WORLD CUP 2014 IN BRAZIL - Associação Brasileira da Infraestrutura e Indústrias de Base Analysis of infrastructure at candidate host cities for ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
WORLD CUP 2014 IN BRAZIL Analysis of infrastructure at candidate host cities for FIFA World Cup 2014 in Brazil Associação Brasileira da Infraestrutura e Indústrias de Base Ralph Lima Terra Executive Vice President Pág. 1
Summary • Technical Cooperation Agreement • Objectives, assumptions and directions • Methodology • Main results • Next steps • Phase II Pág. 2
ABDIB PROJECT FOR WORLD CUP 2014 Pág. 3
OBJECTIVE, ASSUMPTIONS and DIRECTIONS: • Identify the actual status of infrastructure and services as well as the investment need in the 18 candidate cities to host the World Cup 2014. • Based on FIFA parameters, ABDIB selected 2 requirement levels – minimum and ideal – and also 49 indicators across 9 different dimensions to be able to evaluate the status of infrastructure and services and also the efforts to be made to match those requirements. • Dimensions analyzed: urban mobility, airports, ports, telecommunications, energy, sanitation, hospital network, hotel network, and public security. Pág. 4
OBJECTIVE, ASSUMPTIONS and DIRECTIONS: • Analysis of • projects already under way, • existing projects (with no works started yet); • projected investment (with no structured projects yet). • Recommendation for projects and investment to attain FIFA minimum or ideal requirements, with private participation preferencially. • All projects must be economically and financially sustainable to avoid over investment that may become obsolete after World Cup 2014. • Investment must leave a legacy of economic and social development to the cities. Pág. 5
ASSUMPTIONS BY EACH DIMENSION: Examples URBAN MOBILITY: MOBILITY besides its vegetative growth, it takes into consideration the traffic increase in each particular city, once it grows at different rates depending on the transport fleet expansion. AIRPORTS: AIRPORTS metropolitan areas are considered (for SP, Rio and BH a circle with a 150 km radius). For SP, three airports are analyzed, for Rio and BH two. PORTS: PORTS it considers the sector growth projection for passenger transport HOTELS: HOTELS It considers the tourist rate growth for each one of the cities until 2014 and its urban population growth based on figures by IBGE in a circle with a 150 km radius. Pág. 6
ASSUMPTIONS BY EACH DIMENSION: Examples ENERGY: ENERGY It contemplates supply and ditribution of electric energy and all metropolitan regions. TELECOMMUNICATION: TELECOMMUNICATION It includes fixed and mobile telephony and also wide band. HOSPITAL NETWORK: NETWORK It includes both public and private hospitals, with all services, including emergency and intensive care. SANITATION: It considers both metropolitan and exclusively municipal infrastructure systems. SECURITY: SECURITY Civilian and military police are analyzed, with other specialized services as well as firemen. Pág. 7
Example: 2008 hotel network in SP Pág. 8
Example: 2008 urban mobility in SP Pág. 9
Process and methodology Focus was on: Existing investment plans: Projects officially informed by the candidate cities, government and/or other authorities. Additional recommended projects: Projects that may contribute to improve infrastructure status and services in each city as well as to attain the minimum or the ideal quality level, according to FIFA. Minimum Set of requirements to be a host city for World Cup 2014. Level Ideal Enabling the city to host any game for World Cup 2014, independently of the phase. Level Pág. 10
Process and methodology Conclusion and analysis report for each city Gap evaluation and suggestion of alternative plans Local survey of missing information Evaluation of collected information (around 50 professionals involved) Identification of supplementary information Identification of scenarios to be achieved (KPI’s focus) Identification of indicators and/or criteria to be evaluated Institutional calls Analysis of the program of public works Dimensions (Urban Mobility, Airports, Ports, Hotel network, Hospital network, Sanitation, Energy, Telecommunication, Public Security Pág. 11
Process and methodology Collection of information at governmental institutions Institution Collected information DNIT Investment in transport Ministry of the Cities Investment in infrastructure Ministry of Justice Investment in public security ABRADEE Information on energy ANAC Investment in airports ANATEL Information on telecommunications ONS Information on energy ANTAQ Information on ports Infraero Investment in airports Embratur Information on international tourism ANEEL Investment in energy ANTT Investment in transport FOHB Information on lodging SENASP Information on public security ANA Information on sanitation ANS Information on healthcare Pág. 12
WORLD CUP 2014 GAP ANALYSIS Explanation 18 Urban A B Candidate A Actual status Mobility cities B Estimated status in Key Indicators- Minimum level - 2014 Airports A B 2014 with existing Key Indicators - Ideal level - 2014 projects Gap still open to be Ports A B closed with recommended Hotel A B additional projects network Minimum Minimum Power A B Level level of requirements to be a host city for 2014 Telecomm. A B World Cup Hospital network A B Ideal Ideal level to level enable a city Sanitation to host any A B game in 2014 World Cup, independently Security 13 A B of the phase
WORLD CUP 2014 Process and methodology Number of indicators used in each area Area* Number of indicators Transport – Airports 3 Transport - Ports 1 (*) Transport – Urban Mobility 6 Hotel Network 6 Hospital Network 5 Basic sanitation 8 Security 10 Power 7 Telecommunications 3 Total 49 (*) For passenger terminals only Pág. 14
WORLD CUP 2014 AIRPORTS Selected and used indicators Indicator Unit Minimum Ideal Level Level Saturation level of passenger terminals % 95 90 Percentage of international flights occupancy % 85 75 Saturation level of take-off and landing tracks % 70 60 Pág. 15
WORLD CUP 2014 URBAN MOBILITY Selected and used indicators Indicator Unit Ideal Level Minimum Level No. of passengers carried by Pass/day.vehicle 1,500 2,000 day – railway system Avg. area occupated in each Pass/m3 4 6 transport unit No. of passengers carried by Pass/day.vehicle 400 500 day – bus Saturation level of passenger % 80 90 terminals in intermunicipal bus stations Avg. speed at rush hours Km/h 30 22 No. of inhabitants by taxi Inhab./taxi 300 430 Pág. 16
WORLD CUP 2014 HOTEL NETWORK Selected and used indicators Indicators – Hotel network Indicator Unit Ideal Level Minimum Level Occupancy rate – De luxe % 50 70 Occupancy rate - Superior % 45 70 Occupancy rate - Standard % 40 70 No. of tourits by Super-economic unit tourist/UH 550 1000 Total occupancy rate – June 2008 % 40 70 Total occupancy rate – July 2008 % 40 70 Pág. 17
WORLD CUP 2014 HOSPITAL NETWORK Selected and used indicators Indicators – Hospital network Indicator Unit Ideal Minimum Level Level Regular Beds at public units Beds/thous. inhab. 3.38 2.92 Intensive care beds at public units Beds/thous. inhab. 0.34 0.29 Regular Beds at private units Beds/thous. inhab. 3.38 2.92 w/healthcare plan Intensive care beds at private units Beds/thous. inhab. 0.34 0.29 w/healthcare plan No. of medical doctors Doctors/thous. Inhab. 5.54 1 Pág. 18
WORLD CUP 2014 SANITATION Selected and used indicators Indicators - Sanitation Indicator Unit Ideal Level Minimum Level Water supply coverage % houses 100 98 Water supply volumes l/inhab./day 440 360 Sewage treatment volumes l/inhab./day 220 180 Days with no water supply No. days 0 15 Percentage of metered connections % houses 100 98 Sewage collection coverage % houses 90 70 % treated sewage % sewage 90 70 % recycled waste % collected waste 5 3 Pág. 19
WORLD CUP 2014 SECURITY Selected and used indicators Indicators - Criminality Indicator Unit Recomm. Tolerable Level Level No. of annual thefts by 100,000 inhab. Thefts/100,000 325 480 No. of annual vehicle thefts by 100,000 Vehicle 243 417 inhab. thefts/100,000 No. of annual robberies by 100,000 inhab. Robbery/100,000 280 1,759 No. of annual homicides by 100,000 inhab Homicide/100,000 19 38 No. of policemen by police station Number/police unit 18 51 No. of military policemen by squad Number/unit 107 360 No. of firemen by station Number/unit 33 123 Inhabitants by policeman Inhab/ global force 594 1.144 Inhabitants by military policeman Inhab./global force 195 330 Inhabitants by fireman Inhab./global force 916 2,500 Pág. 20
WORLD CUP 2014 ENERGY Selected and used indicators Indicators – Energy supply Indicator Unit Ideal Minimum Level Level No. of impacts on the energy system % (impacts with no energy >85 80 in analyzed area cut/total annual impacts) Impact duration at a control point Minutes/year
WORLD CUP 2014 TELECOMMUNICATION Selected and used indicators Indicators Indicator Unit Ideal Level Minimum Level Density /100 inhab. - fixed Fixed lines/100 inhab. 25 30 Density /100 inhab. - mobile Mobile lines/100 inhab. 70 80 Wide band accesses/ 100 inhab. Wide band accesses/100 15 20 inhab. Pág. 22
Process and methodology Evaluation Legend Projects whose financial igures are in line with the works to be done, with guaranteed financing sources and their bids and execution timeframes are in accordance to World Cup 2014. These projects have a low chance not to be accomplished on time Projects whose timeframe still allows their conclusion by the Cup, but are showing one of below situations: - financial figures are not as planned ; – financing source is not guaranteed yet; – process is late (several potentail reasons: environmental study, lack of basic project, etc); – still dependent on next government commitment; These projects have a moderate chance not to be accomplished on time Projects that won’t be ready for the World Cup 2014, unless a severe commitment at all level is made to accelerate the process and guarantee the necessary resources. Gin general, they show more than one of the above issues and their conclusion is too close to the Cup. These projects have a high chance not to be accomplished on time. Pág. 23
WORLD CUP 2014 • Main results: • First report to Government in February 2009 • Selection by FIFA of the 12 host cities in May 2009 • Set up for Project Phase II, focusing the selected 12 host cities. 24
WORLD CUP 2014 Legacy • Promotion of a huge investment in infrastructure and public services, required for the country’s development and growth, that will be accelerated because of the World Cup. • Considerable improvement in public urban transport, sanitation and tourism, in both large cities and touristic locations. • Improvement of infrastructure services in airports, ports, energy and transport at large. Pág. 25
WORLD CUP 2014 Legacy • Reduction of deseases tied to lack of sanitation because of heavy investment in critical areas. • Intallation of a set of multi-use arenas in almost all key regions helping to put Brazil in the international route for entertainement. • Brazil in the international tourism destinations thanks to a new visibility about its locations, nature, history, culture, society. • Promotion of a better sustainable environment by expanding sanitation and urban transportation. Pág. 26
Abdib Project for World Cup 2014 • Next steps • Phase II Pág. 27
WORLD CUP 2014 Next Steps • Abdib is making availaible specific reports on the study to all 18 candidate cities • Abdib disseminates all key results for each city together with each local Authority • Abdib setting up a new specific structure for Phase II of the World Cup 2014 Pág. 28
WORLD CUP 2014 PHASE II “Even more important than the strategic plan is to materialize the necessary investment” • Focus on detailing all identified projects financially • Focus on developing the executive projects (engineering, financing, environmental licensing) • Focus on modeling partnerships between public and private investors • Focus on managing implementation and timeframes • Focus on actions required to eliminate possible risks and obstacles to investment Pág. 29
ASSOCIAÇÃO BRASILEIRA DA INFRAESTRUTURA E INDÚSTRIAS DE BASE www.abdib.org.br abdib@abdib.org.br Pág. 30