Amesbury Elementary School - Amesbury Neighbors' Meeting Elementary School - March 3, 2021 - Amesbury, MA
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
50' ZONING SETBACK (SIDE) Amesbury SETBACK (SIDE) Elementary School 50' ZONING Neighbors’ Meeting March 3, 2021 CK SETBA NING 50' ZO (SIDE) Amesbury Elementary School © 2021 DiNisco Design, Inc.
Project Updates • Introductions • City Initiatives Culvert Improvements Highland & Friend Street Intersection Lions Mouth Road Sidewalk Extension • Design Update • Site Update Site Lighting Site Planting Construction Schedule & Phasing Soil Management and Arsenic 2
City Initiatives | Culvert Improvements F e d S ee D a age • Esse Count Mosquito Control cleared stream in December • Project funded in Capital Plan for FY funds a ailable August • E pect engineering project start September • Conser ation Commission Application December • Begin Construction June • Construction complete December • Project includes replacing drain from Park Pond to Friend Street 3
City Initiatives | Highland & Friend Street Intersection Plotted on 10-Feb-2021 10:15 AM AMESBURY N FRIEND ST, HIGHLAND ST, & MERRIMAC ST TRAFFIC SIGN & PAVEMENT MARKING PLANS - 1 OF 3 SHEET 8 OF 16 3 T0791.01_HD5(TRAFFIC SIGN & PAVEMENT MARKING PLANS).DWG NAD 8 PROP RRFB W/ 00 S1-1 (2) 14+ ERADICATE EXIST PVMT W16-7pL MARKINGS CONFLICTING W/ W16-7pR PROP MARKINGS (TYP) .10 +40 PCC 13 6" SWL L 6" DBY 8' CW MEET EXIST PVMT MARKINGS 6" SWL 10+00 20+00 6" DBYL 11 12 L PC +14.23 6" SW 6" SWL FRIEND STREET PC +16.61 PROP RRFB W/ S1-1 (2) W16-7pL 8' CW RET W16-7pR 12" SL R&R 6" R&S SW R&S 6" D R&R L R&R BY 6" R&R L SW R&S L PT21 +9 4.7 0 HIG HL W 8' C AN R&R DS R&R TR EE T 22 +0 0 RET 0 20 50 100 SCALE: 1" = 20' 4
City Initiatives | Lions Mouth Sidewalk Extension 5
Proposed Conditions | Site Plan 6
Proposed | View of Main Entry 7
Proposed | View from Parking Lot 8
Proposed | Main Entry View Towards Cashman 9
Proposed | View From Playground 10
Proposed | View Towards Gym 11
Existing | View from Woodsom 12
Proposed | View from Woodsom 13
Proposed | Site Lighting Fixtures LO W LOW INE LO LO TY L W W PER PRO W LO 3 2 2 1 3 4 1 4 80 40 2 20 10 5 TOSS 1 3 4 EIGHT SEVEN SIX FIVE FOUR THREE N RU TWO ONE 50 STANDI JUMP NG 2 1 40 20 4 3 DOTST 30 THE CONNEC 10 0 TIGH ROPE T TE EA CR MON HOP E T STE SCO THR EA CR Aa Bb Cc Zz Dd Yy Ee Xx Ff Ww Gg Hh Vv Uu Ii Tt Jj Ss Kk Rr Mm Ll Qq Pp Nn Oo W LO LOW 10 ft pole mounted fixtures - Pedestrian LOW W LO LOW LO W W LO W LO LOW W PRO PER LO TY L INE LO W Building - Wall mounted LO 16 ft pole mounted fixtures - Vehicular W W LO PROPERTY LINE LO LOW 14 W
Proposed | Site Lighting & Controls LO W LOW NE LO TY LI LO W W PER PRO TE A CRE W LO 2 1 3 5 4 1 6 8 7 10 9 10 9 8 7 6 5 4 3 1 2 1 1 2 4 2 1 3 1 3 4 2 80 40 20 10 4 AT 5 RE E 8 9 5 6 2 3 10 3 7 20 4 1 1 C 2 10 3 40 30 1 0 55 4 0 600 C RE N 500 ATE START M I Aa 10 350 G A 650 Bb 660 Cc 0 15 20 N I 450 Dd CRE E E Ee 30 AT 0 Zz 400 25 Ff Yy 40 300 G g Xx 50 Hh W w 200 Ii 60 Vv Jj 100 Uu 70 Kk 80 90 Tt Ll Ss Mm Rr Nn Qq Oo Pp W LO LOW LOW W LO LOW LO W W LO W LO LOW W PRO PER LO TY LI CE NE LO FEN W ION UCT STR N CO / NO NLY LL O LO STA W W LO E IN PROPERTY LINE ENC F OR WF LO OW W LLO N LOW Called LO North W W LO E ENC NF IO LOW UCT LOW STR 02 November 2020 N CO PROPERTY LINE / NO JM, TD, EG NLY LL O 0 40 80 STA PROPERTY LINE E IN C FEN FOR LOW Site Lighting Plan LOW W LO ary School\10.1.03.dwg / 11/25/2020 12:57:52 PM 15 PROPERTY LINE
Proposed | Site Lighting Photometrics 16
Proposed | Revised Planting & Site Improvements NO PARKING KING PAR NO G IN RK PA NO ING ARK NO P 17
Proposed | Site Trees Columnar Sargent Cherry Paper Birch New Harmony Elm Eastern Redbud NO PARKING KING PAR NO G IN RK PA NO ING ARK NO P Black Tupelo Eastern White Pine Eastern Red Cedar October Glory Red Maple Armstrong Gold Maple Red Oak 18
Planting | Revised Plant List Native Plants from the Amesbury Conservation REPLACE WITH UM-NEW HARMONY ELM suggested plant list REPLACE WITH ARO-OCTOBER RED GLORY RED MAPLE Native Plant Cultivars from the Amesbury Conservation suggested plant list Native Plants not listed on the Amesbury Conservation suggested plant list REPLACE WITH JUH-JUNIPER AND PH-HAMELN DWARF FOUNTAIN GRASS Non-Native adaptive plant appropriate for Mid-Atlantic states to New Hampshire - BSC Group Peer Review Requirement. Brown + Sardina January 18, 2021 19
Construction Logistics | Phase 1 LOCATION OF NEW SCHOOL LITTLE LEAGUE FIELDS TO REMAIN IN USE LIMIT OF WORK CONSTRUCTION FENCE CASHMAN SCHOOL OPERATIONAL (NOT AFFECTED) CONSTRUCTION OF ACCESS ROAD STORMWATER MGMT AREA CONSTRUCTION ACCESS CONSTRUCTION TRAILERS LOCATION Spring 2021 to July 1, 2021 20 N
Construction Logistics | Phase 2 Summer 2021 (July 1, 2021 to August 20, 2021) 21
Construction Logistics | Phase 3 NEW AMESBURY ELEMENTARY SCHOOL LOCATION BUILDING: CONSTRUCTION ONGOING EXISTING ROADWAY FOR BUS, SERVICE AND DELIVERIES TO REMAIN CASHMAN SCHOOL OPERATIONAL LIMIT OF WORK CONSTRUCTION FENCE SITE: DRIVEWAYS, PARKING, UTILITIES CONSTRUCTION EXISTING PARKING & ONGOING DROP OFF TO REMAIN CONSTRUCTION ACCESS August 20, 2021 to June 17, 2022 N 22 DIAGRAM: NOT TO SCALE 3 MARCH 2021
Construction Logistics | Phase 4 BUILDING CONSTRUCTION ONGOING SITE CONSTRUCTION ONGOING CASHMAN SCHOOL CLOSED FOR SUMMER INSTALLATION OF STORMWATER SYSTEM COMPONENTS, RECONSTRUCTION OF CASHMAN ENTRY DRIVE & PARKING LOT Lions Mouth Road Summer 2022 (June 20, 2022 to August 24, 2022) N 23 Site Phasing: Phase 4 - Summer 2022 DIAGRAM: NOT TO SCALE 0315 MARCH 2021 JUNE 2020
Construction Logistics | Phase 5 BUILDING COMPLETION, SYSTEMS TESTING, FURNITURE INSTALLATION COMPLETE SITEWORK & LANDSCAPING, INSTALL PLAYGROUND EQUIPMENT COMPLETE POROUS CASHMAN SCHOOL OPERATIONAL PAVING PARKING LOT WITH NEW PARKING & ROADWAYS & FINAL ROADWAY PAVING INSTALL PERMANENT SPLIT RAIL FENCE Lions Mouth Road August 25, 2022 to March 2023 N 24 Site Phasing: Phase 5 - Fall 2022 to Completion DIAGRAM: NOT TO SCALE 0315 MARCH 2021 JUNE 2020
Construction Logistics | Completion Lions Mouth Road March 2023 N 25 GRAM: NOT TO SCALE
Soil Management | Arsenic Background 26
Soil Management | Limit of Work 27
Soil Management | Impacted Soils Pre-Construction • Naturally occurring arsenic impacted soils • Risk Assessment: detected levels do not pose an Imminent Hazard under the Massachusetts Contingency Plan (the relevant state regulatory program) During Construction • Dust Monitoring, Reporting & Management Post Construction - Project Completion • Clean cover within limit of construction work • 12” clean soil at areas of landscape work • 24” clean soil at recreation areas Cashman Playground 28
50' ZONING SETBACK (SIDE) Amesbury SETBACK (SIDE) Elementary School 50' ZONING Neighbors’ Meeting March 3, 2021 CK SETBA NING 50' ZO (SIDE) Amesbury Elementary School © 2021 DiNisco Design, Inc.
Proposed | Lighting Photometrics at Building 30
Proposed | View from Woodsom 31