WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING

Page created by Judith Molina
 
CONTINUE READING
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC
REALM STRATEGY AND STREETSCAPE MASTER PLAN
PUBLIC MEETING
FEB 25, 2021

               THE VIRTUAL MEETING WILL BEGIN AT 7:00PM. THIS MEETING IS BEING RECORDED.
                      YOUR CAMERA IS TURNED OFF AND ALL ATTENDEES ARE MUTED.

                           HAVING CONNECTION ISSUES?
                       YOU CAN ALSO CALL-IN TO THE MEETING
                                    BY DIALING
                           +1-647-375-2971 FOLLOWED BY
                            637 8232 0947 THEN 809081
               CONTACT AZAND@LURA.CA IF YOU ARE EXPERIENCING TECHNICAL DIFFICULTIES

DTAH / TMIG / AW HOOKER / R.E. MILLWARD / LURA
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
WELCOME &
LAND ACKNOWLEDGMENT

                      2
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
AGENDA

»»How to Participate
»»Introducing the Project Team
»»Overview Presentation
»»Questions and Comments
»»Next Steps

                                 3
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
HOW TO PARTICIPATE

                                                       1. Raise your hand using the
                                                       “raise hand” button in the
                                                       Participants window. You will
                                                       be unmuted by a member of the
                                                       project team to speak.
    Type your question/     Raise/lower your hand      2. Phone-in participants must
     comment into the       using the “Raise Hand”     dial *9
    chat module. Ensure     icon in the Participants
   “Everyone” is selected             tab              3. Type your question into
                                                       the Chat window. Make sure
                                                       “Everyone” is selected”.

                                                       We will do our best to answer as
                                                       many questions as possible!

                                                                                          4
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
INTRODUCTIONS

                5
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
PUBLIC MEETING
PUBLIC REALM FRAMEWORK PLAN
& STREETSCAPE DESIGN_DRAFT

CITY OF VAUGHAN
VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY
AND STREETSCAPE MASTER PLAN

FEB 25, 2021

DTAH / TMIG / AW HOOKER / R.E. MILLWARD / LURA
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
CONTENTS

»»Introduction and Background
»»Recap of Phase 01 and Phase 02
»»Public Realm Framework Plan_Draft
»»Streetscape Design_Draft
»»Discussion
»»Next Steps

                                      7
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
STUDY AREA: 146 HECTARES (+/-360 ACRES)

                                                                                                               We
                                                                    Komura                                       st
                                                                                                 Julliard           D   on
                                                                   Road Park
                                                                                                  Park

                                                                                                                         River
                              Vellore Woods

                                                                                                       Julliard Dr.
                                                                                    Sweetriver
                                       Blvd.

                                                                                        Blvd.
                                                                   Rutherford Rd.
                                                                                                                                                      W
                                                                                                                                                       es
                                                                                                                                                         tD
                                                                                                                                                            on
                                                                                                                                                                 R
                                                                                                                                                                  iv
                  Weston Rd

                                                                                                                                                                     er

                                                                                                                                        Caldari Rd.
                                                    Highw
                                               ay 40 hermans W
                                                                       Vaughan Mills Mall

                                                    0
                                                    Fis

                                                                                                                             Jane St.
       Astona Blvd.

                                                              ay

                                                                   Blvd.
                                                                   Edgeley
                                                                                    Bass Pro Mills Dr.

                                                                                                                                                                          8
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
VAUGHAN MILLS TODAY - EAST SIDE

                                  9
WELCOME TO THE VAUGHAN MILLS CENTRE PUBLIC REALM STRATEGY AND STREETSCAPE MASTER PLAN PUBLIC MEETING
VAUGHAN MILLS TODAY - WEST SIDE

                                  10
VAUGHAN MILLS CENTRE SECONDARY PLAN (2014)_9 SCHEDULES

Height and Density            Open Space Network   Transportation Network

Ground Floor Frontage Types   Transit Network      Active Transportation Network

                                                                                   11
STUDY PURPOSE + OBJECTIVES

       Build Upon &
       Complement                                        Establish               Develop a
                              Guide Design,              Coherent                 Legible
       Vaughan Mills         Implementation,
          Centre                                          Design               Public Realm
                              & Maintenance              Approach               Framework
         Secondary
           Plan

                                          Elevate and                Create a
                     Improve              Emphasize                 Robust and
                   Connectivity          User Comfort,           Timeless Palette
                   Within and             Experience,            of Materials and
                      Beyond                Choice                 Furnishings

                                                                                              12
STUDY PROCESS

                                                                                   Are
                                                                                We ere

                  1                          2                         3          H
                                                                                                 4
                  Background,                Design                    Public Realm              Implementation &
                  Review &                   Guidelines                Framework and             Phasing Strategy
                  Analysis                                             Streetscape Plan          Report
                   Mar to July 2020          July to Oct 2020          Sept to Feb 2021          Feb to June 2021

           Project Purpose            Public Realm and          Public Realm Framework    Prepare Draft Report
           and Schedule               Streetscape Vision        and Streetscape
                                      Guiding Principles        Master Plan

           Background,                Draft Design Guidelines   Public Realm              TAC Meeting
           Review & Analysis                                    Framework and             Public Meeting
                                                                Streetscape Plan Report

           Project Management         TAC Meeting               Design Review Panel_02    Implementation and
           Meeting                                              TAC Meeting               Phasing Strategy
           TAC Meeting                                                                    Final Report

           Stakeholder/Landowner                                Stakeholder/Landowner     Council Working Session
           Meeting                                              Meeting
           Public Meeting                                       Public Meeting

           Design Review Panel_01

                                                                                                                    13
RECAP
PHASE 1 & PHASE 2

                    14
WHAT WE‘VE HEARD: KEY MESSAGES SO FAR

          Technical                         Design                            Public                         Stakeholders
          Advisory                       Review Panel                         Online                          October 22,
         Committee                          July 30 &                      Questionnaire                         2020
         May 27 & Sept                    Jan 28, 2020                     Summer 2020
           10, 2020                                                         (618 people)

        We Love Streets!            Strong Public Realm Identity         Value of Green Spaces       Incremental Development of Mall
       Arterials As Places          Define the Heart of the Place       Variety of Seating Options          Future Tertiary Plan
      Varied Open Spaces          West Side in the Role of the Centre      Safety is Paramount       People Moving Capacity of Streets
Employment Area Opportunities        Build + Plan For Tomorrow               Concerns about             Mitigate Traff ic Infiltration
Quick Wins+Long Term Strategies   Lockstep Design with Maintenance          Traffic Congestion         Improved Cycle and Pedestrian
                                      Definition to Parks, POPS                                        Environment at 400 Crossings
                                                                                                       Flexibility in the Locations for
                                                                                                          Streets and Mid-Block/
                                                                                                      Pedestrian Connections & POPS
                                                                                                              Parking Strategy
                                                                                                                                          15
PUBLIC REALM VISION FROM SECONDARY PLAN

          ..The Vision reflects a desired ”urban village” character,
          having a regular pattern of connected streets
          and blocks, focusing areas of intensification around
          unique and vibrant pedestrian oriented
          mixed-use corridors that provide neighbourhood
          amenity for Vaughan Mills Centre, and function as
          both local and regional destinations.”

          “…The Vision supports a modal shift
          that accommodates transportation modes
          such as cycling and walking….”
          Vaughan Mills Secondary Plan (2014)

                                                                       16
GUIDING PRINCIPLES: DRAFT

Sense of Place and Identity                          Green, Attractive and Vibrant                           Connected
• Build on natural heritage and cultural identity    • Provide a variety of parks, plazas and open           • Connect streets, paths and trails with other
• Highlight the importance of a pedestrian and         spaces to create a connected system and                 pedestrian areas to create a linked and
  bicycle-friendly Centre                              support a range of local social and recreational        connected Vaughan Mills Centre
• Create a unified and cohesive character for the      activities                                            • Design streets as complete streets and public
  Centre, while reinforcing the unique identity of   • Improve the urban canopy                                spaces to encourage cycling and walking
  individual character areas                         • Incorporate LID and green infrastructure              • Provide pedestrian and cycle connections to
• Establish strong gateways                          • Design POPS to contribute to an animated,               transit hubs and stops
• Incorporate a variety of types of public art         coherent and accessible green space system            • Integrate wayfinding

Safe, Healthy and Comfortable                        Sustainable and Resilient                               Promote High Quality Design
• Frame and animate parks and streets edges and      • Improve environmental, material, financial and        • Express a sophisticated high quality of design
  improve pedestrian comfort with supportive,          social sustainability and reflect best practices in   • Utilize a restrained and timeless palette of
  pedestrian scaled buildings                          sustainability in all new open space, landscape         materials and street furniture. Simple is better
• Design the public realm as multi-functional,         and streetscape projects                              • Plan and design for tomorrow. A commitment to
  flexible and multi-seasonal                        • Design the Black Creek Common as a landmark             enhanced maintenance practices must be made
• Incorporate opportunities to grow food and           sustainable open space that functions both as           in concert
  support associated programming                       storm-water management infrastructure and an
• Remove barriers to make parks and open spaces        innovative public space
  inclusive and equitably accessible to pedestrian
  and cycling connectivity
                                                                                                                                                                  17
PUBLIC REALM STRATEGY
FRAMEWORK PLAN_DRAFT

                        18
BUILDING ON THE INITIAL CONCEPTS (PHASE 01)

Character Areas                                                                                                                                              Family of Complete Streets                                                                                                                                                                                          Emerald Necklaces
                                                                                                                                                                                          Comdel
                                                                                                                                                                                           Park                                                            Komura
                                                                                                                                                                                                                                                          Road Park                                                                West
                                                                                                   West                                                                                                                                                                                                                                 D on       Ri
                                                                                                        Do n   R                                                                                                                                                                                                    Julliard

                                                                                                                                                                                                                                                                                                                                                    ver
                                                                                                                                                                                                                                                                                                                     Park

                                                                                                               iver

                                                                                                                                                                                                   Vellore Wo

                                                                                                                                                                                                                                                                                    S w eetriver Blvd.
                                                                                                                       Jane St.

                                                                                                                                                                                                                                                                                                                            Julliard Dr.
                                                                                                                                                                                                             ods
                                                                                                                                                                                                                                                                                                                                                                             5

                                                                                                                                                                                                                 B lvd.
                                                                                                                                                                                                                                                                   Rutherford Rd.
                                                                                                                                     Rutherford Rd.

             Weston                        Highway                                                                                                                                                                                                                                                                                                                           1

                                                                                                                                                                        Weston Rd
              Street                      Landscape

                                                                                                                                                                                                                              Highway
                                                                  Rutherford Road Area Jane Street Corridor
             Corridor

                                                                                                                                                                                                                                                                                                                                                          Jane St.
                                          Highway

                                                                                 Fishermens Way                                                                                                                                                                                                                                                                2

                                                                                                                                                                                                                                      400
              Business District
                Business District
                                                  400

                                                                                                                                                                                                                                                                                                                                                           Riverock Gate
                                                              Vaughan Mills Mall                                                                                                                                                                                                    Vaugh
                                                                                                                                                                                                                                                                                                         an Mills

                                                                                                                                                             Astona Blvd.                                                                                                                                                                      3
                                                                                                                                                                                                                                                  Fishe
                                                                                                                                                                                                                                                       rmen
                                                                                                                                                                                                                                                           s Way

                                                                                                                                                                                                                                                                                                                                           4

                                                        Bass Pro Mills                                                                                                                                                                                                                                                                     6
                                                                                                                                                                                                                          8                                                                                                         7
                                                                                                                                                                                                                                            Bass Pro Mills Dr.
 Weston Rd

                                                                              Bass Pro Mills Dr.

                                                                                                                                                                                                                                                                      Edgeley

                                                                                                                                                                                                                                                                                                                                                               Caldari Rd.
                                                                                                                       Caldari Rd.
                      Creek                                                                                                                                                              Creek
                Black                                                                                                                                                                 ck
                                                                     Edg

                                                                                                                                                                                    Bla

                                                                                                                                                                                                                                                                                                                           Romina Dr.
                                                                                                                                                                                                                                                                    Blv
                                                                        e

                                                                                                                   0                                  500m

                                                                                                                                                                                                                                                                        d.
                                                                   l ey
                                                                 Blvd
                                                                 .

Gateways                                                                                                                                                     Blue-Green Network                                                                                                                                                                                                  Landscape Stitch

                      *                                     Rutherford Road

                                                                              *                    *
                     *                                   *         *
                                                                                                    Transit

                                                                 *
                                                                                                    Hub

*                                                            * ** *
                                    400

** *                                                     * *
                                Highway

                                                                 * *
                                                                                                                               Jane

               *                                        * *    *

                                                                                                                                                                                                                                                                                                                                                                                                     19
PUBLIC REALM FRAMEWORK

09
             Green Frame            Urban Plazas & POPS
             Emerald Necklaces      Landscape Stitch
             Parks                  Gateways
ELEMENTS
             Internal Streets and   Cycling Connections
             Connections            Transit Connections

                                                          20
EXISTING CONDITION
                                                                                                     We
                                                           Komura                                      st
                                                                                        Julliard          D   on
                                                          Road Park
                                                                                         Park

                                                                                                               River
                       Vellore Woods

                                                                                              Julliard Dr.
                                                                           Sweetriver
                                Blvd.

                                                                               Blvd.
                                                          Rutherford Rd.
                                                                                                                                            W
                                                                                                                                             es
                                                                                                                                               tD
                                                                                                                                                  on
                                                                                                                                                       R
                                                                                                                                                        iv
           Weston Rd

                                                                                                                                                           er

                                                                                                                              Caldari Rd.
                                            Highw
                                         ay 40
                                                              Vaughan Mills Mall
                                        0
                                        Fishe

                                                                                                                   Jane St.
Astona Blvd.
                                              rmans
                                                    Way

                                                          Blvd.
                                                          Edgeley          Bass Pro Mills Dr.

                                                                                                                                                                21
1 | GREEN FRAME

                Rutherford Rd.

                                 Highw
                                      ay 400
    Weston Rd

                                                                Jane St.
                                           Bass Pro Mills Dr.

                                                                           Arterials
                                                                           Bass Pro Mills

                                                                                            22

Green Frame
2 | EMERALD NECKLACES

                Rutherford Rd.

                                 Highw
                                      ay 400
                       1                                        2
    Weston Rd

                                                                    Jane St.
                                           Bass Pro Mills Dr.

                                                                               Emerald Necklace/ Main Street

                                                                                                               23

Emerald Necklace
3 | PARKS

                Rutherford Rd.

                                 Highw
                                      ay 400
    Weston Rd

                                                                Jane St.
                                           Bass Pro Mills Dr.
                                                                           Urban Parks
                                                                           Greenways
                                                                           Black Creek Common

                                                                                                24

Parks
PARK PRECEDENTS
Urban Parks       Greenways   Black Creek Common

                                                   25
4 | INTERNAL STREETS AND CONNECTIONS

                Rutherford Rd.

                                 Highw
                                      ay 400
    Weston Rd

                                                                Jane St.
                                           Bass Pro Mills Dr.              Streets
                                                                           Mid-Block/
                                                                           Pedestrian Connections
                                                                           Mall Connections
                                                                           Pedestrian and
                                                                           Cycling Bridge
                                                                                                    26
                                                                           Potential Bridge
Connections
INTERNAL STREET PRECEDENTS
Streets                      Mid-Block Connections

                                                     27
5 | URBAN PLAZAS AND POPS

                Rutherford Rd.

                                 Highw
                                      ay 400
    Weston Rd

                                                                Jane St.
                                           Bass Pro Mills Dr.              Urban Plaza/Pops Design Character
                                                                              Plaza/Gateway
                                                                              Green
                                                                              Courtyards/Mews
                                                                              Mall
                                                                                                               28

Urban Plazas & POPS
Figure 18. Additional pedestrian connections shall be
   URBAN PLAZA AND POPS CHARACTER
         provided in coordination with built form.

Figure 19.Private Open Space could take different
   POP’sshapes
          can takeanddifferent
                       locationsshapes       and
                                    within the block,
         provided
   locations       thata itblock,
              within         is accessible
                                   provided andthey
                                                 connected
         with to theand
   are accessible    pedestrian     network to meet
                            connected.
         guidelines.
   (Vaughan Metropolitan Centre UDG)

                                                             29
6 | LANDSCAPE STITCH

                Rutherford Rd.

                                 Highw
                                      ay 400
    Weston Rd

                                                                Jane St.
                                           Bass Pro Mills Dr.
                                                                           Greening Opportunities
                                                                           Improved Street Crossings
                                                                           New Fisherman’s Way Crossing
                                                                           New North/South Pedestrian and
                                                                           Cycling Connections              30

Landscape Stitch
GREENING + ACTIVE TRANSPORTATION

                                   31
400 CROSSING PRECEDENT

                         Red Hill Creek Pedestrian Bridge, Hamilton over the QEW
                                                                                   32
7 | GATEWAYS

                Rutherford Rd.

                                 Highw
                                      ay 400
    Weston Rd

                                                                Jane St.
                                           Bass Pro Mills Dr.

                                                                           Urban Gateway

                                                                           Landscape Gateway
                                                                                               33

Gateways
GATEWAY PRECEDENTS
Landscape Gateways   Green Frame Gateways

                                            34
8 | CYCLING CONNECTIONS

               Rutherford Rd.

                                Highw
                                     ay 400
   Weston Rd

                                                                               Jane St.
                                                                                          Existing/Planned Boulevard MUP
                                                                                          (Within R-O-W)

                                                                                          Proposed Boulevard MUP
                                                                                          (Within R-O-W)
                                          Bass Pro Mills Dr.

                                                               Edgeley Blv
                                                                                          Planned /Proposed
                                                                                          Bike Lane/Signed Route

                                                                                          Bi-directional Bike Lane

                                                                                          Shared

                                                                                          Trails (Existing/Potential)      35
                                                                          d.
CYCLING INFRASTRUCTURE PRECEDENTS
Separated / Designated                                    Multi-Use Paths (Off Road )

Cycle Track Singe Direction   Protected

                                                          Shared

Cycle Track Bi-Directional    Boulevard Multi-Use Paths

                                                                                        36
9 | TRANSIT CONNECTIONS

                 Rutherford Rd.

                                  Highw
                                       ay 400

                                                                                         0m
                                                                                        50
     Weston Rd

                                                                                                        0m
                                                                                                      80
                                                                 Jane St.
                                                                            Potential Future Rapid Transit
                                                                            Transit Priority (HOV Lanes)
                                                                            Potential Future YRT
                                                                            Possible Spadina Subway
                                            Bass Pro Mills Dr.              Extension
                                                                            Potential Future Transit Hub Area
                                                                            Potential Future Transit Stops

                                                                                                                37

Transit
PUBLIC REALM FRAMEWORK_DRAFT

                                                                                                                         Jane St.
                                                                                                          Julliard Dr.
                                                                                      Sweetriver
                                                                                          Blvd.
              Rutherford Rd.

                                                                                                                                                    Wes t
                                                                                                                                                         on

                                                                                                                                                      D
                                                                                                                                                                Rive
                                                                                                                                                                    r

                                                                                      Fishermens Way
                         Business                                                                                                                Vaughan Mills Centre

                                      Highwa
                          District                                                                                                               Green Frame Streets

                                                                                                                                    Caldari Rd
                                                                                                                                                 Bass Mills Pro Dr.
  Weston Rd

                                     y 400
                                                                                                                                                 Improvements

                                                                                    Vaughan Mills                                                Main Street /
                                                                                                                                                 Emerald Necklaces
                                                                                        Mall

                                                                                                                                    .
                                                                                                                                                 Street Greening

                                                                                                                                                 Mid-block/
                                                                                                                                                 Pedestrian Connection

                                                                                                                                                 Urban Plazas/ POPS

                                                                                                                                                 Park/ Open Space

                                                                                                                                                 Natural Area

                                                                                                                                                 Future Transit Hub

                                                                                                                                                 Cycling Connection
                                               Bass Pro Mills Dr.

                                                                    Edgeley B

                                                                                                       Rom
                                                                                                                                                 Gateway

                       Creek
                    ck

                                                                                                          ino Dr
                                                                                                                                                 Ped/Cycle Bridge
                 Bla

                                                                                                                                                 Mall Connections
                                                                             lvd.

                                                                                                                                                                         38
Highway Landscape                            Rutherford Road                                    Vaughan Mills Mall
    CHARACTER AREAS                                           DD Greenway edges and buffer planting
                                                              DD North/south active transportation
                                                                                                           DD Commercial and residential
                                                                                                              mixed-use neighbourhood
                                                                                                                                                              DD Subject to tertiary plan
                                                                                                                                                              DD Short term: pedestrian
                                                                 linkages                                  DD Rutherford Road: strong                            pathways, mews, and sidewalks
                                                              DD Green Gateways                               green character and active                         to ensure safe and comfortable
                                                                                                              transportation focus                               pedestrian and cycle movement
     Weston Street Corridor                                   DD Fisherman’s Way Crossing
                                                                                                           DD Pedestrian/cycle friendly                          to/through Vaughan Mills
     DD Commercial focus                                                                                      internal streets and                            DD Long term: incremental
     DD Pedestrian/cycle friendly streets and POP’s linking                                                   POP’s linking Rutherford                           transformation into a
        Weston Road and Business District                                                                     Road, Mall and internal                            walkable more compact urban
     DD Weston Road: active transportation and strong                                                         neighbourhood parks                                neighbourhood.
        green character
     DD Urban Gateways

                             Rutherford Rd.

                           Weston                                  Highway
                            Street                                Landscape               Rutherford Road Area Jane Street Corridor
                           Corridor

                                                                  Highw
                                                                       ay 400
                                                                                                                                                                 Jane Street Corridor
                                  Business District                                                                                                              DD Higher density mixed-use
                                                                                                                                                                    neighbourhood
             Weston Rd

                                                                                      Vaughan Mills Mall                                                         DD Future transit hub gateway
                                                                                                                                                                 DD Jane Street: an active urban
                                                                                                                                                                    main street focus with strong
                                                                                                                                                                    green character
                                                                                                                                                                 DD Enhanced connectivity with
                                                                                                                                                                    the West Don Natural

                                                                                                                                               Jane St.
                                                                                                                                                                    Heritage Area
                                                                                                                                                                 DD Urban gateways with
                                                                                                                                                                    supportive buildings frontages

                                                                                    Bass Pro Mills

                                                                            Bass Pro Mills Dr.
Business District                                                                                     Bass Pro Mills
DD Unique mixed-use employment district that                                                          DD Mixed-use residential neighbourhood with future school/community facility
   is vibrant, walkable, bikeable and active.                                                         DD Urban square, new park and POP’s knitting together the mall, residential mixed-
DD Focused around the Black Creek Common -                                                               use areas and employment area to the south.
   a central storm water management + public                                                          DD Bass Pro Mills: strong green character and green infrastructure function.
   realm focal point.                                                                                                                                                                                39

     Character Areas
GREEN INFRASTRUCTURE STRATEGY                                                                                   Green Frame Streets
                                                                                                                  DD Underground storage
                                                                                                                  DD Oil-grit separators
                                                                                                                  DD Stormwater tree
                                                                                                                     trenches
                                                                                                                  DD Soil cells
                                                                                                                  DD Enhanced urban
                                                                                                                     tree canopy
Emerald Necklaces
DD Bio-retention cells /
   storm-water planters
DD Curb extensions with
   bio-retention                                                Rutherford Rd.
DD Stormwater tree
   trenches
DD Soil cells
DD Enhanced urban

                                 Highw
   tree canopy

                                      ay 400
                                                                                                            Bass Pro Mills
                                                                                                            DD Bio-retention swales (linear)
            Weston Rd

                                                                                                 Jane St.
                                                                                                            DD Bio-retention cells / storm-water
                                                                                                               planters (shorter/discontinuous)
                                                                                                            DD Stormwater tree trenches
                                                                                                            DD Soil cells
                                                                                                            DD Sub-surface ex-filtration system
                                                                                                               (where soil and groundwater
                                                                                                               conditions permit)
                                                                                                            DD Enhanced urban tree canopy

      Employment Connectors
                                           Bass Pro Mills Dr.
      DD As per Emerald
         Necklaces

                                                                  Neighbourhood Connectors
                                                                  DD As per Emerald Necklaces.
                                                                                                                                                   40

    Family of Complete Streets
GREEN INFRASTRUCTURE PRECEDENTS

Bio-Retention Swales   Curb Extensions with          Passive Irrigation
                       Bio-Retention

Soil Cells             Increased Urban Tree Canopy   Permeable Paving to Parking   Bio-Retention / Storm Planters

                                                                                                                    41
STREETSCAPE MASTER PLAN
STREET DESIGN_DRAFT

                          42
COMPLETE STREETS APPROACH

   Street for          Street as           Street as green
   movement            destinations        infrastructure

   Link                Place               Ecology

   Design Objective:   Design Objective:   Design Objective:
   Move people         Spend time          Improved ecosystem
                                                                43
GREEN FRAME STREET / JANE STREET DEMONSTRATION
                Rutherford Rd.
                                                                                       Right-of-Way 45.0m
                                                                                        Boulevards 12.2m
                                 Highw

                                                                           Pedestrian Clearway 2.1m/ Cycle Track 2.0m
                                      ay 400
    Weston Rd

                                                                                         Roadway 20.6m

                                                                Jane St.
                                           Bass Pro Mills Dr.                 Travel Lanes 3.0m, Curb Lanes 3.5m
Green Frame
                                                                              Future Dedicated Transit Lanes 7.6m

                                                                                                                        44
JANE STREET PRECEDENTS

                         45
DEVELOPING A CONSISTENT JANE FRONTAGE
                                                     West
                                                          D on     Ri
                                       Julliard

                                                                    ver
                                        Park

                                                                                                                     1. RLDC - Phase 1                                                                        2. Tesmar                                                                                     3. Dulcina Investments Inc.
                                                                                                                     8960 Jane Street                                                                         Holdings Corp.                                                                                (Charisma Phase 1)
        S w eetriver Blvd.

                                                                            Jane St.
                                              Julliard Dr.

                                                                                         5         5
d Rd.
                                                                                                                     • +/- 3m setback                                                                                                                                                                       • +/- 5m setback
                                                                                                                                                                                                              • +/- 4 to 6m landscape setback                                                               • Commercial at grade
                                                                                         11                          • Commercial at grade
                                                                                                                                                                                                              • Residential at grade                                                                        • Street trees in open planters &
                                                                                                                     • Street trees in lawn in ROW
                                                                                                                                                                                                              • Street trees and lawn in ROW                                                                  linear planting beds in ROW
                                                                            2

                                                                          Riverock Ga
                                                                                              te
        Vaugha
                             n Mills
                                                                                                                                                                                           West Side                                                                               West Side                                                                                                                         East Side
                                                              33

                                                              44

                                                                                                                                                                                                                                                                                                                                                  Public Right-of-Way

                                                                                                                                                                                                                                                                                                                                                                                     Public Right-of-Way
                                                                                                                                                                                                                             Public Right-of-Way

                                                                                                                                                                                                                                                             Public Right-of-Way
                                                                                                                                     Public Right-of-Way

                                                                                                                                                                     Public Right-of-Way
                                                             66
                                                      7
                                              7                                                        1 Private
                                                                                                       8   Capitol
                                                                            Caldari Rd

                                                                                                                                                                                                                                                                                                                Active retail
                                             Romina Dr

                                                                           .
                                                      .

                              Developments Along
                              Jane Street                                                                                                                                                                            5.0m-7.0m                        2.0m                                  5.0-6.0m
                                                                                                                                                                                                                                                                                                                                  4.0m-6.0m                                3.6m                               2.0m          5.0m-7.0m
                                                                                                                             5.0m-7.0m                        2.0m                               3.0m
                                                                                                                                                                                                                                                                                                                                Private Setback                          Planting/                         Pedestrian         Planting/
                                                                                                                              Planting/                    Pedestrian                       Private Setback           Planting/                    Pedestrian                            Private Setback
                                                                                                                                                                                                                                                                                                                                                                        Furnishing                          Clearway         Furnishing
                                                                                                                             Furnishing                     Clearway                        Active Frontage          Furnishing                     Clearway                          Landscaped Frontage
                                                                                                                                                                                                                                                                                                                                                                           Zone                                                 Zone
                                                                                                                                Zone                                                                                    Zone

                                                                                                                                                                                                                                                                                                                                                                                                                                          46
GREEN FRAME STREET / WESTON ROAD DEMONSTRATION
                Rutherford Rd.                                                           Right-of-Way 43.0m
                                                                                           Boulevards 8.5m
                                 Highw

                                                                                 Multi-Use Paths 3.0m, Roadway 26m
                                      ay 400
    Weston Rd

                                                                           Travel Lanes and Curb Lanes 3.5m, Median 5.0m

                                                                Jane St.
                                           Bass Pro Mills Dr.
                                                                                         Subject to EA Study

Green Frame

                                                                                                                           47
GREEN FRAME STREET / BASS PRO MILLS DEMONSTRATION
                Rutherford Rd.
                                                                                              Right-of-Way 30.0m
                                                                                         North Side Promenade 11.1m
                                                                                          South Side Boulevard 6.1m
                                 Highw
                                      ay 400

                                                                           Pedestrian Clearway 2.0m/ Bi-directional Cycle Track 3.0m
    Weston Rd

                                                                Jane St.
                                                                                                Roadway 12.8m
                                                                                      Travel Lanes 3.0m, Curb Lanes 3.5m
                                           Bass Pro Mills Dr.

Green Frame                                                                                   Subject to EA Study

                                                                                                                                       48
BASS PRO MILLS PRECEDENTS

                            49
EMERALD NECKLACE STREETS / FISHERMANS WAY DEMONSTRATION
                Rutherford Rd.                                                   Right-of-Way 26.0m
                                                                                  Boulevard 5.65m
                                 Highw

                                                                              Pedestrian Clearway 2.0m
                                      ay 400
    Weston Rd

                                                                           Roadway 14.7m (Inc. Travel Lanes

                                                                Jane St.
                                           Bass Pro Mills Dr.
                                                                               3.3m, Cycle Lane 2.0m +
                                                                              1.0m Buffer, Parking 2.1m)
Green Frame

                                                                                                              50
EMERALD NECKLACE STREETS / PARK INTERFACE DEMONSTRATION
                Rutherford Rd.                                                   Right-of-Way 26.0m
                                                                                  Boulevard 5.65m
                                 Highw

                                                                              Pedestrian Clearway 2.0m
                                      ay 400
    Weston Rd

                                                                           Roadway 14.7m (Inc. Travel Lanes

                                                                Jane St.
                                           Bass Pro Mills Dr.
                                                                               3.3m, Cycle Lane 2.0m +
                                                                              1.0m Buffer, Parking 2.1m)
Green Frame

                                                                                                              51
EMERALD NECKLACE STREETS / BLACK CREEK COMMON INTERFACE DEMO.
                Rutherford Rd.                                                                 Right-of-Way 26.0m
                                                                                                 Boulevard 5.65m
                                 Highw

                                                                           Bi-directional Cycle Track 3.0m/ Pedestrian Clearway 2.0m
                                      ay 400
    Weston Rd

                                                                                                  Roadway 8.7m

                                                                Jane St.
                                           Bass Pro Mills Dr.
                                                                                        Travel Lanes 3.3m/ Parking 2.1m

Green Frame

                                                                                                                                       52
BLACK CREEK COMMON ENTRANCE

                              53
BLACK CREEK COMMON INTERFACE PRECEDENTS

                                          54
NEIGHBOURHOOD CONNECTOR / LOCAL STREETS DEMONSTRATION
                Rutherford Rd.

                                                                            Right-of-Way 22.0/23.0m
                                                                                Boulevard 5.0m
                                 Highw
                                      ay 400

                                                                           Pedestrian Clearway 2.0m
    Weston Rd

                                                                Jane St.
                                                                               Travel Lanes 3.5m
                                           Bass Pro Mills Dr.
                                                                                  Parking 2.5m
Green Frame

                                                                                                      55
ADAPTIVE STREET DEMONSTRATION
                Rutherford Rd.

                                                                                   Right-of-Way 17.5m-20m
                                                                           6.0m Travelway / 2.5m Furnishing, Planting
                                 Highw
                                      ay 400

                                                                              or Parking Strips / 5.25m Clearways
    Weston Rd

                                                                Jane St.
                                                                                  Rolled Curbs or Flush Curbs
                                           Bass Pro Mills Dr.
                                                                                        Private or Public
Green Frame

                                                                                                                        56
ADAPTIVE STREET PRECEDENTS

Market Street, Toronto       Scott Street, Toronto   57
ADAPTIVE STREET PRECEDENTS

Argyle and Grafton Streets, Halifax   58
ADAPTIVE STREET PRECEDENTS

Bell Street Park, Seattle    59
MATERIALS PALETTE: LEARNING FROM WHAT WORKS

                                              60
MATERIALS PALETTE: VAUGHAN MILLS CENTRE

Paving and Curbs   Planters   Lighting    Street Furniture   Wayfinding

                                                                          61
BOULEVARDS
JANE STREET

    Sidewalk View

                                 ay
          RO
            W                 arw
                           Cle
                    rian
                est
            Ped
                              g/ Zone
                         ntin   g
                      Pla ishin
                           n
                       Fur

                                              ck
                                     le   Tra
                                 Cyc
                                                                e
                                                        on
                                                      gZ
                                                 n tin
                                             Pla
                                                                    e
                                                               on
                                                            geZ
                                                         Ed

                                                                        62
BOULEVARDS
RUTHERFORD ROAD (GREEN DATUM)

    Sidewalk View

                      W
                    RO
                                        h
                                    Pat
                               se
                          lti-U
                      Mu

                                           /     ne
                                         ng g Zo
                                     nti    n
                                  Pla nishi
                                      r
                                   Fu
                                                    ne
                                                 Zo
                                              ge
                                           Ed

                                                         63
BOULEVARDS
EMERALD NECKLACES

    Sidewalk View

                      W
                    RO
                               rian
                           est
                     Ped arway
                      C l e
                                       /     ne
                                     ng g Zo
                                 nti    n
                              Pla nishi
                                 u r
                               F
                                                  ne
                                               La
                                         cle
                                       Cy
                                                        r
                                                    ffe
                                               Bu

                                                           rking
                                                        Pa

                                                                   64
BOULEVARDS
NEIGHBOURHOOD CONNECTORS

    Sidewalk View

                      W
                    RO
                                rian
                            est
                      Ped arway
                       C l e
                                         /      ne
                                       ng g Zo
                                   nti    n
                              Pla nishi
                                    r
                                Fu             ne
                                            Zo
                                         ge
                                      Ed

                                             rking
                                          Pa

                                                     65
QUESTIONS & COMMENTS

»»This meeting is being recorded. Only presentations and
  presenters will be visible during the Question & Comment
  period.

»»We will answer as many questions as we can during this time.
  Outstanding answers to commonly asked questions from this
  meeting will be provided in the final consultation summary
  report.

»»You can also provide feedback and submit comments through
  the survey until March 14 available at haveyoursay.vaughan.ca

»»We ask that you keep questions and comments brief, so as to
  allow others time to participate.
                                                                  66
HOW TO PARTICIPATE

                                                       1. Raise your hand using the
                                                       “raise hand” button in the
                                                       Participants window. You will
                                                       be unmuted by a member of the
                                                       project team to speak.
    Type your question/     Raise/lower your hand      2. Phone-in participants must
     comment into the       using the “Raise Hand”     dial *9
    chat module. Ensure     icon in the Participants
   “Everyone” is selected             tab              3. Type your question into
                                                       the Chat window. Make sure
                                                       “Everyone” is selected”.

                                                       We will do our best to answer as
                                                       many questions as possible!

                                                                                          67
NEXT STEPS

»» Consider and incorporate input received       »» Develop guidance and recommendations
   to date into draft recommendations               for parks and open spaces

»» Survey (Feb 26 – March 14)                    »» Develop operations and maintenance
                                                    strategies, including cost estimates
»» Further develop the technical aspects of
   the plan                                      »» Finalize the Public Realm Guidelines and
                                                    Streetscape Master Plan (early summer)
»» Develop draft planting palettes for streets
   and other public spaces

                                                                                               68
THANK YOU FOR JOINING US!

                    PLEASE VISIT
              HAVEYOURSAY.VAUGHAN.CA
               TO COMPLETE THE ONLINE
           QUESTIONNAIRE BY MARCH 14, 2021

                                             69
You can also read