WORLD CUP 2014 IN BRAZIL

 Analysis of infrastructure at candidate host
  cities for FIFA World Cup 2014 in Brazil

Associação Brasileira da Infraestrutura
         e Indústrias de Base

                                   Ralph Lima Terra
                                Executive Vice President

                                               Pág. 1
Summary

• Technical Cooperation Agreement
• Objectives, assumptions and directions
• Methodology
• Main results
• Next steps
• Phase II

                                           Pág. 2
ABDIB PROJECT FOR WORLD CUP 2014

                                   Pág. 3
OBJECTIVE, ASSUMPTIONS and DIRECTIONS:
• Identify the actual status of infrastructure and services as well as
  the investment need in the 18 candidate cities to host the World
  Cup 2014.

• Based on FIFA parameters, ABDIB selected 2 requirement levels
  – minimum and ideal – and also 49 indicators across 9 different
  dimensions to be able to evaluate the status of infrastructure
  and services and also the efforts to be made to match those
  requirements.

• Dimensions    analyzed:    urban  mobility,   airports,  ports,
  telecommunications, energy, sanitation, hospital network, hotel
  network, and public security.

                                                                   Pág. 4
OBJECTIVE, ASSUMPTIONS and DIRECTIONS:
• Analysis of
   • projects already under way,
   • existing projects (with no works started yet);
   • projected investment (with no structured projects yet).

• Recommendation for projects and investment to attain FIFA minimum
  or ideal requirements, with private participation preferencially.

• All projects must be economically and financially sustainable to avoid
  over investment that may become obsolete after World Cup 2014.

• Investment must leave a legacy of economic and social development to
  the cities.

                                                                     Pág. 5
ASSUMPTIONS BY EACH DIMENSION:
                           Examples

URBAN MOBILITY:
          MOBILITY besides its vegetative growth, it takes into consideration
the traffic increase in each particular city, once it grows at different rates
depending on the transport fleet expansion.

AIRPORTS:
AIRPORTS metropolitan areas are considered (for SP, Rio and BH a circle
with a 150 km radius). For SP, three airports are analyzed, for Rio and BH
two.

PORTS:
PORTS it considers the sector growth projection for passenger transport

HOTELS:
HOTELS It considers the tourist rate growth for each one of the cities until
2014 and its urban population growth based on figures by IBGE in a circle
with a 150 km radius.

                                                                          Pág. 6
ASSUMPTIONS BY EACH DIMENSION:
                          Examples

ENERGY:
ENERGY It contemplates supply and ditribution of electric energy and all
metropolitan regions.

TELECOMMUNICATION:
TELECOMMUNICATION It includes fixed and mobile telephony and also
wide band.

HOSPITAL NETWORK:
             NETWORK It includes both public and private hospitals, with all
services, including emergency and intensive care.

SANITATION: It considers both metropolitan and exclusively municipal
infrastructure systems.

SECURITY:
SECURITY Civilian and military police are analyzed, with other specialized
services as well as firemen.

                                                                           Pág. 7
Example: 2008 hotel network in SP

                                    Pág. 8
Example: 2008 urban mobility in SP

                                     Pág. 9
Process and methodology
Focus was on:

Existing investment plans:
Projects officially informed by the candidate cities, government and/or other
authorities.

Additional recommended projects:
Projects that may contribute to improve infrastructure status and services in each
city as well as to attain the minimum or the ideal quality level, according to FIFA.

 Minimum   Set of requirements to be a host city for World Cup 2014.
  Level

  Ideal    Enabling the city to host any game for World Cup 2014, independently of the phase.
  Level

                                                                                       Pág. 10
Process and methodology
Conclusion and analysis report for each city

  Gap evaluation and suggestion of alternative plans

  Local survey of missing information

  Evaluation of collected information
  (around 50 professionals involved)
  Identification of supplementary information

  Identification of scenarios to be achieved (KPI’s focus)

  Identification of indicators and/or criteria to be evaluated

   Institutional calls

   Analysis of the program of public works

                                                      Dimensions
  (Urban Mobility, Airports, Ports, Hotel network, Hospital network, Sanitation, Energy, Telecommunication, Public Security
                                                                                                                         Pág. 11
Process and methodology
        Collection of information at governmental institutions

Institution                  Collected information
DNIT                         Investment in transport
Ministry of the Cities       Investment in infrastructure
Ministry of Justice          Investment in public security
ABRADEE                      Information on energy
ANAC                         Investment in airports
ANATEL                       Information on telecommunications
ONS                          Information on energy
ANTAQ                        Information on ports
Infraero                     Investment in airports
Embratur                     Information on international tourism
ANEEL                        Investment in energy
ANTT                         Investment in transport
FOHB                         Information on lodging
SENASP                       Information on public security
ANA                          Information on sanitation
ANS                          Information on healthcare
                                                                    Pág. 12
WORLD CUP 2014

                          GAP ANALYSIS                                                                                                    Explanation
                                                                                                                           18
 Urban
             A            B                                                                                                Candidate    A   Actual status
 Mobility
                                                                                                                           cities
                                                                                                                                        B   Estimated status in

                                      Key Indicators- Minimum level - 2014
 Airports    A                B                                                                                                             2014 with existing

                                                                                     Key Indicators - Ideal level - 2014
                                                                                                                                            projects
                                                                                                                                             Gap still open to be
  Ports      A                    B                                                                                                         closed with
                                                                                                                                            recommended
  Hotel      A                                                               B                                                              additional projects
 network
                                                                                                                                       Minimum Minimum
 Power       A       B                                                                                                                  Level level of
                                                                                                                                               requirements
                                                                                                                                               to be a host
                                                                                                                                               city for 2014
Telecomm.    A                                                                   B                                                             World Cup

Hospital
network      A            B                                                                                                              Ideal   Ideal level to
                                                                                                                                         level   enable a city
Sanitation                                                                                                                                       to host any
             A   B                                                                                                                               game in 2014
                                                                                                                                                 World Cup,
                                                                                                                                                 independently
 Security                                                                                                                                                           13
             A       B                                                                                                                           of the phase
WORLD CUP 2014

           Process and methodology
                        Number of indicators used in each area
               Area*                               Number of indicators
       Transport – Airports                                 3
         Transport - Ports                                 1 (*)
   Transport – Urban Mobility                               6
          Hotel Network                                     6
         Hospital Network                                   5
         Basic sanitation                                   8
              Security                                      10
               Power                                        7
       Telecommunications                                   3
                Total                                       49

(*) For passenger terminals only
                                                                          Pág. 14
WORLD CUP 2014

                         AIRPORTS
                Selected and used indicators

Indicator                                         Unit   Minimum    Ideal
                                                         Level      Level
Saturation level of passenger terminals           %            95           90

Percentage of international flights occupancy     %            85           75

Saturation level of take-off and landing tracks   %            70           60

                                                                                 Pág. 15
WORLD CUP 2014

                         URBAN MOBILITY
                    Selected and used indicators
Indicator                         Unit               Ideal Level         Minimum Level

No. of passengers carried by      Pass/day.vehicle            1,500                 2,000
day – railway system

Avg. area occupated in each       Pass/m3                           4                     6
transport unit

No. of passengers carried by      Pass/day.vehicle                 400               500
day – bus

Saturation level of passenger     %                                80                    90
terminals in intermunicipal bus
stations

Avg. speed at rush hours          Km/h                             30                    22

No. of inhabitants by taxi        Inhab./taxi                      300               430

                                                                                              Pág. 16
WORLD CUP 2014

                     HOTEL NETWORK
                Selected and used indicators
Indicators – Hotel network
Indicator                               Unit         Ideal Level    Minimum Level
Occupancy rate – De luxe                %                      50               70

Occupancy rate - Superior               %                      45               70

Occupancy rate - Standard               %                      40               70

No. of tourits by Super-economic unit   tourist/UH            550             1000

Total occupancy rate – June 2008        %                      40               70

Total occupancy rate – July 2008        %                      40               70

                                                                                     Pág. 17
WORLD CUP 2014

                  HOSPITAL NETWORK
              Selected and used indicators
Indicators – Hospital network
Indicator                              Unit                    Ideal          Minimum
                                                               Level          Level
Regular Beds at public units           Beds/thous. inhab.              3.38         2.92

Intensive care beds at public units    Beds/thous. inhab.              0.34         0.29

Regular Beds at private units          Beds/thous. inhab.              3.38         2.92
                                       w/healthcare plan
Intensive care beds at private units   Beds/thous. inhab.              0.34         0.29
                                       w/healthcare plan
No. of medical doctors                 Doctors/thous. Inhab.           5.54             1

                                                                                            Pág. 18
WORLD CUP 2014

                      SANITATION
               Selected and used indicators
Indicators - Sanitation
Indicator                           Unit                Ideal Level   Minimum Level
Water supply coverage               % houses                    100               98

Water supply volumes                l/inhab./day                440              360

Sewage treatment volumes            l/inhab./day                220              180

Days with no water supply           No. days                      0               15

Percentage of metered connections   % houses                    100               98

Sewage collection coverage          % houses                     90               70

% treated sewage                    % sewage                     90               70

% recycled waste                    % collected waste             5                   3

                                                                                          Pág. 19
WORLD CUP 2014

                        SECURITY
               Selected and used indicators
Indicators - Criminality
Indicator                                   Unit                  Recomm.    Tolerable
                                                                  Level      Level
No. of annual thefts by 100,000 inhab.      Thefts/100,000             325           480

No. of annual vehicle thefts by 100,000     Vehicle                    243           417
inhab.                                      thefts/100,000
No. of annual robberies by 100,000 inhab.   Robbery/100,000            280         1,759

No. of annual homicides by 100,000 inhab    Homicide/100,000            19               38

No. of policemen by police station          Number/police unit          18               51

No. of military policemen by squad          Number/unit                107           360

No. of firemen by station                   Number/unit                 33           123

Inhabitants by policeman                    Inhab/ global force        594         1.144

Inhabitants by military policeman           Inhab./global force        195           330

Inhabitants by fireman                      Inhab./global force        916         2,500
                                                                                              Pág. 20
WORLD CUP 2014

                         ENERGY
               Selected and used indicators
Indicators – Energy supply
Indicator                             Unit                            Ideal        Minimum
                                                                      Level        Level
No. of impacts on the energy system   % (impacts with no energy           >85           80
in analyzed area                      cut/total annual impacts)
Impact duration at a control point    Minutes/year
WORLD CUP 2014

                    TELECOMMUNICATION
                 Selected and used indicators
Indicators
Indicator                        Unit                      Ideal Level   Minimum
                                                                         Level
Density /100 inhab. - fixed      Fixed lines/100 inhab.             25             30
Density /100 inhab. - mobile     Mobile lines/100 inhab.            70             80
Wide band accesses/ 100 inhab.   Wide band accesses/100             15             20
                                 inhab.

                                                                                        Pág. 22
Process and methodology
Evaluation                                  Legend

             Projects whose financial igures are in line with the works to be done, with
             guaranteed financing sources and their bids and execution timeframes are in
             accordance to World Cup 2014.
             These projects have a low chance not to be accomplished on time

             Projects whose timeframe still allows their conclusion by the Cup, but are
             showing one of below situations:
                 -   financial figures are not as planned ;
                – financing source is not guaranteed yet;
                – process is late (several potentail reasons: environmental study, lack of
                  basic project, etc);
                – still dependent on next government commitment;
                These projects have a moderate chance not to be accomplished on time

             Projects that won’t be ready for the World Cup 2014, unless a severe
             commitment at all level is made to accelerate the process and guarantee the
             necessary resources. Gin general, they show more than one of the above issues
             and their conclusion is too close to the Cup.

             These projects have a high chance not to be accomplished on time.

                                                                                             Pág. 23
WORLD CUP 2014

• Main results:

    • First report to Government in February 2009

    • Selection by FIFA of the 12 host cities in May 2009

    • Set up for Project Phase II, focusing the selected 12 host cities.

                                                                           24
WORLD CUP 2014
                            Legacy

• Promotion of a huge investment in infrastructure and public
  services, required for the country’s development and growth,
  that will be accelerated because of the World Cup.

• Considerable improvement in public urban transport, sanitation
  and tourism, in both large cities and touristic locations.

• Improvement of infrastructure services in airports, ports, energy
  and transport at large.

                                                                 Pág. 25
WORLD CUP 2014
                             Legacy

• Reduction of deseases tied to lack of sanitation because of heavy
  investment in critical areas.

• Intallation of a set of multi-use arenas in almost all key regions
  helping to put Brazil in the international route for entertainement.

• Brazil in the international tourism destinations thanks to a new
  visibility about its locations, nature, history, culture, society.

• Promotion of a better sustainable environment by expanding
  sanitation and urban transportation.

                                                                       Pág. 26
Abdib Project for World Cup 2014

•   Next steps

• Phase II

                                         Pág. 27
WORLD CUP 2014

                         Next Steps

• Abdib is making availaible specific reports on the study to all 18
candidate cities

• Abdib disseminates all key results for each city together with
each local Authority

• Abdib setting up a new specific structure for Phase II of the
World Cup 2014

                                                                   Pág. 28
WORLD CUP 2014

                            PHASE II
“Even more important than the strategic plan is to materialize the
necessary investment”

• Focus on detailing all identified projects financially
• Focus on developing the executive projects (engineering,
  financing, environmental licensing)
• Focus on modeling partnerships between public and private
  investors
• Focus on managing implementation and timeframes
• Focus on actions required to eliminate possible risks and
  obstacles to investment

                                                               Pág. 29
ASSOCIAÇÃO BRASILEIRA DA
INFRAESTRUTURA E INDÚSTRIAS DE BASE