Magnitude 313 Magna Park Milton Keynes - glp.com/eu
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Magnitude 313 Magna Park Milton Keynes Speculative development 313,620 sq ft 29,136 sq m 19m clear height Practical completion 24 August 2020 Enhanced 2020 spec MK17 8EW glp.com/eu Computer generated image
Magna Park Milton Keynes Strategic The story opportunity so far... The development of Milton Keynes began its formal designation as a new town on 8 24hr Cambridge/ Oxford Arc 23 January 1967. It was built to help alleviate Strategic Occupiers Security London’s housing problem and to provide position a commercial centre for Buckinghamshire. 60,000 residents in 1967 grew to 261,800 in 2015 and is projected to be over 300,000 by 2027. A strategic location, that underpins the success of M1 M1 M25 Magna Park, Milton Keynes is the city of choice to service the South East and the Midlands. Junction 13 Junction 14 36 miles 2 miles (5 mins) 3 miles (10 mins) (45 mins) Proven Fully Market strategic Landscaped Leading location Eco Specification environment
Magnitude 313 Key statistics 19m clear internal height (From internal ground floor level) Built for Storage Energy Increased Sustainability logistics capacity supply parking and well being 33 76,370 4 1000KVA 354* Excellent Dock VNA pallet Potential Incoming Car parking BREEAM levellers positions mezzanine levels power supply spaces fit-out rating 4 57,070 50% 18 A Level access Wide aisle Solar PV ready Electric car EPC Providing additional doors positions power charging bays Rating 19m 881,785 82 Clear internal sq ft of mezzanine HGV parking height capacity spaces 50m 80 Internal ground Yard KN psm depth Floor load floor level 1.2m dock wall height * Includes electric car charging bays
Magna Park Milton Keynes Computer generated image Magnitude Strategic locaon 313 Strategic location A proven strategic locationfor UK’s leading brands — placed between Junctions 13 and 14 of the M1. Magnitude 313 is a speculative development Sustainable offering 313,620 sq ft of highly specified benefits distribution and logistics space. Strategically located on the east side of Milton Keynes, Magnitude 313 sits adjacent to the A421 which offers Enhanced easy access to the M1 via junctions 13 and 14. 2020 spec Sustainable benefits Built into every development The new units will feature The development benefits from a best-in-class at no extra cost including water the enhanced GLP 'standard' specification, including a 50 m yard depth, 19 m harvesting and optimising specification 2020 — with a range clear internal height, 33 dock levellers and natural light. of cutting edge enhancements 4 level access doors. throughout. Distribution and logistics warehouse Strong 313,620 sq ft labour pool 29,136 sq m Strong labour pool 2,000 employees in Milton Keynes 1 work in ‘Warehousing and support activities for transportation’.
A607 A1 A1 A47 A47 A47 Norwich 101 A511 A Telford A41 A449 7 6 22 A46 5 4 12 11 A47 A606 Magna Park Milton Keynes 3 11 T6 M1 M42 M54 A1 Tamworth 2 1 T4 A47 12 2 10 A444 A47 Peterborough A1 21 A47 A1 46 A12 A 6003 10 A1139 34 Wolverhampton 43 Walsall A10 9 A11 A4 3 T3 A1 A458 A454 8 7 A38 A6 17 M6 9 Nuneaton A140 Dudley T1 05 1 16 41 1 6 A6 A strategic location, that M69 A5 A1 2 43 A458 A427 Birmingham 4 A1(M) M6 3 A1 Stourbridge 5 3 20 A1066 06 6 A6 A442 A45 2 A1 A449 M1 41 16 Coventry M6 1 A1 A1 underpins the success 5 A14 A11 42 A452 4 Rugby A143 A134 4 2 A14 5 A1 A448 3 A4 4a 3a A46 18 A456 M42 M45 A43 A11 42 16 17 A12 A508 0 of Magna Park Milton Keynes A1 Redditch Leamington A45 A14 A140 5 A1 15 14 Spa A425 A45 A14 A435 A14 M5 13 16 A428 A6 A428 Cambridge 6 15a A44 Worcester A422 A46 12 A423 15 12 A11 A12 11 7 A428 4 A46 Bedford A14 A13 M40 A508 A44 A509 M1 A429 05 10 Ipswich Magna Park Milton Keynes is situated within A5 A5 A1 A421 the Oxford/Cambridge Arc. Banbury ✓⃝ Access to over 54.8 million people 11 A43 Milton 14 Magna Park Milton Keynes A14 8 A505 1 A46 Keynes 13 A6 10 Situated 6 miles from Milton Keynes station, and within a 4.5 hour HGV drive A10 A12 A44 approximately 50 miles north of London and 71 miles 31 M1 M11 2 9 A421 Felixstowe A1 49 M50 9 south of Birmingham, the town sits within the Oxford/ A5 12 ✓⃝ The National Infrastructure Commission A4 M5 10 A4421 0 Cambridge Arc, planned to benefit from significant Colchester A12 8 projects that the Oxford/Cambridge Arc 3 11a 4 A4 Luton Stevenage infrastructure improvements and up to 1 million new A40 11 Cheltenham 4 M40 Dunstable 11 7 A6 02 A120 8 A120 homes planned by 2050. will become host to major hi-tech industrial 18 10a developments and will be the site to one million 9 Gloucester A1 A1(M) A4 10 A41 31 11a The site is strategically located, which provides direct 3 A34 A1 3 6 new homes by 2050, with Milton Keynes alone A1 30 A12 A4 A40 Aylesbury 9 Clacton-on-Sea access to the A421 dual carriageway, which offers access 17 Hemel A414 doubling in population to 500,000 St Albans 4 to the M1 junction 13 to the south (2 miles) and the M1 29 8 Hempstead Chelmsford Oxford A A4 8a A41 M10 7 4 junction 14 (3 miles). A41 13 40 1 A10 A4 8 22 21a A421 improvement planned for completion Q4 2020 — 13 20 6 24 25 High 5 26 A12 A130 single lane upgrade to full double lane dual carriageway 6 A1 Wycombe to J13 M1. 5 18 M1 3 43 A355 17 9 A 20 M40 Watford 28 A421 A419 Opportunity to be 03 9 4 A127 A4 M25 A42 M5 2 29 Single lane upgrade to Swindon A34 1 Basildon part of the best LONDON 1 full double lane dual 15 large scale logistics 20 M25 16 Slough A13 Southend-on-Sea carriageway to J13 M1 development in the 19 17 9b 7 30 6 A346 1 M4 18 5 4 3 M4 UK — this is almost 4a planned for completion 2 M4 M32 Reading A329 14 M4 13 13 A20 2 A2 Margate A4 Q4 2020 12 10 the final plot A4 1 1 11 A4 Newbury 6 3 2 A299 A322 A249 M3 M25 A228 8 A3 11 A350 3 Croydon 4 M20 3 4 5 A2 Ramsgate 46 3 10 4 6 7 A3 A3 4 M26 2a 5 6 M2 A34 39 4a 7 M3 A3 M25 A25 Maidstone 8 A256 A2 A36 A37 5 8 6 Basingstoke 6 A338 Guildford A21 M20 8 A2 7 M23 361 A
Magna Park Milton Keynes A1(M) Large and growing 85% M6 LEEDS HULL M62 M62 workforce within a Strong Earnings 932,000 working LIVERPOOL M60 M1 M18 M180 30-minute car commute of UK population lives MANCHESTER labour pool are lower population M56 SHEFFIELD within a 4.5 hour HGV drive Source: CACI, 2017 estimates M6 NOTTINGHAM Available labour force* Number of employees in ‘Warehousing and support activities for transportation’** Destination Miles M1 Junction 13 2 • Some 6,300 people aged 16 to 64 are unemployed M1 2000 4000 6000 8000 10,000 12,000 M54 M1 Junction 14 3 LEICESTER • An additional 8,600 people aged 16 to 64 who are 12,000 HGV drive times M25 36 economically inactive say they want a job Milton Keynes 1 hour BIRMINGHAM M6 A1(M) Central London 50 M42 Northampton 2 hours Birmingham 71 932,000 people live within a 30-minute car drive† 4.5 hours NORTHAMPTON Leeds 148 Bedford • Projected to grow to 1,037,000 by 2027 M5 Manchester 153 Luton M40 Milton Keynes Luton Airport 20 • Projected population growth of 11.3% FELIXSTOWE much faster than the GB average (6.3%) Heathrow Airport 49 M1 A1(M) M11 Stansted Airport 68 Proportion of employees in ‘Warehousing and support activities for transportation’** OXFORD Gatwick Airport 86 Strong relevant skills†† M25 1% 2% 3% 4% 5% 6% London Gateway 78 • Some 12,000 employees in Milton Keynes work READING in ‘Warehousing and support activities for Milton Keynes 5.4% M4 LONDON Southampton Port 114 transportation’ — 5.4% of all employees compared Drive to work time Felixstowe 110 BRISTOL M2 with a GB average of 1.8% Northampton 30 min labour pool M3 • Milton Keynes has a larger number and proportion of Bedford M23 M20 DOVER employees in ‘Warehousing and support activities for M5 transportation’ than other M1 corridor locations — highlighting SOUTHAMPTON Luton a large pool of workers with warehouse and transport skills GB EXETER MK17 8EW * Annual Population Survey, June 2016-July 2017. * * BRES 2016, Travel to Work Areas. † Source: CACI, 2017 estimates and projections. †† Business Register and Employment Survey 2016. All labour force statistics are based on the official Milton Keynes Travel to Work Area.
Magnitude 313 2020 SPEC Modern, glazed entrance with LED feature lighting New, improved GLP base build specification 2020 SPEC Distinctive reception area 2020 SPEC Open plan kitchen and break-out area The new units will each feature the enhanced GLP ‘standard’ specification 2020 which includes an ultra-modern treatment to the design of the primary office elevation together with a range of cutting-edge enhancements throughout the welfare facilities. New innovations The new innovations include a new feature reception, the use of natural materials and finishes throughout, acoustic panels and exposed services in the office space and an open plan kitchen Enhanced an break-out area. 2020 spec 2020 SPEC 2020 SPEC 2020 SPEC The new units will feature Modern simplified American light oak timber finish, Environment analytics system the enhanced GLP 'standard' building design brightens interior spaces to monitor building use specification 2020 — with a range of cutting edge enhancements throughout.
M1 J13 M1 J14 Magna Park Milton Keynes A421 (2 miles) (3 miles) A421 Home to leading occupiers M1 Magnitude 88 Magnitude 313 Magna Park Milton Keynes is one of the premier distribution parks in Europe, now home to the UK’s leading brands, employing some 4,500 people. Totalling 388 acres, its floor space will amount to 5.7m sq ft upon the completion of Magnitude 313. Distribution and logistics warehouse 313,620 sq ft 29,136 sq m Computer generated image
Magna Park Milton Keynes Magna Park Milton Keynes All the benefits of a modern logistics park Award winning development Infrastructure complete IAS Awards Development of the year 2014 Throughout the park offering easy access to the A421 dual carriageway in turn leading Proven strategic location to the M1 Ideally placed between Junctions 13 and 14 of the M1 Local bus services Magna Park Milton Keynes is serviced by Home to leading occupiers the 34, 300 and 310 bus services, providing a John Lewis, Waitrose, River Island, main link between Magna Park and CMK/Rail A.G. Barr and DHL Station and Coachway at J14. These operate every half-hour, 7 days a week Sustainability as standard Allowing customers to save up to Rail 1,300,000kg of CO2 per annum Milton Keynes Central Station is just a 15‑minute drive from Magna Park, giving Strong labour pool occupiers of Magnitude 313 access into Highly‑skilled, readily available central London in just 30 minutes workforce within 30 minutes’ drive Infrastructure Local complete bus service
Magnitude 313 Potential Site plan sprinkler location Schedule of accommodation 7 M high level & spec access door SQ FT SQ M Fire track Attenuation lagoon 313,620 29,136 28 M turn HGV Apiary Warehouse 296,839 SQ FT 27,577 SQ M Offices (2 storey) 16,566 SQ FT 1,539 SQ M dia Gatehouse 215 SQ FT 20 SQ M Total GIA 313,620 SQ FT 29,136 SQ M 2 lev ss acce el Key features M 128 17 d 19m clear 15.75 acres ock internal height (6.37 ha) le 82 HGV velle parking spaces 4 level 33 dock 18 charging (incl. loading) access doors 50m yard depth rs car bays 50 M Magnitude 313 82 HGV parking 354 car parking 18 charging car bays 313,620 SQ FT 16 d 80 kN (29,136 SQ M) 216 ock psm leve Floor loading M llers Retaining wall Potential area for waste management 2 lev ss acce 215 sq ft el gatehouse Gatehouse es Offic Abundant power supply Visitor parking 344 car parking spaces (incl. 13 disabled and 18 10 car parking spaces 2‑storey External electric car charging bays — incl. 2 disabled bays) (incl. 3 disabled) offices seating area
Magnitude 313 Indicative racking layout Indicative racking layout Wide aisle racking layout Narrow aisle racking layout 216 m 216 m 96 m 96 m 128 m 128 m ET POSITI ET POSITI L L O O PAL PAL NS NS 57,070 76,370 44 m 16 Dock Levellers 17 Dock Levellers 44 m 2 Level Access 2 Level Access 2 Level Access 16 Dock Levellers 17 Dock Levellers 2 Level Access Main Office Main Office (2 Storeys) (2 Storeys)
Magnitude 313 Indicative mezzanine layout Indicative mezzanine layout 216 m 216 m 216 m Clear Height (19 m) Clear Clear Height (19 m)Height (19 m) 4.5 m Head Height Mezzanine 96 m 96 m 96 m 881,785 SQ FT / 81,920 SQ M Mezz 4 10.7 m Head Height 10.7 m Head Height 3 m Floor to Floor 128 m 128 m 128 m Mezz 3 3 m Floor to Floor Mezz 2 Mezz 1 Mezz 1 3 m Floor to Floor Mezz 1 Mezzanine Mezzanine 8 m Floor to floor 8 m Floor to floor 72,334 SQ FT SQ / 6,720 M SQ M 5.5 m Floor to floor 72,334 SQ FT / 6,720 44 m 44 m 16 Dock Levellers 17 Dock Levellers 16 Dock16Levellers Dock Levellers 17 Dock17Levellers Dock Levellers 44 m 2 Level Access 2 Level Access 2 Level Access 2 Level Access 2 Level Access 2 Level Access Ground Level Ground Level Ground Level Main Office Main Office Main Office (2 Storeys) Mezzanine 5.5 m clear (2 Storeys) (2 Storeys) MezzanineMezzanine 8 m clear8 m clear
Magna Park Milton Keynes Our Building Environmental Cost Analycs sustainability Monitoring energy usage Our online energy dashboard can help customers proactively manage their Cost-effective We use high-quality materials and sustainable initiatives to add value and bottom-line savings energy consumption. through reduced operating costs. Many of our customers require their warehouse buildings to demonstrate excellent environmental performance. GLP is now recognised across the world for delivering industry-leading warehouse buildings that continuously Water Opmising exceed our original environmental aspirations, while usage natural light supporting our customers’ business operations in many effective ways. Optimising the use Reducing water usage of natural light Rainwater harvesting for use Our triple skinned factory assembled in toilet flushing and other rooflight solutioncan save up to 13% non-potable applications. a year on running costs. BREEAM® UK New Construction 2018: Industrial (Shell and Core) A Net zero CO2 emissions BREEAM UK New Construction 2014: Industrial A 0-25 A 16 This is how energy efficient the building is. (Shell and Core) Recycling Exceeding B 26-50 BREEAM UK New Construction 2014: Industrial performance regulaons Overall Score: 73.5% Net zero CO2 emissions C 51-75 A 16 This is how energy efficient 0-25 the building is. Rating: Excellent (Shell and Core) D 76-100B 26-50 Overall Score: Rating: 58.1% Excellent E 101-125C 51-75 Rating: Very Good F 126-150D Recycled & recyclable materials Exceeding requirements 76-100 Our initiatives contribute to a GLP is a pioneer in G Over 150 E 101-125 greener world and offer distinct environmentally sustainable advantages to our customers ‘eco‑warehouse’ development, F 126-150 and communities. setting the industry standard. G Over 150
Magnitude 313 Base building specification highlights Structural steel frame Dock leveller Roof light panels Photo Voltaic array Solar thermal hot water system Schedule of accommodation Carbon footprint reduction measures HGV parking 82 Car park access width 6m Standard initiatives The following features assisting the reduction in the carbon footprint Car parking 354 (incl. 16 disabled and 18 electric car charging bays incl. 2 disabled bays) HGV yard access width 50 m of the building are included within this specification: Site area 15.75 acres (6.37 Ha) HGV stacking 4 ✓ Triple Skinned factory assembled roof lights to the warehouse ✓ Air source Heat pumps Site density 45.74% Warehouse floor category FM2 as defined by TR34 4th Edition 2013 ✓ Optimised natural light to warehouse via roof lights and/or wall lights ✓ Heat recovery Air handling units Standard loading docks 29 Roof lights max 15% ✓ Rainwater Harvesting for use in toilet flushing and other non-potable ✓ High efficiency Low Nox boilers Standard dock door size 2.75 m wide x 3 m high clear opening Wall lights 2 m height Kingspan KS1000 DLAWP clear applications ✓ Low flush volume WCs Standard dock leveller size Will rise to a trailer bed height of 1550 mm and fall to a trailer bed height of wall light system to east elevation above docks ✓ Excellent air tightness ✓ Low water use spray taps 1050 mm. Min 2.0 m x 3.5 m, 1 m telescopic lip. Rainwater harvesting tank 10,000 litres ✓ Regionally sourced planting ✓ Responsibly sourced timber Standard dock shelter size Minimum size 3.5 m wide x 3.5 m high ✓ LED office lighting ✓ Solar thermal pre heating of hot water Large loading docks 4 (open/closed) pit ✓ DSG (Desolphogypsum) partitions ✓ Dyson Airblade V or equal approved high efficiency hand driers Large dock door size 2.75 m wide x 3.5 m high clear opening SQ FT SQ M ✓ Rockfon ceiling tiles or similar utilising recycled content ✓ Sub metering of base build electrical main and sub circuits in ✓ Organic water-based paint conjunction with FM Managers monitoring regime Large dock leveller size Will rise to a trailer bed height of 1650 mm and fall to a trailer bed height of Warehouse 296,839 27,577 ✓ Carpets with 80% recyclable yarns ✓ Pulse metering of incoming gas/water/electric supplies in 950 mm. Min 2 m x 4 m, 1 m telescopic lip. Offices (2 storey) 16,566 1,539 ✓ Variable speed drives conjunction with FM Managers regime Large dock shelter size Minimum size 3.5 m x 4.5 m high Gatehouse 215 20 ✓ C02 Sensors Dock wall height 1.20 m Total GIA 313,620 29,136 Standard level access doors 3 Standard level access doors size 4 m wide x 5 m high Large level access doors 1 This specification has been prepared for the construction of a new Large level access doors size 4 m wide x 7 m high warehouse/distribution facility. The building is to be designed and constructed in accordance with the planning permission and all Clear internal height 19 m clear continuous clear height to be provided free of all services current and relevant codes of practice, legislation, statutory, local Roof pitch Nominally 6 degrees and nominally minimum 4 degrees after deflection authority and fire officer requirements. The building will be certified Warehouse frame spacing 8m BREEAM 2014 Excellent, and with an EPC A rating, when taking into Dock spacing 4m cognisance assumed fit out measures. In order to satisfy all such criteria, GLP reserves the right to modify detailed provisions under Portal span 32 m the scope of design development.
Magnitude 313 Base building specification highlights Lift Dyson Airblade V Building Management System (BMS) Electric car charging Cycle parking Security fencing Substructure Superstructure Primary office layout Interior finishes Mechanical services Electrical services External areas Site preparation and foundations Frame Warehouse external walls Reception area Generally Office block heating and cooling External lighting Parking for cars and HGVs ✓ The foundations are to be designed ✓ The structural steel frame will be designed ✓ High level external wall cladding to be ✓ The reception area will have space for ✓ All office external walls will be lined ✓ The occupied office areas shall be ✓ Lighting for external roadways, and lorry ✓ Car parking areas will receive a bitumen macadam having regard to the site-specific ground in accordance with BS EN 1993 (Eurocode LPC certified Grade B micro rib composite visitor waiting and a reception desk (not internally with a dry lining using DSG heated/cooled by an Air Source Reverse parking areas shall be provided by ‘silver‘ LED wearing surface with white thermoplastic white conditions and in accordance with 3). Loadings shall be in accordance with BS panels, achieving a ‘U’ value in compliance provided) and will be provided with a lift to plasterboard system (skim coat or tape cycle heat pump VRF heat recovery hybrid luminaires mounted on the building and/or lining including directional arrows the recommendations of BS EN 1997 EN 1991 (Eurocode 1). Steelwork may be with the current Building Regulations. serve ground and upper office levels and joint). Internal division walls will be hydronic system on galvanised columns. All building elevations (Eurocode 7). Structural concrete for designed to BS 5950 as an alternative to External coating to provide a minimum of constructed using suitable metal stud shall be provided with security lighting Landscaping foundations will be designed in accordance Eurocode 3, in this scenario the equivalent 30 years guarantee with a manufacturer’s Upper floor offices general arrangement finished both sides with DSG plasterboard Controls with BS EN 1992 (Eurocode 2) or BS 8110 British Standards will be used in lieu of guarantee providing a ‘Confidex’ or equal where appropriate. Internal division walls ✓ All LED Fittings shall be supplied with an ✓ For all native plant species where feasible supply Eurocodes for loading calculations (BS level of guarantee, typically colours from ✓ The upper floor areas will comprise will extend to the underside of the concrete ✓ All mechanical services systems shall be intelligent wireless sensor as part of the nursery stock grown from certified seed sourced ✓ Wherever possible recycled materials will 6399) and design of structural concrete the range of graded blues, laid horizontally circulation areas, toilets, open plan office floor slab above and achieve a minimum controlled by a packaged control system Built environment analytics system from the Forestry Commission’s relevant regional be used. However recycled aggregates including foundations (BS 8110) areas, kitchenette, toilets and cleaner’s design sound reduction value of 40 dB comprising HVAC control panel, duct, pipe seed zone can only be used when they have been Office external doors cupboards. A meeting room is provided in accordance with BS 5821: Part 1: 1984 and environment mounted temperature Primary office lighting previously tested for contamination Upper floors on the second level, access via the main using measurements from laboratory tests and time controls and all associated Fencing by Delta Simons Limited or an agreed ✓ The main office entrance full circle sliding stair core to BS 2750: Part 3: 1980 sensors, etc. ✓ General lighting shall be provided by means alternative independent third-party ✓ Suspended floors in office areas shall be door system by Dormakaba or equally of Suspended LED luminaires complete with ✓ S ecurity fencing, consisting of 2.4 m high overall environmental engineer designed for an imposed loading of 4kN/ approved, form its own integrated draught Lift Ironmongery ✓ The controls package shall be as electronic drivers. The LED fittings shall be colour coated paladin type fencing on straight m2 plus 1kN/m² allowance for lightweight lobby with a further set of double circular manufactured by Trend System or colour temperature 4000k. Each fitting shall steel posts, will be provided to enclose goods yard Warehouse floor slab partitions plus 0.25 kN/m² for suspended sliding doors leading into the reception ✓ The lift to facilitate access to the upper ✓ All ironmongery must be Mode range from equal and other approved and shall be provided with intelligent wireless sensor services and will be constructed using area. Door diameter to be 2.6 m. They are floors will be a ten person/800kg capacity Allgoods, refer to ironmongery schedule be compatible with a future Customer as part of Built environment analytics system Gatehouse ✓ The warehouse floor slab will be designed either pre-cast hollow core slabs or in automatically powered sliding system by VVVF electric traction passenger lift to for details, with suited Euro profile cylinders BMS installation in accordance with the guidance given in situ concrete on profiled steel decking Dormakaba or similar approved meet the requirements of EN 81-2 and Part throughout Built environment analytics ✓ A gatehouse, to Gazeley’s standard layout Concrete Society Technical Report No. 34 supported by steel beams and columns M2 of the Building Regulations for disabled ✓ Provide an LCD 42-inch television screen (subject to site specific requirements) controlling Fourth Edition, 2013 Dock door access. Each landing will have stainless ✓ Suited Euro profile cylinders are also to be in reception capable of relaying data from ✓ As part of the Internal/External intelligent both incoming and outgoing vehicles Roof steel lift entrance doors and surround. provided for the office external doors and the BMS. Provide ‘American Light Oak’ wall Lighting installation a Built Environment ✓ The concrete mix shall consist of coarse ✓ Insulated sectional panel vertical lift dock Stainless-steel push-button controls will be the personnel fire escape doors mounted framing/housing. The framing/ Analytics system shall be provided. This shall Control barriers aggregates which will be from a quarried ✓ Roofing will be LPC certified Grade B doors by Hormann UK Limited, Assa Abloy located adjacent to the lift entrance doors housing will be smooth and finished with a include but not be limited to the monitoring source, not from material sources likely to trapezoidal composite panels achieving or equal and approved, finished in RAL ✓ 3 master keys will be provided to operate lacquer finish of the following elements: ✓ Control barriers will be provided to each HGV be contaminated with lignite a ‘U’ value in compliance with the current 5010 blue, to be electronically operated ✓ The lift shall achieve the BREEAM 2014 locksets within the office area — LED fittings — health status/energy access and egress lane adjacent to the gatehouse Building Regulations. External coating, by 240-volt, single phase operator with credits monitoring and Emergency lighting test ✓ Pre-cast floor sections between dock colour goosewing grey or similar for light emergency change over to manual — Main office heat mapping Cycle parking provision levellers will be designed to accommodate reflectance, is to provide a minimum operation at low level — Utility Energy metering 50kN/m2 uniformly distributed load 30-year guarantee, with a manufacturer’s — Indoor air quality monitoring ✓ Cycle and motor cycle parking spaces are to be Confidex’ or equal level of guarantee. — EV Car charging provided ideally adjacent to the disabled parking — Dock door monitoring bays complete with good quality galvanised shelters and galvanised locking bars
GLP in Europe GLP owns one of the highest quality portfolios in Europe with assets located in key global gateway and population centres across Germany, UK, France, Spain, Italy, Poland, Hungary, Slovakia, Czech Republic and Netherlands. We have industry-leading capabilities across the whole value chain including Investment, Development, Asset management and Leasing. We have a proven track record of delivering 9 million sq m of warehouse space to a broad range of customers. Our portfolio is characterised by prime big box logistics assets developed to industry-leading specifications and occupied by a diverse customer community. Our current operating portfolio consists of more than 3.9 million sq m across the strategic logistic markets, and we manage three funds in Europe totalling more than €6 billion (US$7 billion) AUM. From our existing land bank, we have the ability to develop a further 4 million sq m of new space in strategic locations within our key European markets.
Derby 48 A1 A1 A52 25 A46 A50 A453 A607 A50 48 Magnitude 313 A1 A15 24 A606 A1 A46 A151 7 M1 Loughborough A14 A42 5 23 A1101 06 A38 0 A6 A607 6 A1 A1 A47 A47 A47 Norwich MK17 8EW A1 A511 Location & travel distances 22 A46 11 A606 A47 M1 M42 A1 Tamworth A444 A47 Peterborough A47 12 2 10 A47 A1 21 A1 46 A12 A 6003 A1139 34 43 A10 A11 A43 3 A1 9 A6 17 Nuneaton A140 T1 1 5 16 41 M69 A5 A60 A1 4 A427 A1(M) 43 M6 3 A1 5 20 A1066 06 6 A6 A45 2 A1 M1 1 16 Coventry M6 1 Destination Miles A1 5 A14 A 14 A11 J14 42 A452 Rugby A143 13 M1 Junction 2 A134 5 A14 TO BIRMINGHAM A1 A4 A46 18 M45 A43 A11 M1 Junction 14 3 4 16 17 A508 A12 TO CENTRAL MK 2 0 A1 Leamington A45 A14 A140 A1 M25 36 15 14 Spa A425 A45 A14 A14 Central London 50 A51 13 16 A428 A6 A428 Cambridge 15a Birmingham 71 30 A46 A423 12 12 15 A11 A12 11 A428 Leeds 148 4 Bedford MILTON A14 A13 M40 A508 A509 M1 A429 05 10 Manchester Ipswich 153 A5 A5 A1 A421 KEYNES KINGSTON B4 Banbury 11 A43 14 Magna Park Milton Keynes Luton Airport 20 Milton 034 TO BEDFORD 1 A14 M1 A42 A505 A421 Keynes Heathrow Airport 49 WAY H8 V8 13 A6 10 A10 A12 A44 31 A421 M1 M11 Stansted Airport 68Felixstowe BRINKLOW A1 A5 9 A42 12 1 10 A4421 11a 8 Gatwick Airport Colchester A12 0 86 STA N DI N G J13 A4 Luton Stevenage 4 M40 11 7 A6 A120 London Gateway 78 Dunstable 02 8 A120 A5 8 10a 0 1 13 9 A1 A1(M) Southampton Port 114 A4 10 A41 31 3 A34 A1 TO LONDON 3 6 A1 30 A12 0 Aylesbury 9 Felixstowe Clacton-on-Sea 110 Hemel A414 St Albans 4 1 46 A421 8 Oxford A Hempstead M10 Chelmsford A4 414 8a 7 A41 TO LEIGHTON BUZZARD 40 1 A10 A Single lane A5 upgrade to A4 21a 22 full double lane dual 13 20 6 24 25 26 A12 High A130 carriageway to J13 M1 5 6 A1 Wycombe 5 18 M1 planned for completion A355 17 2 0 M40 4 Watford 28 A127 A4 M25 2 1 29 Q4 2020 ndon A34 Basildon LONDON 1 M25 15 Slough A13 Southend-on-Sea 9b 7 30 6 A346 5 4 3 M4 4a M4 Reading A329 14 M4 13 13 A20 2 A2 Margate
Contacts If you would like any further information on the building, or to arrange a meeting, please contact: 33 Margaret Street London W1G 0JD savills.co.uk 020 7499 8644 020 7493 4933 Joe Garwood John Burbage Toby Green Ed Cole Development Director, GLP john.burbage@burbagerealty.com tgreen@savills.com ed.cole@eu.jll.com joe.garwood@glp.com +44 (0)7769 670 231 +44 (0)7870 555 716 +44 (0)7872 677 751 +44 (0)7583 118 543 Franco Capella Matt Jones Jack Booth James Atkinson franco.capella@burbagerealty.com jbooth@savills.com matt.jones@eu.jll.com Development Manager, GLP +44 (0)7834 197 403 +44 (0)7807 999 558 +44 (0)7795 043 881 james.atkinson@glp.com Christian Wright Katie Hoggarth +44 (0)7890 564 941 MK17 8EW cwright@savills.com katie.hoggarth@eu.jll.com +44 (0)7870 186 483 +44 (0)7736 374 045 Magnitude 313 Design by Freestone Creative London office Magna Park 50 New Bond Street Milton Keynes London WS1 1BJ MK17 8EW GLP is committed to a policy of continuous development and reserves the right to make changes to information without notice. This brochure, the descriptions and measurements contained herein do not form part of any contract and whilst every effort has been made to ensure accuracy, this cannot be guaranteed. July 2020. Terms: Available leasehold — details upon application. Please contact the agents for a detailed proposal. Printed in the UK. glp.com/eu
You can also read