Landfill Remediation at Former Military Radar Sites

Page created by Jose Lambert
 
CONTINUE READING
Landfill Remediation at Former Military Radar Sites
Landfill Remediation at
Former Military Radar Sites
                       NATO- CCMS
               Cardiff, U.K. May 23-26, 2004

Michael Nahir &
Joanna Ankersmit
Northern Affairs,
Government of Canada

Wayne Ingham
WESA Consulting
Landfill Remediation at Former Military Radar Sites
Outline
z   Background
    information
z   Remediation Standard
    Development
z   Example Sites
z   Technical and
    Logistical Challenges
z   Landfill Assessment
    and Remediation
z   Landfill Monitoring
z   Acknowledgements
Landfill Remediation at Former Military Radar Sites
Background Information
           z   The DEW Line was built
               during the height of the
               Cold War.
           z   Radar sites:
               – 42 sites in Canada were
                 operated between 1955 and
                 1985 by USAF & Canada
               – Replaced by the North
                 Warning System.
               – 21 INAC sites, some
                 abandoned since 1963.
               – INAC has responsibility for
                 numerous similar sites
Landfill Remediation at Former Military Radar Sites
INTRODUCTION:
DND DEW Line Sites
Landfill Remediation at Former Military Radar Sites
INAC DEW Line Sites
Landfill Remediation at Former Military Radar Sites
Background Information
z   Waste disposal
    with little
    environmental
    consideration
Landfill Remediation at Former Military Radar Sites
DEW Line Cleanup Protocol
1989-93:
z Assessments took place at the DEW Line.

z   Scientific investigations led to the development of a
    cleanup protocol for the DEW Line (including concept
    cleanup plans for contaminated soil and landfills).

z   Cleanup criteria for contaminants were developed
    specifically for the Arctic - the DEW Line Cleanup Criteria
    (DCC).
Landfill Remediation at Former Military Radar Sites
CAPE CHRISTIAN LORAN
Landfill Remediation at Former Military Radar Sites
HORTON RIVER DEW LINE
Landfill Remediation at Former Military Radar Sites
PEARCE POINT
ISACHSEN, NT
ISACHSEN, NT
Investigation Phase
Challenging Factors
z   Construction Season
    – Limited to summer usually 3 –4 months
z   Remote and isolated locations
    – Logistics, on-site analysis, supplies
z   Resources
    – On-site resources: gravel, shale, bedrock, permafrost
    – Contractors and equipment
z   Ecosystem
    – Linear foodchain
z   Global Warming
    – Permafrost degradation
Permafrost degradation above equipment burial area.
Landfill Concept
z Remediation/Closure    of
 Existing Landfills
  – Risk Evaluation
  – Excavate/Remediate
z Development   of New Landfills
  – Non-hazardous
  – Contaminated Soil
Engineering Design
z   The designs require;
       z   demolition of facilities,
       z   On-site disposal of site debris,
       z   Off-site disposal of hazardous materials and
           contaminated soils,
       z   development and closure of landfills,
       z   use of permafrost,
       z   use of existing granular material sources,
       z   site grading.
Landfill Risk Evaluation
z   Background information
    – Based on National Classification System
z   Matrix factors
    –   Contaminant source
    –   Pathways
    –   Receptors
    –   Special considerations
    –   Traditional knowledge
z   Interpreting the score
Contaminant Source
z LandfillExtent
z Estimated Depth of Landfill
z Presence of Leachate
z Presence of Surface Contaminated Soil
z Presence of Surface Debris
Pathways
z AerialTransport
z Water Transport
  – Topography
  – Cover material (type and depth)
  – Runoff potential
  – Precipitation
  – Distance to downgradient drainage channels
Receptors
z Downgradient      Freshwater/marine habitat
  – Proximity, usage
z Terrestrial   habitat
  – Extent, usage
z Landuse
  – Occupation, use of drinking water and food
    resources
Unique factors
z Special   Considerations
  – Non-generic, site specific factors
  – Potentially worth 10% of each category
z Traditional   knowledge
  – Site workers
  – Local community
Landfill Evaluation Score
Landfill Evaluation Score – Maximum = 150

Potential Environmental Risk Classification
>100                                 High
>75,
Landfill Remediation
z   High Risk Landfills
    – Excavate
    – Waste separated and classified
z   Moderate Risk Landfills
    – Leachate contain or excavate component
    – More detailed assessment – eg. visual and thermal
      monitoring; and groundwater and soil sampling
z   Low Risk Landfills
    – Regrade against erosion if necessary
    – visual monitoring and soil sampling
Demolition of Facilities
Removal of Site Debris
Landfill
Excavation
Landfill
Excavation
Verification
                  Sampling

   Waste
Classification
Non-Hazardous Waste Landfill
                                                                                                                    GRANULAR FILL COVER

                                                                                               (TYP.)
                                                                                        0.3m
                                                                                                        WASTE       INTERMEDIATE GRANULAR
                                                                                                                    FILL COVER

                                                                                               (MAX)
                                                                                        1m
                                                                                                        WASTE

                     GRANULAR FILL COVER

GRANULAR FILL BERM

                                                               NON-HAZARDOUS WASTE

                                                                                                        GRANULAR FILL BERM
                                           EXISTING GROUND

                                                             NON-HAZARDOUS WASTE LANDFILL
Leachate Containment
                                               Modification

               GRANULARFILL(THICKNESS
               BASEDONDESIGNACTIVELAYER)

                                                        RIPRAP

SAND             NON-WOVENGEOTEXTILE
                 ABOVEANDBELOW
                 GEOMEMBRANE

       0.15mMIN. SAND

                         0.3mMIN. SAND

                        GEOMEMBRANE          0.7mMIN. SATURATED
                                             GRANULARFILL
                                             0.15mMIN. SAND

                                  LANDFILL WITH LEACHATE CONTAINMENT
Contaminated Soil Landfill
                                                                                                                        0.3m DCC TIER   CONTAMINATED SOIL
                                                                                                                        0.15m MIN. INTERMEDIATE GRANULAR FILL COVER
                                                                                                                        (REQUIRED ONLY FOR LANDFILLING OF SOFT SOILS)

                                                    GRANULAR FILL COVER                                                 0.3m DCC TIER   CONTAMINATED SOIL

                                  EXISTING GROUND

EXCAVATE TO SATURATED
PERMAFROST
                                                                            COMPACTED TIER
                                                                            CONTAMINATED SOIL
                                                                                                SATURATED FROZEN BERM

                                 0.3m MIN. SAND
                                                         GEOMEMBRANE
                                0.15m MIN. SAND
                        0.3m MIN. GRANULAR FILL      NON-WOVEN GEOTEXTILE
                                                     ABOVE AND BELOW
                                                     GEOMEMBRANE

                                                                          TIER         DISPOSAL FACILITY
Landfill
Monitoring
      - visual
- soil/groudwater
    - thermal
Acknowledgments
z   Indian and Northern Affairs Canada
    – Ms Joanna Ankersmit (Contaminants Sites Program)
    – Dr Wayne Ingham (Water and Earth Science
      Associates)
z   Department of National Defence
    – Dew Line Cleanup Team
z   Environment Canada
    – Lisa Keller, Country Representative
Contact Information

Indian and Northern Affairs Canada   Water and Earth Science Associates
Les Terrasses de la Chaudiere        The Woolen Mill, 4 Cataraqui St.
Room 616                             Kingston, ON, Canada
10 Wellington St. Gatineau,          K7K 1Z7
Quebec, Canada                       ph: (613) 531 2725
K1A 0H4                              Fx: (613) 531 1852
ph: (819) 997-8413                   wingham@wesa.ca
fx: (819) 953-2590
nahirm@inac.gc.ca