ERF 25543 SAWMILL VILLAGE - TRANSPORT IMPACT ASSESSMENT GEORGE, WESTERN CAPE JANUARY 2020 - HILLAND ENVIRONMENTAL
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Transport Impact Assessment Erf 25543 Sawmill Village George, Western Cape January 2020 5th Floor Imperial Terraces Carl Cronje Drive Tyger Waterfront Bellville, 7530 (021) 914 6211 (T) e-mail: mail@itsglobal.co.za
SUMMARY SHEET Report Transport Impact Assessment Type Title Erf 25543 Sawmill Village Location George, Western Cape Client Reigate Development Projects (Pty) Ltd Reference ITS 3583.2 Number Project Christoff Krogscheepers Team Amelia Daniels Carina Dippenaar Contact Tel: 021 914 6211 Details Date January 2020 Report Draft Status File Name C:\AmeliaITS\3583.2_TIA Sawmill Village Update\Report\3583.2_Erf 25543 Sawmill Village TIA Report_AD_2020-01-17.docx This transport study was prepared by a suitably qualified and registered professional traffic engineer. Details of any of the calculations on which the results in this report are based will be made available on request. INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page i
January 2020 Erf 25543 Sawmill Village ITS 3583.2 TABLE OF CONTENTS 1 Purpose of Study................................................................................................................. 1 2 Locality ................................................................................................................................ 1 3 Land Use ............................................................................................................................. 1 4 Existing Roadways .............................................................................................................. 1 5 Future Roadways ................................................................................................................ 1 6 Analyses Hours ................................................................................................................... 3 7 Scenarios Analysed ............................................................................................................. 3 8 Study Intersections (existing control)................................................................................. 3 9 Existing Intersection Operations ........................................................................................ 3 10 Approved Developments/ Latent Rights ............................................................................ 4 11 Future Background Traffic Conditions ................................................................................ 5 12 Site Access .......................................................................................................................... 5 13 Trip Generation Rates and Development Trips .................................................................. 6 14 Trip Distribution .................................................................................................................. 6 15 2025 Total Traffic Conditions ............................................................................................. 6 16 Public Transport and Non-Motorised Transport ................................................................ 6 17 Parking ................................................................................................................................ 8 18 Conclusion & Recommendations ....................................................................................... 8 REFERENCES ............................................................................................................................. 10 INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page ii
January 2020 Erf 25543 Sawmill Village ITS 3583.2 Annexures Appendix A: Figures Appendix B: Tables Abbreviations COTO Committee of Transport Officials Ha Hectare HCM Highway Capacity Manual LOS Level of Service NMT Non-motorised Transport SATGR South African Trip Generation Rates SQM Square Meters (m2) TIA Transport Impact Assessment V/C Volume to Capacity Ratio WCG Western Cape Government INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page iii
January 2020 Erf 25543 Sawmill Village ITS 3583.2 Transport Impact Assessment 1 Purpose of Study This report assesses the expected transport related impact of the proposed Erf 25543 Sawmill Village Development in George, Western Cape. This study summarises the impact of the land use rights on the existing road network as well as the existing transportation conditions within the site vicinity and provides an assessment of the transportation impacts of the proposed development on the surrounding transportation system. 2 Locality The proposed development will be located on Erf 25543, George. The proposed development is situated to the north of the N2 off-ramp intersection with Knysna Street, west of Welgelegen Estate and south of the Modderrug River. The proposed new alignment of the N2 is situated to the south of the proposed development. Refer to Annexure A, Figure 1 for the locality of the development. 3 Land Use The proposed land use is residential, as listed below: 37 Group Housing units 35 Duplex units 28 Semi-detached Housing units 68 Flats Refer to Annexure A, Figure 2 for the site development plan. The analysis in the TIA is based on the development fully constructed by the year 2025. 4 Existing Roadways The following roads are located in close vicinity of the development. N2: a Class 1 highway with two lanes per direction and posted speed of 100/80 km/h. No parking is allowed along this road and there is a median and street lighting in both directions. Knysna Rd: a Class 2 primary arterial with two lanes per direction and posted speed varying between 60 km/h and 80 km/h. No parking is available along this median divided road with street lighting in both directions. The road provides access to the N2 towards Cape Town with on- and off-ramps to the southwest of the proposed development. Welgelegen Road: Class 3 road with a single lane per direction, a one metre shoulder and a posted speed of 60 km/h. No parking is provided along the road and there are sidewalks present for pedestrians in both directions. Street lighting is provided. 5 Future Roadways A significant amount of planning has gone into the road network within the vicinity of the proposed development and this is documented in several studies of which the most noteworthy are: George Roads Master Plan Kraaibosch Roads Master Plan Planning as part of the transport impact assessments done in the area. An extract of the George Roads Master plan is provided in the figure below. Refer also to the George Roads Master Plan in Figure 10, Annexure A. INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 1
January 2020 Erf 25543 Sawmill Village ITS 3583.2 Figure 1: Extract from George Roads Master Plan The relevant long term planning of roads in the area based on the George Roads Master Plan are the following: The extension of the N2 to the west across the existing Sawmill, past the Welgelegen Estate. The timeframe for this future extension is not clear. All the planning for the Welgelegen Estate and proposed development had to take the future alignment into account. Welgelegen Road linking Welgelegen Estate and the areas around the Sawmill with the N2 at the roundabout at Rademachers. The extension of and/or link between the Welgelegen Road and the Victoria Bay Access Road, crossing the N2. A new interchange to the west of the current Knysna Road I/C for the southern extension of Park Road across the N2 into the proposed Destiny Africa development and also linking to Park Road to the north. The extension of Park Road to the N2 to link to the new proposed interchange. The extension of the Servitude Road to the west to link across the rail line and the valley to Sandkraal Road in the west. A Southern Arterial which will intersect the current N2 at the Rademachers Roundabout and run across the proposed Destiny Africa land to link up with Sandkraal Road in Thembalethu and to continue all the way to the west to link to Pacaltsdorp. This will provide a parallel route to the south of the N2. New roads have to be developed in the Kraaibosch area as part of the Kraaibosch Roads Master Plan, refer to Figure 11, Annexure A. These roads include the following important links: The extension of the Northern Access Road of Kraaibosch Estate from Knysna Road opposite the Mall Access Road. This road will link to the proposed Kraaibosch Development and will eventually intersect with the Saasveld Road north of Glenwood. The extension of Welgelegen Road to the north and towards Kraaibosch INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 2
January 2020 Erf 25543 Sawmill Village ITS 3583.2 Estate via a bridge across the Modderrug River to provide links to the residential developments of Groenkloof and Glenwood. The extension of the southern access road of Kraaibosch Estate to link the extended Welgelegen Road and Groenkloof Avenue to the north. As part of the various TIA’s which were done for the different developments the long-term road planning was considered in detail. The planned and actual roll-out of the roads network was in part effected by using the Municipalities Development Contribution (DC) model to fund the construction of the major road links. 6 Analyses Hours The traffic analyses for the TIA were based on the weekday AM and PM peak hours. The following peak hours are representative of the study area: Weekday AM peak hour: 07:00 to 08:00 Weekday PM peak hour: 16:00 to 17:00 7 Scenarios The transport impact of the proposed development was analysed for the following Analysed scenarios: 1. 2020 Existing conditions 2. 2025 Background traffic + Latent right traffic 3. 2025 Total traffic conditions (Background traffic conditions + Latent Right + Development trips) The traffic growth assumptions used to analyse future scenarios are discussed in Section 11. 8 Study The following intersections are included in the study: Intersections Intersection 1: Knysna Road / Welgelegen Road (existing control) Intersection 2: Knysna Road / N2 On-ramp Intersection 3: Knysna Road / N2 Off-ramp Intersection 4: Knysna Road / Mall Access Road Intersection 5: Knysna Road / Servitude Road Intersection 6: Welgelegen Road/ Access to Development and Welgelegen Estate The existing geometry and control of the intersections included in the study can be seen in Annexure A, Figure 3. 9 Existing Traffic counts conducted to the end of 2018 were used. These counts were verified Intersection and revised according to CTO data from April – October 2019 from CTO stations Operations situated in or near the study area. All the intersection operation analyses were performed in accordance with the procedures stated in the 2000 Highway Capacity Manual (HCM). The intersections in the study area were analysed to determine the level of service (LOS), delay per vehicle (in seconds) and volume per capacity (V/C) for each intersection in the peak hour. Refer to Annexure A, Figure 4A and Figure 4B as well as Annexure B, Table 2 and Table 3 for the weekday AM and PM peak hour traffic operations for the existing traffic conditions. Based on the existing conditions analysis it is evident that all the intersections are operating acceptably during both the typical weekday peak hours, i.e. a.m. and p.m. peak hours. There are no improvements required to mitigate any of existing operational issues at any of the study intersections. INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 3
January 2020 Erf 25543 Sawmill Village ITS 3583.2 ITS Engineers was involved in many previous studies in the area, one of these being the Eden Meander Development. As part of the Eden Meander TIA (ITS, 2012. Study is available on request) it was pointed out that improvements are required to accommodate what was termed the Phase 3 traffic of the Eden Meander Development. One specific improvement was identified at the intersection of Knysna Road/Mall Road and the issue that was identified is the capacity constraint for the right turning traffic coming out of the mall and turning right towards the N2. It was identified that the current through and right turn lane should be changed to a shared through and right turn lane with a dedicated right turn lane. This will in fact result in two right turn lanes, since the through traffic towards the Kraaibosch Manor area are relatively low. The intersection layout is such that the identified improvement is not simply a re-marking of the approach, but involved some geometric work to change the median islands to assist with the movement. This work is currently in process. 10 Approved To correctly evaluate the proposed development in terms of its transport impacts Developments/ and to ensure that all trips in the area are taken into account in a logical and fair Latent Rights manner, the growth in the area and the approved/latent rights were considered. There are a number of developments approved in the vicinity of the study area. Some of these have started and are in process, while others have not started and in fact there are questions about some of the larger developments such as the Destiny Africa Development which may not realize within the next five years. The following approved developments are relevant and only those on the southern side of the Modderrug River are listed: Blue Mountain Village: Mostly residential with rights for nearly 1 000 units from single residential to retirement units. Approved prior to 2007. (Approximately 80% – 90% developed). Blue Mountain Gardens: More than 1 500 residential units also from single residential, town houses, to retirement units and apartments. Approved prior to 2007. (Approximately 80% – 90% developed). Kraaibosch Country Estate (Various Phase): In the order of 300 residential units from single residential, group housing to retirement units and some smaller retail areas. Approved prior to 2007. (Approximately 90% developed). Destiny Africa (Sallywood Developments): 5000 seat Conference facilities, 2 2 2 35 000 m Expo Centre, 150 000 m Office and Techno Park, 150 000 m 2 Retail and Shopping Mall, 10 000 m Recreational uses, 2000 seat Sport Centre, 11 468 Rooms of Hotel and Lodges. Approved in 2007. Welgelegen Estate: 221 single residential units. Approved in 2007. (Approximately 40% developed). 2 Eden Meander: Commercial rights of more than 140 000 m including retail, offices, motor dealerships and some residential units. Approved in phases since 2013. (Approximately 70% developed). The Destiny Africa development has been approved more than 8 years ago and still has not started. The other approved developments are in varying stages of development. The rate of development is determined by the economy and the take- up of development opportunities. It is unlikely that all these developments will be INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 4
January 2020 Erf 25543 Sawmill Village ITS 3583.2 fully built-out within the next 5 years, i.e. within the analysis horizon of this TIA. The development that will have the most direct impact on the proposed development will be Welgelegen Estate, which is approximately 40% developed. The remaining 60% will generate estimated peak hour trips of 200 and a 25:75 directional split. The future trips that would be generated by the other developments were not specifically taken into account but an annual traffic growth rate was applied to the existing trips on the network to account for it. Refer to Annexure A, Figure 1 for the locality of the developments and to Annexure A, Figure 6A and Figure 6B for the 2025 background traffic conditions, including the growth rate and latent rights. 11 Future Background Based on a review of historical growth along the major roadways in the vicinity of Traffic Conditions the development, it is expected that the traffic in the George area will grow with between 3% - 3.5% per annum. Most of this growth is normally a result of new developments. The 2025 background traffic was therefore determined by applying a 3% growth rate per annum and adding the remaining expected trips of the Welgelegen Estate development. Refer to Annexure A, Figure 5A and Figure 5B for the expected trips generated by Welgelegen Estate and to Annexure A, Figure 6A and Figure 6B as well as Annexure B, Table 2 and Table 3 for the 2025 background traffic conditions, including the growth rate and latent rights. Based on the analysis illustrated in the figures it is evident that the intersections will operate acceptably during both the a.m. and the p.m. peak hours of typical weekdays. Therefore, no additional mitigation is required at any of the study intersections as a result of the anticipated growth in traffic due to completion of the developments in the area that already have development rights. 12 Site Access Access to the development will be via Welgelegen Road opposite the access to Welgelegen Estate. Addition of a western approach will provide access to the proposed development. INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 5
January 2020 Erf 25543 Sawmill Village ITS 3583.2 13 Trip Generation All trip generation rates used to determine the expected development trips are Rates and from the South African Trip Data Manual (COTO TMH17, 2013). The trip generation Development Trips for the proposed development is provided in Annexure B, Table 1 and also summarised below: Total trips for the AM peak hour In: 30 vph Out: 91 vph Total: 122 vph Total trips for the PM peak hour In: 85 vph Out: 37 vph Total: 122 vph 14 Trip Distribution The expected trip distribution for the development during the AM and PM peak hours are based on the current traffic patterns, the type of development and the location of the major trip generators in the greater area. The estimated trip distribution are as follows: 55% to/from George CBD 15% to/from Knysna 10% to/from Cape Town 5% to/from the south at Sasol Garage on N2 10% to/from Garden Route Mall access road 5% to/from Blue Mountain Village and Blue Mountain Gardens road Refer to Annexure A, Figure 7A and Figure 7B for the added volumes due to the trips that are expected to be generated by the proposed development and the assumed trip distribution for the AM and PM peak hours respectively. 15 2025 Total Traffic The 2024 total traffic conditions include the background traffic on the network and Conditions the total traffic that will be generated by the development. A summary of the analysis is included in Annexure A, Figure 8A and Figure 8B as well as Annexure B, Table 2 and Table 3. The transport network will still operate acceptably and no additional mitigation measures are required to ensure acceptable operations. Refer to Annexure A, Figure 8A and Figure 8B for the 2025 Total Traffic Conditions and Annexure A, Figure 9 for the proposed lane configuration for the Erf 25543 Sawmill Village access. 16 Public Transport Existing Public Transport (PT) Facilities: and Non- There are no existing minibus taxi and/or bus routes within the immediate vicinity Motorised of the site. Welgelegen Estate is a high income residential area and since it is just Transport starting to development there is little public transport need to/from the site and there are also very little public transport facilities. No bus or taxi stops are currently provided along Welgelegen Road. Planned PT Network: George Municipality/Western Cape Government is planning to extend the current INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 6
January 2020 Erf 25543 Sawmill Village ITS 3583.2 GoGeorge Public Transport System services from George CBD to Victoria Bay in Phase 5 and the Nelson Mandela University (NMU) Phase 6. Planned route C59 to Victoria Bay will be running past the Sawmill site along the current N2. Refer to Annexure A, Figure 12. The bus route C59 between Vitoria Bay and George CBD can be routed to include the Welgelegen and Kraaibosch areas. Additionally with the bridge over the Modderrug River the M5 bus route to NMU can also be re-routed to include the Welgelegen Area. Proposed PT Facilities: It is recommended that taxi and bus stops be provided along Welgelegen Road at the access intersections to the site, as well as along the key circulation routes within the site. Existing Non-Motorised Transport (NMT) Facilities: Welgelegen Road has kerbed sidewalks on both sides of the road and pedestrian warning signs at the intersection approach of the Sasol Service station. Street lighting is also provided along the northbound side of the road. The cross-section of the Welgelegen Road provides sufficient shoulders for cyclists. Due to the limited development along Welgelegen Road there is more than sufficient capacity for additional pedestrians and cyclists. The Welgelegen/Knysna Road intersection also provides for pedestrians crossing at the north side of the roundabout with dropped kerbs and a paved path through the median. Motorists are also cautioned by yield signs to give right of way to pedestrians. Pedestrian/NMT Movements Pedestrians and cyclists can access the site via existing facilities and/or footpaths. There is an existing gravel footpath along and north of the N9 which links to Knysna Road at the Knysna Road/Mall Access intersection. Pedestrians can cross safely at the intersection where a signalled pedestrian crossing is available. Pedestrians can also access the Rademachers area via the existing sidewalks along Welgelegen Access Road which runs all the way along the frontage of the proposed development and links to the N2 at the roundabout. There are sufficient pedestrian facilities at the roundabout to safely cross the N2. Proposed NMT Facilities: All new interior roads to be constructed as part of the proposed Sawmill development need to provide sidewalks for pedestrians. Streetlights and traffic calming measures must also be provided in areas with high pedestrian movements/activity. It is not anticipated that dedicated cyclist facilities are provided along the roads within the development. However, it is advisable to provide bike racks and bike storage facilities at the entrances to the buildings. Cyclist can access the development via the existing shoulders along the Welgelegen Access Roads, but will have to use the normal traffic lanes within the development. The design speeds of the roadways within the development will be sufficiently low to ensure safe passage for cyclists. INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 7
January 2020 Erf 25543 Sawmill Village ITS 3583.2 17 Parking The required parking and parking ratios as determined by the George Municipal Planning By-Laws must be adhered to which will ensure sufficient parking on the property. 18 Conclusion & The Erf 25543 Sawmill Village Development is proposed on Erf 25543, George. The Recommendations access to the proposed development is planned to be off Welgelegen Road, opposite the access to Welgelegen Estate. It is expected that the proposed development will generate 122 vehicle trips in the AM peak hour and 122 vehicle trips in the PM peak hour. Significant future road planning for the George area was done. This include the implementation of the: Extension of Welgelegen Road. Extension of the northern and southern access roads from the Kraaibosch Estate to Saasveld Rd and Groenkloof Ave. Extension of the N2, located to the south of the proposed Kraaibosch Development. A new interchange to the west of the existing Knysna Rd I/C for the southern extension of the Park Road across the N2. It is expected that the traffic that will be generated by the latent right developments are catered for with a 3% annual growth rate. The remaining 60% of the Welgelegen Estate Development was included as latent rights. From the Capacity Analysis of the different scenarios the following was found: Existing Conditions: All the intersections are operating acceptably during both the typical weekday peak hours, i.e. a.m. and p.m. peak hours. There are no improvements required to mitigate any of existing operational issues at any of the study intersections. Background Conditions: With the proposed improvements in place as identified in other studies, no further improvements will be required to accommodate the future background traffic volumes. Total Traffic Conditions: To accommodate the expected additional traffic that will be generated by the proposed development the following mitigation measures will be required: Addition of the western approach at the Access to Welgelegen Estate from Welgelegen Road which will provide access to the proposed development. Sidewalks along the full length of all new roads providing access to the development. Bus-laybys need to be constructed as close as possible to the new development. However, the location and need of these laybys need to be done in consultation with the GoGeorge design teams to ensure that if they are required that they are built in the correct locations. It is concluded that the additional traffic from the proposed development can be INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 8
January 2020 Erf 25543 Sawmill Village ITS 3583.2 accommodated on the transport network with minor mitigation required. It is recommended that the proposed development be approved from a transportation point of view provided that the required mitigation is in place. INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 9
January 2020 Erf 25543 Sawmill Village ITS 3583.2 REFERENCES 1. Highway Capacity Manual (HCM), Quality and Level-of-Service Concepts, Transportation Research Board, 9 March 2015 2. South African Road Classification and Access Management Manual, TRH26, Version 1.0, August 2012 3. South African Trip Data Manual, TMH17, Version 1.1, COTO, September 2013 4. Smec, Kraaibosch Roads Master Plan and Cost Apportionment Rev 03, April 2016 5. Vela VKE, Apportionment of Cost for Improvements and Additions to the Road Infrastructure in the Kraaibosch Area, January 2006 INNOVATIVE TRANSPORT SOLUTIONS (PTY) LTD Page 10
Annexure A Figures
List of Figures Figure 1 Locality Map Figure 2 Development Plan Figure 3 Existing 2020 Intersection Geometry Figure 4A 2020 Existing Weekday AM Traffic Volumes & Analysis Results Figure 4B 2020 Existing Weekday PM Traffic Volumes & Analysis Results Figure 5A Latent Rights: Welgelegen Estate Trip Distribution and Assignment AM Peak Hour Figure 5B Latent Rights: Welgelegen Estate Trip Distribution and Assignment PM Peak Hour Figure 6A 2025 Background Traffic Conditions with Latent Rights AM Peak Hour Figure 6B 2025 Background Traffic Conditions with Latent Rights PM Peak Hour Figure 7A Development Trip Distribution and Assignment AM Peak Hour Development Trip Figure 7B Distribution and Assignment PM Peak Hour 2025 Total Traffic Conditions AM Figure 8A Peak Hour Figure 8B 2025 Total Traffic Conditions PM Peak Hour Figure 9 Proposed Intersection Geometry to Accommodate Total Future Volumes Figure 10 George Roads Master Plan Figure 11 Kraaibosch Roads Master Plan Figure 12 GoGeorge Bus Routes
WELGELEGEN George ESTATE PROPOSED NEW Proposed KN ET YS DEVELOPMENT Development RE NA ST RO RK A KRAAIBOSCH D YO (T R 2/1 COUNTRY ESTATE 0) N2 N2 TO G EORG E CB D KN YSN AR OA D GARDEN ROUTE MALL REGIONAL MAP (N.T.S) N2 N2 W N TO PE CA TO ENGEN SASOL TO KN YS N A SCHEMATIC PROJECT: FIGURE: NUMBER: Erf 25543 Sawmill Village DEVELOPMENT LOCALITY MAP 1
SCHEMATIC PROJECT: FIGURE: NUMBER: Erf 25543 Sawmill Village Site Development Plan 2
(T R TO 2/ KN 10 GE ) YS OR NA PRO GE P OSE D FU RO GLE NWO TURE R CB OD O AD ARE ADS A D 5 PROPOSED LONG TERM ACCESS r KRAAIBOSCH Rive OA D COUNTRY ESTATE r K loof ER de UD Mod VIT SER 2 N E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en Road EAST GARDEN ROUTE MALL SERV ICE R OA D BLUE MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN N ENGEN VI SE W TO CT CT E OR IO C AP IA N TO BA Y TO RY KN AR YS N QU A TO 4 3 2 1 5 LEGEND DEVELOPMENT TRAFFIC SIGNAL SCHEMATIC ROUNDABOUT PROJECT: FIGURE: NUMBER: Erf 25543 Sawmill Village EXISTING 2020 INTERSECTION GEOMETRY 3
(T R TO 2/ KN 10 GE ) Y SN O RG PRO POS A ED F RO E GLE U CB NWO TURE R OD O AD ARE ADS A D 5 PROPOSED LONG TERM ACCESS r Rive loof KRAAIBOSCH D OA COUNTRY ESTATE r K ER de UD Mod IT RV SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en EAST GARDEN ROUTE MALL Road SERV ICE R OAD BLUE MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN N ENGEN VI SE W TO CT CT PE OR IO CA IA N TO BA Y TO RY KN AR YSN QU A 4 3 2 1 TO 95 30 40 25 5 50 0 56 60 < 5 50 3 590 660 405 495 LOS=B 255 LOS=A Del=16.9 LOS=B LOS=A 5 Del=2.2 V/C=0.77 Del=10.6 Del=8.1 555 V/C=0.28 V/C=0.41 200 V/C=0.19 200 60 35 5 5 60 5 5 5 2 200 420 20 30 5 80 50 5 91 5 12 20 20 LOS=A Del=4.5 V/C=0.32 45 10 5 74 0 11 1 5 LEGEND 60 DEVELOPMENT INTERSECTION LEVEL OF SERVICES (SIGNALISED) / LOS CRITICAL MOVEMENT LEVEL OF SERCIE (UNSIGNALISED) INTERSECTION AVERAGE DETALY (SIGNALISED) / Del CRITICAL MOVEMENT DELAY UNSIGNALISED NOTE: V/C CRITICAL VOLUME-TO-CAPACITY RATION CAPACITY ANALYSIS BASED ON LANE CONFIGURATION AS SHOWN IN FIGURE 3. PROJECT: FIGURE: NUMBER: 2020 EXISTING WEEKDAY AM Erf 25543 Sawmill Village 4A TRAFFIC VOLUMES & ANALYSIS RESULTS
(T R TO 2/ KN 10 GE ) Y SN O RG PRO POS A ED F RO U E GLE NWO TURE R CB OD O AD ARE ADS A D 5 PROPOSED LONG TERM ACCESS r Rive loof KRAAIBOSCH D OA COUNTRY ESTATE r K ER de UD Mod IT RV SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en EAST GARDEN ROUTE MALL Road SERV ICE ROA BLUE D MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN N ENGEN VI SE W TO CT CT PE OR IO CA IA N TO BA Y TO RY KN AR Y SN QU A TO 4 3 2 1 90 35 65 40 10 80 5 15 5 5 0 40 9 455 815 415 295 LOS=B 400 LOS=A Del=11 LOS=B LOS=A 10 Del=2.4 V/C=0.55 Del=10.1 Del=8.8 385 V/C=0.29 V/C=0.33 225 V/C=0.32 225 155 50 5 5 20 < 0 4 1 5 310 325 60 295 5 74 5 12 45 0 80 10 15 LOS=A Del=4.3 V/C=0.26 50 20 55 64 5 2 11 5 LEGEND 5 DEVELOPMENT INTERSECTION LEVEL OF SERVICES (SIGNALISED) / LOS CRITICAL MOVEMENT LEVEL OF SERCIE (UNSIGNALISED) INTERSECTION AVERAGE DETALY (SIGNALISED) / Del CRITICAL MOVEMENT DELAY UNSIGNALISED NOTE: V/C CRITICAL VOLUME-TO-CAPACITY RATION CAPACITY ANALYSIS BASED ON LANE CONFIGURATION AS SHOWN IN FIGURE 3. PROJECT: FIGURE: NUMBER: 2020 EXISTING WEEKDAY PM Erf 25543 Sawmill Village 4B TRAFFIC VOLUMES & ANALYSIS RESULTS
(T R TO 25 2/ KN 10 % GE ) YS O NA PRO RG POS ED F RO U E GLE NWO TURE R CB OD O AD ARE ADS A D 5 PROPOSED LONG % TERM ACCESS r 20 KRAAIBOSCH f Riv e OA D COUNTRY ESTATE er Kloo R d DE Mod ITU RV SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en Road EAST GARDEN ROUTE MALL SERV ICE R OAD BLUE 5% MOUNTAIN % 15 1 GARDENS RADE MACHERS N2 1 TO TER SASOL IN WN ENGEN VI SE O CT CT ET OR IO P 20 CA IA N TO % BA 5% Y TO RY KN AR YSN QU A TO 4 3 2 1 5 11 0 40 1 0 3 25 30 30 70 90 90 25 5 10 10 5 15 10 40 30 PROJECT: FIGURE: NUMBER: LATENT RIGHTS: WELGELEGEN ESTATE Erf 25543 Sawmill Village TRIP DISTRIBUTUTION AND ASSIGNMENT 5A AM PEAK HOUR
(T R TO 2/ 25 KN 10 GE ) YS % O NA PRO RG POS ED F RO U E GLE NWO TURE R CB OD O AD ARE ADS A D 5 PROPOSED LONG % TERM ACCESS r 20 KRAAIBOSCH of R ive RO AD COUNTRY ESTATE der Klo UD E Mod R VIT SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en Road EAST GARDEN ROUTE MALL SERV ICE R OAD BLUE MOUNTAIN % % 15 GARDENS 15 RADE MACHERS N2 1 TO TER SASOL IN WN ENGEN VI SE TO CT CT PE OR IO CA 20 IA N TO BA % Y TO 5% RY KN AR YS NA QU TO 4 3 2 1 40 11 5 5 0 1 70 90 90 25 30 30 10 10 30 25 5 40 30 15 10 PROJECT: FIGURE: NUMBER: LATENT RIGHTS: WELGELEGEN ESTATE Erf 25543 Sawmill Village TRIP DISTRIBUTUTION AND ASSIGNMENT 5B PM PEAK HOUR
(T R TO 2/ KN 10 GE ) YSN O PRO RG P A OSE D FU RO E GLE NWO TURE R CB OD O AD ARE ADS A D 5 PROPOSED LONG TERM ACCESS r Rive loof KRAAIBOSCH D OA COUNTRY ESTATE r K ER de UD Mod IT RV SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en EAST GARDEN ROUTE MALL Road SERV ICE ROA BLUE D MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN N ENGEN VI SE W TO CT CT PE OR IO CA IA N TO BA Y TO RY KN AR Y SN QU A 4 3 2 1 TO 110 35 45 0 14 0 95 0 65 70 1 0 60 7 705 795 500 575 LOS=B 295 LOS= A Del=14.9 LOS=B LOS=A 5 Del=2.9 V/C=0.86 Del=13.6 Del=8.7 710 V/C=0.34 V/C=0.55 320 V/C=0.24 320 95 40 5 15 50 6 0 10 3 230 485 25 45 5 60 75 95 10 5 14 25 25 LOS=A Del=5.2 V/C=0.39 50 10 5 90 0 14 1 10 0 0 LEGEND DEVELOPMENT INTERSECTION LEVEL OF SERVICES (SIGNALISED) / LOS CRITICAL MOVEMENT LEVEL OF SERCIE (UNSIGNALISED) INTERSECTION AVERAGE DETALY (SIGNALISED) / Del CRITICAL MOVEMENT DELAY UNSIGNALISED NOTE: CAPACITY ANALYSIS BASED ON LANE CONFIGURATION AS SHOWN IN FIGURE 3. V/C CRITICAL VOLUME-TO-CAPACITY RATION PROJECT: FIGURE: NUMBER: 2025 BACKGROUND TRAFFIC CONDITIONS Erf 25543 Sawmill Village WITH LATENT RIGHTS 6A AM PEAK HOUR
(T R TO 2/ KN 10 GE ) Y SN O RG PRO POS A ED F RO U E GLE NWO TURE R CB OD O AD ARE ADS A D 5 PROPOSED LONG TERM ACCESS r Rive loof KRAAIBOSCH D OA COUNTRY ESTATE r K ER de UD Mod IT RV SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en EAST GARDEN ROUTE MALL Road SERV ICE R OAD BLUE MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN N ENGEN VI SE W TO CT CT PE OR IO CA IA N TO BA Y TO RY KN AR Y SN QU A 4 3 2 1 TO 105 40 75 85 23 75 6 15 5 5 15 45 1 103 570 595 5 340 LOS=B 465 LOS=A Del=10.3 LOS=B LOS=A 10 Del=2.8 V/C=0.61 Del=11.3 Del=9.6 470 V/C=0.39 V/C=0.41 290 V/C=0.4 290 190 60 0 35 85 1 0 4 1 5 360 375 70 365 5 89 5 14 50 5 95 10 15 LOS=A Del=4.6 V/C=0.31 60 25 95 76 0 3 14 0 5 LEGEND DEVELOPMENT INTERSECTION LEVEL OF SERVICES (SIGNALISED) / LOS CRITICAL MOVEMENT LEVEL OF SERCIE (UNSIGNALISED) INTERSECTION AVERAGE DETALY (SIGNALISED) / Del CRITICAL MOVEMENT DELAY UNSIGNALISED NOTE: CAPACITY ANALYSIS BASED ON LANE CONFIGURATION AS SHOWN IN FIGURE 3. V/C CRITICAL VOLUME-TO-CAPACITY RATION PROJECT: FIGURE: NUMBER: 2025 BACKGROUND TRAFFIC CONDITIONS Erf 25543 Sawmill Village WITH LATENT RIGHTS 6B PM PEAK HOUR
(T R TO 2/ KN 55 10 GE ) Y % SN O RG PRO POS A ED F RO U E GLE NWO TURE R CB OD O AD ARE ADS A D 5 PROPOSED LONG 5% TERM ACCESS r Rive loof KRAAIBOSCH D OA COUNTRY ESTATE r K ER de UD Mod IT RV SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en EAST GARDEN ROUTE MALL Road SERV ICE R OAD BLUE MOUNTAIN 10% GARDENS % 10 RADE MACHERS N2 1 TO TER SASOL IN N ENGEN VI SE W TO CT CT PE OR IO CA IA N TO 15 BA % Y TO 5% RY KN AR YSN QU A 4 3 2 1 TO 75 25 5 5 1 20 20 20 55 65 65 10
(T R TO 2/ KN 55 NA R 10 GE ) Y % O S O RG PRO POS ED F E GLE U CB NWO TURE R OD O AD ARE ADS A D 5 PROPOSED LONG 5% TERM ACCESS r Rive loof KRAAIBOSCH D OA COUNTRY ESTATE r K ER de UD Mod IT RV SE N 2 E F R O PA TU NT KRAAIBOSCH WELGELEGEN GA TE E RO FU ME RK N RD AS U COUNTRY ESTATE PROPOSED 6 ESTATE IG DR BLUE MOUNTAIN LL EN T A DEVELOPMENT IV VILLAGE E 4 EXISTING (TR 2/1 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en EAST GARDEN ROUTE MALL Road SERV ICE R OAD BLUE MOUNTAIN 10% GARDENS % 10 RADE MACHERS N2 1 TO TER SASOL IN N ENGEN VI SE W TO CT CT PE OR IO CA IA N TO 15 BA % Y TO 5% RY KN AR YSN QU A TO 4 3 2 1 30 5 70 < 5 50 60 60 20 25 25 5 5 15 10 5 45 5 20
(T R TO 2/ KN 10 GE ) YS OR NA PRO POS GE ED F RO GLE U NWO TURE R CB AD OD O ARE ADS D A 5 PROPOSED LONG TERM ACCESS r ive KRAAIBOSCH of R AD COUNTRY ESTATE de r Klo RO DE Mod ITU RV SE N 2 E F PA R O TU NT GA TE E RO RK KRAAIBOSCH WELGELEGEN FU ME RD AS U N COUNTRY ESTATE G DR PROPOSED ESTATE L I EN T BLUE MOUNTAIN 6 AL IV VILLAGE DEVELOPMENT E 4 (TR 2/1 EXISTING 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en Road EAST GARDEN ROUTE MALL SERV ICE R OAD BLUE MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN VI SE N ENGEN OW CT CT ET OR IO AP IA N C TO BA Y TO RY KN AR YS NA QU TO 4 110 3 2 1 35 45 5 12 50 21 5 0 6 70 1 5 60 8 725 815 520 575 LOS=B 5 295 LOS=A Del=15.5 765 LOS=C LOS=A Del=3.2 V/C=0.85 100 Del=15.4 Del=9 V/C=0.39 V/C=0.6 385 V/C=0.26 385 40 5 20 50 6 0 10 3 230 485 25 45 5 6 60 90 95 10 5 5 26 14
(T R TO 2/ KN 10 GE ) YS OR NA PRO GE POS ED F RO GLE UT CB NWO URE R AD OD O ARE ADS D A 5 PROPOSED LONG TERM ACCESS r e KRAAIBOSCH f Riv AD COUNTRY ESTATE e r Kloo O d D ER Mod ITU RV SE N 2 E F PA R O TU NT RO GA T E E RK KRAAIBOSCH WELGELEGEN FU ME RD AS U N COUNTRY ESTATE G DR PROPOSED ESTATE LI 6 EN T BLUE MOUNTAIN AL IV VILLAGE DEVELOPMENT E 4 (TR 2/1 EXISTING 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en Road EAST GARDEN ROUTE MALL SERV ICE R OAD BLUE MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN VI SE N ENGEN CT CT W TO OR IO PE CA IA N TO BA Y TO RY KN AR YS NA QU TO 4 105 3 2 1 40 75 5 30 75 11 5 6 15 5 20 45 1 109 630 645 5 340 LOS=B 465 LOS=A Del=10.6 LOS=B LOS=A 10 Del=3.0 V/C=0.62 Del=11.7 Del=9.8 490 V/C=0.42 V/C=0.42 315 V/C=0.41 315 190 60 5 50 85 1 0 4 1 5 360 375 70 375 5 6 94 5 14 50 0 90 95
(T R TO 2/ KN 10 GE ) YS OR NA PRO POS G ED F RO E GLE U NWO TURE R CB AD OD O ARE ADS D A 5 PROPOSED LONG TERM ACCESS r KRAAIBOSCH Rive D COUNTRY ESTATE r K loof RO A de DE Mod U VIT SER 2 N E F PA R O TU NT GA TE E RO RK KRAAIBOSCH WELGELEGEN FU ME RD AS U N COUNTRY ESTATE IG DR PROPOSED ESTATE LL EN T BLUE MOUNTAIN 6 A IV VILLAGE DEVELOPMENT E 4 (TR 2/1 EXISTING 0) 3 SAW MILL 2 Welgeleg GARDEN PROPOSED MEDUIM ROUTE TERM ACCESS en EAST GARDEN Road ROUTE MALL SERV ICE R OAD BLUE MOUNTAIN GARDENS RADE MACHERS N2 1 TO TER SASOL IN VI SE N ENGEN CT CT OW ET OR IO P CA IA N TO BA Y TO RY KN AR YS NA QU TO 4 3 2 1 5 6 LEGEND DEVELOPMENT TRAFFIC SIGNAL EXISTING 2015 LANE CONFIGURATION UPGRADES PROPOSED FOR 2020 TOTAL ROUNDABOUT TRAFFIC CONDITIONS SCHEMATIC STOP CONTROL PROJECT: FIGURE: NUMBER: PROPOSED INTERSECTION GEOMETRY TO Erf 25543 Sawmill Village 9 ACCOMMODATE TOTAL FUTURE VOLUMES
SCHEMATIC PROJECT: FIGURE: NUMBER: Erf 25543 Sawmill Village George Roads Master Plan 10
SCHEMATIC PROJECT: FIGURE: NUMBER: Erf 25543 Sawmill Village Kraaibosch Roads Master Plan 11
Kerriwood Eskom g u B ta Searle Goedemoed n gu o t a /M Golden Valley on d nc m op g rt M tlan an r ck ou Fa r ay in ie ai ap yl w BLANCO M Fa Fr G H Du Plessis N Bus Routes: Phases 1 , 2 & 3 Violet Pieter George A Vrugte Sonop Theron Factory Fortuin Jonas Phase 1 HEATHER PARK Crowley Malgas n to A er ys s er Ke iel nt st George B ee oo he C56 DENNEOORD ⇄ CBD M C R Airway B Airway A ut C24 LOERIE PARK ⇄ CBD Wattle o ow ea Aalwyn nh A ot lie ill d ic A w W Pr O oo A do Er rtle Meent B Pine a w ea C53 ROSEMOOR ill y M M H Heather/Langenhoven This part of the Rosemoor route runs from start of Hillwood B Assegaai service in the morning to 10am until further notice. Myrtle B Arum Stadium CBD ⇄ WILDERNESS (initially only as far as t M7 Plane HEATHERLANDS rif Sports Club sd Garden Route Mall) er Barrie ph B Hospital a am ak ic Arbour/Davidson Mountain Er O C A CBD Herrie n on ai r nt go ni B cG y us ou /U M ar re e A in av y ibr Va et Palm M A Valley g at th gr rin k g y k e nd L ch ns ar ar dy er le r lu l Fi h A g Cathedral A Fo h ar d Yo Sa rge Pa th Fi M M B der de B rc lin D an st th h ur hu xt eo ro ar ft nl in d Si A A N D G C G Lang York D Varing Sixth B Cathedral B Meade DENNEOORD Seventh Correctional Cathedral C Tiekiedraai CRADOCK CBD C W St Po W er Jo B en O B Ei mm Ei St B au O ou el e lu iq lo B lo l’ ut ut gh e la oc al av hn rt P e u ub s nd at rt lin en lis th klo ke gr Nelson B a en gt ch ok iq el A l ns Mandela A Pa Hope/York B ay on Fi ua l tr Mitchell / om B of Hibernia Palgrave A Fichat D Victoria A Station Memoriam st iek e l l eu ria ar du br Clay A Union B m dw In Fa ns ag Ring Museum ar re Sa Centre H G Fo at C y g dr in Mission La un ch Fi Biddulphs George High Sauer INDUSTRIA Rosemoor an w Grens B ie n rv e Harmonie os Ring i Fa M R Widom Suikerbossie Kanarie Third Abattoir Miller Park Fourth A C O’Connell Beer A Heriot LOERIE PARK k or Hurter Fourth B /Y Francis Kapkappie an ry rb Hicks Stander ve U Woltemade Meyer A Legend co ie l ar ss is Lo nw d/ Pe D n B s O uy er oo G so ll Sa K le el na er ne ie B as ny Swaardlelie O on H Bus Stop v s av a d ’C l Triumph h eu an en ot O d M Sweetpea R B Transfer Point PW ROSEMOOR Protea Valley Kalkoentjie Kraaibosch Terminal Point CBD Terminal Garden Route Railway Line (Mall) Bi-directional Cane Adam ⇄ Forward & Reverse g Phase 2 a St Sarah Eve Works Genesis ROSEDALE Infantry Square Hill A Panther C Panther A/ Genesis B Isaac M2 BLANCO ⇄ CBD Antelope Panther B Reuben ew /Beach A The 6:00 and 6:45 trip from the CBD and 18:30 t vi es r nt la DP Primary and 19:30 from Gwayang will follow this route. cr p ou ill Po k ie in H M ris am er Noord/Olympic/ er C3 BLANCO COMMUNITY Fl B Si r n a ok iv st fe am lio Beach B/Beach C ill R a gb Sy H ta lo /E Ll rin Wilger e at on fic ar C58 HEATHER PARK ⇄ HEATHERLANDS ic B Sp af u si lin e n Sq r is Tarentaal Tr Fe C Mission M A Protea B Valk Fir C13 CITY LOOP Phalidas Short Cantley Protea Hibiscus Browns Petunia Daffodil Phase 3 t y ou Rose on lh m PACALTSDORP ⇄ CBD ee ar M1 G er n k da k H ac l pi fo th n ho B or ra ea C ca N M12 PACALTSDORP ⇄ INDUSTRIA H Ja PACALTSDORP Weekdays only Every day of the week M9 INDUSTRIA ⇄ CBD C60 ROSEDALE COMMUNITY C55 PACALTSDORP COMMUNITY
Annexure B Tables
List of Tables Table 1 Trip Generation for the AM and PM Peak Hours Table 2 Capacity Analysis Results for the AM Peak Hour Table 3 Capacity Analysis Results for the PM Peak Hour
Table 1: Trip Generation for the AM and PM Peak Hours Directional Split Trip Generation No. Land use Extent Trip rate Source In (%) Out (%) In (vph) Out (vph) Total (vph) AM Peak Hour 1 Group Housing 37 units 0.65 COTO220 25% 75% 6 18 24 2 Duplex Housing 35 units 0.85 COTO231 25% 75% 7 22 30 3 Semi-Detached Housing 28 units 0.85 COTO231 25% 75% 6 18 24 4 Flats 68 units 0.65 COTO220 25% 75% 11 33 44 Total 30 91 122 PM Peak Hour Directional Split 8 Extent Trip rate Source In (%) Out (%) In (vph) Out (vph) Total (vph) 1 Group Housing 37 units 0.65 COTO220 70% 30% 17 7 24 2 Duplex Housing 35 units 0.85 COTO231 70% 30% 21 9 30 3 Semi-Detached Housing 28 units 0.85 COTO231 70% 30% 17 7 24 4 Flats 68 units 0.65 COTO220 70% 30% 31 13 44 Total 85 37 122 Table 2: Capacity Analysis Results for the AM Peak Hour 2025 Background Traffic + 2020 Existing Conditions AM 2025 Total Traffic Conditions Nr Intersection Latent Right Traffic AM Peak Peak Hour AM Peak Hour Hour LOS Del (s) v/c LOS Del (s) v/c LOS Del (s) v/c 1 Knysna Rd / Welgelegen Rd A 2.2 0.28 A 2.9 0.34 A 3.2 0.39 2 Knysna Rd / N2 On-ramp A 8.1 0.19 A 8.7 0.24 A 9.0 0.26 3 Knysna Rd / N2 Off-ramp B 10.6 0.41 B 13.6 0.55 C 15.4 0.60 4 Knysna Rd / Mall Access Rd B 16.9 0.77 B 14.9 0.86 B 15.5 0.85 5 Knysna Rd / Servitude Rd A 4.5 0.32 A 5.2 0.39 A 5.1 0.39 Welgelegen Rd / Access to 6 Future Intersection B 14.9 0.24 Development and Welgelegen Estate Table 3: Capacity Analysis Results for the PM Peak Hour 2025 Background Traffic + 2020 Existing Conditions PM 2025 Total Traffic Conditions Nr Intersection Latent Right Traffic PM Peak Peak Hour PM Peak Hour Hour LOS Del (s) v/c LOS Del (s) v/c LOS Del (s) v/c 1 Knysna Rd / Welgelegen Rd A 2.4 0.29 A 2.8 0.39 A 3.0 0.42 2 Knysna Rd / N2 On-ramp A 8.8 0.32 A 9.6 0.40 A 9.8 0.41 3 Knysna Rd / N2 Off-ramp B 10.1 0.33 B 11.3 0.41 B 11.7 0.42 4 Knysna Rd / Mall Access Rd B 11.0 0.55 B 10.3 0.61 B 10.6 0.62 5 Knysna Rd / Servitude Rd A 4.3 0.26 A 4.6 0.31 A 4.6 0.32 Welgelegen Rd / Access to 6 Future Intersection C 17 0.15 Development and Welgelegen Estate
J Christoff Krogscheepers Johann Christoff Krogscheepers Pr Eng, Ph D, MITE, FSAICE DATE OF BIRTH: 26 December 1964 PRESENT POSITION: Director – ITS Engineers (Pty) Ltd. LANGAUGES: Afrikaans - speaks, read and write excellent English - speaks, read and write excellent QUALIFICATIONS: Doctor of Philosophy (Ph.D.) University of Natal, Durban - 1997 M.Eng (Transport) University of Pretoria. Pretoria - 1992 Certificate in Arbitration University of Pretoria, Pretoria - 1991 B.Eng (Honorus) University of Pretoria, Pretoria - 1989 B.Eng (Civil, Cum Laude) University of Stellenbosch, Stellenbosch - 1986 PROFESSIONAL MEMBERSHIP Fellow, South African Institute of Civil Engineers, 1993. (No. 090491) Registered Engineer, Engineering Council of South Africa, 1992 (No. 920021). Member, Institute of Transportation Engineers, 1999 (No 32767). Summary of Project Experience Related to this Tender: Joint Monitoring Team (JMT) for the New Realigned Runway Project at Cape Town International Airport (TENDER REFERENCE NO. CIA6205/2019/RFP) Project Director – Consultants for the Operations and Maintenance of the Huguenot Tunnel including civil, electrical, electronic, geotechnical and mechanical work on the tunnel (2018 to 2026 - ongoing). Project Director – Consultants for Refurbishment of the Huguenot Tunnel South bore which includes replacement of water mains, resurfacing of western portal, upgrade of ventilation and smoke extraction system, replacement of lighting and new fire detection system. (2019 to 2020) Project Director and Project Manager – Consultants for Design, Construction and operations of the Western Cape Freeway Management System, including all field devices, communication, civil works and the construction and activation of the TMC in Goodwood (2008 to 2010). Project Director and Traffic & Transport Expert – Consultants for Design, Construction and operations of the National Freeway Management System (WC, Gauteng, KZN and EC) – Continued Operations and Expansion of the system including all field devices, communications, civil works and operations in the TMC’s (2019 to 2021). Project Director and Project Manager on the Advanced Public Transport Management System for the MyCiti buses in the Cape Town includes all electronic and tracking systems on the buses and the passenger information system in the stations (2010 to date). Project Manager – Master Planning for Cape Town Airport, land side and air side. Full review and understanding of all IATA rules and regulations related to runways and taxiways (1997 to 1998). Project Designer and Analyst on several noise, jet blast and runway capacity studies at Cape Town Airport (1999) Project Designer and Project Manager for the Bravo Apron at Cape Town Airport constructed during 1998. Project Designer and Project Manager for several internal airside roads at Cape Town Airport 1997. SUMMARY OF EXPERIENCE Christoff Krogscheepers is a director of ITS Engineers in Cape Town where he has managed projects ranging from large road rehabilitation projects, business planning of large projects, transportation master plans, toll impact studies, operational analysis of tunnels and road infrastructure, economic analysis of passenger and freight transportation, public transport infrastructure projects, multimodal studies and integrated transport, transportation impact studies, data collection projects and Intelligent Transport Projects (Freeway Management Systems, Traffic Signal Systems, Bus Rapid Transport Systems, Setting up and Management of FMS Control Rooms). Prior to 2001 he worked for Kittelson & Associates, Inc. in their Portland (Oregon, USA) office. As a senior engineer and ITS (Pty) Ltd, 5th Floor Imperial Terraces, Carl Cronje Drive, Tyger Waterfront, Bellville, 7530 Tel +27 (21) 914 6211, Fax +27 (12) 914 6211 (www.itsglobal.co.za)
J Christoff Krogscheepers project manager he was responsible for several traffic impact studies, bridge replacement studies, college master plans, urban planning studies, and access management plans. These studies were mostly for developments located in the States of Oregon, Florida and Washington. Prior to 1999 he was in the employ of BKS (Pty) Ltd (1989 to 1998) The first three years from 1989 to 1991 he was in full time employment and worked in the Pretoria and Johannesburg (South Africa) offices of the company. The next five years from 1992 to 1996 he was in part time employment of BKS while lecturing at the University of Natal and he joined BKS in their Cape Town offices again in January 1997. During the first three years at BKS he was involved in all transport and transportation related matters from traffic signal design to traffic impact studies. He also gained extensive project and construction management experience by being involved in a large laboratory for AECI. As a senior lecturer at the University of Natal he was involved in teaching Traffic, Transportation and Project Management from third year to post graduate level while also pursuing his studies towards a doctoral degree. During his employment at BKS in their Cape Town office (South Africa) he has been responsible for various traffic impact studies, master plans, parking studies, jet blast studies, noise studies and traffic and transportation related projects in and around Cape Town International Airport, including the design and construction of new aprons and service roads on the airside. Christoff has served on the board of the Intelligent Transport Society of South Africa (ITSSA) and served on the Urban Streets sub- committee which was responsible for specific chapters of the 2010 Highway Capacity Manual published by the USA Transport Research Board. PROFESSIONAL EXPERIENCE Company: ITS Engineers Position: Office Director for ITS in Cape Town Date: November 2001 – Present Company: BKS Pty (Ltd) Bellville, SA Position: Chief Engineer Date: April 2001 to October 2001 Company: Kittelson & Associates, Inc. Portland, USA. Position: Senior Engineer Date: January 1999 to April 2001 Company: BKS Pty (Ltd) Bellville, SA. Position: Chief Engineer Date: January 1997 to December 1998 Company: University of Natal, Durban, SA Position: Lecturer and Senior Lecturer.- Part time consultant for BKS Pty (Ltd) in Durban Date: January 1992 to December 1996 Company: BKS Pty (Ltd), Pretoria and Johannesburg, SA Position: Engineer in Training and Engineer Date: January 1989 to December 1992 DETAIL PROJECT RELATED EXPERIENCE: ITS Cape (Pty) Ltd Project Leader for the City of Cape Town’s Employee Survey Project, April 2018 to December 2018. Focus was on study design, project management, data analysis and statistical analysis. Project leader for the City of Cape Town’s Data Collection Project, June 2016 to December 2018. Included project management and planning of surveys across the City of Cape Town, involving at times more than 100 surveyors at various locations around the City. Project leader for the City of Cape Town’s Transportation Engineering Assistance 2016 to current. This included a variety of projects and covered aspects of transport planning, transport engineering, traffic engineering, public transport planning and design, multimodal planning and design, economic studies, index development and geometric design. Project leader for the Roads Incident Management System Western Cape Government, for SANRAL. 2015 to current. The focus with this project is on road safety and road incident management. Project leader for the Development of a Roundabout Guide for the Western Cape Government, to be used also by SANRAL and City of Cape Town. Ongoing. Started in 2016 to current Project leader for the City of Cape Town’s Transportation Engineering Assistance (2008 - 2009), (2011 - 2013) and (2013-2016). This included a variety of projects and covered aspects of transport planning, transport engineering, traffic engineering, public transport planning and design, multimodal planning and design, economic studies, index development and geometric design. Project leader for the City of Cape Town’s Employer Trip Reduction Program. Multifaceted and Multi-modal approach to reduced private vehicle trips in the City of Cape Town. ITS (Pty) Ltd, 5th Floor Imperial Terraces, Carl Cronje Drive, Tyger Waterfront, Bellville, 7530 Tel +27 (21) 914 6211, Fax +27 (12) 914 6211 (www.itsglobal.co.za)
J Christoff Krogscheepers Project leader for the Metrorail Rail Census conducted during 2012. Conducting riderships surveys on all Metrorail trains. Project director for the City of Cape Town’s MyCity IRT Control Centre (APTMS) hardware and software systems Managed numerous full ITP’s as well as updates of ITP’s , OLS’s, and CPTR’s for district municipalities and Cities. Cape Town BRT System – Intelligent Transport Systems and Fare Collection. Task Leader responsible for the design and implementation of the ITS systems for the proposed BRT. Cape Town Freeway Management Systems – Project Leader for the implementation of a 100 km of FMS around Cape Town, including design, implementation and operations of a Traffic Management Centre, CCTV surveillance system and a Public Information System (VMS and Web Interface). Cape Town Freeway Management System – Project Leader for implementation of a control centre for the CoCT FMS system. N1/N2 Winelands Toll Consultant for SANRAL, including evaluation of toll strategies, capacity evaluation of main line sections, diversion studies and costing. Evaluation and Design of Interchange Alternatives on the N2 in George and Knysna. Capacity analysis and future forecasts of operations at the Huguenot Toll Plaza to determine upgrade requirements. Micro-simulation of the N1 and the N2 corridors in Cape Town to evaluate the impacts of proposed improvements and adding new interchanges and or upgrading existing interchanges based on an integrated transport and multi-modal approach. Managed and developed a Transportation Demand Management plan and implementation program for the City of Cape Town. This included a transport planning approach which focused on multi-modal and integrated transport. Managed and conducted modelling for the Road Master Planning for the towns of George and Malmesbury. Conducted road corridor studies in George, Knysna, Malmesbury and Beaufort West. Involved in the Transportation Task team for the Business Planning of the Klipfontein Bus Rapid Transit Corridor. This included the evaluation of the optimum mode along the network, demand forecasting, scheduling, infrastructure requirements, cross- sections of roadways and busways, station layouts, costing of infrastructure requirements, costing of services and rolling stock. Economic Analysis of large road design projects in Namibia (Opuwu to Okakao), Northern Cape (Vaalharts Irrigation Road System) and Beaufort West (N1 Alternative Alignments). Lead consultant for the development of a Transportation Management Plan for Mitchell’s Plain. Managed and conducted transportation studies to evaluate the impact of the proposed tolling of the N1 and N2 freeways. Safety improvements, traffic design and geometric design of a rehabilitation project on the N2 between George and Knysna, including the identification of alternatives to improve Kaaimans Pass. Involved in numerous traffic impact studies and access applications on micro and macro scale both local and in the USA. Part-time lecturer at Peninsula Technicon in Project Management and Transportation Planning. Road Construction and Road Improvement Projects at interchanges on the N1 and N2, including safety improvements at hazardous locations and intersections. External Examiner at the University of Stellenbosch, University of Cape Town, Pentech and Cape Town Technicon. BKS Pty (Ltd) Bellville, SA. Project Manager for the transportation element of the Culemborg Development Framework. Managed and conducted a number of transportation studies for different sites in the United States, including large shopping centres and filling stations. These studies were conducted for Kittelson and Associates. In associations with Kittelson and Associates, developed a simulation model using Paramics to test the feasibility of bus priority phasing at seven intersections in Orlando (Florida). Micro-simulation models to test the impacts of large retail developments for both local developments and developments abroad such as in Burlington, Washington (USA). Kittelson & Associates, Inc. Portland, USA. Managed impact studies for various commercial and residential developments in and around the Portland area. Managed a bridge replacement study for the Lewis & Clark bridge across the Columbia at Longview. Managed a transportation study to update the Master Plan for Reed College in Portland. Developed and managed various transportation models employing micro simulation including, amongst others, an interchange evaluation in Eugene (Oregon), a model of downtown Tampa (Florida), evaluation of streetcar operations in downtown Portland (Oregon), evaluation of high occupancy lanes on Interstate 4 in Orlando (Florida), and a number of smaller intersection evaluations. Managed the traffic analysis and design of the signing and striping of a new roadway (Padden Parkway) Lead the development of a course on roundabout analysis and design based on the FHWA Roundabout guide titled: “Roundabouts: An Informational Guide”. Co-presenter of the course at several locations across the United States. BKS Pty (Ltd) Bellville, SA Involved in the final completion of a Master Plan for Cape Town International Airport in co-operation with Mott MacDonald of the United Kingdom. Did the detail design and involved in the preparation of contract documentation for the construction of extensions to the aprons at ITS (Pty) Ltd, 5th Floor Imperial Terraces, Carl Cronje Drive, Tyger Waterfront, Bellville, 7530 Tel +27 (21) 914 6211, Fax +27 (12) 914 6211 (www.itsglobal.co.za)
You can also read