CAPABILITY STATEMENT

Environmental & Social
Performance Services

January 2021

Client:   All

Reference: BZ1056-RHD-ZZ-XX-CS-Z-0001
Status:   S0/P01.01
Date:     2-2-2021
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

Table of Contents
1          Royal HaskoningDHV                                                                1
1.1        Our Company                                                                        1
1.2        Our Markets                                                                        1
1.3        Fully Certified                                                                    3
1.4        Equality, Diversity and Inclusion                                                  4
1.5        UN Sustainable Development Goals                                                   4

2          Our Environmental and Social Performance Services                                 2
2.1        Impact Assessment                                                                  2
2.2        Management Planning                                                                4
2.3        Lender’s Advisor                                                                   4

3          Our Project Experience                                                            5
3.1        Energy & Renewables                                                                6
3.2        Oil & Gas                                                                         10
3.3        Mining                                                                            14
3.4        Water Technology                                                                  15
3.5        Rivers, Deltas and Coasts                                                         17
3.6        Ports and Terminals                                                               20
3.7        Airports                                                                          24
3.8        Roads and Railways                                                                25
3.9        Agribusiness                                                                      26

4          Our Team                                                                          27

2-2-2021            ENVIRONMENTAL AND SOCIAL PERFORMANCE   BZ1056-RHD-ZZ-XX-CS-Z-0001   ii
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

1          Royal HaskoningDHV
1.1 Our Company                                          1.2 Our Markets
Royal HaskoningDHV is an independent,                    We deliver our engineering, project management,
international engineering and project management         consultancy services and products in the markets
consultancy with 140 years of experience. Our            described below. Within these markets, we offer a
professionals deliver services in the fields of          range of services recognised as being at the
aviation, buildings, energy, industry, infrastructure,   forefront of their field. Our aim is to maintain or
maritime, mining, transport, urban and rural             obtain market leadership. Our clients are private
development and water.                                   companies of all sizes, from multinationals to small
                                                         and medium-sized enterprises. We work for
Backed by expertise and experience of 6,000              governments – national, regional and local. We work
colleagues across the world, we work for public and      for international semi-governmental organisations
private clients in over 140 countries. We understand     and finance institutes as well as not-for-profit
the local context and deliver appropriate local          organisations.
solutions.
                                                         Urban and Rural Development
We focus on delivering added value for our clients
while at the same time addressing the challenges
that societies are facing. These include the growing
world population and the consequences for towns
and cities; the demand for clean drinking water,
water security and water safety; pressures on traffic
and transport; resource availability and demand for
energy and waste issues facing industry.

We aim to minimise our impact on the environment
by leading by example in our projects, our own           Population growth and changes in society, such as
business operations and by the role we see in “giving    an increasing desire for demand-driven sustainable
back” to society. By showing leadership in               transport, are bringing new challenges to both urban
sustainable development and innovation, together         and rural areas. Challenges also include sweltering
with our clients, we are working to become part of       cities, water and floods, ghettos and abandoned
the solution to a more sustainable society now and       industrial zones. We assist our clients with economic
into the future.                                         and market research to create spatial master plans,
                                                         and draw on our multi-disciplinary expertise to shape
                                                         every aspect of urban design, including water
                                                         management,         infrastructure,    utilities   and
                                                         transportation. Our robust, resilient solutions unlock
                                                         the potential of rural areas, balancing economic
                                                         growth and investments with circularity and
                                                         sustainability. Vital services include financial
                                                         feasibility studies, environmental and social impact
                                                         assessments. We develop plans to manage
                                                         resources and improve ecologies, designing
Our head office is in the Netherlands, other principal
                                                         attractive living environments for the benefit of
offices are in the UK, South Africa and Indonesia.
                                                         communities and stakeholders
We also have established offices in Thailand, India
and the Americas; and we have a long standing
presence in Africa and the Middle East.

2-2-2021          ENVIRONMENTAL AND SOCIAL PERFORMANCE                   BZ1056-RHD-ZZ-XX-CS-Z-      1
                                                                                           0001
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

Buildings                                                 Industry

Whether an office, hospital, data centre, factory or      Many of our industrial clients share a common
school building, we approach our clients’ challenges      objective: to produce high quality goods in the most
strategically and holistically. We work in close          efficient way possible. By working in close
partnership with our private and public sector            partnership with our food and beverage,
customers to realise added value for their                pharmaceutical, oil and gas, chemical and
organisations, such as improving data centre              automotive clients, we co-create solutions that are
efficiency and reducing energy consumption. Our           transforming industry through innovation. We
solutions prioritise health, productivity and comfort,    develop digital solutions that design reliable,
whilst achieving KPIs related to asset performance        sustainable and compliant assets and predict
and management. Combining our domain expertise            maintenance and provide timely insights. Combining
with cutting-edge digital twin capability, our            requirements and goals for both the CAPEX and
consulting services ensure the best use of space,         OPEX side of our client’s business, we provide data-
materials and energy, while contributing to, business     driven optimisation solutions that enhance
and climate resilience.                                   performance and minimise environmental impact for
                                                          new and repurposed industrial sites.
Energy
                                                          Transport and Infrastructure

Addressing the energy transition has become a
central challenge for our clients. Our expertise in       Well-functioning infrastructure helps societies thrive
innovative energy solutions draws on over 30 years        and individuals prosper. Smart planning, novel
of consultancy experience in energy diversification.      technologies and stakeholder management are
We provide services across the whole value chain,         achieving multiple goals and delivering wider
from strategy and implementation to technology. Our       societal benefit, such as the energy transition,
clients’ needs are vast and diverse: from large-scale     circularity, accessibility and reduced pollution. We
wind and water infrastructure to technology               are collaborating with clients to shape the new
platforms that optimise energy use across a global        mobility system, which balances individual needs for
portfolio. Together we explore scenarios to deliver       affordability and reliability with society’s need for
the best possible solution for clients seeking leading-   liveability and urban planning.
edge sustainable power supplies

2-2-2021           ENVIRONMENTAL AND SOCIAL PERFORMANCE                   BZ1056-RHD-ZZ-XX-CS-Z-      2
                                                                                            0001
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

Maritime                                               Aviation

We are a world leader in maritime port and             Royal HaskoningDHV’s full subsidiary companies,
infrastructure development and home to one of the      NACO and InterVISTAS, are world leading aviation
largest groups of maritime consulting engineers in     consultancies. We provide independent industry
the world. We are involved in high-profile maritime    services to airports, airlines, governments, investors
projects from Europe to Australia, and Asia to Latin   and contractors. We are experts in airport
America. By applying technology, drawing on our        consultancy, transportation economics, policy and
global expertise and consulting with specialist        regulation advice, finance, master-planning,
partners, we develop smart solutions working           functional planning and design, building design and
together with our clients. Our integrated,             civil engineering. Our expertise in airport systems
multidisciplinary approach means we can deliver all    includes airport IT infrastructure and master
the expertise required – optimising existing           planning, as well as passenger terminal IT, security
terminals, creating new port facilities, relocating    and baggage handling systems.
terminals or refurbishing facilities.
                                                       1.3 Fully Certified
Water for the future
                                                       Royal HaskoningDHV is committed to Quality,
                                                       Health and Safety and Environmental (QHSE)
                                                       Management and these lie at the heart of the
                                                       management of all projects.

A safe and secure living environment is ultimately
about improving the quality of people’s lives and of
systems, as cities, business and infrastructure
become ever-more complex. A holistic vision is
needed to plan for future development. Royal
HaskoningDHV offers a seamless integration of          Our global Management System is based on and
consulting engineering, technology and software        certified against the globally accepted international
services related to water. These services accelerate   standards     ISO     9001:2015     (Quality),   ISO
adaptation to increasing demand and risks. To help     14001:2015 (Environment), ISO 45001:2018
navigate a world of increasing complexities, such as   (Occupational Health & Safety) and ISO 27001:2013
fast-paced climate and societal change, we bring a     (Information Security) and it covers QHSE, integrity,
combination of the deep domain knowledge of our        business continuity, knowledge management,
engineering consultants, our award-winning             information security and our business principles.
technologies and emerging digital technologies such
as digital twin and AI.

2-2-2021          ENVIRONMENTAL AND SOCIAL PERFORMANCE                 BZ1056-RHD-ZZ-XX-CS-Z-      3
                                                                                         0001
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

1.4 Equality, Diversity and Inclusion                    Combined with our expertise we can help our clients
                                                         to define, solve or even prevent problems. Together
Royal HaskoningDHV is committed to promoting             with our clients we adapt and learn from latest
equality, diversity and inclusion (EDI) whilst           technologies to grow our societal intelligence. We
promoting a culture that actively values difference      invest in our people, innovation and technologies to
and recognizes that people from different                efficiently   integrate sustainability    into  our
backgrounds and experiences can bring valuable           (engineering) assignments.
insights to the workplace to enhance the way we
work. It our aim to be an inclusive organisation,        In addition, if and when required or possible, we
where diversity is valued, respected and built upon,     actively contribute to enhancing the communities
with ability to recruit and retain a diverse workforce   who live and work in the surroundings of our project
that reflects the communities it serves.                 locations.

1.5 UN Sustainable Development                           In our Operations
    Goals                                                As an organisation committed to Enhance Society
                                                         Together, we focus on the sustainable and efficient
In our Projects                                          management of our own operations. It reduces risks
Our biggest contribution to inclusive sustainable        and helps to ensure the long-term continuity of our
development comes from integrating new ideas,            business, while acknowledging our own role in
technology, innovations and sustainability into our      contributing to the SDGs. Just as in our projects, we
products and services. More and more, we connect         aspire with our partners to contribute to specific
the digital with the real world. Working together with   SDGs in order to focus our activities in the areas
our clients and partners, we use data and algorithms     where we can achieve maximum impact.
to translate insights into foresights.

2-2-2021          ENVIRONMENTAL AND SOCIAL PERFORMANCE                   BZ1056-RHD-ZZ-XX-CS-Z-     4
                                                                                           0001
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

2          Our Environmental and Social Performance Services
2.1 Impact Assessment
Impact Assessment is a key management tool for        solution for the proposed project to be achieved.
decision-makers on development projects. It           Following execution of the project, the impact
predicts environmental and social impacts of          assessment enables continued monitoring of
projects at an early stage and presents options for   impacts.
avoiding or minimising negative impacts through
alternative designs or mitigation measures.           Impact Assessment should deliver information as
                                                      objective as possible so it can be used by all
Impact Assessment is best undertaken at the           stakeholders: the proponent, the competent
preliminary phase of the project or development, so   authority, investors and the civil society.
that recommendations can be incorporated into the
evolving designs. This enables the optimum

2-2-2021          ENVIRONMENTAL AND SOCIAL PERFORMANCE              BZ1056-RHD-ZZ-XX-CS-Z-    2
                                                                                      0001
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

An integrated process                                    strategic. Having determined the likely magnitude of
                                                         an impact, it is then essential that the significance
Our multidisciplinary teams take an integral             is evaluated. Such evaluation may involve
approach to the impact assessment process. Royal         comparison with national, international or industry
HaskoningDHV blends technical expertise in soil,         standards.
water, air, waste, ecology, legislation, and social
expertise, with architectural, engineering, logistics    •   Define mitigation measures and alternatives
and infrastructure knowledge.
                                                         All significant impacts will be considered for
Our practical project management experience              mitigation and control through avoidance,
allows us to guide a project from concept stage, to      minimisation and compensation measures.
eventual permitting and approval.                        Measures will be developed for incorporation in the
                                                         project design, construction or operation phase. Also
Combined with our organisational expertise, in areas     essential is a consideration of alternatives that are
such as training, public participation, communication    environmentally and socially favourable.
with stakeholders and institutional development, this
                                                         Where the effectiveness of mitigation measures is
makes us an excellent partner for the complete
                                                         uncertain, or depends on assumptions about
process.
                                                         operational procedures, monitoring programmes
                                                         and/or management procedures will be defined.
Key steps delivered
•    Scope the impact assessment                         •   Engage with stakeholders

The scoping exercise ensures that there is a wide        The impact assessment takes account of
consensus on the eventual shape and emphasis of          stakeholders      concerns    about    potential
the impact assessment, provides guidance during          environmental and social issues. A Stakeholder
the rest of the assessment process and partly            Engagement Plan (SEP) is usually developed as
represents the results of the stakeholder                part of the ESIA.
consultations at this stage.
                                                         Other types of Impact Assessment
•    Describe the baseline                               Next the “standard” Impact Assessment, we deliver
As part of the scoping study, an inventory of            other types of assessment studies for specific
available baseline data is conducted and missing         purposes:
data identified. When important information is
missing, which is required for a proper impact           •   Strategic Impact Assessment
assessment baseline field surveys will be required.      •   Cumulative Impact Assessment
                                                         •   Human Rights Impact Assessment
•    Identify and assess the impacts
The identification and assessment of              the    The new digital ESIA, visual, interactive,
environmental, social impacts are based on:              collaborative
•    Project Description,                                Responding to the increasing demand for digitization
•    Legislative Review and Standards,                   and transparency, we have pioneered the way in
•    Environmental and Social Baseline, and              which all data surrounding the impact of a project on
•    Concerns and expectations raised              by    the environment is visualised and shared. This is an
     stakeholders.                                       inspirational world where ESIA reporting is quicker,
                                                         more interactive, transparent, and accessible. A time
All impacts will be identified whether they are          when decision-making is rapid and efficient.
beneficial or adverse, cumulative, short or long-term,
temporary or permanent, direct or indirect, local or     This is #TheNewEIS.

2-2-2021          ENVIRONMENTAL AND SOCIAL PERFORMANCE                   BZ1056-RHD-ZZ-XX-CS-Z-     3
                                                                                           0001
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

2.2 Management Planning                                 2.3 Lender’s Advisor
Our services don’t stop at the delivery and approval    Sponsors of large and complex projects worldwide
of the ESIA report. We further support our clients in   look for finance from specialist investment banks.
the next stages of their project development            These projects all have a variety of technical,
whether it is in the (detailed) engineering,            environmental and social risks, and others which
procurement,      construction,      operation     or   can include stakeholders, organisation and
decommissioning phase.                                  management, as well as political and contractual.

                                                        Working closely with the investment banks we
E&S requirements in procurement                         establish a dedicated team of engineering, social,
process                                                 environmental, economic and legal professionals to
We develop E&S specification to be included in          perform the due diligence (i.e. ESDD’s) and/or
tender documents and review E&S performance of          independent monitoring. We use experts from our
Contractors as part of the tendering process.           local offices, if necessary hiring external specialist to
                                                        complement our own team.
Development of specific Management
                                                        We fully understand and have extensive experience
Plans                                                   in assessing compliance towards lender’s
When the project moving forward more information        environmental        and      social  safeguards
is available, which make it possible to develop more    requirements (IFC Performance Standards, EBRD
specific E&S Management Plans than the ones             Performance Requirements, etc.).
developed as part of the ESIA.                          We are successfully advising financial institutions
                                                        and private clients on these issues.
For example, while the information available during
the ESIA process only allows to develop a               Our due diligence and monitoring delivers
Resettlement Policy Framework, information              pragmatic, technical advice focused on project
available later on about the exact footprint of the     content.      We     emphasise       dialogue     and
project makes it possible to prepare a Resettlement     communication both within the team as well as with
Action Plan. Other specific plans we have               external project stakeholders. Our reporting
experience with include:                                identifies and quantifies the risks, and includes the
• Occupational Health and Safety Plan                   likelihood of occurrence as well as possible
• Traffic Management Plan                               mitigation measures. This list can be used for
• Waste Management Plan                                 highlighting focus areas for future observation as the
• Biodiversity Management Plan                          project progresses. The report also contains
                                                        requirements that can be included in the Common
• Monitoring Plan
                                                        Terms Agreement, as a Condition Precedent (CP) or
• Emergency Preparedness and Response Plan
                                                        in an Environmental and Social Action Plan
• Etc.
                                                        (ESAP).

E&S Management System
As required by IFC PS1, where environmental or
social risks and impacts are identified, the project
promotor/sponsor is required to manage them
through an Environmental and Social Management
System (ESMS) appropriate to the nature and scale
of the project. Depending on the stage of
development of such an ESMS we provide our
expertise in the development and implementation of
the different elements of the system.

2-2-2021          ENVIRONMENTAL AND SOCIAL PERFORMANCE                   BZ1056-RHD-ZZ-XX-CS-Z-       4
                                                                                           0001
Environmental & Social Performance Services - CAPABILITY STATEMENT - Royal ...
Open

3          Our Project Experience
Royal HaskoningDHV has more than 35 years’ experience in delivering Environmental and Social
Consultancy Services worldwide. This section presents a cross section of Royal HaskoningDHV experience
in the last decade.

Clients range from major multinationals, to large and medium sized companies, from national government
to local authorities, to a number of international financing institutions. We have worked in many sectors,
including:
• Energy & Renewables                                      • Ports and Terminals
• Oil & Gas                                                • Airports
• Mining                                                   • Roalds and Railways
• Water Technology                                         • Agribusiness
• Rivers, Deltas and Coasts

                                                                        “I was impressed with Royal HaskoningDHV
    “Throughout the 5 years of their involvement as
                                                                        practical and common sense approach to the work,
    Lender's Advisor, Royal HaskoningDHV
                                                                        whilst also having a comprehensive understanding
    environmental and social specialists were instrumental
                                                                        of best practice and relevant international
    in getting our project compliant with IFC Performance
                                                                        standards. Their approach in working with local
    Standards”
                                                                        people was relaxed and respectful and in line with
                                                                        our internal policy of working with local
    Azura Power ESG Director about our Lender’s
                                                                        communities.”
    Advisor role for the Azura-Edo 450MW Independent
    Power Plant, Nigeria
                                                                        Alliance Mining Commodities General Manager
                                                                        about our undertaking of the ESIA for the Koumbia
                                                                        Pit-to-Port project, Guinea.

     “‘Royal HaskoningDHV have provided
     strategic advice and technical expertise
     to help us agree construction
     documents with all our stakeholders so
     we could start construction on time.”

     Ørsted Hornsea Project Two Consent                                                   "Royal HaskoningDHV
     Manager about our role in discharging                                               delivered real value to our
     the consent requirements for Hornsea                                                Oman GTL project. I was very
     Project Two, the UK                                                                 pleased to see the
                                                                                         commitment at all levels of the
                                                                                         organization. The highlight of
                                                                                         the project was the ability to
                                                                                         bring local talent to the project
     “I would like to extend EBRD’s compliments to Royal HaskoningDHV                    and increasing Shell’s positive
     team for pulling together such a comprehensive report. I feel that the              footprint.”
     E&S components of the report accurately reflect the current status of
     the project and compliance against EBRD’s Performance                               Shell Global Solutions E&S
     Requirements.”                                                                      Performance Lead about our
                                                                                         execution of the ESIA Scoping
     EBRD Senior Environmental Advisor about our first Lender’s                          Study for the GTL Project in
     Independent Monitoring report for the Nador West Med project,                       Duqm, Oman
     Morocco

2-2-2021              ENVIRONMENTAL AND SOCIAL PERFORMANCE                         BZ1056-RHD-ZZ-XX-CS-Z-           5
                                                                                                     0001
Open

3.1 Energy & Renewables

                                               OnePower Lesotho 20 MW PV plant
                                               OnePower Africa is a fast-growing startup based in Lesotho with the
                                               mission to bring electricity to underserved communities in
                                               developing countries. A 20 MWatt Photovoltaic plant is proposed
                                               for development in the Mafeteng district, Lesotho.

                                               Royal HaskoningDHV conducted the project ESIA to IFC standard,
                                               approved by authorities in 2020. The Abbreviated Resettlement
                                               Action Plan (ARAP), including a full census of landowners, is being
                                               carried out in line with IFC and African Development Bank (AfdB)
Client:    OnePower
           US Trade and Development            standard for completion in 2021.
           Agency, AfdB, UKEF, SACE

Country:   Lesotho
Year:      2019 - 2021

                                               PORTHOS Carbon Capture and Storage (CCS)
                                               CO2 Capture & Storage (CCS) project PORTHOS is Europe’s first
                                               project storing CO2 in a produced gas field offshore. The Port of
                                               Rotterdam, together with Gasunie and EBN, intend to create an
                                               infrastructure in the port of Rotterdam to transport CO2.

                                               In order to do so, both an Environmental Impact Assessment (EIA)
                                               and permit application are required, both conducted by Royal
                                               HaskoninDHV. The EIA was carried out, in consultation with client
                                               and authorities, as an interactive i-Report. It involves assessing
                                               the impacts of the construction of the transportation pipelines
Client:    PORTHOS                             onshore and offshore, the impact of a compressor station, and the
                                               storage of CO2 in the deep subsurface.
Country:   Netherlands
Year:      2020

                                               Central Termica de Temane
                                               Mozambique Power Invest in a joint development agreement with
                                               Sasol New Energy Holdings intend to develop the a gas fired power
                                               plant (Central Termica de Temane).

                                               Royal HaskoningDHV acted as the Lenders Independent
                                               Environmental and Social Advisor. The assessment includes the
                                               review and analysis of Project documentation, in particular the
                                               Project’s Environmental, Social and Impact Assessment, specialist
                                               reports and management plans. A site visit was conducted to the
Client:    International Finance Cooperation
                                               site to validate the results of the previous assessment and
           (IFC) and U.S. International
           Development Finance Corporation
                                               consultations were held with representatives of the local
           (DFC)                               administration and potentially affected communities.
Country:   Mozambique
Year:      2020

2-2-2021            ENVIRONMENTAL AND SOCIAL PERFORMANCE                       BZ1056-RHD-ZZ-XX-CS-Z-    6
                                                                                                 0001
Open

                                           Training of Trainers Waste to Energy in China
                                           The objectives of the assignment was to develop and deliver a
                                           training program on international Best Available Technologies
                                           (BAT), Best Environmental Practices (BEP) for the design,
                                           operation and maintenance of Waste to Energy (WtE) plant using
                                           Municipal Solid Waste (MSW) as feedstock. The environmental
                                           aspects of the training included: site visit to three WtE plants to
                                           understand issues of the current operations, environmental profile
                                           of the plants, and identify the training needs of plant managers and
Client:    Foreign Environmental
           Cooperation Center              operators; develop training materials on Environmental
Country:   China                           Performance and Best Practices covering sheets, syllabi,
Year:      2019-ongoing                    exercises and case studies; testing of trainees understanding of
                                           training through working on a case study; support trainees with
                                           preparations towards the execution of nationwide training on WtE
                                           in China.

                                           Samgori South Dome Underground Gas Storage
                                           The planned SSD Underground Gas Storage, located in Gardabani
                                           municipality east of Tbilisi, is a strategic infrastructure supporting
                                           the improvement of energy security of Georgia and providing
                                           guaranteed supply of consumers with natural gas in any possible
                                           critical situation. It includes injection as well as production facilities,
                                           several wells, a condensate pipeline, connection to the main gas
                                           trunk line and an overhead transmission line.

                                           Royal HaskoningDHV delivered the ESIA to Georgian and EIB
Client:    Georgian Gas Storage Company,   Environmental and Social Standards, including Stakeholder
           with funding by KfW and EIB
                                           Engagement Plan (SEP), Environmental Management and
Country:   Georgia
Year:      2019
                                           Monitoring Plans (ESMMPs), Resettlement/Livelihood Restoration
                                           Framework and Plan, HSE Plan, Emergency Response Plan, Spill
                                           Response Plan for drilling operations, and Waste Management
                                           Plan.

                                           Menengai Geothermal Power Plant
                                           The Project concerns the design, build and operate of a Geothermal
                                           Power Plant of 35 MW at Menengai geothermal field in Nakuru
                                           County. The project company is Quantum Power East Africa GT
                                           Menengai Ltd.

                                           Royal HaskoningDHV was contracted to perform E&S Due
                                           Diligence for the Lenders (AfdB and Finnfund), against the IFC PS
                                           and the AfdB E&S Safeguards. The report concluded with an ESAP
                                           and Conditions Precedent. Key elements of the report were land
Client:    African Development Bank,
                                           legacies and register analysis, stakeholder engagement with local
           Finnfund
Country:   Kenya
                                           communities and technical assessments of groundwater modelling
Year:      2018-2019                       and air quality modelling.

2-2-2021            ENVIRONMENTAL AND SOCIAL PERFORMANCE                      BZ1056-RHD-ZZ-XX-CS-Z-        7
                                                                                                0001
Open

                                              ESIA and RPF for Wapsila Ewekoro IPP
                                              The Wapsila Ewekoro Independent Power Producer (IPP) project
                                              consists in 310 MW Power Generation Station (comprised of an
                                              existing 90 MW power plant and a new 220 MW power plant) and a
                                              new ~5 km high voltage transmission line and new substation to
                                              integrate the Power Generation Station to the national grid.

                                              Royal HaskoningDHV upgraded the ESIAs and Resettlement
                                              Policy Framework (RPF) prepared by national consultants to have
Client:    Wapsila, a consortium formed by
           Lafarge Africa, Wärtsilä and the
                                              them to meet IFC Performance Standards and relevant World Bank
           IFC                                EHS guidelines.
Country:   Nigeria
Year:      2016

                                              Hydropower plant near the Ugandan/Tanzanian border
                                              A proposed new Berkely Energy hydro power plant situated near
                                              the Ugandan/Tanzanian border required an E&S Due Diligence
                                              assessment using the IFC Performance Standard and EHS
                                              guideline.

Client:    FMO and Investec

Country:   Uganda and Tanzania
Year:      2016 – 2019

                                              Western Uganda Mini-hydropower and Rural Electrification
                                              Project
                                              The project involved a full feasibility study and concept engineering
                                              for 10 mini hydropower units with together a total capacity of 12
                                              MW, which means electrification for 72,000 households. For each
                                              location a separate ESIA and Resettlement Action Plan (RAP) has
                                              been prepared to enhance the benefits of the small hydro plants for
                                              the local communities and reduce the adverse effects. The ESIAs
                                              follow Ugandan and IFC regulations.

Client:    Ministry of Energy and Mineral
           Development
Country:   Uganda
Year:      2011-2015

2-2-2021             ENVIRONMENTAL AND SOCIAL PERFORMANCE                      BZ1056-RHD-ZZ-XX-CS-Z-     8
                                                                                                 0001
Open

                                               Hornsea Project One and Two
                                               Initially for Hornsea Project One (HOW01) we provided a peer
                                               review role for Ørsted during the preparation of the Environmental
                                               Impact Statement (EIS) and consent process. This involved
                                               technical review of Environmental Statement Chapters and
                                               provision of strategic advice to ensure no overly arduous
                                               construction requirements were placed on Ørsted.

                                               Since the award of consent for HOW01 we have provided a suite of
Client:    Ørsted                              post consent services including ecology surveys, management of
                                               intrusive archaeology surveys, technical advice for traffic
Country:   UK                                  management, flood management, contaminated land and
Year:      2012- 2019
                                               landscape management. We have lead on all consultation
                                               requirements with UK regulators both planning and
                                               environmental. We have then provided continued consenting and
                                               environmental support through construction. This includes
                                               additional consents, environmental reporting and auditing of the
                                               principal contractor. A similar role was performeed as well on
                                               Hornsea Project Two (HOW02).

                                               Central Receiver and Parabolic Trough Solar Technologies
                                               Undertook a comprehensive EIA, which included a Social and
                                               Economic Impact Assessment for a proposed project that will
                                               include the installation of two different solar electricity technologies,
                                               namely a 150MW Central Receiver a 150MW Parabolic Trough
                                               development and their associated electricity and bulk water
                                               infrastructure.

Client:    Solafrica Photovoltaic Energy
           Limited
Country:   South Africa
Year:      2015-2016

                                               IDA Geothermal Power Plant
                                               YERKA Electricity Generation Inc. is undertaking the development
                                               of IDA Geothermal Power Plant in Canakkale province of western
                                               Turkey.

                                               Royal HaskoningDHV was contracted to deliver an ESDD Industrial
                                               Development Bank of Turkey (TSKB) and World Bank in
                                               accordance with the national regulatory requirements, World Bank’s
                                               (WB) applicable Operational Policies (OPs) and IFC PS and
                                               relevant EHS guidelines. In addition were developed a Stakeholder
Client:    YERKA Electricity Generation Inc.
                                               Engagement Plan (SEP) and other relevant Environmental and
           with funding by WB through          Social Management and Monitoring Plans (ESMMPs) including, but
Country:   TSKB
           Turkey                              not limited to, Land Acquisition and Resettlement Action Plan, HSE
Year:      2018-2019                           Plan, Emergency Response Plan, Waste Management Plan,
                                               Pollution Prevention Plan for drilling, construction and operation
                                               phases of the Project.

2-2-2021             ENVIRONMENTAL AND SOCIAL PERFORMANCE                        BZ1056-RHD-ZZ-XX-CS-Z-        9
                                                                                                   0001
Open

3.2 Oil & Gas

                                                Azura-Edo Independent Power Plant
                                                The Azura-Edo IPP is a 450MW Open Cycle Gas Turbine power
                                                station being constructed near Benin City in Edo State. It is Phase
                                                1 of a greenfield 1,500MW IPP facility located on a 100-hectare site,
                                                large enough to accommodate future expansion of the power plant.
                                                Greenfield gas turbine power plant in in Edo State. The project dealt
                                                with impacts in terms of economic and physical displacement.
                                                Royal HaskoningDHV was appointed as Lender’ Advisor to assess
                                                the Technical, Environmental and Social risks of the project. Our
 Client:     Azura Power                        E&S Due Diligence report contained an in-depth assessment of the
             (lenders: FMO, IFC and others)
                                                site as resettlement took place. It also contained an Environmental
 Country:    Nigeria
 Year:       2013 - 2020
                                                and Social Action Plan (ESAP) that was included in the Common
                                                Term Agreement. Regular monitoring visits have been conducted
                                                during the whole construction phase. Royal HaskoningDHV further
                                                guided the project to attain Lender-approved closure on the
                                                Resettlement Action Plan (RAP).

                                                Shell Duqm Gas-to-Liquid (GTL) plant
                                                Shell is in the process of developing of a new GTL plant in the Al
                                                Wusta governorate of the Sultanate of Oman, situated within the
                                                Special Economic Zone of Duqm (SEZAD). The concept of the GTL
                                                plant is to produce natural gas from the Mabrouk North East and the
                                                Greater Barik fields, process this natural gas, a diverse package of
                                                products will be produced, consisting of transport fuels, lubricants,
                                                waxes and chemicals.
Client:     Shell Global Solutions
Country:    Oman
Year:       2019-2020                           Royal HaskoningDHV was contracted to conduct the ESIA Scoping
                                                Study including preliminary baseline studies (air, noise, soil,
                                                hydrology, terrestrial ecology, marine ecology, socio-economic
                                                etc.), alternatives analysis, a baseline studies plan, overview of
                                                environmental and social impact aspects and modelling studies.

                                                Freetown Floating Storage Unit (FSU)
                                                The IFC wishes to explore the possibility for a Floating Storage Unit
                                                (FSU) based LNG terminal situated in the harbour of Freetown,
                                                Sierra Leone. The IFC is undertaking early stage development work,
                                                which is intended to lead to the selection of a strategic partner and
                                                subsequent full development and financing of the Project.

                                                Royal HaskoningDHV was contracted to assist with tasks related to
                                                the development of an ESIA Scoping Study setting the path toward
                                                a “bankable” ESIA as part of eventual project financing. This work
Client:     International Finance Corporation
            (IFC)                               has being conducted in parallel with technical site selection and
                                                conceptual studies (also carried out by Royal HaskoningDHV) and
Country:    Sierra Leone
                                                to develop a business plan, the commercial concept, open season
Year:       2019
                                                design, and pre-marketing activities.

2-2-2021              ENVIRONMENTAL AND SOCIAL PERFORMANCE                       BZ1056-RHD-ZZ-XX-CS-Z-    10
                                                                                                   0001
Open

                                      NLNG Train 7 Project
                                      This Project consists of construction and operation of one additional
                                      complete liquified natural gas (LNG) train and a common
                                      liquefaction unit at the existing Nigeria LNG Ltd (NLNG) facility on
                                      Bonny Island, in the Niger Delta. The project will increase the LNG
                                      capacity from 22 million tonnes per annum (mtpa) to 30 mtpa.

                                      Royal HaskoningDHV was contracted to update and revalidate the
                                      ESIA for the Project. We conducted the ESIA including noise
Client:    Shell Global Solutions     modelling, ambient air modelling, GIS services, field work, Critical
Country:   Nigeria                    Habitat Assessment, Social Impact Assessment, Underwater Noise
Year:      2018 - 2019
                                      Modelling, Effluent Modelling, SDG’s Quick Scan etc. NLNG
                                      received the environmental permit in March 2019. The International
                                      ESIA was approved by the lenders in September 2019, before
                                      financial close in Decembre 2019.

                                      Duqm Petrochemical Project
                                      Duqm Refinery and Petrochemical Industries Company (DRPIC)
                                      are planning to develop integrated refinery and petrochemical
                                      projects in Duqm. The Duqm Petrochemical Project (DPP) is a
                                      grassroots petrochemical facility and comprises three key
                                      development areas:
                                      1. A Petrochemical Complex at Duqm;
                                      2. An Natural Gas Liquids (NGL) Extraction Plant at Saih Nihayda;
                                      and
                                      3. An NGL Pipeline from Saih Nihayda to Duqm.
Client:    DRPIC
Country:   Oman
                                      Royal HaskoningDHV was contracted to conduct the ESIA
Year:      2020 - 2021                Baseline studies for all three studies including air monitoring, soil
                                      sampling, hydrological investigations, terrestrial ecology, marine
                                      ecology and stakeholder engagement.

                                      Nord Stream 2 pipeline Russian landfall
                                      Two 48” pipelines of Nord Stream 2 will largely follow the already
                                      existing Nord Stream pipelines over some 1200 km. The Russian
                                      landfall for Nord Stream 2 is planned at a different location. The
                                      Narva Bay route has been selected as having the least
                                      environmental impact for the Russian landfall. This route crosses
                                      the Kurgalsky Peninsula Nature Reserve/Sanctuary both in
                                      nearshore waters and on land.
Client:    Nord Stream 2 AG
Country:   Russian Federation         Royal HaskoningDHV acts as Independent Technical and
Year:      2017-2020                  Environmental Advisor and review and provide constructive
                                      guidance on the technical, environmental and social aspects related
                                      to the implementation of the Kurgalsky Crossing in Russia (landfall).
                                      We challenge the technical design through participation in
                                      engineering and environmental meetings and monitor the
                                      construction phase by periodical site visits.

2-2-2021             ENVIRONMENTAL AND SOCIAL PERFORMANCE              BZ1056-RHD-ZZ-XX-CS-Z-    11
                                                                                         0001
Open

                                          Drilling exploration Shpirag 5 Albania
                                          Shell Upstream Albania is planning the drilling of several oil
                                          exploration wells in the southern Albanian mountain of Shpirag.

                                          Royal HaskoningDHV was appointed to conduct the ESHIA of the
                                          project in line with the national legislation and IFC Performance
                                          Standards.The ESHIA paid particular attention to stakeholder
                                          engagement and communication with the local communities on the
                                          environmental aspects of the project.
Client:    Shell
Country:   Albania
Year:      2018-2019

                                          ESMS Building and Training for Impala Energy
                                          The Ebedei Compressed Natural Gas (CNG) compressor station
                                          will comprise of eight compressors, each with a capacity of 1,600
                                          scm/h that compresses that gas to 250 bar. Royal HaskoningDHV
                                          was asked to develop an Environmental and Social Management
                                          System (ESMS) for both the construction and the operational
                                          phase. The ESMS includes the integrated management of all
                                          relevant aspects: OHS, HSE, Traffic, (Community) Security,
Client:    Impala Energy, APM Gas         Stakeholder Engagement, Cultural Heritage, Local Content and
Country:   Nigeria                        Waste. The ESMS was built along an ISO 14001 structure. The
Year:      2018-2019                      conclusion of the ESMS was a 3-day training by Royal
                                          HaskoningDHV of all construction staff in Lagos.

                                          Liwa Plastic Industries Complex Project
                                          ORPIC is planning the installation of a new petrochemical complex
                                          which will comprise a NGL extraction plant, a 300km pipeline and a
                                          petrochemical complex.
                                          Royal HaskoningDHV was appointed by ORPIC to conduct a gap
                                          analysis of the EIA documentation and management plans to
                                          ensure that these were compliant with national regulation and
                                          International Standards. We also advised for additional air quality
                                          and noise baseline measurements as well as soil and groundwater
Client:    Oman Oil Refineries and        baseline measurements. We also conducted a detailed review of
           Petroleum Industries Company   the contractor’s management plans including Wastewater and
Country:   (ORPIC)
           Oman                           Water Supply, Construction ESMP, Emergency Response Plan,
Year:      2016                           Chance Find Procedure, Training Plan, Site Security & Security
                                          Personnel Management Plans, Labour Camp Management Plan,
                                          Human rights protection and worker accommodation.

2-2-2021            ENVIRONMENTAL AND SOCIAL PERFORMANCE                  BZ1056-RHD-ZZ-XX-CS-Z-   12
                                                                                            0001
Open

                                            BOST Natural Gas Pipeline
                                            FEED Services for ~750 km of Buried Pipeline Build-out in Ghana.
                                            Royal HaskoningDHV delivered Environmental and Social (E&S)
                                            consultancy services relevant during the FEED phase, including the
                                            identification of E&S considerations to be taken into account in the
                                            Conceptual Study and E&S constraints for the selection of the
                                            pipeline route (based on satellite imagery analysis of land-use /
                                            land-cover for a 200m corridor).

Client:     Penspen (for Bulk Oil Storage
            and Transportation Company
            Limited – BOST)

Country:    Ghana
Year:       2016-2017

                                            Turk Stream Offshore Natural Gas Pipeline Turkish Sector
                                            The TurkStream Project, extending from the Russian Federation to
                                            the Republic of Turkey through the Black Sea, is a new natural gas
                                            pipeline that will provide a new route to supply natural gas to Central
                                            and Eastern European countries from Russia.

                                            Royal HaskoningDHV has prepared the Environmental Impact
 Client:     South Stream Transport B.V.    Assessment (EIA) study for the Project which covers the section of
                                            the pipeline that starts from the Turkey-Bulgaria Exclusive
 Country:    Turkey                         Economic Zone (EEZ) Kilometer Marker 660 (KP660) up to and
 Year:       2015- 2017
                                            including the Turkish shore.

                                            Nustar Terminal Expansion
                                            Nustar Energy owns a liquid bulk terminal on Sint Eustatius, a small
                                            island in the Caribbean Sea. The land available for expansion is
                                            situated next to the airport, close to the village and nearby several
                                            terrestrial protected nature areas. The island is surrounded by a
                                            Marine Reserve due to the presence of sea turtles and has
                                            impressive archaeological remainders.

                                            Royal HaskoningDHV delivered the EIA Memorandum which was
                                            communicated to all the stakeholders. Later on, we executed
Client:     Nustar Energy LP
                                            several impact studies, including specific ecological marine and
Country:    Sint Eustatius (Caribbean)
                                            terrestrial surveys, archaeological surveys and a visual impact
Year:       2011-2015
                                            assessment.

2-2-2021              ENVIRONMENTAL AND SOCIAL PERFORMANCE                    BZ1056-RHD-ZZ-XX-CS-Z-     13
                                                                                                0001
Open

3.3 Mining

                                             Koumbia Bauxite Pit-to-Port Project
                                             The project consists of a conventional open pit bauxite mining
                                             operation, a 120 km road connection to an inland port and transport
                                             by barges to a floating transfer terminal.
                                             ▪ 2011-2013: ESIA of the project in line with IFC PS and Guinea
                                                 regulations. ESIA provided input into the Bankable Feasibility
                                                 Study and was approved by authorities resulting in
                                                 environmental license
Client:     Alliance Mining Commodities      ▪ 2016: Addendum to the approved ESIA to update impacts and
            Ltd (AMC)                            measures following the project design change (change of
Country:    Guinea                               transport corridor from the mine to the river port)
Year:       2011-2017                        ▪ Since 2017: As a roll-out of the ESIA, supporting AMC with the
                                                 development of an E&S Management System for the project
                                                 in line with IFC PS.

                                             Social Best Practice Framework for a Coal Mining Region
                                             Tasked to perform a high-level due diligence on emerging coal
                                             miners in the Waterberg region of the Limpopo Province, using the
                                             IFC’s performance standards as the benchmark. Together with on-
                                             site qualitative data collection, develop a social (and environmental)
                                             best practice standard for such emerging miners in the Waterberg
                                             region that would ultimately be supplying Eskom with coal.

Client:     Eskom (S.A. Electricity Supply
            Commission)
Country:    South Africa
Year:       2015

                                             North Yorkshire Polyhalite Project
                                             The project includes a new potash mine (~1750m deep) situated in
                                             the North York Moors National Park, a subterranean mineral
                                             transport system (36.5km tunnel at ~300m depth), and material
                                             handling/processing plant and harbour at Teeside.

                                             Royal HaskoningDHV led the production and submission of the
                                             Environmental Statement, providing technical leadership and
                                             project management services to the client, including acting as Tier
 Client:    Sirius Minerals                  1 environmental consultant and coordinating a wide range of
                                             environmental services delivered by other consultants. Royal
 Country:   UK                               HaskoningDHV were an embedded part of the client team, involved
 Year:      2013-2019                        in the planning strategy, regulatory and stakeholder engagement,
                                             and conveyor and port designs. Since the initial ES and applications
                                             stage, Royal HaskoningDHV has been providing services in support
                                             of project delivery, including: EIA for various consent amendments
                                             and variations; Hazardous Substances Consent; Waste and
                                             Environmental Permitting; Post-consent and Contractor support.

2-2-2021              ENVIRONMENTAL AND SOCIAL PERFORMANCE                    BZ1056-RHD-ZZ-XX-CS-Z-     14
                                                                                                0001
Open

3.4 Water Technology

                                             Glen Valley Wastewater Treatment Plant Reuse and Drinking
                                             Water Supply
                                             The Water Utilities Corporation (WUC) of Botswana (who are
                                             responsible for the supply of potable water to the greater Gaborone
                                             area) intends using treated wastewater for re-use as drinking water
                                             with the aim to alleviate the scarcity of water supply in the greater
                                             Gaborone area.

                                             With RVO as the financiers the Botswana Government
                                             commissioned Royal HaskoningDHV to undertake the reuse study
Client:    Botswana Government / RVO
           (Netherlands Enterprise Agency)
                                             including the production of a bankable Environmental and Social
                                             Scoping Study.
Country:   Botswana
Year:      2020 - 2021

                                             Sustainable Water Services Harar
                                             The objective of the SWSH project is to provide water infrastructure
                                             to a part of Harar City, Ethiopia that is currently unconnected to the
                                             piped water system. The project consists of an off-take from the
                                             water transmission pipeline from the Erer well field to Harar, a water
                                             distribution reservoir of 500 m3 to connect 13,868 people in 2028.
                                             The project is being carried out in a socially complex context.

Client:    RVO (Netherlands Enterprise       As part of the project an Environmental and Social management
           Agency)
Country:   Ethiopia                          Plan (ESMP) for the construction and operation phase of the project
Year:      2019 - ongoing                    has been prepared.

                                             Pyigiytagon water supply project
                                             Objective of the project is developing a sustainable water supply
                                             system for the Pyigyitagon township (approximately 70% of the
                                             township does not have access to piped water supply).

                                             Royal HaskoningDHV prepared a subsidy application (€30 million)
                                             including ESIA and corresponding management plans, Land
                                             Acquisition & Compensation Framework Plan to suit Lender
                                             (RVO) requirements. The main goal was to comply with
                                             international human rights standards. As a result, the project was
                                             granted with the subsidy. Construction will commence in August
Client:    Ballast Nedam International       2019 and substantial completion is expected in December 2020.
           Projects                          Royal HaskoningDHV will play a role during implementation of the
Country:   Myanmar                           project as EPC coordinator.
Year:      2018 - ongoing

2-2-2021             ENVIRONMENTAL AND SOCIAL PERFORMANCE                     BZ1056-RHD-ZZ-XX-CS-Z-     15
                                                                                                0001
Open

                                             La Paz drinking water project
                                             ESIA of the extension of a water supply plant of Pampahasi in La
                                             Paz and the improvement of the efficiency of water use in La Paz.
                                             The ESIA followed international and Bolivian regulations.The
                                             environmental baseline and impact assessment documents were
                                             prepared by EPSAS with support of Royal HaskoningDHV to reach
                                             international standards.

                                             In addition to the impact assessment, we also support the
                                             Environmental and Social supervision of the construction phase
Client:    EPSAS (Water Company of
           Greater La Paz) / RVO
                                             of the project.
           (Netherlands Enterprise Agency)
Country:   Enterprise Agency
           Bolivia
Year:      2017-ongoing

                                             Kigali Waste water project
                                             This project consists of the collection of urban wastewater in the
                                             centre of Kigali, the transportation to the treatment plant via a trunk
                                             main and a treatment plant itself. The Water Company of Rwanda
                                             (WASAC) is the beneficiary and future operator of the plant.
                                             Especially the trunk main will result in involuntary resettlement.

                                             Royal HaskoningDHV prepared an ESIA, and Resettlement Policy
                                             Framework and Stakeholder Engagement Plan in line with EIB
Client:    Government of the Republic of     and IFC Environmental and Social Safeguard standards, but also
           Rwanda, EIB (European             Rwandan legislation.
           Investment Bank)
Country:   Rwanda
Year:      2015-2016

2-2-2021            ENVIRONMENTAL AND SOCIAL PERFORMANCE                       BZ1056-RHD-ZZ-XX-CS-Z-     16
                                                                                                 0001
Open

3.5 Rivers, Deltas and Coasts

                                         Nyaungdon Bank Protection and Rehabilitation Project
                                         The project involves implementation of structural and non-structural
                                         measures to avoid riverbank erosion along the Pan Hlaing River
                                         and reduce flood risks in Nyaungdon City.

                                         Royal HaskoningDHV was tasked to determine the preferred design
                                         to protect the embankment and develop a detailed design for the
                                         works along a riverbank which is densely populated and utilised. An
Client:    RVO (Netherlands Enterprise
                                         ESIA and Resettlement Policy Framework are also requested for
           Agency)
                                         completion. The project is financed by RVO and implementation is
Country:   Myanmar
Year:      2020 - ongoing                potentially co-financed by the World Bank. Hence, The ESIA had to
                                         comply with both WB Environmental and Social Policies as well as
                                         Myanmar national EIA Procedures.

                                         Deferred and Routine Maintenance Dredging of the Odaw
                                         Drainage Basin in Accra
                                         Various problems come together in the catchment of the Odaw
                                         River in the Greater Accra Regions: reduced drainage capacity in
                                         channels by sedimentation, resulting in flooding; informal settlers
                                         living close to the channels and encroaching the area and; limited
                                         sanitation (solid waste, wastewater, open defaecation, storm water)
                                         in the area resulting in dumping waste in the channels.

Client:    RVO (Netherlands Enterprise   A dredging strategy to provide short-term alleviation and longer-
           Agency)                       term maintenance will be developed, including identification of
Country:   Ghana
                                         disposal sites for dredged materials, sand trap locations and
Year:      2019 - ongoing
                                         options for the future use of a large weir in de Odaw River. Of this
                                         strategy and related works, an ESIA including a project specific
                                         Resettlement Policy Framework are being prepared in line with
                                         Ghanaian and WB Standards.

                                         The Ocean Cleanup’ Interceptor™ Deployment in Ozama River
                                         According to The Ocean Clean-up, roughly 3 million kg of plastic
                                         annually enters the ocean through Ozama River. The Interceptor is
                                         deployed with the aim to remove plastic from the river before it can
                                         reach the ocean.

                                         Royal HaskoningDHV was commissioned to support The Ocean
                                         Clean-up and their partner UNDP by conducting a Rapid Appraisal
Client:    The Ocean Cleanup             of the Environmental and Social impacts of their project to
                                         deploy an Interceptor in Ozama River in Santo Domingo. The
Country:   Dominican Republic            assessment paid special attention to the ecological impact of the
Year:      2020                          deployment of the Interceptor and the by-catch of water hyacinth
                                         during its operation.

2-2-2021            ENVIRONMENTAL AND SOCIAL PERFORMANCE                 BZ1056-RHD-ZZ-XX-CS-Z-    17
                                                                                           0001
Open

                                             Master Plan of the City of Beira
                                             As part of the implementation of the Master Plan of the City of Beira,
                                             the Municipal Council of Beira intends to develop residential and
                                             industrial projects on 500 h each one. In order to allow the land
                                             levelling of these 2 projects, it will be also necessary to dredge
                                             sands from Macúti Bay, Sofala Province.

                                             For each of the 3 Projects, Royal HaskoningDHV carried out the
                                             following tasks:
 Client:    RVO (Netherlands Enterprise      • Environmental Feasibility Study and Scope Definition (EPDA);
            Agency)                          • Elaboration of Terms of Reference for Impact Assessment;
 Country:   Mozambique
                                             • Impact Assessment & Management Plan;
 Year:      2017-present
                                             • Full Stakeholder Engagement Process and Resettlement
                                                  Policy Framework.

                                             ESIA Passenger Transport Chindwin River Myanmar
                                             The Chindwin river basin suffers from illegal mining and
                                             deforestation activities, affecting the natural balance of the system
                                             and navigability of the river. People living along the Chindwin rely
                                             heavily for transportation on the Chindwin and the river itself has
                                             many challenges in socio-economic issues.

                                             Royal HaskoningDHV was commissioned to carry out the
                                             Environmental and Social Impact Assessment (ESIA) of a proposed
Client:     RVO (Netherlands Enterprise
                                             ferry line in which 10 to 20 specialized, very shallow draft
            Agency)
                                             passenger ferry vessels will be provided to the Myanmar
Country:    Myanmar
                                             Government. The ESIA complies with both IFC Standards and
Year:       2020 - 2021
                                             Myanmar EIA procedures.

                                             OmiDelta Delta Planning
                                             The Delta of the Ouémé consists of the flood plains of the Ouémé,
                                             Lac Nokoué and Cotonou Chenal to the sea. The Delta is densely
                                             populated, the Lac is polluted, while agriculture and fishing provide
                                             food security to the people.

                                             Royal HaskoningDHV provides Technical Assistance for Water
                                             Supply, Sanitation and Integrated Water Resources Management.
                                             This includes multi-stakeholder dialogue and a Strategic
                                             Environmental Assessment (SEA) to enhance environmental and
Client:     Government of Benin (financing
                                             social aspects in the Delta Plan.
            from the Netherlands Embassy)

Country:    Benin
Year:       2017-2021

2-2-2021             ENVIRONMENTAL AND SOCIAL PERFORMANCE                     BZ1056-RHD-ZZ-XX-CS-Z-     18
                                                                                                0001
Open

                                            Physical Restauration, Protection and Maintenance Works of
                                            Saly beach
                                            The coastal areas of Saly are currently severely impacted by
                                            coastal erosion. The potential increase in sea level rise threatens to
                                            impact further the current infrastructure built along the coastline
                                            (hotel, fishing village, houses, etc.). Saly, is one of the country's
                                            biggest tourist hubs; as such the Government of Senegal is looking
                                            to address this issue urgently.
Client:    APIX (Investment Promotion and
           Major Projects Agency / World    Royal HaskoningDHV, in partnership with HPR-Ankh, developed
           Bank                             the ESIA and a Resettlement Policy Framework (RPF) to gain
Country:   Senegal                          national consent and also to obtain financing from the World Bank.
Year:      2016                             The detailed review of the project components and alternatives
                                            highlighted early on key constraints which were considered further
                                            in the preliminary design. The consortium developed a tailored
                                            strategy for responsible parties to efficiently manage health, safety,
                                            environmental and social risks during construction and operation of
                                            the new coastal defence.

                                            Maldives Coastal Protection
                                            The densely populated island of Fuvahmulah (8,500 inhabitants) is
                                            experiencing severe erosion and flooding problems, threatening the
                                            safety and livelihood of the inhabitants. Coastal protection works
                                            have been designed to protect the island’s integrity.

                                            An ESIA was prepared to enhance this design in its environmental
                                            and social aspects. The ESIA was an important instrument to
                                            compare two viable alternatives: an offshore breakwater protection
                                            and an onshore revetment on the island ridge. The design was
Client:    Ministry of Environment
                                            adapted to create a sustainable solution to protect the island.
Country:   Maldives
Year:      2015-2016

                                            EKO Atlantic Land Reclamation
                                            South Energyx is undertaking the development of the Eko Atlantic
                                            project. Phase 1 concerns the Shoreline Protection Reclamation
                                            Project, approximately 900 ha of high quality land, requiring about
                                            90 million m3 of sand to be dredged from the selected borrow areas
                                            off the coast. Phase 2 concerns the development of Eko Atlantic
                                            City Master Plan itself including environmental and transport
                                            infrastructures for about 250.000 residents and 150.000
Client:    South Energyx Nigeria Limited    commuters.

Country:   Nigeria                          Besides marine designs and marine supervision construction works
Year:      2012-2016                        Royal HaskoningDHV conducted ESIAs for both project phases
                                            including follow up requirements to comply with local regulations as
                                            well as international standards.

2-2-2021             ENVIRONMENTAL AND SOCIAL PERFORMANCE                    BZ1056-RHD-ZZ-XX-CS-Z-     19
                                                                                               0001
Open

3.6 Ports and Terminals

                                         Guidelines for ESIA in the Port, Harbour and Terminal sector
                                         in Myanmar
                                         Environmental Impact Assessment legislation in Myanmar is well
                                         developed. However, the actual procedures and effectiveness of
                                         the instrument can be enhanced.

                                         Royal HaskoningDHV prepares, together with the Environmental
                                         Conservation Department in Myanmar, the Netherlands
                                         Commission on Environmental Assessment (NCEA) and Water
                                         Bridge Myanmar, Technical and Procedural Guidelines for
Client:    RVO (Netherlands Enterprise
           Agency)
                                         Environmental and Social Impact Assessments (ESIA) in the
                                         Port, Harbour and Terminal sector. We will provide training to
Country:   Myanmar                       Government Officials and other project proponents in Myanmar.
Year:      2020 - 2021

                                         Baku Green Port Strategy: EU support to the Enhancement of
                                         Operational Capabilities of New Port of Baku
                                         Technical assistance to the newly built Baku International Sea
                                         Trade Port with EcoPorts certification (successfully obtained in
                                         2019) and the development and implementation of the Green Port
                                         strategy and roadmap, covering all sustainability aspects of the
                                         port from pollution to energy use, health and safety, climate change
                                         resilience and communities development.

Client:    Port of Baku (EU funding)     In addition a a full review of the oil spill response contingency
                                         planning services was conducted to assist the client aligning their
Country:   Azerbaijan
                                         operations with industry best practise and compliance with
Year:      2018-2020
                                         Azerbaijani legislation

                                         Tema Port Dry Bulk Terminal
                                         Tema Port (Accra) is being re-positioned through an extensive
                                         expansion and modernization programme to better serve the needs
                                         of the trading sectors. The Tema Dry Bulk Terminal shall be the
                                         principal location for handling and temporary storage of dry bulk
                                         commodities, especially the cement-related cargoes such as
                                         clinker, lime, limestone, gypsum, cokes, coal, etc.

                                         Royal HaskoningDHV was contracted to conduct a Red Flag Due
Client:    Supercare                     Diligence to assess any potential environmental and social risk or
                                         opportunity for Supercare as candidate concessionaire to the Tema
Country:   Ghana
                                         Dry Bulk project. The DD consisted of a comprehensive desk to
Year:      2020
                                         literature and documentation review, a site visit and Q&A follow ups.

2-2-2021               ENVIRONMENTAL AND SOCIAL PERFORMANCE               BZ1056-RHD-ZZ-XX-CS-Z-    20
                                                                                            0001