A 21ST CENTURY ICON - Titanic, Made in Belfast
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Harland & Wolff Shipyard with Titanic on the Slipway 1911 from the past Heritage photograph supplied by The Ulster Folk & Transport Museum Photographic Archive
Titanic Quarter… One of Europe’s largest waterfront urban regeneration developments on the banks of Belfast’s river Lagan. The scheme is located at the intersection of technology, urban design and real estate development. Creating spaces and places, building 2 5 a community that will attract the new generation of creative knowledge workers to a dynamic “live/work/play environment” that 18 4 melts the old boundaries in space and time 11 17 between residential, enterprise, educational 10 12 and entertainment real estate. 6a 16 12 3 Titanic Quarter is pioneering the integration of advanced communication and media 9 technologies into the physical form and 15 14 fabric of a new 21st Century City experience. 7 6 13 The Titanic Quarter Open Access Optical 8 Fibre Network infrastructure will ubiquitously 1 pervade the enterprises, institutions, workplaces, leisure venues and residences that will make up this dynamic new location. Key to the Quarter EXISTING PHASE ONE (under construction/completed) PHASE TWO (outline planning granted) Titanic Quarter is transforming 75 ha/185 acres of former shipyard lands on the fringe 1. Odyssey arena and entertainment complex 6. Abercorn Quay, ARC Apartments and Hotels 6a. Abercorn Quay, ARC Apartments and 2. Northern Ireland Science Park and historic 7. Abercorn Basin, marina, shops restaurants Hotels of Belfast City Centre into a new focal point Thompson Dock and Pump House and cafés 10. T itanic Signature Project visitor attraction for Belfast. At its heart are the atmospheric (construction underway) 3. Historic Harland & Wolff HQ and 8. Gateway Office Complex places where Titanic was designed, built Drawing Offices (Phase 1 refurbishment 11. Historic Titanic and Olympic Slipways 9. Belfast Metropolitan College Complex and launched. completed) 12. Mixed use development 13. Public Record Office of Northern Ireland 4. Painthall Film Studio 14. Financial Services Centre (planning lodged) Titanic Quarter… Building the future 5. Channel Commercial Park from the past Additional PHASES 15, 16, 17 & 18. Mixed use development
Interactive Mixed Use Phase II local retail/services and tourism/leisure Development Content Phase I (on site) The rationale for Titanic Quarter is a mixed (outline planning granted) uses. These are uniquely centred in a use development which is configured Residential 47505 sq m (475 units) 200000 sq m (2000 units) waterfront setting that was the birthplace to create a lively, sustainable and safe of RMS Titanic and will include an Workspace 15000 sq m 37000 sq m environment for residents, visitors and international Titanic visitor attraction. workers alike as part of a new 21st Century Leisure - 10000 sq m Spaces and Places City living experience. Hotel 6000 sq m (150 beds) 13000 sq m (300 beds) The layout is linked by a high quality public Tourism - 17800 sq m Sustainable Development and Heritage realm that is memorable, informative and The development takes as its starting Retail & Local Services 2360 sq m 5500 sq m legible. It honours the industrial past and point retention of the significant maritime Further Education 21600 sq m - will give the area a confident new identity industrial heritage of the area. It is led as well as a robust sense of place and Vehicle Parking 5220 sq m ( 1218 spaces) 15000 sq m (3500 spaces) by the development of three residential personality. TOTAL 97685 sq m 298300 sq m neighbourhoods and a ‘village heart’ of Heritage & Public Realm 5.0 ha 11.6 ha Where we once built ships we now build commerce and enterprise surrounded by communities. Phases I & II with the Titanic Signature Project at its heart 21st Century Connections Physical Links: Virtual Links: A Growing Community Road: Direct access to main trunk roads and Titanic Quarter is served with: Existing occupiers within Titanic Quarter Motorway network •D irect Tier 1 (highest level) Internet • Direct and diverse links to mainland UK, include a range of indigenous and Public transport: served by City Metro bus connectivity provision with full resilience London and Global networks international companies: services. Ready access to provincial bus of routing and provider • Access to a Belfast to Dublin 10Gbs private, Autonomy and rail services. Focal point of new £150m Broadsoft •N ext Generation Open Access (carrier diversely routed network, which enables Citigroup Rapid Transit System neutral) Titanic Quarter Network FTTX scaleable capacity on demand ECIT Research Institute & Centre for Secure Airports: George Best, Belfast City •F ibre-to-the-home infrastructure enabling • Access to Project Kelvin – Northern Ireland’s Information Technologies (Queen’s University, Belfast) Airport is within 10 minutes drive. Belfast all occupiers and businesses to have first direct fibre optic link to North America European Connected Health Campus International Airport is under half an concurrent access to multiple services/ offering higher security / lower latency Intelliden hour away providers L&T Infotech Microsoft Ferries: High speed and traditional ferries •N ext Generation Open Access (carrier Northern Ireland Science Park to UK mainland located within Belfast neutral) mobile broadband Polaris Harbour directly opposite the site SQS TDK
Europe & North America UK and Ireland Belfast, Northern Ireland Titanic Quarter Titanic Quarter Development Phases I & II Titanic Quarter Limited, T: +44 (0) 28 9076 6300 Titanic House, 2 Queen’s Road, F: +44 (0) 28 9045 5086 Queen’s Island, Belfast BT3 9DT, E: info@titanicquarter.com Belfast, Northern Ireland Northern Ireland. W: www.titanicquarter.com