separate resource consent application. The design drawings show an indicative design that is similar to the existing Ferndale Drive formation, however this is subject to detailed design and specifications being prepared. It is intended that the retaining wall design, if required, will be submitted to KCDC for building consent prior to construction of the Ferndale Drive extension. The existing formation of Ferndale Drive has been constructed to approximately 7m from the Site boundary, however the earthworks completed with the road construction were undertaken in a manner that introduces www.woods.co.nz P18-320: 22/03/2021 : Page 8 of 20
a number of design scenarios to be able to form a connection to this road from Summerset’s boundary. In order to extend the road with footpaths and berms at acceptable crossfalls, retaining a height of up to 3m will be required within the road reserve or fill will need to extend into the adjacent residential lot. The key constraint is that the ground on the north side of Ferndale Drive drops away abruptly to a low area within the adjacent residential property. As mentioned above, Woods have included an indicative design that confines all works to be on Summerset’s property and road reserve. For the purposes of this resource consent application, the solution that is proposed is the construction of the retaining wall option. However, a potential option is to pursue a fill option on the neighbouring property. That alternative approach shall be provided for in the conditions should it be preferred. 3.3. Retaining Walls Retaining walls will be required throughout the Site to support the cut faces that are created. A larger retaining wall located along the northeast end of the Village platform is required to enable flat usable areas between the main and upper platform. Several small retaining walls will also be required in the southern part of the Site allowing flat access grades to be achieved. The placement and height of internal retaining walls will be refined during the detailed design. Retaining wall heights throughout the Site will vary, but do not exceed 3.0m in height. 3.4. Stormwater Primary and secondary stormwater flows will need to be managed, in accordance with the New Zealand Building Code (NZBC), Kāpiti Coast District Council (through the PDP) and Greater Wellington Regional Council requirements (through the Proposed Natural Resources Plan (PNRP). The proposal is to: − Control the stormwater runoff in frequent storm events by eliminating ponding within the Village. This will be achieved by a conventional piped stormwater network that will be designed for a 10-year ARI storm event (including allowance for climate change). − Mitigate the increased flow rates for the Village for rainfall events exceeding the 2-year ARI up to and including the 100-year ARI event (including allowance for climate change). This will be achieved via two attenuation basins with staged restricted outlets. − Control the stormwater runoff for a 100-year ARI event (including allowance for climate change) by allowing sensible secondary overland flow paths through the Village to provide protection against flooding of buildings. Habitable building floors shall have a freeboard of at least 150mm above the surface water of the secondary level of protection event in accordance with the NZBC. We note that KCDC Subdivision and Development Principles and Requirements, 2012, require the underside of floor slabs of habitable buildings be set to achieve 500mm freeboard above the secondary flow level. This is not achievable within the Village as the roads, paths and driveways need to be designed to be accessible for residents with a maximum grade of 1V:20H (5%). This means the floor level of the buildings is a maximum 275mm above the level of the kerb line (5.5m driveway at 1V:20H). The Village catchment is relatively small and overland flows are typically minor and contained within the kerbs, there is also limited upstream catchment which means that the flood hazard can be effectively controlled within the Village. Therefore, the proposed floor levels provide a 150mm freeboard in accordance with the NZBC. It is considered that the Building Code requirements provide an appropriate level of flood protection. The detailed stormwater management approach for the proposed Village is provided in a separate document (Woods, Stormwater Management Plan, 2020). www.woods.co.nz P18-320: 22/03/2021 : Page 9 of 20
3.5. Wastewater 3.5.1. Wastewater Network Overview The proposed wastewater network for the Village consists of a gravity reticulation system, that will discharge to the existing wastewater network at Park Avenue. The wastewater main along Park Avenue is 300mm diameter and is 2.72m deep based on Beca topographical survey. The proposal to discharge the Village wastewater to this location in the public network has been discussed with John Saxton (KCDC Senior Water and Wastewater Engineer). Mr Saxton has not declared any issues with this proposal, however he has noted that any significant new wastewater demands (such as the proposed) need to be included in the KCDC network model to ensure that there is no capacity limitations. This modelling was requested from KCDC’s consultant in November 2019 and we have not been made aware of any limitations identified by the modelling at this time, therefore, for the purposes of this application, we have assumed that the public network has the capacity for the Summerset sewer discharge at Park Avenue. The following sections summarise the design criteria, bulk wastewater volumes and peak wastewater flow rates. 3.5.1.1. Basis of design The following references and standards have been used in the wastewater design. − Kāpiti Coast District Council - Subdivision and Development Principles and Requirements, 2012 (SDPR) − NZS 4404:2010 - Land Development and Subdivision Infrastructure 3.5.2. Proposed wastewater design The network design is based on the following design parameters and requirements. 3.5.2.1. Wastewater Flow Calculations To determine the specific flow demands for the site, the following design parameters were applied to the site: − Each independent unit on the Site will have an occupancy rate of 1.3. This rate was provided by the client and is based on the average occupancy rate across Summerset’s 26 New Zealand villages. − All main building units have an average design occupancy of one person per unit. Design per capita allowances for the Site are based on the SDPR. These are as follows: − Average dry weather flow allowance of 250 litres per day per person − An allowance has been made for potential future residential subdivision on parts of the site, being 5 lots from Park Avenue and 18 lots from the end of Ferndale Drive. www.woods.co.nz P18-320: 22/03/2021 : Page 10 of 20
Based on the Summerset master plan and the proposed occupancy, the anticipated wastewater flows are summarised in Table 3. Table 3 – Wastewater Flow Calculations Wastewater Flow Calculations Village - Connection at Park Ave Total occupancy 401 Daily flow per person 250 l/day/person Average dry weather flow 1.16 l/s Dry weather diurnal peaking factor 2.5 Peak dry weather flow 2.9 l/s Dilution/infiltration factor for wet weather 2 Peak wet weather flow 5.8 l/s Possible Subdivision - Connection at Park Ave Number of dwellings 5 Number of people per dwelling 2.5 Average dry weather flow 250 l/p/day Average dry weather flow 0.04 l/s Dry weather diurnal peaking factor 2.5 Peak dry weather flow 0.09 l/s Dilution/infiltration factor for wet weather 2 Peak wet weather flow 0.18 l/s Possible Subdivision - Connection at Ferndale Drive Number of dwellings 18 Number of people per dwelling 2.5 Average dry weather flow 250 l/p/day Average dry weather flow 0.13 l/s Dry weather diurnal peaking factor 2.5 Peak dry weather flow 0.33 l/s Dilution/infiltration factor for wet weather 2 Peak wet weather flow 0.65 l/s 3.5.2.2. Reticulation Network New private gravity reticulation will be designed and constructed in accordance with KCDC SDPR and NZBC to provide each unit with a connection. The proposed layout of the wastewater reticulation is shown in the Combined Services Layout Plans at Appendix B. The proposed design indicates that a 150mm diameter pipe is adequate for the site. The private wastewater mains will generally be located under the Village road carriageway with 100mm diameter laterals provided to each villa. Due to the distance between the south corner and the northeast end of the Village, the sewer line to service the northeast end of the Village is approximately 330m long, at minimum grades this line reaches a maximum depth of 5m at the top of the approach road. Full design and detailing of the wastewater system will be provided at building consent stages. 3.5.3. Ferndale Drive Future Residential An allowance is being made for future residential lots from the extension of Ferndale Drive. The Ferndale Drive road extension will be constructed as part of the Village to provide exit only access for Village residents, in addition the design aims to future proof this road extension to cater for future residential subdivision off this road (estimated at up to 18 residential lots). In terms of wastewater, there is an existing public 150mm www.woods.co.nz P18-320: 22/03/2021 : Page 11 of 20
gravity sewer line that has been constructed to the current extents of the Ferndale Drive road formation. Unfortunately, the end of this line is shallow (approximately 1.3m deep), and therefore has very limited ability to service an extension of Ferndale Drive under gravity. Therefore, a pressure sewer system with individual grinder pumps and tanks for each property is proposed for these future lots. 3.6. Water Supply 3.6.1. Water Supply Overview The Village will be fully reticulated with a new private network of watermains within the Village. The water reticulation will consist of a potable / fire hydrant supply and a separate fire main to a sprinkler system in the main building. Summerset’s preference is to have a two-end domestic supply to provide resilience, the supply would be fed from two locations: − 150mm diameter distribution main running parallel to Park Avenue and is located on the opposite side of this road. − 150mm diameter distribution main running parallel to Ferndale Drive and is located on the northern side of the road. The fire main to the main building sprinkler system will be a separate 150mm connection from the KCDC main in Park Avenue. Backflow prevention will be provided to meet KCDC requirements at the Site boundary for all the connections to public mains. The proposed location for the backflow prevention device at the Ferndale Drive end of the Site is adjacent to the gate of the Village Exit Only Road. It is not intended to vest the Ferndale Drive extension as road with the Village construction, but rather under a separate future subdivision. We note that KCDC requires that backflow preventers are located within private property adjacent to road reserve, the proposed location will meet this criteria when the road is vested under a future subdivision. The proposed location for the backflow preventer will comply with the KCDC requirements for the site upon completion of future subdivision (as the road will be vested in the Council as a public road). This approach avoids having to move the backflow preventer to its final place once subdivision occurs. Good access to the backflow preventer will be provided to KCDC staff as Ferndale Drive extension will be constructed to public road standards (although it may not be vested immediately). It is intended that the potable water supply will not be used for irrigation or outside taps and a separate consent is being sought to construct a bore for the irrigation and outside tap supply. www.woods.co.nz P18-320: 22/03/2021 : Page 12 of 20
Figure 4 Existing water supply network The following sections summarise the design criteria, peak water demands and a description of the proposed network design and upgrades. 3.6.1.1. Basis of Design The following references and standards have been used in the water supply design. − Kāpiti Coast District Council – Subdivision and Development Principles and Requirements, 2012 (SDPR); − NZS 4404:2010 – Land Development and Subdivision Infrastructure; − SNZ PAS 4509:2008 – New Zealand Fire Service Firefighting Water Supplies Code of Practice; and − NZ Building Code, Clause G12 “Water Supplies”. 3.6.2. Water Supply Domestic Demand To determine the specific flow demands for the site, the following occupancy rates were applied: − each villa or apartment on the Site will have an occupancy rate of 1.3, this rate was provided by Summerset and is based on the average occupancy rate across Summerset’s 26 New Zealand villages; − assisted living suites, memory care suites and care beds have an occupancy rate of 1; − an allowance is made for 40 staff and 45 visitors using 50 l/p/day; and − an allowance has been made for potential future residential subdivision on parts of the site, being 5 lots from Park Avenue and 18 lots from the end of Ferndale Drive. www.woods.co.nz P18-320: 22/03/2021 : Page 13 of 20
Table 4 Village domestic water demands Village Domestic Supply No of Population Peak Daily demand Total Unit Type units per unit Occupancy L/p/day (1) L/day Independent Living Units 217 1.3 282 350 98,700 Assisted Living Suites 56 1 56 350 19,600 Memory Care Suites 20 1 20 350 7,000 Care Beds 43 1 43 350 15,050 Guests 45 1 45 50 2,250 Staff 40 1 40 50 2,000 Total 144,600 Average Demand (l/s) 1.67 Peak factor (1) 2.2 Peak domestic Village demand (l/s) 3.66 6.0 Peakfactor (1) Daily demand and peak domestic village demand as calculated (l/s) based on actual use by households in by Stantec 6.0 peak as irrigation and outdoor taps to be supplied from Waikanae catchment, assumes no summer bore. Peak domestic village demand (l/s) Table 5 Potential future subdivision water demands Possible Future Subdivisions Within Wider Property Possible Subdivision - Connection at Park Ave Number of dwellings 5 Number of people per dwelling 2.5 Total Population 12.5 Daily demand (from Stantec) (1) (l/p/day) 350 Daily demand (l/day) 4,375 (1) Peak factor (From Stantec) 2.2 Peak domestic demand - 5 lot subdivision (l/s) 0.11 Possible Subdivision - Connection at Ferndale Drive Number of dwellings (conservative estimate) 18 Number of people per dwelling 2.5 Total Population 45 Daily demand (from Stantec) (1) (l/p/day) 350 Daily demand (l/day) 15,750 (1) Peak factor (From Stantec) 2.2 Peak domestic demand - 18 lot subdivision (l/s) 0.40 (1) Daily demand and peak factor as calculated by Stantec based on actual use by households in Waikanae catchment, assumes no summer peak as irrigation and outdoor taps to be supplied from rainwater. www.woods.co.nz P18-320: 22/03/2021 : Page 14 of 20
Table 6 Firefighting demand Firefighting Demand Main Building Sprinkler Demand (Dedicated fire main) Estimated from similar Summerset Buildings (l/s) 17 Residual pressure at valve house (RL 16m) (kPa) 350 Village Fire Hydrant Demand 12.5l/s from 2 x hydrants (SNZ PAS 4509 FW2) (l/s) 25 3.6.3. Fire Hydrant Supply A preliminary fire hydrant demand of 25l/s has been determined in accordance with SNZ PAS 4509:2008 and based on a fire classification of FW2. The required fire-fighting flow is 12.5l/s from a hydrant within 135m with another 12.5l/s from a hydrant within 270m, residual pressure greater than 100Pa. The main building will have a sprinkler system supplied from a separate fire main. The fire main will connect to the KCDC network at Park Avenue with suitable backflow prevention at property boundary. The sprinkler system demand is estimated from similar Summerset buildings at 17l/s with 350kPa residual pressure at valve house. 3.6.4. Effects on KCDC Water Supply Network KCDC maintain a model of their public supply network and Stantec was engaged to test the Village and future subdivision demands in the model to identify any constraints and limitations to the supply. The model was originally run with conservative assumptions for the Village demand, with peak demands for Independent Living Units (ILU’s) based on NZS4404 and the main building supply using a demand based on the number of plumbing fixtures in the building. These initial assumptions were deemed to be conservative and perhaps not fit for purpose for investigations of a network wide scope. The initial assessment with the conservative Village demand applied found that high head losses in parts of the existing network resulted in loss of pressure for some downstream customers. The loss of service for downstream customers was deemed to be outside of acceptable limits. Stantec reported the following in their assessment: • The significant drop in pressure observed at the critical point customers is caused by high head losses in mains in the upstream network in Te Moana Road, between Main Road (old SH1) and Ngarara Road. This network is responsible for delivery of water from Kakariki Reservoir to Te Moana Road, Waikanae Beach and Peka Peka, and is already under stress. • The high level of head loss in Te Moana Road is a known problem, and an upgrade has been proposed to address the problem ahead of development in the Ngarara area (including Park Avenue). This upgrade (known as the Ngarara Loop) consists of around 3km of 200mm diameter mains from Main Road (the old SH1) right through to Field Way in Waikanae Beach. Stage 1 of the upgrade would resolve the issues identified in the original assessment. Following the original assessment, Stantec was requested to re-run the analysis with more realistic, less conservative water demand assumptions for the Village and future subdivision. These values are provided on Tables 2 – 4. The revised values were based on real water demand data for the local area on a per population basis, on the assumption that the residents will use the same volume of water per day with a matching daily use pattern as other residents in the catchment. We believe this is an appropriate assumption for network wide modelling. The revised analysis showed that pressure losses for downstream customers was at an acceptable level. Copies of the Stantec Analysis Reports are attached at Appendix C. 3.6.5. Analysis of Pressure in Peak Demand According to Section 6.3.5.3 of NZS4404:2010, water demands vary on a regional basis depending on a variety of climatic conditions and consumer use patterns. The Council should be able to provide historically- www.woods.co.nz P18-320: 22/03/2021 : Page 15 of 20
based demand information appropriate for design. Therefore, to assess the demand for the Village we used KCDC water demand data instead of default figures from NZS4404. KCDC has comprehensive data for water use in the Waikanae network and this data has been used to model the pressure and flow demands for the Village. The Waikanae water supply is divided into several District Metered Areas (DMAs), the Site is to be serviced from the Te Moana DMA. KCDC has real demand data from the DMA that has been used to produce master planning models for the network. Summerset engaged Stantec (KCDC’s water modelling consultant) to assess the water supply system using KCDC’s master planning model KCDC WS MPL05. Stantec ran several design scenarios using this model and the parameters and results are presented in Appendix C. The first model run used water demands using the default figures from NZS4404 for independent living units and potential future subdivisions and a conservative demand estimate for the main building. The peak water flow was then applied to the DMA profile and an assumed profile was used for the main building demand. While the results of the model showed that complying pressure of more than 25m would be met for all customers, the model predicted a pressure drop for some downstream customers. With further analysis, it was clear that applying the default demands to the real demand profile was not appropriate as it grossly overestimated the water demands for the Village when applied on a network wide basis. For example, this methodology resulted in daily demands of 576l/p/day for ILUs and 634l/p/day for future subdivision. The demands for the Village were subsequently refined and real data from the peak day DMA profile was used to predict the effects on the network. For this model run, Stantec calculated a daily demand of 350l/p/day and a peak factor of 2.2. Noting that no outdoor water uses will be supplied from the potable supply, we believe these figures are suitably conservative and comply with NZS4404 as it uses historically based demand information appropriate for design. 3.6.6. Proposed Reticulation Layout The proposed water reticulation network for the Village is illustrated in the Civil Engineering Drawings provided in Appendix B. The Village will be provided with a fully reticulated supply to the main building and independent living units which will include fire hydrants throughout the Village. A separate dedicated fire main will supply a sprinkler system in the main building. The domestic supply consists of two-end connections at Park Avenue and Ferndale Drive to provide resiliency and security of supply and separate main building fire main connection at Park Avenue. A backflow prevention device is proposed at the connections at each end of the Village. The supply main reticulation within the Village consists of a 150mm diameter or 100mm diameter water main located along primary and secondary roads, with a 63mm rider mains servicing residential lanes. Fire hydrants will provide fire-fighting requirements of the Village and these will be installed on the 150mm and 100mm water mains. All internal watermains for the Village will remain privately owned and operated by Summerset. 3.6.7. Assessment as required by Kāpiti Coast PDP Table 11B.3 The proposal is to supply irrigation and outdoor taps from a private bore supply as an alternative to rainwater tanks. As this is an alternative system to that described under PDP Table 11B.1, the proposal shall be assessed as a Restricted Discretionary Activity under PDP Table 11B3. The first standard on this table requires the following: 1. An assessment that demonstrates the system proposed will permanently reduce water demand associated with the household unit(s) by at least 30% from Household 2007 summer average water use. www.woods.co.nz P18-320: 22/03/2021 : Page 16 of 20
The Household 2007 summer average water use refers to a study that was conducted by BRANZ in 2007 that involved monitoring water use in a sample of residential homes on the Kāpiti Coast. Heinrich, Matthias. 2007. ‘Water End Use and Efficiency Project (WEEP) – Final Report’. BRANZ Study Report 159. BRANZ Ltd, Judgeford, New Zealand. Table 7 summarises the results of this study during the summer period. Table 7 – Summer Average volumes per end use (reproduced from Table 7 of BRANZ Study Report 159) Percent of Total Average (l/p/d) Tap 11.7% 23.9 Shower 22.2% 45.3 Washing Machine 20.4% 41.6 Toilet 17.0% 34.7 Dishwasher 1.3% 2.7 Bathtub 1.5% 3.1 Miscellaneous 0.0% 0.0 Total Indoor 74.22% 151.3 Outdoor 21.8% 44.5 Leaks 3.3% 6.7 Total Use 100.0% 203.9 The assessment provided on Table 8 demonstrates that the system proposed will permanently reduce the water demand by at least 30% from Household 2007 summer average water use. Table 8 – Village Water Demands Reductions Item Reduction Comments Outdoor 21.8% All outdoor taps and irrigation will be supplied from a bore and will not be connected to the potable supply. Leaks 3.3% The potable reticulation will be constructed of modern materials and to modern construction standards and will be tested to ensure that it is free of leaks when commissioned. The system will be actively maintained by Summerset for the life of the asset and any leaks that occur will be promptly repaired. Bathtub 1.5% There will be no bathtubs installed in any units. Shower 4.5% The Village will be fitted with 3 Star Water Efficiency Rated shower heads with a specified flow of 8.5l/min, this represents a 20% reduction in shower flow from the shower flows measured in 2007 study, or a 4.5% reduction overall. Toilet 5.9% The Village will be fitted with 4 Star Water Efficiency Rated toilets with flush volumes of 4.5/3L per flush. This represents a reduction of 35% of the average flush volumes measured in 2007 study or 5.9% overall. Total 37% Table 8 shows that through supplying outdoor uses from a separate source, the use of modern efficient fittings and leak free reticulation, the system will exceed the PDP requirement of 30%. 3.7. Electrical and Communications Summerset has engaged experts to design electrical and communications reticulation for the proposed Village. These experts have confirmed that there is enough capacity to service the Village from the existing networks. www.woods.co.nz P18-320: 22/03/2021 : Page 17 of 20
Appendix A Summerset Waikanae Village Master Plan www.woods.co.nz P18-320: 22/03/2021 : Page 18 of 20
Back Flow Preventer D ROA L Y I T ON Ferndale Dr extension - EX refer to civils drawings Proposed village B32 B31 secondary exit Gate Village Exit Only Road Summerset Village Pedestrian access to B33 NOTE: Over Under Units (B27 - B30) consist of 4 KĀPITI CYCLE ROUTE - EXPRESSWAY Idependent Living Units (ILU's). 2 ILU's are accessed from the north side on the lower level platform. The other 2 ILU's on the first B40 B30 floor level are accessed from the south side up on ry B39 B34 the upper level platform. da o un lB ga Le B41 B35 B29 Raised area of villiage Blocks B11 to B30 inclusive B43 B24 accessed from raised area. B23 Refer to Over Under Unit B42 note for other access to blocks B27-B30 B28 B44 B38 B25 B45 77 B22 76 B37 74 75 B27 B16 73 72 70 71 67 68 69 64 65 66 61 62 63 B15 B49 B36 B17 B26 en ng Gre i B48 B owl B46 B21 Hobbies, Maintenance and Waste B14 B50 54 53 55 52 56 51 T1 57 58 Gas Store B20 50 59 B18 or B53 49 60 B19 B13 at er B47 en 48 B52 G Main Building B51 47 46 45 44 43 26 B12 TOTAL BUILDING FOOTPRINT 25 16 15 B54 42 24 17 MAIN BUILDING TOTAL m² COTTAGE & VILLA TOTAL m² 29 23 20 19 18 30 22 21 3890 m² C1 = 360 m² 41 31 28 36 32 27 B10 NOTE: Louisvilles consist of 4 35 C2 = 183 m² B57 B58 34 Idependent Living Units (ILU's). 33 B09 2 ILU's are located on the ground level C3 = 582 m² B11 while 2 ILU's are located on the first B56 40 C4 = 364 m² B55 floor level. 39 37 V1 = 5670 m² 38 GENERAL LEGEND T1 V2 = 4683 m² TRANSFORMER 1 V3 = 2454 m² B66 B08 T2 TRANSFORMER 2 V4 = 4135 m² B67 LVN = 1260 m2 B07 PS PUMP STATION B60 B05 LVS = 903 m 2 B61 MSDB MAIN DISTRIBUTION BOARD U1-U3 = 1016 m2 GAS STORE = 0 m² B59 VILLAGE GREEN CORRIDOR RESIDENTS WORKSHOP, 14 13 12 PLANTING MAINTENANCE & WASTE REFUSE B02 B06 BUILDING 184m² TRAFFIC CALMING PAVING T2 2 1 4 3 11 10 6 5 B63 B03 9 8 7 N MSDB B62 TOTAL 1.5B 2B 2B 2B 2B 3B 2B 2B 3B 2B 3B TOTAL 1B MC TOTAL CARE Mid End End End Lwr Upr Upr Lwr Upr ILU's SUITES VILLAGE BEDS B64 C1 C2 V1 V2 V3 V4 U1 U2 U3 L1 L2 ALS MCS CB C3 C4 B04 W E B01 13 6 54 44 22 34 8 0 8 14 14 217 56 20 293 43 B65 % MIX (EXCL. CA'S) 6% 3% 25% 20% 10% 16% 4% 0% 4% 6% 6% S % COTTAGES 9% % VILLA MID 25% 1 MASTER PLAN - UNIT TYPE & UNIT MIX % VILLA END 46% 1 : 700 % OTHER ILU's 20% TOTAL VILLAS & COTTAGES 217 PLATFORM INFORMATION A 27/03/20 Resource Consent Issue Rev Date Description Approach Road from TOTAL ASSISTED LIVING SUITES 56 TOTAL SITE AREA 255,022 m 2* Park Avenue as per Client. sheet RC.008 TOTAL MEMORY CARE SUITES 20 TOTAL VILLAGE AREA 79876 m² TOTAL VILLAGE 293 TOTAL BALANCE AREA 175,146 m 2 SITE COVERAGE % (SITE AREA) 10% Summerset Head Office Ph. 04 894 7320 Fax. 04 894 7319 headoffice@summerset.co.nz www.summerset.co.nz TOTAL CARE FACILITY BEDS 43 SITE COVERAGE % (VILLAGE AREA) 32.3% Project Name. TOTAL ROAD SURFACE AREA SUMMERSET VILLAGE 15336 m² AP WAIKANAE PR Lega PARKING INFORMATION TOTAL DRIVEWAYS 5064 m² OA l Bou Project Stage. Block Number. ndar TOTAL SITE PARKING 77 TOTAL FOOTPATHS 2500 m² RESOURCE CONSENT C y H Drawing Title. TOTAL PARKS INCL. VILLAS & ALS/MCS 485 TOTAL SLAB COVERAGE 25795 m² RO (excl patio, service, entrance areas) MASTER PLAN - UNIT TYPES & MIX AD CYCLE PARKS 12 27/03/2020 2:51:13 p.m. TOTAL IMPERVIOUS AREA DO NOT SCALE DRAWINGS. DATE (incl patio, service, entrance areas) 52407 m² Original Sheet Size: A1 27/03/20 Project Number. Drawing Number. Rev 053 RC.011 A.
Appendix B Woods Civil Engineering Drawings for Resource Consent – Refer to Separate Document www.woods.co.nz P18-320: 22/03/2021 : Page 19 of 20
Appendix C Stantec Water Modelling Reports www.woods.co.nz P18-320: 22/03/2021 : Page 20 of 20
Kapiti Coast District Council (KCDC) Park Avenue Development Report This report has been prepared for the benefit of Kapiti Coat District Council. No liability is accepted by this company or any employee or sub-consultant of this company with respect to its use by any other person. Rev. Checked Reviewed Approved Date Description Prepared By No. By By By 0 08/01/2019 Final A Brotherston B Davies B Davies B Davies 1 Introduction KCDC has engaged Stantec to report on the water supply available at the proposed development of a Retirement Village at 32 Park Avenue, Waikanae. The development will consist of 217 Independent Living Units (ILUs) and a central Main Building. This study will also assess the impact of the demand for the proposed 5 lots near the connection point at Park Avenue, and the proposed 18 lots near the connection at Ferndale Drive. The location of the main development and the approximate location of the additional developments are shown in Figure 1-1. This document describes the requirements for water supply at the development site. Retirement Village 18 Lots 5 Lots Figure 1-1: Location of Proposed Development Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 1
1.1 Network Configuration The proposed development lies within the Waikanae, Paraparaumu and Raumati (WPR) Network. The WPR network is mainly fed from the Water Treatment Plant (WTP) on Waikanae River. From there, water is pumped along separate trunk mains, north to Waikanae and south to Paraparaumu/Raumati (Figure 1-2). Within the Waikanae network there are several District Metered Areas (DMAs), the Park Road development is supplied from the Te Moana DMA. Figure 1-2: WPR Network Schematic 2 Water Supply Requirements 2.1 Design Pressure Schedule 6 of the Kapiti Coast District Councils Subdivision and Development Principles and Requirements, 2012 (SDPR), states that the design pressure (i.e. during Average Day Peak Week demand) shall be between 250kPa and 900kPa (25m to 90m head) at the point of supply. 2.2 Available Fire Flow Table 2 of SNZ PAS 4509:2008 New Zealand Fire Service Firefighting Water Supplies Code of Practice (Fire Code) states the minimum firefighting water supply required for residential buildings is 12.5L/s flow within a distance of 135m of the building and a further 12.5L/s within 270m, with minimum 10m pressure at each source during 60% of annual peak demand. Information provided by the developer states a sprinkler system is in place for the main building, which is estimated to require 17 l/s at 350 kPa when operating. Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 2
3 Network Modelling For reference, the modelling is based on the master planning model KCDC WS MPL05, using the 2018 and 2046 upgraded scenario. A variation named “KCDC WS MPL05 C04 Summerset Development” has been created for this assessment. 3.1 Proposed Water Supply Network The development at Park Road consists of a Retirement Village and two areas for residential subdivision development. The Retirement Village will be made up a central Main Building and 217 Independent Living Units (ILU), while the residential development will consist of 5 lots at the Park Avenue connection and up to 18 lots at the Ferndale Drive connection. The Retirement Village will have a dedicated fire main which will supply the sprinkler system for the Main Building. It is proposed to create a loop main by connecting the development to the existing 150mm PE main on Ferndale Drive and linking this to either the existing 150mm AC main on Park Avenue (Scenario 1) or the existing 200mm AC main on Te Moana Road (Scenario 2). 3.1.1 Scenario 1 – Park Avenue Connection The development plan (Figure 3-1) was used to add the proposed development pipe network, following the proposed on-site road layout. The proposed size of the distribution main and the dedicated fire main is 150mm. Hydrants are proposed at 135m intervals as per requirements of The Fire Code of Practice (described in 2.2). Ferndale Drive Connection Park Avenue Connection Figure 3-1: Scenario 1 Development Layout Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 3
3.1.2 Scenario 2 – Te Moana Road Connection In the same way as the previous scenario, the pipe network has been added based on the developer plan which partially follows the route of the proposed on-site road layout. Te Moana Road Connection Ferndale Drive Connection Figure 3-2: Scenario 2 Development Layout 3.2 Demands This development consists of four separate demands; Retirement Village Domestic, Main Building, Park Avenue subdivision, and Ferndale Drive subdivision. Peak flow rates were provided by the developer, and the following method was used to apply these to the model. For the three residential parts of the development the demand was applied to the model by applying the peak flow to the DMA_TeMoana demand profile. Discussions with the developer indicated the expected total daily demand for the Main Building may be around 100,000 l/day. A new demand profile was therefore created for the Main Building demand, as using the standard residential demand pattern with the peak instantaneous flow of 10l/s would result in far higher daily demand by volume. The figures provided by the developer and the daily demands are shown below in Table 3-1. Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 4
Table 3-1: Peak flows obtained from developer Demand Category Peak Flow (l/s) Daily Demand (l/prop/day) Village Domestic 4.1 748 Main Building 10 n/a Park Ave Subdivision 0.2 1,585 Ferndale Dr Subdivision 0.7 1,541 For the three residential parts of the development the demand was applied to the model by applying the peak flow to the DMA_TeMoana demand profile. Discussions with the developer indicated the expected total daily demand for the Main Building may be around 100,000 l/day. A new demand profile was therefore created for the Main Building demand, as using the standard residential demand pattern with the peak instantaneous flow of 10l/s would result in far higher daily demand by volume. Estimated daily demands used in the model are shown in Figure 3-3, Figure 3-4, Figure 3-5 and Error! Reference source not found.. It is recommended that the expected flow profile of the main building is confirmed before the design of the system is finalised. Village Domestic Demand (l/s) 5 4 3 2 1 0 00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00 Figure 3-3: Estimated Daily Demand for 217 ILUs (748.2l/prop/day) Park Avenue Subdivision (l/s) 0.25 0.2 0.15 0.1 0.05 0 00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00 Figure 3-4: Estimated Daily Demand for Park Avenue Subdivision (5 properties - 1585.3l/prop/day) Ferndale Drive Subdivision (l/s) 0.8 0.6 0.4 0.2 0 00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00 Figure 3-5: Estimated Daily Demand for Ferndale Drive Subdivision (18 properties - 1541.3l/prop/day) Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 5
Main Building Demand (l/s) 12 10 8 6 4 2 0 00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00 Figure 3-6: Estimated Daily Demand for Main Building 4 System Performance 4.1 Current Peak Day (2018) – Scenario 1 In the current peak day scenario (2018) using the Scenario 1 point of connection, minimum pressure of 25m can be met for all customers when the additional demand from the proposed development is added to the model. Pressure at the development site is predicted to remain above 40m. However, although modelled pressures remain well above the threshold of 25m, the addition of proposed development has a very large impact on the pressures at existing properties in Waikanae Beach. This can be seen in the pressure comparison graph showing an increase in the pressure drop at peak demand of between 15 and 20m(Figure 4-1). This indicates the network is severely overloaded and any inaccuracies in the model or a small increase in the expected demand could cause the network to drop below the 25m level of service. To ensure the continued ability of the Waikanae network to meet the level of service for minimum pressure, mitigation will be required to reduce the impact of the proposed development. Proposed Development Area Critical Point (Frimley Terrace) Figure 4-1: Minimum pressures in the Waikanae network after development Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 6
Figure 4-2: Pressure comparison at Critical Customer (Frimley Terrace) The significant drop in pressure observed at the critical point customers is caused by high head losses in mains in the upstream network in Te Moana Road, between Main Road (old SH1) and Ngarara Road. This network is responsible for delivery of water from Kakariki Reservoir to all of Te Moana Road, Waikanae Beach and Peka Peka, and is already under stress. The additional demand from the proposed development therefore results in a significant increase in head loss in this network. Figure 4-3 shows which mains have high headloss and are causing reduction in pressure within the network. Proposed development Area with high headloss Kakariki Reservoir - source Figure 4-3: Option 1 - Maximum headloss throughout network Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 7
4.2 Current Peak Day (2018) – Scenario 2 In the current peak day scenario (2018) using the Scenario 2 point of connection, minimum pressure of 25m can be met all at nodes when the additional demand from the proposed development is added to the model. Pressure at the development is predicted to remain well above the required 25m. The situation is identical to Scenario 1, and there is a significant impact on pressures within the network when the development demand is added to the model (Figure 4-5). Due to the large volume of flow at peak times and the impact this has on pressures within the Waikanae network, mitigation will be required to reduce the impact of the proposed development. Proposed Development Area Figure 4-4: Minimum pressures in the Waikanae network after development Figure 4-5: Pressure comparison at Critical Customer The pressure at the critical point in Scenario 2 reacts in the same way as in Scenario 1, with a significant drop in pressure throughout the network and observed in Figure 4-5 at the critical point. This can be explained by mains at the start of the network which have high headloss and cause the drop in downstream pressures in the network, shown in Figure 4-6. Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 8
Proposed development Area with high headloss Kakariki Reservoir - source Figure 4-6: Option 2 - Maximum headloss throughout the network 4.3 Fire Flows – Scenario 1 and 2 Due to negative network performance, fire flow analysis was not conducted on the un-mitigated scenarios. 5 Mitigation Options The results in Section 4 shows the proposed development has significant detrimental effects on the distribution network, due to the undersized network supplying all of Te Moana Road and Waikanae Beach. This section details four mitigation options which will allow the development to be connected while minimizing the adverse effects on the existing network. 5.1 Option 1 – Deferment: Wait for Ngarara Loop Upgrade The high level of head loss in Te Moana Road is a known problem, and an upgrade has been proposed to address the problem ahead of development in the Ngarara area (including Park Avenue). This upgrade (known as the Ngarara Loop) consists of around 3km of 200mm diameter mains from Main Road (the old SH1) right through to Field Way in Waikanae Beach. Figure 5-1 shows the proposed upgrade. Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 9
Figure 5-1 : Ngarara Loop Upgrade (from Water Network Development Plan 2017) The first option is to delay implementation of the development (or at least the main building) until the first stage of this upgrade has been completed. At this stage the upgrade is due for implementation in 2025. Discussions with the developer have indicated this is not a viable option. 5.2 Option 2 – Temporary On-site Storage The high level of headloss observed at peak times is due to the high peak flow from the Main Building demand. This has been modelled as occurring during the morning peak as without restriction and connecting directly to reticulation this flow can occur at any time during the day. Option 2 is to install an on-site tank which is restricted from filling during periods of low network pressures and supplies the Main Building of the Retirement Village. The peak flow of the Village domestic and subdivision developments is relatively low and therefore continues to be supplied directly from the proposed 150mm distribution main without the need for additional storage. This tank would only be required until the first stage of the Ngarara Loop upgrade was complete. 5.2.1 Normal Operation A tank size of 100m3 was tested, based on the estimated daily demand of the Main Building. The tank was restricted from filling between 06:00 and 09:00 during the morning peak and between 17:00 and 21:00 during the evening peak. The tank inlet flow was limited to a maximum of 5l/s during permitted filling periods. This mitigation scenario was modelled over three days to allow the tank level to achieve a steady state. The impact Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 10
on pressure at the point of supply after the development is added is shown in Figure 5-3. The tank level and inlet flow can be seen in Figure 5-4: Tank inlet flow (3 days) Figure 5-4Figure 5-4 and Figure 5-6. Figure 5-5 Proposed Development Area Figure 5-2: Option 2 - Minimum pressures after mitigation Figure 5-3: Option 2 - Pressure comparison at the critical point Figure 5-3 shows there is a much smaller impact at the point of supply than without mitigation. The drop in pressure due to the tank filling can be observed at 09:00, when there is sufficient pressure. As a comparison, this Stantec Status – Draft │ 08 January 2020│ Project Number – 310101208 │ Park Avenue Development Report final 08.01.2020.docx Page 11