CAPABILITY STATEMENT Environmental & Social Performance Services January 2021 Client: All Reference: BZ1056-RHD-ZZ-XX-CS-Z-0001 Status: S0/P01.01 Date: 2-2-2021
Open Table of Contents 1 Royal HaskoningDHV 1 1.1 Our Company 1 1.2 Our Markets 1 1.3 Fully Certified 3 1.4 Equality, Diversity and Inclusion 4 1.5 UN Sustainable Development Goals 4 2 Our Environmental and Social Performance Services 2 2.1 Impact Assessment 2 2.2 Management Planning 4 2.3 Lender’s Advisor 4 3 Our Project Experience 5 3.1 Energy & Renewables 6 3.2 Oil & Gas 10 3.3 Mining 14 3.4 Water Technology 15 3.5 Rivers, Deltas and Coasts 17 3.6 Ports and Terminals 20 3.7 Airports 24 3.8 Roads and Railways 25 3.9 Agribusiness 26 4 Our Team 27 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z-0001 ii
Open 1 Royal HaskoningDHV 1.1 Our Company 1.2 Our Markets Royal HaskoningDHV is an independent, We deliver our engineering, project management, international engineering and project management consultancy services and products in the markets consultancy with 140 years of experience. Our described below. Within these markets, we offer a professionals deliver services in the fields of range of services recognised as being at the aviation, buildings, energy, industry, infrastructure, forefront of their field. Our aim is to maintain or maritime, mining, transport, urban and rural obtain market leadership. Our clients are private development and water. companies of all sizes, from multinationals to small and medium-sized enterprises. We work for Backed by expertise and experience of 6,000 governments – national, regional and local. We work colleagues across the world, we work for public and for international semi-governmental organisations private clients in over 140 countries. We understand and finance institutes as well as not-for-profit the local context and deliver appropriate local organisations. solutions. Urban and Rural Development We focus on delivering added value for our clients while at the same time addressing the challenges that societies are facing. These include the growing world population and the consequences for towns and cities; the demand for clean drinking water, water security and water safety; pressures on traffic and transport; resource availability and demand for energy and waste issues facing industry. We aim to minimise our impact on the environment by leading by example in our projects, our own Population growth and changes in society, such as business operations and by the role we see in “giving an increasing desire for demand-driven sustainable back” to society. By showing leadership in transport, are bringing new challenges to both urban sustainable development and innovation, together and rural areas. Challenges also include sweltering with our clients, we are working to become part of cities, water and floods, ghettos and abandoned the solution to a more sustainable society now and industrial zones. We assist our clients with economic into the future. and market research to create spatial master plans, and draw on our multi-disciplinary expertise to shape every aspect of urban design, including water management, infrastructure, utilities and transportation. Our robust, resilient solutions unlock the potential of rural areas, balancing economic growth and investments with circularity and sustainability. Vital services include financial feasibility studies, environmental and social impact assessments. We develop plans to manage resources and improve ecologies, designing Our head office is in the Netherlands, other principal attractive living environments for the benefit of offices are in the UK, South Africa and Indonesia. communities and stakeholders We also have established offices in Thailand, India and the Americas; and we have a long standing presence in Africa and the Middle East. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 1 0001
Open Buildings Industry Whether an office, hospital, data centre, factory or Many of our industrial clients share a common school building, we approach our clients’ challenges objective: to produce high quality goods in the most strategically and holistically. We work in close efficient way possible. By working in close partnership with our private and public sector partnership with our food and beverage, customers to realise added value for their pharmaceutical, oil and gas, chemical and organisations, such as improving data centre automotive clients, we co-create solutions that are efficiency and reducing energy consumption. Our transforming industry through innovation. We solutions prioritise health, productivity and comfort, develop digital solutions that design reliable, whilst achieving KPIs related to asset performance sustainable and compliant assets and predict and management. Combining our domain expertise maintenance and provide timely insights. Combining with cutting-edge digital twin capability, our requirements and goals for both the CAPEX and consulting services ensure the best use of space, OPEX side of our client’s business, we provide data- materials and energy, while contributing to, business driven optimisation solutions that enhance and climate resilience. performance and minimise environmental impact for new and repurposed industrial sites. Energy Transport and Infrastructure Addressing the energy transition has become a central challenge for our clients. Our expertise in Well-functioning infrastructure helps societies thrive innovative energy solutions draws on over 30 years and individuals prosper. Smart planning, novel of consultancy experience in energy diversification. technologies and stakeholder management are We provide services across the whole value chain, achieving multiple goals and delivering wider from strategy and implementation to technology. Our societal benefit, such as the energy transition, clients’ needs are vast and diverse: from large-scale circularity, accessibility and reduced pollution. We wind and water infrastructure to technology are collaborating with clients to shape the new platforms that optimise energy use across a global mobility system, which balances individual needs for portfolio. Together we explore scenarios to deliver affordability and reliability with society’s need for the best possible solution for clients seeking leading- liveability and urban planning. edge sustainable power supplies 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 2 0001
Open Maritime Aviation We are a world leader in maritime port and Royal HaskoningDHV’s full subsidiary companies, infrastructure development and home to one of the NACO and InterVISTAS, are world leading aviation largest groups of maritime consulting engineers in consultancies. We provide independent industry the world. We are involved in high-profile maritime services to airports, airlines, governments, investors projects from Europe to Australia, and Asia to Latin and contractors. We are experts in airport America. By applying technology, drawing on our consultancy, transportation economics, policy and global expertise and consulting with specialist regulation advice, finance, master-planning, partners, we develop smart solutions working functional planning and design, building design and together with our clients. Our integrated, civil engineering. Our expertise in airport systems multidisciplinary approach means we can deliver all includes airport IT infrastructure and master the expertise required – optimising existing planning, as well as passenger terminal IT, security terminals, creating new port facilities, relocating and baggage handling systems. terminals or refurbishing facilities. 1.3 Fully Certified Water for the future Royal HaskoningDHV is committed to Quality, Health and Safety and Environmental (QHSE) Management and these lie at the heart of the management of all projects. A safe and secure living environment is ultimately about improving the quality of people’s lives and of systems, as cities, business and infrastructure become ever-more complex. A holistic vision is needed to plan for future development. Royal HaskoningDHV offers a seamless integration of Our global Management System is based on and consulting engineering, technology and software certified against the globally accepted international services related to water. These services accelerate standards ISO 9001:2015 (Quality), ISO adaptation to increasing demand and risks. To help 14001:2015 (Environment), ISO 45001:2018 navigate a world of increasing complexities, such as (Occupational Health & Safety) and ISO 27001:2013 fast-paced climate and societal change, we bring a (Information Security) and it covers QHSE, integrity, combination of the deep domain knowledge of our business continuity, knowledge management, engineering consultants, our award-winning information security and our business principles. technologies and emerging digital technologies such as digital twin and AI. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 3 0001
Open 1.4 Equality, Diversity and Inclusion Combined with our expertise we can help our clients to define, solve or even prevent problems. Together Royal HaskoningDHV is committed to promoting with our clients we adapt and learn from latest equality, diversity and inclusion (EDI) whilst technologies to grow our societal intelligence. We promoting a culture that actively values difference invest in our people, innovation and technologies to and recognizes that people from different efficiently integrate sustainability into our backgrounds and experiences can bring valuable (engineering) assignments. insights to the workplace to enhance the way we work. It our aim to be an inclusive organisation, In addition, if and when required or possible, we where diversity is valued, respected and built upon, actively contribute to enhancing the communities with ability to recruit and retain a diverse workforce who live and work in the surroundings of our project that reflects the communities it serves. locations. 1.5 UN Sustainable Development In our Operations Goals As an organisation committed to Enhance Society Together, we focus on the sustainable and efficient In our Projects management of our own operations. It reduces risks Our biggest contribution to inclusive sustainable and helps to ensure the long-term continuity of our development comes from integrating new ideas, business, while acknowledging our own role in technology, innovations and sustainability into our contributing to the SDGs. Just as in our projects, we products and services. More and more, we connect aspire with our partners to contribute to specific the digital with the real world. Working together with SDGs in order to focus our activities in the areas our clients and partners, we use data and algorithms where we can achieve maximum impact. to translate insights into foresights. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 4 0001
Open 2 Our Environmental and Social Performance Services 2.1 Impact Assessment Impact Assessment is a key management tool for solution for the proposed project to be achieved. decision-makers on development projects. It Following execution of the project, the impact predicts environmental and social impacts of assessment enables continued monitoring of projects at an early stage and presents options for impacts. avoiding or minimising negative impacts through alternative designs or mitigation measures. Impact Assessment should deliver information as objective as possible so it can be used by all Impact Assessment is best undertaken at the stakeholders: the proponent, the competent preliminary phase of the project or development, so authority, investors and the civil society. that recommendations can be incorporated into the evolving designs. This enables the optimum 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 2 0001
Open An integrated process strategic. Having determined the likely magnitude of an impact, it is then essential that the significance Our multidisciplinary teams take an integral is evaluated. Such evaluation may involve approach to the impact assessment process. Royal comparison with national, international or industry HaskoningDHV blends technical expertise in soil, standards. water, air, waste, ecology, legislation, and social expertise, with architectural, engineering, logistics • Define mitigation measures and alternatives and infrastructure knowledge. All significant impacts will be considered for Our practical project management experience mitigation and control through avoidance, allows us to guide a project from concept stage, to minimisation and compensation measures. eventual permitting and approval. Measures will be developed for incorporation in the project design, construction or operation phase. Also Combined with our organisational expertise, in areas essential is a consideration of alternatives that are such as training, public participation, communication environmentally and socially favourable. with stakeholders and institutional development, this Where the effectiveness of mitigation measures is makes us an excellent partner for the complete uncertain, or depends on assumptions about process. operational procedures, monitoring programmes and/or management procedures will be defined. Key steps delivered • Scope the impact assessment • Engage with stakeholders The scoping exercise ensures that there is a wide The impact assessment takes account of consensus on the eventual shape and emphasis of stakeholders concerns about potential the impact assessment, provides guidance during environmental and social issues. A Stakeholder the rest of the assessment process and partly Engagement Plan (SEP) is usually developed as represents the results of the stakeholder part of the ESIA. consultations at this stage. Other types of Impact Assessment • Describe the baseline Next the “standard” Impact Assessment, we deliver As part of the scoping study, an inventory of other types of assessment studies for specific available baseline data is conducted and missing purposes: data identified. When important information is missing, which is required for a proper impact • Strategic Impact Assessment assessment baseline field surveys will be required. • Cumulative Impact Assessment • Human Rights Impact Assessment • Identify and assess the impacts The identification and assessment of the The new digital ESIA, visual, interactive, environmental, social impacts are based on: collaborative • Project Description, Responding to the increasing demand for digitization • Legislative Review and Standards, and transparency, we have pioneered the way in • Environmental and Social Baseline, and which all data surrounding the impact of a project on • Concerns and expectations raised by the environment is visualised and shared. This is an stakeholders. inspirational world where ESIA reporting is quicker, more interactive, transparent, and accessible. A time All impacts will be identified whether they are when decision-making is rapid and efficient. beneficial or adverse, cumulative, short or long-term, temporary or permanent, direct or indirect, local or This is #TheNewEIS. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 3 0001
Open 2.2 Management Planning 2.3 Lender’s Advisor Our services don’t stop at the delivery and approval Sponsors of large and complex projects worldwide of the ESIA report. We further support our clients in look for finance from specialist investment banks. the next stages of their project development These projects all have a variety of technical, whether it is in the (detailed) engineering, environmental and social risks, and others which procurement, construction, operation or can include stakeholders, organisation and decommissioning phase. management, as well as political and contractual. Working closely with the investment banks we E&S requirements in procurement establish a dedicated team of engineering, social, process environmental, economic and legal professionals to We develop E&S specification to be included in perform the due diligence (i.e. ESDD’s) and/or tender documents and review E&S performance of independent monitoring. We use experts from our Contractors as part of the tendering process. local offices, if necessary hiring external specialist to complement our own team. Development of specific Management We fully understand and have extensive experience Plans in assessing compliance towards lender’s When the project moving forward more information environmental and social safeguards is available, which make it possible to develop more requirements (IFC Performance Standards, EBRD specific E&S Management Plans than the ones Performance Requirements, etc.). developed as part of the ESIA. We are successfully advising financial institutions and private clients on these issues. For example, while the information available during the ESIA process only allows to develop a Our due diligence and monitoring delivers Resettlement Policy Framework, information pragmatic, technical advice focused on project available later on about the exact footprint of the content. We emphasise dialogue and project makes it possible to prepare a Resettlement communication both within the team as well as with Action Plan. Other specific plans we have external project stakeholders. Our reporting experience with include: identifies and quantifies the risks, and includes the • Occupational Health and Safety Plan likelihood of occurrence as well as possible • Traffic Management Plan mitigation measures. This list can be used for • Waste Management Plan highlighting focus areas for future observation as the • Biodiversity Management Plan project progresses. The report also contains requirements that can be included in the Common • Monitoring Plan Terms Agreement, as a Condition Precedent (CP) or • Emergency Preparedness and Response Plan in an Environmental and Social Action Plan • Etc. (ESAP). E&S Management System As required by IFC PS1, where environmental or social risks and impacts are identified, the project promotor/sponsor is required to manage them through an Environmental and Social Management System (ESMS) appropriate to the nature and scale of the project. Depending on the stage of development of such an ESMS we provide our expertise in the development and implementation of the different elements of the system. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 4 0001
Open 3 Our Project Experience Royal HaskoningDHV has more than 35 years’ experience in delivering Environmental and Social Consultancy Services worldwide. This section presents a cross section of Royal HaskoningDHV experience in the last decade. Clients range from major multinationals, to large and medium sized companies, from national government to local authorities, to a number of international financing institutions. We have worked in many sectors, including: • Energy & Renewables • Ports and Terminals • Oil & Gas • Airports • Mining • Roalds and Railways • Water Technology • Agribusiness • Rivers, Deltas and Coasts “I was impressed with Royal HaskoningDHV “Throughout the 5 years of their involvement as practical and common sense approach to the work, Lender's Advisor, Royal HaskoningDHV whilst also having a comprehensive understanding environmental and social specialists were instrumental of best practice and relevant international in getting our project compliant with IFC Performance standards. Their approach in working with local Standards” people was relaxed and respectful and in line with our internal policy of working with local Azura Power ESG Director about our Lender’s communities.” Advisor role for the Azura-Edo 450MW Independent Power Plant, Nigeria Alliance Mining Commodities General Manager about our undertaking of the ESIA for the Koumbia Pit-to-Port project, Guinea. “‘Royal HaskoningDHV have provided strategic advice and technical expertise to help us agree construction documents with all our stakeholders so we could start construction on time.” Ørsted Hornsea Project Two Consent "Royal HaskoningDHV Manager about our role in discharging delivered real value to our the consent requirements for Hornsea Oman GTL project. I was very Project Two, the UK pleased to see the commitment at all levels of the organization. The highlight of the project was the ability to bring local talent to the project “I would like to extend EBRD’s compliments to Royal HaskoningDHV and increasing Shell’s positive team for pulling together such a comprehensive report. I feel that the footprint.” E&S components of the report accurately reflect the current status of the project and compliance against EBRD’s Performance Shell Global Solutions E&S Requirements.” Performance Lead about our execution of the ESIA Scoping EBRD Senior Environmental Advisor about our first Lender’s Study for the GTL Project in Independent Monitoring report for the Nador West Med project, Duqm, Oman Morocco 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 5 0001
Open 3.1 Energy & Renewables OnePower Lesotho 20 MW PV plant OnePower Africa is a fast-growing startup based in Lesotho with the mission to bring electricity to underserved communities in developing countries. A 20 MWatt Photovoltaic plant is proposed for development in the Mafeteng district, Lesotho. Royal HaskoningDHV conducted the project ESIA to IFC standard, approved by authorities in 2020. The Abbreviated Resettlement Action Plan (ARAP), including a full census of landowners, is being carried out in line with IFC and African Development Bank (AfdB) Client: OnePower US Trade and Development standard for completion in 2021. Agency, AfdB, UKEF, SACE Country: Lesotho Year: 2019 - 2021 PORTHOS Carbon Capture and Storage (CCS) CO2 Capture & Storage (CCS) project PORTHOS is Europe’s first project storing CO2 in a produced gas field offshore. The Port of Rotterdam, together with Gasunie and EBN, intend to create an infrastructure in the port of Rotterdam to transport CO2. In order to do so, both an Environmental Impact Assessment (EIA) and permit application are required, both conducted by Royal HaskoninDHV. The EIA was carried out, in consultation with client and authorities, as an interactive i-Report. It involves assessing the impacts of the construction of the transportation pipelines Client: PORTHOS onshore and offshore, the impact of a compressor station, and the storage of CO2 in the deep subsurface. Country: Netherlands Year: 2020 Central Termica de Temane Mozambique Power Invest in a joint development agreement with Sasol New Energy Holdings intend to develop the a gas fired power plant (Central Termica de Temane). Royal HaskoningDHV acted as the Lenders Independent Environmental and Social Advisor. The assessment includes the review and analysis of Project documentation, in particular the Project’s Environmental, Social and Impact Assessment, specialist reports and management plans. A site visit was conducted to the Client: International Finance Cooperation site to validate the results of the previous assessment and (IFC) and U.S. International Development Finance Corporation consultations were held with representatives of the local (DFC) administration and potentially affected communities. Country: Mozambique Year: 2020 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 6 0001
Open Training of Trainers Waste to Energy in China The objectives of the assignment was to develop and deliver a training program on international Best Available Technologies (BAT), Best Environmental Practices (BEP) for the design, operation and maintenance of Waste to Energy (WtE) plant using Municipal Solid Waste (MSW) as feedstock. The environmental aspects of the training included: site visit to three WtE plants to understand issues of the current operations, environmental profile of the plants, and identify the training needs of plant managers and Client: Foreign Environmental Cooperation Center operators; develop training materials on Environmental Country: China Performance and Best Practices covering sheets, syllabi, Year: 2019-ongoing exercises and case studies; testing of trainees understanding of training through working on a case study; support trainees with preparations towards the execution of nationwide training on WtE in China. Samgori South Dome Underground Gas Storage The planned SSD Underground Gas Storage, located in Gardabani municipality east of Tbilisi, is a strategic infrastructure supporting the improvement of energy security of Georgia and providing guaranteed supply of consumers with natural gas in any possible critical situation. It includes injection as well as production facilities, several wells, a condensate pipeline, connection to the main gas trunk line and an overhead transmission line. Royal HaskoningDHV delivered the ESIA to Georgian and EIB Client: Georgian Gas Storage Company, Environmental and Social Standards, including Stakeholder with funding by KfW and EIB Engagement Plan (SEP), Environmental Management and Country: Georgia Year: 2019 Monitoring Plans (ESMMPs), Resettlement/Livelihood Restoration Framework and Plan, HSE Plan, Emergency Response Plan, Spill Response Plan for drilling operations, and Waste Management Plan. Menengai Geothermal Power Plant The Project concerns the design, build and operate of a Geothermal Power Plant of 35 MW at Menengai geothermal field in Nakuru County. The project company is Quantum Power East Africa GT Menengai Ltd. Royal HaskoningDHV was contracted to perform E&S Due Diligence for the Lenders (AfdB and Finnfund), against the IFC PS and the AfdB E&S Safeguards. The report concluded with an ESAP and Conditions Precedent. Key elements of the report were land Client: African Development Bank, legacies and register analysis, stakeholder engagement with local Finnfund Country: Kenya communities and technical assessments of groundwater modelling Year: 2018-2019 and air quality modelling. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 7 0001
Open ESIA and RPF for Wapsila Ewekoro IPP The Wapsila Ewekoro Independent Power Producer (IPP) project consists in 310 MW Power Generation Station (comprised of an existing 90 MW power plant and a new 220 MW power plant) and a new ~5 km high voltage transmission line and new substation to integrate the Power Generation Station to the national grid. Royal HaskoningDHV upgraded the ESIAs and Resettlement Policy Framework (RPF) prepared by national consultants to have Client: Wapsila, a consortium formed by Lafarge Africa, Wärtsilä and the them to meet IFC Performance Standards and relevant World Bank IFC EHS guidelines. Country: Nigeria Year: 2016 Hydropower plant near the Ugandan/Tanzanian border A proposed new Berkely Energy hydro power plant situated near the Ugandan/Tanzanian border required an E&S Due Diligence assessment using the IFC Performance Standard and EHS guideline. Client: FMO and Investec Country: Uganda and Tanzania Year: 2016 – 2019 Western Uganda Mini-hydropower and Rural Electrification Project The project involved a full feasibility study and concept engineering for 10 mini hydropower units with together a total capacity of 12 MW, which means electrification for 72,000 households. For each location a separate ESIA and Resettlement Action Plan (RAP) has been prepared to enhance the benefits of the small hydro plants for the local communities and reduce the adverse effects. The ESIAs follow Ugandan and IFC regulations. Client: Ministry of Energy and Mineral Development Country: Uganda Year: 2011-2015 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 8 0001
Open Hornsea Project One and Two Initially for Hornsea Project One (HOW01) we provided a peer review role for Ørsted during the preparation of the Environmental Impact Statement (EIS) and consent process. This involved technical review of Environmental Statement Chapters and provision of strategic advice to ensure no overly arduous construction requirements were placed on Ørsted. Since the award of consent for HOW01 we have provided a suite of Client: Ørsted post consent services including ecology surveys, management of intrusive archaeology surveys, technical advice for traffic Country: UK management, flood management, contaminated land and Year: 2012- 2019 landscape management. We have lead on all consultation requirements with UK regulators both planning and environmental. We have then provided continued consenting and environmental support through construction. This includes additional consents, environmental reporting and auditing of the principal contractor. A similar role was performeed as well on Hornsea Project Two (HOW02). Central Receiver and Parabolic Trough Solar Technologies Undertook a comprehensive EIA, which included a Social and Economic Impact Assessment for a proposed project that will include the installation of two different solar electricity technologies, namely a 150MW Central Receiver a 150MW Parabolic Trough development and their associated electricity and bulk water infrastructure. Client: Solafrica Photovoltaic Energy Limited Country: South Africa Year: 2015-2016 IDA Geothermal Power Plant YERKA Electricity Generation Inc. is undertaking the development of IDA Geothermal Power Plant in Canakkale province of western Turkey. Royal HaskoningDHV was contracted to deliver an ESDD Industrial Development Bank of Turkey (TSKB) and World Bank in accordance with the national regulatory requirements, World Bank’s (WB) applicable Operational Policies (OPs) and IFC PS and relevant EHS guidelines. In addition were developed a Stakeholder Client: YERKA Electricity Generation Inc. Engagement Plan (SEP) and other relevant Environmental and with funding by WB through Social Management and Monitoring Plans (ESMMPs) including, but Country: TSKB Turkey not limited to, Land Acquisition and Resettlement Action Plan, HSE Year: 2018-2019 Plan, Emergency Response Plan, Waste Management Plan, Pollution Prevention Plan for drilling, construction and operation phases of the Project. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 9 0001
Open 3.2 Oil & Gas Azura-Edo Independent Power Plant The Azura-Edo IPP is a 450MW Open Cycle Gas Turbine power station being constructed near Benin City in Edo State. It is Phase 1 of a greenfield 1,500MW IPP facility located on a 100-hectare site, large enough to accommodate future expansion of the power plant. Greenfield gas turbine power plant in in Edo State. The project dealt with impacts in terms of economic and physical displacement. Royal HaskoningDHV was appointed as Lender’ Advisor to assess the Technical, Environmental and Social risks of the project. Our Client: Azura Power E&S Due Diligence report contained an in-depth assessment of the (lenders: FMO, IFC and others) site as resettlement took place. It also contained an Environmental Country: Nigeria Year: 2013 - 2020 and Social Action Plan (ESAP) that was included in the Common Term Agreement. Regular monitoring visits have been conducted during the whole construction phase. Royal HaskoningDHV further guided the project to attain Lender-approved closure on the Resettlement Action Plan (RAP). Shell Duqm Gas-to-Liquid (GTL) plant Shell is in the process of developing of a new GTL plant in the Al Wusta governorate of the Sultanate of Oman, situated within the Special Economic Zone of Duqm (SEZAD). The concept of the GTL plant is to produce natural gas from the Mabrouk North East and the Greater Barik fields, process this natural gas, a diverse package of products will be produced, consisting of transport fuels, lubricants, waxes and chemicals. Client: Shell Global Solutions Country: Oman Year: 2019-2020 Royal HaskoningDHV was contracted to conduct the ESIA Scoping Study including preliminary baseline studies (air, noise, soil, hydrology, terrestrial ecology, marine ecology, socio-economic etc.), alternatives analysis, a baseline studies plan, overview of environmental and social impact aspects and modelling studies. Freetown Floating Storage Unit (FSU) The IFC wishes to explore the possibility for a Floating Storage Unit (FSU) based LNG terminal situated in the harbour of Freetown, Sierra Leone. The IFC is undertaking early stage development work, which is intended to lead to the selection of a strategic partner and subsequent full development and financing of the Project. Royal HaskoningDHV was contracted to assist with tasks related to the development of an ESIA Scoping Study setting the path toward a “bankable” ESIA as part of eventual project financing. This work Client: International Finance Corporation (IFC) has being conducted in parallel with technical site selection and conceptual studies (also carried out by Royal HaskoningDHV) and Country: Sierra Leone to develop a business plan, the commercial concept, open season Year: 2019 design, and pre-marketing activities. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 10 0001
Open NLNG Train 7 Project This Project consists of construction and operation of one additional complete liquified natural gas (LNG) train and a common liquefaction unit at the existing Nigeria LNG Ltd (NLNG) facility on Bonny Island, in the Niger Delta. The project will increase the LNG capacity from 22 million tonnes per annum (mtpa) to 30 mtpa. Royal HaskoningDHV was contracted to update and revalidate the ESIA for the Project. We conducted the ESIA including noise Client: Shell Global Solutions modelling, ambient air modelling, GIS services, field work, Critical Country: Nigeria Habitat Assessment, Social Impact Assessment, Underwater Noise Year: 2018 - 2019 Modelling, Effluent Modelling, SDG’s Quick Scan etc. NLNG received the environmental permit in March 2019. The International ESIA was approved by the lenders in September 2019, before financial close in Decembre 2019. Duqm Petrochemical Project Duqm Refinery and Petrochemical Industries Company (DRPIC) are planning to develop integrated refinery and petrochemical projects in Duqm. The Duqm Petrochemical Project (DPP) is a grassroots petrochemical facility and comprises three key development areas: 1. A Petrochemical Complex at Duqm; 2. An Natural Gas Liquids (NGL) Extraction Plant at Saih Nihayda; and 3. An NGL Pipeline from Saih Nihayda to Duqm. Client: DRPIC Country: Oman Royal HaskoningDHV was contracted to conduct the ESIA Year: 2020 - 2021 Baseline studies for all three studies including air monitoring, soil sampling, hydrological investigations, terrestrial ecology, marine ecology and stakeholder engagement. Nord Stream 2 pipeline Russian landfall Two 48” pipelines of Nord Stream 2 will largely follow the already existing Nord Stream pipelines over some 1200 km. The Russian landfall for Nord Stream 2 is planned at a different location. The Narva Bay route has been selected as having the least environmental impact for the Russian landfall. This route crosses the Kurgalsky Peninsula Nature Reserve/Sanctuary both in nearshore waters and on land. Client: Nord Stream 2 AG Country: Russian Federation Royal HaskoningDHV acts as Independent Technical and Year: 2017-2020 Environmental Advisor and review and provide constructive guidance on the technical, environmental and social aspects related to the implementation of the Kurgalsky Crossing in Russia (landfall). We challenge the technical design through participation in engineering and environmental meetings and monitor the construction phase by periodical site visits. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 11 0001
Open Drilling exploration Shpirag 5 Albania Shell Upstream Albania is planning the drilling of several oil exploration wells in the southern Albanian mountain of Shpirag. Royal HaskoningDHV was appointed to conduct the ESHIA of the project in line with the national legislation and IFC Performance Standards.The ESHIA paid particular attention to stakeholder engagement and communication with the local communities on the environmental aspects of the project. Client: Shell Country: Albania Year: 2018-2019 ESMS Building and Training for Impala Energy The Ebedei Compressed Natural Gas (CNG) compressor station will comprise of eight compressors, each with a capacity of 1,600 scm/h that compresses that gas to 250 bar. Royal HaskoningDHV was asked to develop an Environmental and Social Management System (ESMS) for both the construction and the operational phase. The ESMS includes the integrated management of all relevant aspects: OHS, HSE, Traffic, (Community) Security, Client: Impala Energy, APM Gas Stakeholder Engagement, Cultural Heritage, Local Content and Country: Nigeria Waste. The ESMS was built along an ISO 14001 structure. The Year: 2018-2019 conclusion of the ESMS was a 3-day training by Royal HaskoningDHV of all construction staff in Lagos. Liwa Plastic Industries Complex Project ORPIC is planning the installation of a new petrochemical complex which will comprise a NGL extraction plant, a 300km pipeline and a petrochemical complex. Royal HaskoningDHV was appointed by ORPIC to conduct a gap analysis of the EIA documentation and management plans to ensure that these were compliant with national regulation and International Standards. We also advised for additional air quality and noise baseline measurements as well as soil and groundwater Client: Oman Oil Refineries and baseline measurements. We also conducted a detailed review of Petroleum Industries Company the contractor’s management plans including Wastewater and Country: (ORPIC) Oman Water Supply, Construction ESMP, Emergency Response Plan, Year: 2016 Chance Find Procedure, Training Plan, Site Security & Security Personnel Management Plans, Labour Camp Management Plan, Human rights protection and worker accommodation. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 12 0001
Open BOST Natural Gas Pipeline FEED Services for ~750 km of Buried Pipeline Build-out in Ghana. Royal HaskoningDHV delivered Environmental and Social (E&S) consultancy services relevant during the FEED phase, including the identification of E&S considerations to be taken into account in the Conceptual Study and E&S constraints for the selection of the pipeline route (based on satellite imagery analysis of land-use / land-cover for a 200m corridor). Client: Penspen (for Bulk Oil Storage and Transportation Company Limited – BOST) Country: Ghana Year: 2016-2017 Turk Stream Offshore Natural Gas Pipeline Turkish Sector The TurkStream Project, extending from the Russian Federation to the Republic of Turkey through the Black Sea, is a new natural gas pipeline that will provide a new route to supply natural gas to Central and Eastern European countries from Russia. Royal HaskoningDHV has prepared the Environmental Impact Client: South Stream Transport B.V. Assessment (EIA) study for the Project which covers the section of the pipeline that starts from the Turkey-Bulgaria Exclusive Country: Turkey Economic Zone (EEZ) Kilometer Marker 660 (KP660) up to and Year: 2015- 2017 including the Turkish shore. Nustar Terminal Expansion Nustar Energy owns a liquid bulk terminal on Sint Eustatius, a small island in the Caribbean Sea. The land available for expansion is situated next to the airport, close to the village and nearby several terrestrial protected nature areas. The island is surrounded by a Marine Reserve due to the presence of sea turtles and has impressive archaeological remainders. Royal HaskoningDHV delivered the EIA Memorandum which was communicated to all the stakeholders. Later on, we executed Client: Nustar Energy LP several impact studies, including specific ecological marine and Country: Sint Eustatius (Caribbean) terrestrial surveys, archaeological surveys and a visual impact Year: 2011-2015 assessment. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 13 0001
Open 3.3 Mining Koumbia Bauxite Pit-to-Port Project The project consists of a conventional open pit bauxite mining operation, a 120 km road connection to an inland port and transport by barges to a floating transfer terminal. ▪ 2011-2013: ESIA of the project in line with IFC PS and Guinea regulations. ESIA provided input into the Bankable Feasibility Study and was approved by authorities resulting in environmental license Client: Alliance Mining Commodities ▪ 2016: Addendum to the approved ESIA to update impacts and Ltd (AMC) measures following the project design change (change of Country: Guinea transport corridor from the mine to the river port) Year: 2011-2017 ▪ Since 2017: As a roll-out of the ESIA, supporting AMC with the development of an E&S Management System for the project in line with IFC PS. Social Best Practice Framework for a Coal Mining Region Tasked to perform a high-level due diligence on emerging coal miners in the Waterberg region of the Limpopo Province, using the IFC’s performance standards as the benchmark. Together with on- site qualitative data collection, develop a social (and environmental) best practice standard for such emerging miners in the Waterberg region that would ultimately be supplying Eskom with coal. Client: Eskom (S.A. Electricity Supply Commission) Country: South Africa Year: 2015 North Yorkshire Polyhalite Project The project includes a new potash mine (~1750m deep) situated in the North York Moors National Park, a subterranean mineral transport system (36.5km tunnel at ~300m depth), and material handling/processing plant and harbour at Teeside. Royal HaskoningDHV led the production and submission of the Environmental Statement, providing technical leadership and project management services to the client, including acting as Tier Client: Sirius Minerals 1 environmental consultant and coordinating a wide range of environmental services delivered by other consultants. Royal Country: UK HaskoningDHV were an embedded part of the client team, involved Year: 2013-2019 in the planning strategy, regulatory and stakeholder engagement, and conveyor and port designs. Since the initial ES and applications stage, Royal HaskoningDHV has been providing services in support of project delivery, including: EIA for various consent amendments and variations; Hazardous Substances Consent; Waste and Environmental Permitting; Post-consent and Contractor support. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 14 0001
Open 3.4 Water Technology Glen Valley Wastewater Treatment Plant Reuse and Drinking Water Supply The Water Utilities Corporation (WUC) of Botswana (who are responsible for the supply of potable water to the greater Gaborone area) intends using treated wastewater for re-use as drinking water with the aim to alleviate the scarcity of water supply in the greater Gaborone area. With RVO as the financiers the Botswana Government commissioned Royal HaskoningDHV to undertake the reuse study Client: Botswana Government / RVO (Netherlands Enterprise Agency) including the production of a bankable Environmental and Social Scoping Study. Country: Botswana Year: 2020 - 2021 Sustainable Water Services Harar The objective of the SWSH project is to provide water infrastructure to a part of Harar City, Ethiopia that is currently unconnected to the piped water system. The project consists of an off-take from the water transmission pipeline from the Erer well field to Harar, a water distribution reservoir of 500 m3 to connect 13,868 people in 2028. The project is being carried out in a socially complex context. Client: RVO (Netherlands Enterprise As part of the project an Environmental and Social management Agency) Country: Ethiopia Plan (ESMP) for the construction and operation phase of the project Year: 2019 - ongoing has been prepared. Pyigiytagon water supply project Objective of the project is developing a sustainable water supply system for the Pyigyitagon township (approximately 70% of the township does not have access to piped water supply). Royal HaskoningDHV prepared a subsidy application (€30 million) including ESIA and corresponding management plans, Land Acquisition & Compensation Framework Plan to suit Lender (RVO) requirements. The main goal was to comply with international human rights standards. As a result, the project was granted with the subsidy. Construction will commence in August Client: Ballast Nedam International 2019 and substantial completion is expected in December 2020. Projects Royal HaskoningDHV will play a role during implementation of the Country: Myanmar project as EPC coordinator. Year: 2018 - ongoing 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 15 0001
Open La Paz drinking water project ESIA of the extension of a water supply plant of Pampahasi in La Paz and the improvement of the efficiency of water use in La Paz. The ESIA followed international and Bolivian regulations.The environmental baseline and impact assessment documents were prepared by EPSAS with support of Royal HaskoningDHV to reach international standards. In addition to the impact assessment, we also support the Environmental and Social supervision of the construction phase Client: EPSAS (Water Company of Greater La Paz) / RVO of the project. (Netherlands Enterprise Agency) Country: Enterprise Agency Bolivia Year: 2017-ongoing Kigali Waste water project This project consists of the collection of urban wastewater in the centre of Kigali, the transportation to the treatment plant via a trunk main and a treatment plant itself. The Water Company of Rwanda (WASAC) is the beneficiary and future operator of the plant. Especially the trunk main will result in involuntary resettlement. Royal HaskoningDHV prepared an ESIA, and Resettlement Policy Framework and Stakeholder Engagement Plan in line with EIB Client: Government of the Republic of and IFC Environmental and Social Safeguard standards, but also Rwanda, EIB (European Rwandan legislation. Investment Bank) Country: Rwanda Year: 2015-2016 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 16 0001
Open 3.5 Rivers, Deltas and Coasts Nyaungdon Bank Protection and Rehabilitation Project The project involves implementation of structural and non-structural measures to avoid riverbank erosion along the Pan Hlaing River and reduce flood risks in Nyaungdon City. Royal HaskoningDHV was tasked to determine the preferred design to protect the embankment and develop a detailed design for the works along a riverbank which is densely populated and utilised. An Client: RVO (Netherlands Enterprise ESIA and Resettlement Policy Framework are also requested for Agency) completion. The project is financed by RVO and implementation is Country: Myanmar Year: 2020 - ongoing potentially co-financed by the World Bank. Hence, The ESIA had to comply with both WB Environmental and Social Policies as well as Myanmar national EIA Procedures. Deferred and Routine Maintenance Dredging of the Odaw Drainage Basin in Accra Various problems come together in the catchment of the Odaw River in the Greater Accra Regions: reduced drainage capacity in channels by sedimentation, resulting in flooding; informal settlers living close to the channels and encroaching the area and; limited sanitation (solid waste, wastewater, open defaecation, storm water) in the area resulting in dumping waste in the channels. Client: RVO (Netherlands Enterprise A dredging strategy to provide short-term alleviation and longer- Agency) term maintenance will be developed, including identification of Country: Ghana disposal sites for dredged materials, sand trap locations and Year: 2019 - ongoing options for the future use of a large weir in de Odaw River. Of this strategy and related works, an ESIA including a project specific Resettlement Policy Framework are being prepared in line with Ghanaian and WB Standards. The Ocean Cleanup’ Interceptor™ Deployment in Ozama River According to The Ocean Clean-up, roughly 3 million kg of plastic annually enters the ocean through Ozama River. The Interceptor is deployed with the aim to remove plastic from the river before it can reach the ocean. Royal HaskoningDHV was commissioned to support The Ocean Clean-up and their partner UNDP by conducting a Rapid Appraisal Client: The Ocean Cleanup of the Environmental and Social impacts of their project to deploy an Interceptor in Ozama River in Santo Domingo. The Country: Dominican Republic assessment paid special attention to the ecological impact of the Year: 2020 deployment of the Interceptor and the by-catch of water hyacinth during its operation. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 17 0001
Open Master Plan of the City of Beira As part of the implementation of the Master Plan of the City of Beira, the Municipal Council of Beira intends to develop residential and industrial projects on 500 h each one. In order to allow the land levelling of these 2 projects, it will be also necessary to dredge sands from Macúti Bay, Sofala Province. For each of the 3 Projects, Royal HaskoningDHV carried out the following tasks: Client: RVO (Netherlands Enterprise • Environmental Feasibility Study and Scope Definition (EPDA); Agency) • Elaboration of Terms of Reference for Impact Assessment; Country: Mozambique • Impact Assessment & Management Plan; Year: 2017-present • Full Stakeholder Engagement Process and Resettlement Policy Framework. ESIA Passenger Transport Chindwin River Myanmar The Chindwin river basin suffers from illegal mining and deforestation activities, affecting the natural balance of the system and navigability of the river. People living along the Chindwin rely heavily for transportation on the Chindwin and the river itself has many challenges in socio-economic issues. Royal HaskoningDHV was commissioned to carry out the Environmental and Social Impact Assessment (ESIA) of a proposed Client: RVO (Netherlands Enterprise ferry line in which 10 to 20 specialized, very shallow draft Agency) passenger ferry vessels will be provided to the Myanmar Country: Myanmar Government. The ESIA complies with both IFC Standards and Year: 2020 - 2021 Myanmar EIA procedures. OmiDelta Delta Planning The Delta of the Ouémé consists of the flood plains of the Ouémé, Lac Nokoué and Cotonou Chenal to the sea. The Delta is densely populated, the Lac is polluted, while agriculture and fishing provide food security to the people. Royal HaskoningDHV provides Technical Assistance for Water Supply, Sanitation and Integrated Water Resources Management. This includes multi-stakeholder dialogue and a Strategic Environmental Assessment (SEA) to enhance environmental and Client: Government of Benin (financing social aspects in the Delta Plan. from the Netherlands Embassy) Country: Benin Year: 2017-2021 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 18 0001
Open Physical Restauration, Protection and Maintenance Works of Saly beach The coastal areas of Saly are currently severely impacted by coastal erosion. The potential increase in sea level rise threatens to impact further the current infrastructure built along the coastline (hotel, fishing village, houses, etc.). Saly, is one of the country's biggest tourist hubs; as such the Government of Senegal is looking to address this issue urgently. Client: APIX (Investment Promotion and Major Projects Agency / World Royal HaskoningDHV, in partnership with HPR-Ankh, developed Bank the ESIA and a Resettlement Policy Framework (RPF) to gain Country: Senegal national consent and also to obtain financing from the World Bank. Year: 2016 The detailed review of the project components and alternatives highlighted early on key constraints which were considered further in the preliminary design. The consortium developed a tailored strategy for responsible parties to efficiently manage health, safety, environmental and social risks during construction and operation of the new coastal defence. Maldives Coastal Protection The densely populated island of Fuvahmulah (8,500 inhabitants) is experiencing severe erosion and flooding problems, threatening the safety and livelihood of the inhabitants. Coastal protection works have been designed to protect the island’s integrity. An ESIA was prepared to enhance this design in its environmental and social aspects. The ESIA was an important instrument to compare two viable alternatives: an offshore breakwater protection and an onshore revetment on the island ridge. The design was Client: Ministry of Environment adapted to create a sustainable solution to protect the island. Country: Maldives Year: 2015-2016 EKO Atlantic Land Reclamation South Energyx is undertaking the development of the Eko Atlantic project. Phase 1 concerns the Shoreline Protection Reclamation Project, approximately 900 ha of high quality land, requiring about 90 million m3 of sand to be dredged from the selected borrow areas off the coast. Phase 2 concerns the development of Eko Atlantic City Master Plan itself including environmental and transport infrastructures for about 250.000 residents and 150.000 Client: South Energyx Nigeria Limited commuters. Country: Nigeria Besides marine designs and marine supervision construction works Year: 2012-2016 Royal HaskoningDHV conducted ESIAs for both project phases including follow up requirements to comply with local regulations as well as international standards. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 19 0001
Open 3.6 Ports and Terminals Guidelines for ESIA in the Port, Harbour and Terminal sector in Myanmar Environmental Impact Assessment legislation in Myanmar is well developed. However, the actual procedures and effectiveness of the instrument can be enhanced. Royal HaskoningDHV prepares, together with the Environmental Conservation Department in Myanmar, the Netherlands Commission on Environmental Assessment (NCEA) and Water Bridge Myanmar, Technical and Procedural Guidelines for Client: RVO (Netherlands Enterprise Agency) Environmental and Social Impact Assessments (ESIA) in the Port, Harbour and Terminal sector. We will provide training to Country: Myanmar Government Officials and other project proponents in Myanmar. Year: 2020 - 2021 Baku Green Port Strategy: EU support to the Enhancement of Operational Capabilities of New Port of Baku Technical assistance to the newly built Baku International Sea Trade Port with EcoPorts certification (successfully obtained in 2019) and the development and implementation of the Green Port strategy and roadmap, covering all sustainability aspects of the port from pollution to energy use, health and safety, climate change resilience and communities development. Client: Port of Baku (EU funding) In addition a a full review of the oil spill response contingency planning services was conducted to assist the client aligning their Country: Azerbaijan operations with industry best practise and compliance with Year: 2018-2020 Azerbaijani legislation Tema Port Dry Bulk Terminal Tema Port (Accra) is being re-positioned through an extensive expansion and modernization programme to better serve the needs of the trading sectors. The Tema Dry Bulk Terminal shall be the principal location for handling and temporary storage of dry bulk commodities, especially the cement-related cargoes such as clinker, lime, limestone, gypsum, cokes, coal, etc. Royal HaskoningDHV was contracted to conduct a Red Flag Due Client: Supercare Diligence to assess any potential environmental and social risk or opportunity for Supercare as candidate concessionaire to the Tema Country: Ghana Dry Bulk project. The DD consisted of a comprehensive desk to Year: 2020 literature and documentation review, a site visit and Q&A follow ups. 2-2-2021 ENVIRONMENTAL AND SOCIAL PERFORMANCE BZ1056-RHD-ZZ-XX-CS-Z- 20 0001