Request for Bids West Lafayette Fire Department Fire Station One 2021 Re-Roofing CDBG Project - City of West Lafayette, Indiana

Page created by Randy Mccoy
 
CONTINUE READING
Request for Bids West Lafayette Fire Department Fire Station One 2021 Re-Roofing CDBG Project - City of West Lafayette, Indiana
Request for Bids
                                           West Lafayette Fire Department
                                         Fire Station One 2021 Re-Roofing
                                                             CDBG Project

Contact:
Jeff Need

Fire Chief

West Lafayette Fire Department   Release Date: August 17, 2021
765-775-5179                     Deadline for Proposals: September 7, 2021
jneed@westlafayette.in.gov
                                 Notification of Award: September 14, 2021
Appendices:
Notice to bidders ...............................................................................................3
Project Narrative ...............................................................................................4
Existing Conditions and Bid Requirements .......................................................4
Wage Rates Notification ....................................................................................4
West Lafayette Provisions for Contracts ...........................................................5
HUD 5380EZ Form ...........................................................................................10
Davis-Bacon Wage Rates for July 2, 2021.......................................................16
NOTICE TO BIDDERS

The Board of Public Works and Safety of the City of West Lafayette, Indiana will receive sealed bids for Re-
roofing for the City of West Lafayette’s Fire Department Station 1 until the hour of 8:30 AM local time on
September 7, 2021, at the Office of the Clerk, Margerum City Hall 222 North Chauncey Avenue, West Lafayette,
IN 47906 for the completion of the work hereinafter listed. The project consists of re-shingling of West
Lafayette’s Fire Station 1 and is being funded by Community Development Block Grant (CDBG) funds, and as
such, is subject to meeting the requirements set forth by the United States Department of Housing and Urban
Development (HUD) for entitlement grantees. Wage rates on the project shall not be less than the Federal
Davis-Bacon wage scale published by the US Department of Labor.

All bids received by said time will be held unopened and then taken to the Board of Public Works meeting in the
City Council Chambers at Margerum City Hall, 222 North Chauncey, West Lafayette, IN and there be publicly
opened and read aloud. Late bids will be returned unopened. No oral, telephoned, telegraphed, facsimile, or
email bids or changes to bids will be considered.
Bids must be entered upon the bid form and the State Form 52414 (R2/ 3-13)/Form 96 (Revised 2013)
submitted with the bid and non-collusion affidavit properly executed, and must comply with the statutes of
Indiana and with the rules and regulation of the State Board of Accounts of Indiana. Bids shall be in a sealed
envelope marked “Re-roofing for the City of West Lafayette’s Fire Department Station 1”.

Bids remain in effect for thirty (30) days. The Board reserves the right to reject any or all bids and waive
irregularities of bidding. If you have any questions, please call 765-775-5150.

                                               Project Specifications

   •   All work shall be completed in 90 days of contract acceptance
   •   Old roofing system shall be removed down to decking, repairing/replacing any decking needing such
   •   The bid shall specify all work being completed
   •   The site is an active fire station, so the contractor shall work closely with fire department personnel to
       maintain response from the station
   •   The shingle system needs to meet the following rating
           o At least a Class G Wind Rating (120+ mph)
           o Class A Fire Rating
           o A Class 4 Impact Rating
           o Use of recycled materials where available

CITY OF WEST LAFAYETTE
BOARD OF PUBLIC WORKS & SAFETY
Sana G. Booker, Clerk

Published: August 19 and 26, 2021
Project Narrative & Existing
    Conditions
                                                                                         2

Project Narrative
The City of West Lafayette is requesting bids for the West Lafayette Fire Station 1
building, 300 N. Street, West Lafayette, IN, for the replacement of the current
deteriorating roof using Community Development Block Grant funding provided
by the U.S. Department of Housing & Urban Development. Currently, the
condition of the roof is causing damage to the interior of the structure. Our
overall goal is to replace the current roofing materials with like materials that are
approved by the Secretary of the Interior Standards for Historic Preservation and
local applicable regulation. The fire station is not currently designated in a local
historic district and does not need to go through the West Lafayette Historic
Preservation Commission, however, replacing with like kind is preferred.
Existing Conditions
    ▪   Roof is currently leaking in several places

Bid Requirements
•   All work shall be completed within 90 days of contract acceptance
•   Old roofing system shall be removed down to decking, repairing/replacing any
    decking needing such
•   The bid shall specify all work being completed
•   The site is an active fire station, so the contractor shall work closely with fire
    department personnel to maintain response from the station
•   The Shingle System needs to meet the following ratings:
        o At least a Class G Wind Rating (120+ mph)
        o Class A Fire Rating
        o A Class 4 Impact Rating
        o Use recycled materials where available

Wage Rates Notification
Wage rates on the project shall not be less than the Federal Davis-Bacon wage
scale published by the US Department of Labor. The prevailing wage rates
applicable to the project are in the attachments section. If project does not start
within 90 dates of the most current wage determination, then a new
determination will need to be used. Additional General Contract Conditions for
Small Construction/Development Contracts are included in the appendices.                     3
City of West Lafayette Provisions Required in All Contracts
This section is included as a courtesy to give advanced notice of requirements on
all city contracts. Please acknowledge ability to meet these requirements in the
Acknowledgments section of your proposal.

Prevailing Party – Attorney Fees
Notwithstanding any term or condition in this Contract to the contrary, in the
event litigation is commenced to enforce any term or condition of this Contract,
the prevailing party shall be entitled to costs and expenses of litigation including
a reasonable attorney fee.

E-Verify
[Selected Respondent] shall comply with E-Verify Program as follows:
      a. Pursuant to IC 22-5-18, [Selected Respondent] shall enroll in and verify
         the work eligibility status of all newly hired employees of [Selected
         Respondent] through the E-Verify Program (“Program”). [Selected
         Respondent] is not required to verify the work eligibility status of all
         newly hired employees through the Program if the Program no longer
         exists.
      b. [Selected Respondent] and its subcontractors shall not knowingly
         employ or contract with an unauthorized alien or retain an employee or
         contract with a person that [Selected Respondent] or its subcontractors
         subsequently learns is an unauthorized alien. If [Selected Respondent]
         violates this Section 7(b), the City of West Lafayette shall require
         [Selected Respondent] to remedy the violation not later than thirty (30)
         days after the City of West Lafayette notifies [Selected Respondent]. If
         [Selected Respondent] fails to remedy the violation within the thirty
         (30) day period, the City of West Lafayette shall terminate the contract
         for breach of contract. If the City of West Lafayette terminates the
         contract, [Selected Respondent] shall, in addition to any other
         contractual remedies, be liable to the City of West Lafayette for actual
         damages. There is a rebuttable presumption that [Selected
         Respondent] did not knowingly employ an unauthorized alien if
         [Selected Respondent] verified the work eligibility status of the
         employee through the Program.
      c. If [Selected Respondent] employs or contracts with an unauthorized
         alien but the City of West Lafayette determines that terminating the
         contract would be detrimental to the public interest or public property,
         the City of West Lafayette may allow the contract to remain in
         effect until the City of West Lafayette procures a new contractor.       4
d. [Selected Respondent] shall, prior to performing any work, require each
        subcontractor to certify to [Selected Respondent] that the
        subcontractor does not knowingly employ or contract with an
        unauthorized alien and has enrolled in the Program. [Selected
        Respondent] shall maintain on file a certification from each
        subcontractor throughout the duration of the Project. If [Selected
        Respondent] determines that a subcontractor is in violation of this
        Section 7(d), [Selected Respondent] may terminate its contract with the
        subcontractor for such violation. Such termination may not be
        considered a breach of contract by [Selected Respondent] or the
        subcontractor.
     e. By its signature below, [Selected Respondent] swears or affirms that it
        i) has enrolled and is participating in the E-Verify program, ii) has
        provided documentation to the City of West Lafayette that it has
        enrolled and is participating in the E-Verify program, and iii) does not
        knowingly employ an unauthorized alien.

Non-Discrimination
[Selected Respondent] agrees:
     a. That in the hiring of employees for the performance of work under this
        contract or any subcontract hereunder, no contractor, or subcontractor,
        nor any person acting on behalf of such contractor or subcontractor,
        shall, by reason of race, religion, color, sex, national origin or ancestry,
        discriminate against any citizen of the State of Indiana who is qualified
        an available to perform the work to which the employment relates;
     b. That no contractor, subcontractor, nor any person on his behalf shall, in
        any manner, discriminate against or intimidate any employee hired for
        the performance of work under this contract on account of race,
        religion, color, sex, national origin, or ancestry;
     c. That the City of West Lafayette may deduct from the amount payable to
        the contractor a penalty of five dollars ($5.00) for each person for each
        calendar day during which such person was discriminated against or
        intimidated in violation of the provisions of the contract;
     d. If there is a second or any subsequent violation of the terms or
        conditions of this section, then this contract may be cancelled or
        terminated by the City of West Lafayette and all money due or to
        become due hereunder will be forfeited.

                                                                                 5
Compliance with Accessibility
It is the intent and goal of the city to ensure that all new construction within the
City of West Lafayette shall comply with all ADA and PROWAG guidelines.
Pursuant to Title II regulations at 28CFR 35.151; and the 2004 ADAAG CFR part
1191, appendices B and D, the City of West Lafayette adopted the 2010 ADA SAD
standards for new construction and alterations for facilities, and also adopted the
Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right of
Way (PROWAG) as published July 26, 2011.
Facilities located within the City of West Lafayette, the 2010 ADA SAD standards
shall be met for new construction and alterations for projects within the City.
Facilities located within the right of way, PROWAG standards shall be met for new
construction and alterations for projects within the city.
Fair Housing Act (FHA) and Section 504 of the Rehabilitation Act, and the
Architectural Barriers Act (ABA) standards and guidelines shall be followed.
Accessibility guidelines shall be met on all projects requiring compliance with the
FHA, Section 504, or the ABA.
Projects found to not be in compliance with these standards and guidelines will
be accessed fines, as follows:

      •   Non-compliant fee ($250 per day), and a “Stop Work” order will be
          issued.
      •   If after (3) violations and (10) business days to correct non-compliance
          issues, your contract will be revoked.

Compliance with Title VI
It is the intent and goal of the city to ensure that all new construction within the
City of West Lafayette shall comply with the Title VI guidelines.
 [Selected Respondents] in accordance with Title VI of the Civil Rights Act of
1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal
Regulations, Department of Transportation, Subtitle A, Office of the Secretary,
Part 21, Nondiscrimination in Federally assisted programs of the Department of
Transportation and Title 23 Code of Federal Regulations, Part 200, Title VI
Program and Related Statues, issued pursuant to such Acts, hereby notifies all
bidders that it will affirmatively ensure that in any contract entered into pursuant
to this advertisement, disadvantaged business enterprises will be afforded full
opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of religion, race, color, national
                                                                                6
origin, sex, sexual orientation, gender identity, age, disability/handicap and low
income in consideration for an award.

                                                                                     7
CITY OF WEST LAFAYETTE NON-COLLUSION AFFIRMATION

STATE OF INDIANA
COUNTY OF: TIPPECANOE                SS:

The undersigned offeror or agent, duly swears, under penalties for perjury, that
he has not, nor has any other member, representative, or agent of the firm,
company, corporation or partnership represented by him, entered into any
combination, collusion or agreement with any person relative to the price to be
offered by any person nor to prevent any person from making an offer nor to
induce anyone to refrain from making an offer and that this offer is made without
reference to any other offer.

                                                                     Offeror (Firm)

                                                      Signature of Offeror or Agent

Before me, a Notary Public in and for said County and State personally appeared,
                                           , who acknowledged the truth of the
statements in the foregoing affirmation on this          day of                ,
20 .

My Commission Expires:

                                                            (written) Notary Public

                                                                          (printed)
                               County of Residence:

                                                                                      8
7/13/2021                                                       SAM.gov

        An official website of the United States government
        Here’s how you know

              You have 2 new alerts
              Show / Hide Alerts

    Wage
    Determination

      Overview

      Document

      History                       WAGE DETERMINATIONS
                                    Davis-Bacon Act WD #
                                    IN20210002
                                                                                           Wage Determination

                                           11

                                    State
                                    Indiana

                                    Counties
                                    Adams, Allen, Bartholomew, Benton, Blackford, Boone, Carroll, Cass,
                                    Clinton, Delaware, Fountain, Fulton, Grant, Hamilton, Hancock, Hendricks,
                                    Howard, Huntington, Jay, Johnson, Madison, Marion, Miami, Monroe,
                                    Montgomery, Morgan, Noble, Shelby, Steuben, Tippecanoe, Tipton,
                                    Wabash, Warren, Wells, White, Whitley

https://sam.gov/wage-determination/IN20210002/11                                                                1/50
7/13/2021                                                    SAM.gov

                                    Document                                  Download      Print

                                                     "General Decision Number: IN20210002 07/

                                           Superseded General Decision Number: IN20200002

                                           State: Indiana

                                           Construction Type: Building

                                           Counties: Adams, Allen, Bartholomew, Benton, Black
                                           Boone, Carroll, Cass, Clinton, DeKalb, Delaware, F
                                           Fulton, Grant, Hamilton, Hancock, Hendricks, Howar
                                           Huntington, Jay, Johnson, Madison, Marion, Miami,
                                           Montgomery, Morgan, Noble, Shelby, Steuben, Tippec
                                           Wabash, Warren, Wells, White and Whitley Counties

                                           BUILDING CONSTRUCTION(does not include single fami
                                           apartments up to and including 4 stories)

                                           Note: Under Executive Order (EO) 13658, an hourly
                                           of $10.95 for calendar year 2021 applies to all co
                                           subject to the Davis-Bacon Act for which the contr
                                           awarded (and any solicitation was issued) on or af
                                           1, 2015. If this contract is covered by the EO, t
                                           must pay all workers in any classification listed
                                           determination at least $10.95 per hour (or the app
                                           rate listed on this wage determination, if it is h
                                           all hours spent performing on the contract in cale
                                           2021. If this contract is covered by the EO and a
                                           classification considered necessary for performanc
                                           the contract does not appear on this wage determin
                                           contractor must pay workers in that classification
                                           wage rate determined through the conformance proce
                                           in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage ra
https://sam.gov/wage-determination/IN20210002/11                                                    2/50
7/13/2021                                                     SAM.gov

                                           higher than the conformed wage rate). The EO mini
                                           will be adjusted annually. Please note that this
                                           the above-mentioned types of contracts entered int
                                           federal government that are subject to the Davis-B
                                           itself, but it does not apply to contracts subject
                                           Davis-Bacon Related Acts, including those set fort
                                           5.1(a)(2)-(60). Additional information on contract
                                           requirements and worker protections under the EO i
                                           at www.dol.gov/whd/govcontracts.

                                            Modification Number         Publication Date
                                                      0                  01/01/2021
                                                      1                  01/29/2021
                                                      2                  02/12/2021
                                                      3                  02/26/2021
                                                      4                  03/12/2021
                                                      5                  03/26/2021
                                                      6                  04/09/2021
                                                      7                  04/23/2021
                                                      8                  04/30/2021
                                                      9                  05/07/2021
                                                      10                 06/25/2021
                                                      11                 07/02/2021

                                             ASBE0018-004 06/01/2020

                                           BARTHOLOMEW, BENTON, BOONE, CARROLL, CLINTON, DELA
                                           FOUNTAIN, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JO
                                           MADISON, MARION, MONROE, MONTGOMERY, MORGAN, SHELB
                                           TIPPECANOE, TIPTON, AND WARREN COUNTIES:

                                                                                 Rates      F

                                           ASBESTOS WORKER/HEAT & FROST
                                           INSULATOR (includes
                                           application of all insulating
                                           materials, protective
                                           coverings, coatings and

https://sam.gov/wage-determination/IN20210002/11                                                3/50
7/13/2021                                                     SAM.gov

                                           finishings to all types of
                                           mechanical systems)..............$ 32.85
                                           HAZARDOUS MATERIAL HANDLER
                                           (includes preparation,
                                           wettings, stripping, removal,
                                           scrapping, vacuuming, bagging
                                           & disposing of all
                                           insulation materials, whether
                                           they contain asbestos or not,
                                           from mechanical systems).........$ 23.00

                                             ASBE0041-002 03/01/2021

                                           ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTO
                                           MIAMI, NOBLE, STEUBEN, WABASH, WELLS AND WHITLEY C

                                                                             Rates          F

                                           ASBESTOS WORKER/HEAT & FROST
                                           INSULATOR (includes
                                           application of all insulating
                                           materials, protective
                                           coverings, coatings and
                                           finishings to all types of
                                           mechanical systems)..............$ 29.00
                                           HAZARDOUS MATERIAL HANDLER
                                           (includes preparation,
                                           wettings, stripping, removal,
                                           scrapping, vaccuming, bagging
                                           & disposing of all insulation
                                           materials, whether they
                                           contain asbestos or not, from
                                           mechanical systems)..............$ 23.00

                                             ASBE0075-003 06/01/2020

                                           CASS, FULTON and WHITE COUNTIES

                                                                             Rates          F

https://sam.gov/wage-determination/IN20210002/11                                                4/50
7/13/2021                                                     SAM.gov

                                           ASBESTOS WORKER/HEAT & FROST
                                           INSULATOR (includes
                                           application of all insulating
                                           materials, protective
                                           coverings, coatings and
                                           finishings to all types of
                                           mechanical systems)..............$ 32.00
                                           HAZARDOUS MATERIAL HANDLER
                                           (includes preparation,
                                           wetting, stripping, removal,
                                           scrapping, vaccuming, bagging
                                           & disposing of all insulation
                                           materials, whether they
                                           contain asbestos or not, from
                                           mechanical systems)..............$ 23.00

                                             BOIL0374-002 03/01/2018

                                                                                Rates       F

                                           BOILERMAKER......................$ 37.22

                                             BRIN0003-001 06/01/2020

                                           INDIANAPOLIS
                                           BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGO
                                           and SHELBY COUNTIES

                                                                                Rates       F

                                           Bricklayer, Stone Mason,
                                           Pointer, Caulking................$    32.85
                                           TERRAZZO FINISHER................$    20.52
                                           TERRAZZO WORKER/SETTER...........$    32.79
                                           Tile & Marble Finisher...........$    21.02
                                           Tile, Marble Setter..............$    32.04

                                             BRIN0004-004 06/01/2020

https://sam.gov/wage-determination/IN20210002/11                                                5/50
7/13/2021                                                                      SAM.gov

                                           FORT WAYNE
                                           ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN,
                                           WHITLEY COUNTIES:

                                                                                                                  Rates    F

                                           BRICKLAYER (STONE MASON,
                                           MARBLE MASONS, POINTER,
                                           CLEANER, AND CAULKER)............$                                     31.02
                                           Terrazzo Grinder Finisher........$                                     27.50
                                           Terrazzo Worker Mechanic.........$                                     31.68
                                           Tile Setter & Marble Mason
                                           Mechanic.........................$                                     27.00
                                           Tile, Marble & Terrazzo
                                           Finisher.........................$                                     24.38

                                             BRIN0004-021 06/01/2020

                                           BARTHOLOMEW and MONROE COUNTIES

                                                                                                                  Rates    F

                                           Bricklayer, Stonemason. ...................... $                        29.76
                                           TERRAZZO FINISHER. ................................. $                  20.52
                                           TERRAZZO WORKER/SETTER. ...................... $                        32.79
                                           Tile & Marble Finisher. ...................... $                        21.02
                                           Tile & Marble Setter; Mosaic
                                           Worker. .......................................................... $    32.04

                                             BRIN0011-001 06/01/2020

                                           LAFAYETTE
                                           BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WA
                                           WHITE COUNTIES

                                                                                                                  Rates    F

https://sam.gov/wage-determination/IN20210002/11                                                                               6/50
7/13/2021                                                             SAM.gov

                                           Bricklayer, Stonemason,
                                           Pointer, Caulker & Cleaner.......$                    30.26
                                           TERRAZZO FINISHER................$                    20.52
                                           TERRAZZO WORKER/SETTER...........$                    32.79
                                           Tile & Marble Finisher...........$                    21.02
                                           Tile & Marble Setter; Mosaic
                                           Worker...........................$                    32.04

                                             BRIN0018-001 06/01/2020

                                           CASS, FULTON, GRANT, HOWARD, MIAMI and WABASH COUN

                                                                                                 Rates      F

                                           Bricklayer, Stonemason,
                                           Pointer, Caulker & Cleaner. ............. $            30.28
                                           Terrazzo Worker Finisher. ................. $          30.00
                                           TERRAZZO WORKER/SETTER. ...................... $       32.71
                                           Tile & Marble Finisher. ...................... $       30.00
                                           Tile, Marble Setter.............................. $    31.71

                                             BRIN0019-001 06/01/2020

                                           MUNCIE CHAPTER
                                           BLACKFORD, DELAWARE, HAMILTON, JAY, MADISON AND TI

                                                                                                 Rates      F

                                           Bricklayer, Stonemason,
                                           Pointer, Caulker & Cleaner.......$                    31.26
                                           TERRAZZO FINISHER................$                    19.07
                                           TERRAZZO WORKER/SETTER...........$                    29.57
                                           Tile & Marble Finisher...........$                    19.96
                                           Tile & Marble Setter; Mosaic
                                           Worker...........................$                    28.98

                                           * CARP0215-001 06/01/2021

                                           BENTON, CARROLL, CLINTON,               TIPPECANOE, WARREN AND

https://sam.gov/wage-determination/IN20210002/11                                                                7/50
7/13/2021                                                     SAM.gov

                                           COUNTIES:

                                                                             Rates          F

                                           CARPENTER........................$ 31.76
                                           MILLWRIGHT.......................$ 31.01

                                             CARP0232-001 06/01/2020

                                           ALLEN, DEKALB, NOBLE, STEUBEN and WHITLEY COUNTIES

                                                                             Rates          F

                                           Carpenter & Piledrivermen........$ 26.47

                                             CARP0615-001 06/01/2020

                                           ADAMS, CASS, FULTON, GRANT, HOWARD, HUNTINGTON, MI
                                           WABASH and WELLS COUNTIES

                                                                             Rates          F

                                           Carpenter & Piledrivermen........$ 27.01

                                           * CARP0912-001 06/01/2021

                                                                             Rates          F

                                           CARPENTER
                                                ZONE 2: BOONE, FOUNTAIN,
                                                HENDRICKS, MONROE,
                                                MONTGOMERY AND MORGAN
                                                COUNTIES
                                                 Carpenters, Drywall........$ 30.39
                                                 Millwright.................$ 31.32
                                                ZONE 4: BLACKFORD,
                                                DELAWARE, JAY AND MADISON
                                                COUNTIES

https://sam.gov/wage-determination/IN20210002/11                                                8/50
7/13/2021                                                      SAM.gov

                                                   Carpenters, Drywall........$ 30.10
                                                   Millwright.................$ 31.03

                                           * CARP0912-002 06/01/2021

                                           HAMILTON, HANCOCK, JOHNSON (Townships of White Riv
                                           and Clark), MARION

                                                                               Rates        F

                                           Carpenters:
                                                Carpenters, Drywall
                                                Installers, Piledrivers.....$ 31.90
                                                Millwright..................$ 31.07
                                                Soft Floor Layers...........$ 28.85

                                           * CARP0999-008 06/01/2021

                                           BARTHOLOMEW, JOHNSON (Townships of Union, Hensley,
                                           Nineva, Needham and Blue River), SHELBY COUNTIES

                                                                               Rates        F

                                           Carpenters:
                                                Carpenters, Drywall
                                                Installers, Piledriver......$ 28.91
                                                Millwright..................$ 31.07
                                                Soft Floor Layers...........$ 28.85

                                             CARP1029-001 06/01/2020

                                           ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT
                                           HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI,
                                           JOSEPH, STEUBEN, TIPTON, WABASH, WELLS and WHITLEY

                                                                               Rates        F

https://sam.gov/wage-determination/IN20210002/11                                                9/50
7/13/2021                                                      SAM.gov

                                           MILLWRIGHT.......................$ 28.58

                                             ELEC0305-002 12/01/2020

                                           ADAMS, ALLEN, DE KALB, HUNTINGTON, NOBLE, STEUBEN,
                                           WHITLEY COUNTIES

                                                                               Rates          F

                                           ELECTRICIAN......................$ 34.69        9.02

                                           * ELEC0481-005 05/31/2021

                                           BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS,
                                           MADISON, MARION, MONTGOMERY, MORGAN AND SHELBY COU

                                                                               Rates          F

                                           ELECTRICIAN......................$ 36.30

                                             ELEC0538-006 01/01/2020

                                           FOUNTAIN AND WARREN COUNTIES:

                                                                               Rates          F

                                           ELECTRICIAN......................$ 35.30

                                             ELEC0668-002 01/01/2021

                                           BENTON, CARROLL, CASS, FULTON, TIPPECANOE and WHIT

                                                                               Rates          F

                                           ELECTRICIAN......................$ 34.14

                                               FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memo
                                               July 4th, Labor Day, Veterans Day Thanksgiving D

https://sam.gov/wage-determination/IN20210002/11                                                  10/50
7/13/2021                                                      SAM.gov

                                               Christmas Day

                                             ELEC0725-006 06/01/2020

                                           MONROE COUNTY

                                                                               Rates          F

                                           Communication Technician.........$ 28.67

                                               Includes the installation, operation, inspection
                                               maintenance, repair and service of radio, televi
                                               recording, voice sound and vision production and
                                               reproduction apparatus, equipment and appliances
                                               domestic, commercial, education, entertainment a
                                               telephone systems.

                                             ELEC0725-011 10/01/2020

                                           MONROE COUNTY:

                                                                               Rates          F

                                           ELECTRICIAN......................$ 37.98

                                             ELEC0855-003 06/01/2020

                                           BLACKFORD, DELAWARE, AND JAY COUNTIES

                                                                               Rates          F

                                           ELECTRICIAN......................$ 33.17

                                             ELEC0873-002 03/01/2021

                                           CLINTON, GRANT, HOWARD, MIAMI, TIPTON AND WABASH C

                                                                               Rates          F

https://sam.gov/wage-determination/IN20210002/11                                                  11/50
7/13/2021                                                      SAM.gov

                                           ELECTRICIAN......................$ 34.65

                                             ELEV0034-001 01/01/2021

                                                                               Rates             F

                                           ELEVATOR MECHANIC................$ 51.23         36.

                                               a) PAID HOLIDAYS: New Year's Day, Memorial Day,
                                               Day, Labor Day, Vetern's Day, Thanksgiving Day,
                                               after Thanksgiving, and Christmas Day.

                                               b) Employer contributes 8% of regular hourly rat
                                               pay credit for employee with more than 5 years o
                                               6% for less than 5 years' service.

                                             ELEV0044-002 01/01/2021

                                                                               Rates             F

                                           ELEVATOR MECHANIC................$ 53.07         36.

                                               a) PAID HOLIDAYS: New Year's Day, Memorial Day,
                                               Day, Labor Day, Vetern's Day, Thanksgiving Day,
                                               after Thanksgiving, and Christmas Day.

                                               b) Employer contributes 8% of regular hourly rat
                                               pay credit for employee with more than 5 years o
                                               6% for less than 5 years' service.

                                             ENGI0103-001 04/01/2016

                                           BENTON, CARROLL, CASS, CLINTON, GRANT, HOWARD, MIA
                                           TIPPECANOE, TIPTON, WABASH, and WHITE COUNTIES

                                                                               Rates             F

https://sam.gov/wage-determination/IN20210002/11                                                     12/50
7/13/2021                                                         SAM.gov

                                           Power equipment operators:
                                                   GROUP   1.....................$   33.06
                                                   GROUP   2.....................$   30.06
                                                   GROUP   3.....................$   28.49
                                                   GROUP   4.....................$   24.79

                                           POWER EQUIPMENT OPERATOR CLASSIFICATIONS

                                               GROUP 1: A-Frame Winch Truck, Air Compressors o
                                               cu.ft., Air Tugger, Autograde (CMI), Auto Patrol
                                               Ballast Regulator (RR), Batcher Plant (electrici
                                               concrete), Bending Machine (pipe), Bituminous Pl
                                               (engineer), Bituminous Plant, Bituminous Mixer T
                                               Plant, Bituminous Paver, Bituminous Roller, Buck
                                               Bull Dozer, Cable Way, Chicago Boom, Clamshell,
                                               Mixer (21 cu. ft. or over), Concrete Paver, Conc
                                               Pump(crete), Crane, Craneman, Crusher Plant, Der
                                               Derrick Boat, Dinkey, Dope Pots (pipeline), Drag
                                               Dredge Operator, Dredge Engineer, Drill Operator
                                               Elevating Grader, Elevator, Ford Hoe (or similar
                                               equipment), Forklift, Formless Paver, Gantry Cra
                                               Gradall, Grademan, Grout Pump, Helicopter Crew,
                                               Paver, High-Lift, Hoist, Hopto, Hough Loader (or
                                               type), Hydro Crane, Hydro Hammer, Locomotive Cra
                                               Locomotive, Mechanic, Mobile Mixer, Motor Crane,
                                               Machine, Multiple Tamping Machine (rr), Overhead
                                               Pile Driver, Pulls, Push Dozer, Push Boats, Roll
                                               foot), Ross Carrier, Scoop, Shovel, Side Boom, S
                                               Tail Boom, Tar Machine (pipeline), Throttle Valv
                                               Crane, Trench Machine, Welder (heavy duty), Truc
                                               Concrete Pump, Truck-Mounted Drill, Well Point,

                                               GROUP 2: Air Compressor (up to 600 cu. ft.), Br
                                               Float, Concrete Mixer (over 10s and under 21s),
                                               Spreader or Puddler, Deck Engine, Drill Helper,
                                               Vibrator Kompactor (earth or rock), Finishing Ma
                                               Gireman, Greaser (on grease facilities servicing
                                               equipment), Material Pump, Motor Boats, Motor Cr
                                               Portable Loader, Post Hole Digger, Power Broom,

https://sam.gov/wage-determination/IN20210002/11                                                  13/50
7/13/2021                                                      SAM.gov

                                               Roller, Roller-Wobble Whell (earth or rock), Spi
                                               (RR) Seamen Tiller, Spreader Rock, Sub Grader, T
                                               Machine, Truck Mounted Drill Oiler, Welding Mach
                                               Widener (apsco or similar type)

                                               GROUP 3: Air Compressor 210 cu ft & over, Bitum
                                               Distributor, Chair Cart, Concrete Curing Machine
                                               Saw, Dope Pot Power Agitated, Flex Plane, Form G
                                               Hydrohammer, Jacks Hydraulic Power Driven, Pavin
                                               Machine, Post Hole Digger, Roller Earth, Throttl
                                               Track Jack Power Driven, Tractor Farm Type, Truc
                                               Driver

                                               GROUP 4: Air Compressor (under 200 cu. fr. per
                                               Bituminous Distributor, Cement Gun, Concrete Saw
                                               Deck Hand Oiler, Earth Roller, Form Grader, Gene
                                               Guardrail Driver, Heater, Oiler, Paving Joint Ma
                                               Power Traffic Signals, Steam Jenny, Vibrator, Wa
                                               ""JLG"" Lifts and ""Scissor"" Lift or similar ma

                                             ENGI0103-002 04/01/2016

                                           BLACKFORD, DELAWARE, HAMILTON, HANCOCK, JAY, JOHNS
                                           MARION, and SHELBY COUNTIES

                                                                                Rates         F

                                           Power equipment operators:
                                                GROUP 1.....................$    34.80
                                                GROUP 2.....................$    33.85
                                                GROUP 3.....................$    29.80
                                                GROUP 4.....................$    26.10

                                           POWER EQUIPMENT OPERATOR CLASSIFICATIONS

                                               GROUP 1: Air Compressor (pressurizing shafts, t
                                               drivers); Air Tugger; Auto Patrol; Back Filler;
                                               Boom Cat; Boring Machine; Bull Dozer; Caisson Dr

https://sam.gov/wage-determination/IN20210002/11                                                  14/50
7/13/2021                                                      SAM.gov

                                               Machine; Cherry Picker; Compactor (with dozer bl
                                               Concrete Mixer (dual drum); Concrete plant; Conc
                                               Crane with all attachments; Crane- Electric over
                                               Derrick; Ditching Machine (18' and over); Dredge
                                               (when hoisting material or tools); Fork Lift (ma
                                               Formless Paver; Generator (power for welders of
                                               compressor); Gradall; Helicopter; Helicopter Win
                                               Operator; High Lift-Front End Loader; Hoist-Mate
                                               Personnel over 3 Floors; Locomotive; Mechanic on
                                               Mucking Machine; Panel Board Concrete Plant; Pil
                                               Push Cat; Scoop & Tractor; Scraper-Rubber Tired;
                                               Spreader-Tractor Mounted; Straddle Carrier-Ross
                                               Base Finish Machine (C.M.I. or smiliar); Tower C
                                               Tractor with Backhoe (over 1/2 yard); Welder (cr

                                               GROUP 2: A Frame Truck; Batcher Plant (automati
                                               Bending Machine-Power Driven; Bituminous Mixer;
                                               Paver; Bituminous Plant Engineer; Boatman; Bull
                                               Compactor or Tamper-Self Propelled; Concrete Mix
                                               ft. or over); Concrete Spreader-Power Driven; Di
                                               Engine; Ditching Machine; Ditching Machine (less
                                               Drilling Machine; Finish Machine & Bull Float; F
                                               Machine; Fireman-Pile Driving and Boilers; Fork
                                               Lift-Masonry & Material; Gunite Machine; Head Gr
                                               Hoist-Material and/or personnel 3 floors and und
                                               Mechanic in shop; Mesh Depresser-Mesh Placer; P.
                                               Concrete Belt Placer; Ruller-Asphalt, stone & su
                                               Sheepsfoot Roller- Self Propelled; Shop Mule; Sp
                                               Base Paver-Self Propelled; Sub Grader; Throttle
                                               air compressor or boiler; Tractor with Backhoe (
                                               under); Tractor-high lift-farm type; Tractor-Ind
                                               Type; Tractor with Winch; Well Points; Winch Tri

                                               GROUP 3: Air Compressor (210 cu. ft. & over); b
                                               Distributor; Chair Cart; Concrete Curing Machine
                                               Saw; Dope Pot Power Agitated; Flex Plane; Form G
                                               Hydrohammer; Jacks-Hydraulic-Power Driven; Minor
                                               opr. 3,4, or 5; Paving Joint Machine; Post Hole
                                               Roller-Earth; Throttle Valve; Track Jack-Power D
                                               Tractor-Farm Type; Truck Crane Driver

https://sam.gov/wage-determination/IN20210002/11                                                  15/50
7/13/2021                                                       SAM.gov

                                               GROUP 4: Air Compressor (less than 210 cu. ft.)
                                               Mixer (under 21cu. ft.); Conveyor; Generator; Me
                                               Heater; Oiler; Operator-2 pieces of miner equipm
                                               Broom; Pump; Welding Machine

                                             ENGI0103-007 04/01/2016

                                           ADAMS, ALLEN, DEKALB, HUNTINGTON, STEUBEN, WELLS,
                                           COUNTIES

                                                                                Rates          F

                                           Power equipment operators:
                                                GROUP 1.....................$    33.13
                                                GROUP 2.....................$    32.18
                                                GROUP 3.....................$    29.18
                                                GROUP 4.....................$    25.68

                                           POWER EQUIPMENT OPERATOR CLASSIFICATIONS

                                               GROUP 1: Air Tugger; Auto Patrol, Back Filler;
                                               Boom Cat; Boring Machine; Bull Dozer; Caisson Dr
                                               Machine; Cherry Picker; Compactor (with dozer bl
                                               Concrete Mixer (dual drum); Concrete Plant; Conc
                                               Crane with all attachments; Crane Electric overh
                                               Derrick; Ditching Machine (18"" and over); Dred
                                               Lift (machinery); Formless Paver; Gradall; Heli
                                               Helicopter Winch Operator; High Lift Front End L
                                               Hoist Material and/or personnel over 3 floors; L
                                               Mechanic on Job Site; Mucking Machine; Panel Boa
                                               Plant; Pile Driver; Push Cat; Scoop & Tractor; S
                                               Tubber Tired; Skid Steer Machine (grading and ba
                                               Spreader Tractor Mounted; Straddle Carrier Ross
                                               Base Finish Machine (C.M.I.or similar); Tower Cr
                                               Tractor with backhoe (over 1/2 yard); Welder for

                                               GROUP 2:   A-Frame Truck; Batcher Plant (automati

https://sam.gov/wage-determination/IN20210002/11                                                   16/50
7/13/2021                                                      SAM.gov

                                               Bending Machine Power Driven; Bituminous Mixer;
                                               Paver; Bituminous Plant Engineer; Boatman; Bull
                                               Compactor or Tamper Riding Only; Concrete Mixer
                                               or over); Concrete Spreader Power Driven; Dinkey
                                               Ditching Machine (less than 18"" riding only); D
                                               Machine; Elevators (when hoisting material or to
                                               Finish Machine and bull Float (excluding trowell
                                               machine); Fireman Pile Driving and Boilers; Guni
                                               Head Greaser; Hoist Material and/or personnel 3
                                               under; Mesh Depressor Mesh Placer; P.C.C. Concre
                                               Placer; Roller Asphalt, Stone & Sub Base; Sheeps
                                               Self Propelled; Shop Mule; Spreader or Base Pave
                                               Propelled; Sub Grader; Throttle Valve with Air C
                                               or Boiler; Tractor with Backhoe (1/2 yard & unde
                                               High Lift Farm Type; Tractor Industrial Type; Tr
                                               Winch; Winch Truck.

                                               GROUP 3: Bituminous Distributor; Chair Cart; Co
                                               Machine; Dewatering Sytems; Dope Pot Power Agita
                                               Plane; Fork Lift (masonry and material); Form Gr
                                               Hydrohammer; Jacks Hydraulic Power Driven; Pavin
                                               Machine; Post Hole Digger (machine Mounted); Rol
                                               Skid Steer Machine (fork lift and trasporting);
                                               Valve; Track Jack Power Driven; Tractor Farm Typ

                                               GROUP 4: Air Compressor (pressurizing shafts, t
                                               divers); Air Compressor (over 210 cu. ft.); Con
                                               Conveyor; Generators; Oiler; Operating minor equ
                                               Power Broom; Truck Crane Driver; Welding Machine
                                               amps (2 or more).

                                             ENGI0150-017 06/01/2020

                                           FULTON and NOBLE COUNTIES

                                                                               Rates          F

                                           POWER EQUIPMENT OPERATOR
                                                GROUP 1.....................$ 30.15

https://sam.gov/wage-determination/IN20210002/11                                                  17/50
7/13/2021                                                         SAM.gov

                                                   GROUP   2.....................$   28.80
                                                   GROUP   3.....................$   28.00
                                                   GROUP   4.....................$   27.20
                                                   GROUP   5.....................$   24.60

                                           POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

                                               GROUP 1: Mechanic, Asphalt Plant, Asphalt Sprea
                                               Grader; Batch Plant, Benoto (requires 2 Engineer
                                               and Throttle Valve, Boring Machine (road), Bulld
                                               engines of 140 net horse power or more) Caisson
                                               Central Redi-mix Plant, Concrete Conveyor System
                                               Power (over 27E cu. ft.), Concrete Paver (27E cu
                                               under), Concrete Pumps/Grout cncrete placer (Tru
                                               Mounted), Concrete Tower, Cranes and backhoes (a
                                               Cranes, Hammerhead Tower, Creter Crane, Derricks
                                               Forklift (capble of hoisting and mechanically mo
                                               horizontally), Grader, Elevating, Highlift Shove
                                               End Loaders (over 3 yd bucket), Hoists (2 or mor
                                               Locomotives (all), Laser screed, Motor Patrol, P
                                               and Skid Rig, Pre-Stress Machines, Pump Cretes &
                                               Types, Rock Drill (Self-Propelled), Rock Drill (
                                               propelled Truck Mounted), Scoops (tractor drawn)
                                               Paver, Tournapull, Tractor with Boom & Side Boom
                                               Machine (12 or more inches in width), Combinatio
                                               Front End Loader Machine with backhoe 1/2 yd buc
                                               attachments.

                                               GROUP 2: Air Compressor (600 cu. ft. and over),
                                               (over 3/4 cu. yd.), Boilers, Broom (all powered
                                               Bull Dozers with engines of less than 140 net ho
                                               combination backhoe front end loader 1/2 yf bskh
                                               under, Compressor and Throttle Valve, Concrete B
                                               (truck mounted), Concrete Mixer (of moore than 2
                                               capacity), Forklift (with fixed or tilt mast), G
                                               Engineer, Highlift shovel or front endloader 3 y
                                               and under, Hoists (1 drum), Hydrulic Boom Truck,
                                               Digger (vehicle mounted), Pump Cretes (squeze cr
                                               pumps, Gypsum, bulker , Rollers(all), Steam Gene
                                               Stone Crushers, Stradddle Buggies, Tractors, Win

https://sam.gov/wage-determination/IN20210002/11                                                  18/50
7/13/2021                                                       SAM.gov

                                               (with ""a"" frame.

                                               GROUP 3: Buck Hoist, Combination (small equipme
                                               .Conveyor (portable), Grouting Machine, Hoist El
                                               (material and personnel), Hydraulic Power Units,
                                               and Pile Driving, Stud Welder, Trenching Machine
                                               12 inches in width, Welding Machines (8 through

                                               GROUP 4: Bobcat (up to and including 3/4 cu. yd
                                               Compressor (over 210 cu. ft. and less than 600 c
                                               Generator (over 50 kw.), Heaters, Mechanical, Ho
                                               elevator, permanent installation), Hoist (automa
                                               (tugger single drum), Oilers, Pumps, Well Points
                                               electric submersible, Small Rubber Tired End Loa
                                               cu. yd. and under), Tractors (farm type) Welding
                                               (2 through 8).

                                           GROUP 5:    Bobcats and forklifts (commercial or res

                                             ENGI0181-004 04/01/2021

                                           BARTHOLOMEW COUNTY

                                                                               Rates          F

                                           Power equipment operators:
                                                GROUP A.....................$ 28.35
                                                GROUP B.....................$ 35.70

                                           POWER EQUIPMENT OPERATOR CLASSIFICATIONS

                                               GROUP A: A-frame winch truck, articulating dump
                                               (CMI), auto patrol, ballast regulator (RR), batc
                                               (electrical control concrete), bending machine (
                                               bituminous plant (engineer), bituminous plant, b
                                               mixer travel plant, bituminous paver, bituminous
                                               boring machine, buck hoist, bull dozer, cable wa
                                               boom, chimney hoist, clamshell, concrete mixer (
                                               or over), concrete paver, concrete pump (crete),

https://sam.gov/wage-determination/IN20210002/11                                                  19/50
7/13/2021                                                      SAM.gov

                                               construction elevator (Allmac or similar) creane
                                               creaneman, crawler backhoe, bcreawler high-lift,
                                               plant, derrick, derrick boat, dinkey, directiona
                                               machine, dope pots (pipeline), double drum tugge
                                               or air), dragline, dredge operator, dredge engin
                                               operator, elevating grader, extendable boom fork
                                               formless paver, gantry crane, gator (or similar
                                               tiller), gradeall, grader, grademan, greaser (on
                                               facility servicing heavy equipment), G.P.S. Syst
                                               equipment within the classificaitons), grout pum
                                               greaser, helicopter crew, Hetherington paver, ho
                                               (motorized, gas or disel), hydraulic crane, ghdr
                                               Industrial type forklift (over 9,000 lbs.), lase
                                               screed, laser or remote controlled equipment (wi
                                               classifications), locomotive crane, locomotive,
                                               mobile mixer, botor creane, mucking machine, mul
                                               tamping machine (RR) overhead crane, pile driver
                                               push dozer, push boats, roller (sheep foot), rou
                                               crain, R.T. backhoe, R.T. endloader, Ross carrie
                                               shovel, side boom, skidsteer loader (bobcat or s
                                               type), swing crane, tail boom, tar machine (pipe
                                               tower crane, trench machine, welder (heavy duty)
                                               mounted concrete pump, truck-mounted drill, vacu
                                               well point, whirleys

                                               GROUP B: Air compressor (1 or more, 600 cfm and
                                               compressor with throttle valve, bituminous distr
                                               brakeman, bullfloat, cement gun, concret mixer,
                                               say, soncrete spreader or puddlers, conveyor, de
                                               oiler, deck engine, drill helper, earth roller e
                                               vibrator compactor (earth or rock), elevator (in
                                               automatic), finishing machine fireman, form grad
                                               generator, guard-rail driver, heater, oiler, Ind
                                               type forklift (9,000 lbs and under), aterail pum
                                               boats, paving joint machine, post hole digger, p
                                               power traffic signals, rock roller, rock spreade
                                               (earth or rock), spike machine (RR), steam jenny
                                               grader, taping machine, gruck crane oiler, truck
                                               drill oiler Tugger (one-drum, air or electric)vi
                                               vibro-piling hammer- hydraulic hammer or auger,

https://sam.gov/wage-determination/IN20210002/11                                                  20/50
7/13/2021                                                      SAM.gov

                                               widener (apsco or similar type) welding machine,
                                               and scissor lifts or similar machine.

                                             ENGI0841-008 04/01/2020

                                           BOONE, FOUNTAIN, HENDRICKS, MONROE, MONGOMERY, MOR
                                           WARREN COUNTIES

                                                                               Rates          F

                                           Power equipment operators:
                                                GROUP 1.....................$ 32.25
                                                GROUP 2.....................$ 25.10

                                           POWER EQUIPMENT OPERATOR CLASSIFICATIONS

                                               GROUP 1: Power Cranes, Draglines, Derricks, Sho
                                               Gradalls, Mechanics, Tractor Highlift, Tournadoz
                                               Concret Mixers with Skip Tournamixer, Two-Drum M
                                               One-Drum Hoist with Tower or Boom, Cableways, To
                                               Machines, Motor Patrol, Boo Tractor, Boom or Win
                                               Winch or Hydraulic Boom Truck, Truck Crane, Tour
                                               Tractor Operating Scoops, Bulldozer, Push Tracto
                                               Planer, Finishing Machine on Asphalt, Large Roll
                                               Earth, Rollers on Asphalt Mix, Ross Carrier or S
                                               Machine, Gravel Processing Machine, Asphalt Plan
                                               Paver Operator, Farm Tractor with Half Yard Buck
                                               Backhoe Attachments, Dredge Engineer, or Dredge
                                               Central Mix Plant Engineer, CMI or Similar Type
                                               Truck or Skid Mounted Concrete Pump, Tower Crane
                                               Rock Crusher Plant, Concrete Plant Engineer, Dit
                                               Machine with Dual Attachment, Tractor Mounted Lo
                                               Cherry Picker, Hydro Crane, Standard or Dinkey L
                                               Scoopmobiles, Euclid Loader, Soil Cement Machine
                                               Filler, Elevating Machine, Power Blade, Drilling
                                               including Well Testing, Caissons, Shaft or any s
                                               Drilling Machines, Motor Driven Paint Machine, P
                                               Cleaning Machine, Pipe Wrapping Machine, Pipe Be

https://sam.gov/wage-determination/IN20210002/11                                                  21/50
7/13/2021                                                      SAM.gov

                                               Machine, Apsco Paver, Boring Machine, (Equipment
                                               Barber-Greene Loaders, Formless Paver, (Well Poi
                                               Concrete Spreader, Hydra Ax, Span Saw and Simila
                                               Marine Scoops, Brush Mulcher, Brush Burner, Mesh
                                               Tree Mover, Helicopter Crew (3), Piledriver-Skid
                                               Crawler, Stump Remover, Root Rake, Tug Boat Oper
                                               Refrigerating Machine, Freezing Operator, Chair
                                               Propelled, Hydra Seeder, Straw Blower Power Sub
                                               Bull Float, Finishing Machine, Self-Propelled Pa
                                               Breaker (Backhoe Attached), Lull (or Similar Typ
                                               Two Air Compressors, Compressors Hooked in Manif
                                               Overhead Crane, Chip Spreader, Mud Cat, Sull-Air
                                               (Except when used for Landscaping Work), Soil St
                                               (Seaman Tiller, Bo Mag, Rago Gator and Similar t
                                               Equipment), Tube Float, Spray Machine, Curing Ma
                                               Concrete or Asphalt Milling Machine, Snooper Tru

                                               GROUP 2: Concrete Mixers without Skips, Rock Cr
                                               Ditching Machine Under 6', Curbing Machine, One
                                               Machines without Tower or Boom, Air Tugger, Self
                                               Concrete Saw, Machin- Mounted Post Hole Digger,
                                               Generators, Water Pumps, or Welding Machines, wi
                                               Air Compressor 600 cu. ft. and Under, Rollers on
                                               and Seal Coat Surfaces, Fork Lifts (When used fo
                                               Landscaping Work), Concrete and Blacktop Curb Ma
                                               Tractor with less than Half Yard Bucket, One Wat
                                               Iolers, Air Valves or Steam Valves, One Welding
                                               Truck Jack, Mud Jack, Gunnite Machine, House Ele
                                               used for Hoisting Material, Engine Tenders, Wago
                                               Flex Plane, Conveyor, Siphons nad Pulsometer, Sw
                                               Fireman on Paint Pots, Fireman on Asphalt Plants
                                               Distributor Operators on Trucks, Tampers, Self-P
                                               Power Broom, Striping Machine (motor driven), Fo
                                               Bulk Cement Plan Equipment Greaser, Deck Hands,
                                               Oiler Driver, Cement Blimps, Form Grader, Tempor
                                               Throttle Valve, Farm Tractor, Super Sucker (and
                                               type of equipment). FOOTNOTE: Employees operat
                                               from 149 ft. to 199 ft. including jib, shall rec
                                               additional seventy five cents (.75)per hour abov
                                               Employees operating booms over 199 ft. including

https://sam.gov/wage-determination/IN20210002/11                                                  22/50
7/13/2021                                                      SAM.gov

                                               receive an additional one dollar and twenty-five
                                               ($1.25) per hour above the regular rate.

                                             IRON0022-004 06/01/2020

                                           BARTHOLOMEW; BENTON, BOONE; CARROLL; CASS; CLINTON
                                           2/3); FOUNTAIN; FULTON (SW 1/4 OF COUNTY); GRANT (
                                           HAMILTON; HANCOCK; HENDRICKS; HOWARD; JOHNSON; MAD
                                           MIAMI; MONROE; MONTGOMERY; MORGAN; SHELBY; TIPPEC
                                           WARREN AND WHITE COUNTIES

                                                                               Rates          F

                                           IRONWORKER.......................$ 33.79

                                               The following holidays shall be observed: New Ye
                                               Memorial Day, Independence Day, Labor Day, Thank
                                               and the day after Thanksgiving and Christmas Day
                                               holiday which occurs on a Sunday shall be observ
                                               following Monday, unless the legal observance of
                                               holidays is changed by law.

                                             IRON0147-004 06/01/2020

                                           ADAMS, ALLEN, BLACKFORD, DEKALB, DELAWARE (NORTHEA
                                           COUNTY), FULTON (EASTERN PART), GRANT (EXCLUDING S
                                           PORTION), HUNTINGTON, JAY, MIAMI (NORTHEAST HALF),
                                           (EXCLUDING NORTHEAST TIP), STEUBEN, WABASH, WELLS,
                                           COUNTIES

                                                                               Rates          F

                                           IRONWORKER.......................$ 29.58

                                             IRON0292-006 06/01/2020

https://sam.gov/wage-determination/IN20210002/11                                                  23/50
7/13/2021                                                      SAM.gov

                                           FULTON (Remainder of County) and NOBLE (Northeaste
                                           COUNTIES

                                                                               Rates          F

                                           IRONWORKER.......................$ 31.75

                                             LABO0120-001 06/01/2020

                                           MARION and SHELBY COUNTIES

                                                                               Rates          F

                                           Laborers:
                                                GROUP 1.....................$ 24.39
                                                GROUP 2.....................$ 25.14
                                                GROUP 3.....................$ 25.39

                                           LABORER CLASSIFICATIONS

                                               GROUP 1: Building and Construction Laborers; Sc
                                               Builders (other than for Masons and Plasterers);
                                               Tenders; Window Washers and cleaners; Railroad W
                                               Masonry Wall Washers; Portable Water pumps with
                                               up to (3) inches; Flag & Signal Person; Waterpro
                                               Handling of Creosot Lumber or like treated mater
                                               (excluding railroad material); Asphalt Rakers an
                                               Kettlemen; Air Tool Operators; Pneumatic Tool Op
                                               Air and Electric Vibrators and Chipping Hammer O
                                               Earth Compactors Jackmen and Sheetmen working Di
                                               deeper than (6) ft.in depth; Laborers working in
                                               (6) ft.in depth or deeper; Assembly of Unicrete
                                               Saw and Demolition Saw; Tile Layers (sewer or fi
                                               Sewer Pipe Layer (metallic or non-metallic); Mot
                                               Wheelbarrows and Concrete Buggies; Hyster Operat
                                               Crete Assemblers; Concrete Conveyor Assemblers;
                                               Operators; Cement, Lime or Silica Clay Handlers
                                               bag); Handling of Toxic Materials damaging to cl
                                               Pneumatic Spikers; Deck Engine and Winch Operato

https://sam.gov/wage-determination/IN20210002/11                                                  24/50
7/13/2021                                                      SAM.gov

                                               Main and Cable Ducking (metallic and non-metall
                                               Man or Screw Operator on Asphalt Paver; Asbestos
                                               and Hazardous Waste Removal.

                                               GROUP 2: Plaster Tenders; Mason Tenders; Mortar
                                               Welders (Acetylene or electric); Cutting Torch o
                                               Cement Nozzle Laborers; Cement Gun Operator; Sca
                                               Builders when working for Plasterers and Masons;
                                               Blast Machine.

                                               GROUP 3: Dynamite men, Drillers-air track or wa
                                               for explosives.

                                             LABO0204-001 06/01/2020

                                           FOUNTAIN, HENDRICKS, and WARREN COUNTIES

                                                                                Rates            F

                                           Laborers:
                                                Caisson and Tunnel Work in
                                                Compressed and Free Air
                                                 GROUP 1....................$    23.18
                                                 GROUP 2....................$    23.93
                                                 GROUP 3....................$    24.18
                                                 GROUP 4....................$    23.13
                                                LABORERS
                                                 GROUP 1....................$    23.18
                                                 GROUP 2....................$    23.93
                                                 GROUP 3....................$    24.18

                                           LABORER CLASSIFICATIONS

                                               GROUP 1: Building and Construction Laborers; Sc
                                               Builders (other than for Masons and Plasterers);
                                               Tenders; Window Washers and cleaners; Railroad W
                                               Masonry Wall Washers; Portable Water pumps with
                                               up to (3) inches; Flag & Signal Person; Waterpro
                                               Handling of Creosot Lumber or like treated mater

https://sam.gov/wage-determination/IN20210002/11                                                     25/50
7/13/2021                                                      SAM.gov

                                               (excluding railroad material); Asphalt Rakers an
                                               Kettlemen; Air Tool Operators; Pneumatic Tool Op
                                               Air and Electric Vibrators and Chipping Hammer O
                                               Earth Compactors Jackmen and Sheetmen working Di
                                               deeper than (6) ft.in depth; Laborers working in
                                               (6) ft.in depth or deeper; Assembly of Unicrete
                                               Chain Saw and Demolition Saw; Tile Layers (sewer
                                               and Sewer Pipe Layer (metallic or non-metallic);
                                               driven Wheelbarrows and Concrete Buggies; Hyster
                                               Pump Crete Assemblers; Concrete Conveyor Assembl
                                               Drill Operators; Cement, Lime or Silica Clay Han
                                               or bag); Handling of Toxic Materials damaging to
                                               Pneumatic Spikers; Deck Engine and Winch Operato
                                               Main and Cable Ducking (metallic and non- metal
                                               Screed Man or Screw Operator on Asphalt Paver, A
                                               Removal, Hazardous Waste Removal.

                                               GROUP 2: Plaster Tenders; Mason Tenders; Mortar
                                               Welders (Acetylene or electric); Cutting Torch o
                                               Cement Nozzle Laborers; Cement Gun Operator; Sca
                                               Builders when working for Plasterers and Masons;
                                               Blast Machine.

                                               GROUP 3: Dynamite men, Drillers-air track or wa
                                               for explosives.

                                               LABORER CLASSIFICATIONS For CAISSON AND TUNNEL W
                                               COMPRESSED and FREE AIR

                                               GROUP 1: Cage Tenders, Dump Men, Flagman, Signal
                                               Laborers, Rod Men.

                                               GROUP 2: Concrete Repairmen, Lock Tenders (press
                                               Motor men, Muckers, Grout Machine, Track Layers,
                                               Key Board, Agitator Car, Car Pushers, Concrete L
                                               Grout Laborers, Lock Tenders (free air side), St
                                               Setters, Tuggers, Switchmen.

                                               GROUP 3: Mucking Machine, Laser Beam, Liner Plat
                                               Setter, Shield Drivers, Power Knife, Welders Bur

https://sam.gov/wage-determination/IN20210002/11                                                  26/50
7/13/2021                                                      SAM.gov

                                               Jacking Machine, Skinners, Maintenance Technicia
                                               Bricklayer Tenders, Concrete Blowers, DRillers,
                                               Form Men, Jackhammermen, Mining Machine.

                                               GROUP 4: Dynamite Men, Drillers air track or wag
                                               for explosives.

                                             LABO0213-001 06/01/2020

                                           ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN,
                                           AND WHITLEY COUNTIES

                                                                               Rates           F

                                           Laborers:
                                                GROUP 1.....................$ 21.28
                                                GROUP 2.....................$ 21.78
                                                GROUP 3.....................$ 22.28

                                           LABORERS CLASSIFICATION

                                               GROUP 1: Building and Construction Laborers; Sc
                                               Builders (other than for Masons and Plasterers);
                                               Tenders; Window Washers and cleaners; Railroad W
                                               Masonry Wall Washers; Portable Water pumps with
                                               up to (3) inches; Flag & Signal Person; Waterpro
                                               Handling of Creosot Lumber or like treated mater
                                               (excluding railroad material); Asphalt Rakers an
                                               Kettlemen; Air Tool Operators; Pneumatic Tool Op
                                               Air and Electric Vibrators and Chipping Hammer O
                                               Earth Compactors Jackmen and Sheetmen working Di
                                               deeper than (6) ft.in depth; Laborers working in
                                               (6) ft.in depth or deeper; Assembly of Unicrete
                                               Layers (sewer or field) and Sewer Pipe Layer (me
                                               non-metallic); Motor driven Wheelbarrows and Con
                                               Buggies; Hyster Operators; Pump Crete Assemblers
                                               Drill Operators; Cement, Lime or Silica Clay Han
                                               or bag); Handling of Toxic Materials damaging to

https://sam.gov/wage-determination/IN20210002/11                                                   27/50
7/13/2021                                                      SAM.gov

                                               Pneumatic Spikers; Deck Engine and Winch Operato
                                               Main and Cable Ducking; Screed Man or Screw Op
                                               Asphalt Paver; Chain and Demolition Saw Operato
                                               Concrete Conveyor Assemblers

                                               GROUP 2: Plaster Tenders; Mortar Mixers; Welders
                                               or electric); Cutting Torch or Burner; Cement No
                                               Laborers; Cement Gun Operator; Scaffold Builders
                                               working for Plasterers; Water Blast Machine

                                               GROUP 3: Dynamite men-drillers-air track or wago
                                               for explosives

                                             LABO0274-001 06/01/2020

                                           BENTON, BOONE, CARROLL, CASS, CLINTON, FULTON, HOW
                                           MONTGOMERY, TIPPECANOE, TIPTON, and WHITE COUNTIES

                                                                               Rates          F

                                           Laborers:
                                                GROUP 1.....................$ 23.23
                                                GROUP 2.....................$ 23.98
                                                GROUP 3.....................$ 24.23

                                           LABORER CLASSIFICATIONS

                                               GROUP 1: Building and construction laborers; Sca
                                               builders (other than for masons or plasterers);
                                               Workers; Masonry Wall Washers (interior & exteri
                                               Portable Water Pumps with Discharge of Up to Thr
                                               Inches; Handling of Creosote Lumber or Like Trea
                                               Material (excluding railroad material); Asphalt
                                               Lutemen; Earth Compactors; Jackmen and Sheetmen
                                               Ditches Deeper than Six (6) Feet in Depth; Labor
                                               Ditches Six (6) Feet in Depth or Deeper; Assembl
                                               Unicrete Pump; Tile Layers (sewer or field) and
                                               Layers (metallic or non-metallic); Motor Driven

https://sam.gov/wage-determination/IN20210002/11                                                  28/50
7/13/2021                                                      SAM.gov

                                               Wheelbarrows and Concrete Buggies; Hyster Operat
                                               Crete Assemblers; Core Drill Operators; Cement,
                                               Silica Clay Handler (bulk or bag); Handling of T
                                               Material Damaging to Clothing; Pneumatic Spikers
                                               Engine and Winch Operators; Water Main and Cable
                                               (metallic and non-metallic); Screed Man or Screw
                                               on Asphalt Paver; Chain Saw and Demolition Saw O
                                               Concrete Saw; Concrete Conveyor Assemblers; Appl
                                               Curing Compound; Sinking of Wellpoints; Dewateri
                                               Systems

                                               GROUP 2: Plaster Tenders; Mason Tenders; Mortar
                                               Welders (acetylene or electric); Cutting Torch o
                                               Cement Nozzle Laborers; Cement Gun Operators; Sc
                                               Builders for Plasterers; Scaffold Builders for M
                                               Water Blast Machine Operators, Air and Electric
                                               and Chipping Hammer Operators; Asbestos Removal;
                                               Waste Removal; All Boiler Setters Laborers, incl
                                               Expediters, Bottom Men, Bell Men, and Mason Tend

                                               GROUP 3: Dynamite man, Drillers-air track or wag
                                               explosives.

                                             LABO0741-003 06/01/2020

                                           BARTHOLOMEW, JOHNSON, MONROE, and MORGAN COUNTIES

                                                                               Rates           F

                                           Laborers:
                                                GROUP 1.....................$ 23.13
                                                GROUP 2.....................$ 23.88
                                                GROUP 3.....................$ 24.13

                                           LABORERS CLASSIFICATIONS

                                               GROUP 1: Building and Construction Laborers; Sca
                                               Builders (other than for masons or plastersrs);
                                               Workers; Masonry Wall Washers (interior & exteri

https://sam.gov/wage-determination/IN20210002/11                                                   29/50
7/13/2021                                                      SAM.gov

                                               Portable Water Pumps with Discharge up to three
                                               Handling of Creosote Lumber or Like Treated Mate
                                               (excluding railroad material); Asphalt Rakers an
                                               Earth Compactors; Jackmen and Sheetmen Working D
                                               Deeper than Six (6) Feet in Depth; Laborers Work
                                               Six (6) Feet in Depth or Deeper; Assembly of Uni
                                               Tile Layers (sewer or field) and Sewer Pipe Laye
                                               (metallic or non-metallic); Motor Driven Wheelba
                                               Concrete Buggies; Hyster Operators; Pump Crete A
                                               Core Drill Operators; Cement, Lime or Silica Cla
                                               (bulk or bag); Handling of Toxic Material Damagi
                                               Clothing; Pneumatic Spikers; Deck Engine and Win
                                               Operators; Water Main and Cable Ducking (metalli
                                               non-metallic); Screed Man or Screw Operator on A
                                               Paver; Chain Saw and Demolition Saw Operators; C
                                               Saw; Concrete Conveyor Assemblers; Applying of C
                                               Compound; Sinking of Wellpoints; Dewatering Head

                                               GROUP 2: Plaster Tenders; Mason Tenders; Mortar
                                               Welders (acetylene or electric); Cutting Torch o
                                               Cement Nozzle Laborers; Cement Gun Operators; Sc
                                               Builders for Plasterers; Scaffold Builders for M
                                               Water Blast Machine Operators; Air Tool Operator
                                               Pneumatic Tool Operators, Air and Electric Vibra
                                               Chipping Hammer Operators; Asbestos Removal; Haz
                                               Waste Removal; Biler Setters Laborers, including
                                               expediters, bottom men, bell men, and Mason Tend

                                               GROUP 3: Dynamite men; Drillers-air track or wa
                                               for explosives

                                             LABO1112-001 06/01/2020

                                           BLACKFORD, DELAWARE, GRANT, HAMILTON, HANCOCK, HEN
                                           MADISON COUNTIES

                                                                               Rates             F

https://sam.gov/wage-determination/IN20210002/11                                                     30/50
7/13/2021                                                       SAM.gov

                                           Laborers:
                                                   GROUP 1.....................$ 22.81
                                                   GROUP 2.....................$ 23.56
                                                   GROUP 3.....................$ 23.81

                                           LABORER CLASSIFICATIONS

                                               GROUP 1: Building and construction laborers, sc
                                               builders (other than for masons of plasterers),
                                               tenders, window washers and cleaners, railroad w
                                               masonry wall washers, portable water pumps with
                                               up to 3 inches, signal & flag person, Waterproof
                                               hauling of creosote lumber or like treated mater
                                               (excluding railroad material), asphlat rakers an
                                               kettlemen, air tool operator, pneumatic tool ope
                                               & electric vibrators and chipping hammer operato
                                               compactors, jackman & sheetmen in ditches more t
                                               deep, laborers in ditches 6' deep or deeper, ass
                                               unicrete pump, tile layers (sewer or field), sew
                                               layers, motor- driven wheelbarrows and concrete
                                               hyster operator, pumpcrete assemblers, core dri
                                               operator, cement, lime or silica clay handlers,
                                               toxic materials damaging to clothing, pneumatic
                                               deck engine & winch operator, water main & cable
                                               screed man or screw operator on asphalt paver, c
                                               demolition saw operator, concrete conveyor assem

                                               GROUP 2: Plaster tenders; mortar mixers; welders
                                               or electric); cutting torch or burner; cement no
                                               laborers; cement gun operators; scaffold builder
                                               plasterers; scaffold builders for masons; water
                                               machine operator; Air tool Operators and all Pnu
                                               Operators, Air and Electric Vibrators and Chippi
                                               Operators; Asbestos removal; Hazardous waste rem
                                               Boiler Setters Laborers, including expediters, b
                                               bell men, and Mason Tenders

                                               GROUP 3: Dynamite men-drillers-air track or wag
                                               for explosives

https://sam.gov/wage-determination/IN20210002/11                                                  31/50
7/13/2021                                                     SAM.gov

                                             PAIN0047-003 06/01/2020

                                           BARTHOLOMEW, BOONE, HAMILTON, HANCOCK, HENDRICKS,
                                           MARION, MONROE, MORGAN AND SHELBY COUNTIES:

                                                                             Rates             F

                                           PAINTER
                                                Brush and Roller............$ 26.23
                                                Spray and Sandblasting......$ 27.23

                                             PAIN0080-001 06/01/2020

                                           BENTON, CARROLL, CASS, CLINTON, FOUNTAIN, MONTGOME
                                           AND WARREN COUNTIES

                                                                             Rates             F

                                           PAINTER
                                                Brush and Roller............$ 25.05
                                                Spray and Sandblasting......$ 26.00

                                             PAIN0091-005 06/01/2020

                                           FULTON COUNTY

                                                                             Rates             F

                                           PAINTER
                                                Brush & Roller, Drywall
                                                Taping & Finishing,
                                                Vinyl/Paper Hanging.........$ 27.00
                                                Spray.......................$ 27.50

                                             PAIN0460-002 06/01/2020

                                           WHITE COUNTY

https://sam.gov/wage-determination/IN20210002/11                                                   32/50
7/13/2021                                                     SAM.gov

                                                                                Rates       F

                                           Painters:
                                                Brush & Roller..............$ 37.85
                                                Drywall Finisher............$ 35.85

                                             PAIN0469-001 06/01/2020

                                           ADAMS, ALLEN, DEKALB, GRANT, HUNTINGTON, NOBLE, ST
                                           WABASH, WELLLS, and WHITLEY COUNTIES

                                                                                Rates       F

                                           Painters:
                                                Brush, Roller,
                                                Paperhanger, & Drywall
                                                Finishing...................$   22.86
                                                Lead Abatement..............$   27.66
                                                Spray & Sandblast Pot
                                                Tenders and Ground
                                                Personnel...................$   22.86
                                                Spray, Sandblast, Power
                                                Tools, Waterblast, & Steam
                                                Cleaning....................$   22.86

                                             PAIN0669-001 05/01/2021

                                           BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, HOW
                                           MADISON, MIAMI, RANDOLPH, RUSH, TIPTON, UNION and

                                                                                Rates       F

                                           Painters:
                                                Brush; Roller;
                                                Paperhanging; Drywall
                                                Finishers...................$ 21.70
                                                Spray/Waterblasting;

https://sam.gov/wage-determination/IN20210002/11                                                33/50
7/13/2021                                                       SAM.gov

                                                   Sandblasting................$ 22.70

                                             PAIN1165-010 07/01/2020

                                           FULTON COUNTY

                                                                                Rates       F

                                           GLAZIER..........................$ 29.56

                                             PAIN1165-013 07/01/2020

                                           ADAMS, ALLEN, BLACKFORD, DEKALB, GRANT, HUNTINGTON
                                           STEUBEN, WABASH, WELLS, WHITLEY

                                                                                Rates       F

                                           GLAZIER..........................$ 26.57

                                             PAIN1165-016 01/01/2021

                                           BARTHOLOMEW, BENTON, BOONE, CARROLL, CASS, CLINTON
                                           FOUNTAIN, HAMILTON, HANCOCK, HENDRICKS, HOWARD, JO
                                           MADISON, MARION, MIAMI, MONROE, MONTGOMERY, MORGAN
                                           TIPPECANOE, TIPTON, WARREN, and WHITE COUNTIES

                                                                                Rates       F

                                           GLAZIER..........................$ 29.36

                                             PLAS0101-002 06/01/2018

                                           FULTON COUNTY

                                                                                Rates       F

                                           CEMENT MASON/CONCRETE FINISHER...$ 28.84
                                           PLASTERER........................$ 26.81

https://sam.gov/wage-determination/IN20210002/11                                                34/50