We are WSP
WSP is one of the world's leading professional
services consulting firms. We are dedicated to our
local communities and propelled by international
brainpower. We are technical experts and strategic
advisors including engineers, technicians, scientists,
architects, planners, surveyors and environmental
specialists, as well as other design, program and
construction management professionals. We
design lasting solutions in the Transportation &
Infrastructure, Property & Buildings, Environment,
Power & Energy, Resources and Industry
sectors, as well as offering strategic advisory
services. With approximately 49,500 talented
people globally, we engineer projects that will
help societies grow for lifetimes to come.
URBAN PASSENGER RAIL Light Rail Transit - WSP
Designing
World-Class
Light Rail Transit
Systems

Our cities are evolving. The primacy of the suburbs   rising ridership, many governments and transit
is waning, and urban living has become fashionable.   agencies are recognizing the urgency to expand
Neighbourhoods that were once filled with smoke       their services in order to respond to the increased
stacks and factories are now gentrifying to welcome   demand. New public transit options are essential.
young professionals with their burgeoning families
and empty nesters who want to enjoy the benefits      Light Rail Transit (LRT) offers key advantages
of their city. These urbanites do not glorify big     that have led to its resurgence in recent decades.
green front lawns with their requisite hours of       It offers a lower price point compared to metros,
mowing and two-car garages, preferring instead        which require extensive tunnelling. Many cities
shorter commute times, access to restaurants,         are also embracing the romance of yesteryear
museums and shopping, and freedom from the            that comes with the renaissance of tramway
dependency on cars for transportation. At the same    and streetcar systems. New LRT lines help
time, more people are leaving their rural roots for   invigorate neighbourhoods, improving property
cities, in search of better economic opportunities,   values, and encouraging new construction.
further contributing to population growth.            Their overland transport is also beneficial to
                                                      local businesses situated between stops, who
This shift in population centers, the need to connect lose visibility when trains run underground.
newly gentrified neighbourhoods into the transport
network, and greater reliance on public transit       WSP is proud to present this collection of our
is changing the way that cities must plan. With       work in the domain of light rail transit.
URBAN PASSENGER RAIL Light Rail Transit - WSP
URBAN PASSENGER RAIL Light Rail Transit - WSP
Table of Contents
Adelaide, Australia                               Lusail City, Qatar                     San Diego, United States
Coast to Coast Light Rail, Stage II           6   Lusail Tram                       32   Green Line Extension                             57
                                                                                         Mid-Coast Corridor Transit                       58
                                                                                         Old Town Trolley Extension                       59
Baltimore, United States                          Macau, China                           Orange and Blue Lines Rehabilitation             60
Central Line                                  7   Macau LRT, Phase I                34

                                                                                         San Francisco, United States
Calgary, Canada                                   Manchester, United Kingdom             SFMTA Central Subway                             63
Calgary West Expansion                       8    Manchester Metrolink              36

                                                                                         San Jose, United States
Canberra, Australia                               Maryland, United States                Tasman West Light Rail                           65
Capital Metro                                10   Purple Line                       38

                                                                                         Seattle, United States
Chicago, United States                            New Orleans, United States             Sound Transit Light Rail                         66
Construction Management On-Call Consultant   11   New Orleans Streetcar Expansion   41

                                                                                         Stockholm, Sweden
Cincinnati, United States                         Newark, United States                  South Tramway                                    68
Cincinnati Bell Connector                    13   Newark Light Rail Extension       43   Tramway City                                     71

Cleveland, United States                          Newcastle, Australia                   Sydney, Australia
Waterfront Transit Line                      14   Newcastle Light Rail System       44   CBD and South East Light Rail                    72
                                                                                         Light Rail Transit                               73
                                                                                         Parramatta Light Rail                            74
Copenhagen, Denmark                               Odense, Denmark
Greater Copenhagen Light Rail                16   Odense Tramway                    45
                                                                                         Taipei, Taiwan
                                                                                         Taipei Metro, Neihu Line                         76
Edinburgh, United Kingdom                         Ottawa, Canada
Edinburgh Tram                               19   Confederation Line                46
                                                                                         Toronto, Canada
                                                                                         Agincourt Grade Separation, Sheppard East        77
Gold Coast, Australia                             Perth, Australia
                                                                                         Eglinton Crosstown                               78
Gold Coast Rapid Transit                     20   Inner City Transit                48   Spadina Subway Extension                         81

Helsinki, Finland                                 Phoenix, United States                 Turku, Finland
Raide-Jokeri Line                            23   Valley Metro Rail                 51   Turku Tramway                                    82

Hudson and Bergen Counties,                       Portland, United States                Vancouver, Canada
United States                                     Interstate MAX                    53   Canada Line                                      85
Hudson-Bergen Light Rail                     24                                          Evergreen Line                                   86
                                                  Sacramento, United States              Millennium Line                                  89

Kuala Lumpur, Malaysia                            Sacramento South Corridor         54
Kuala Lumpur Light Rail, Line III            27
                                                                                         About WSP
                                                  Salt Lake City, United States          Our People                                       93

Los Angeles, United States                        Transit Express (TRAX)            56
LA Metro Gold Line                           28
LA Metro Expo Line, Phase II                 31                                              Also see our Metros and Stations Brochures
URBAN PASSENGER RAIL Light Rail Transit - WSP
Adelaide
                     Coast to Coast
                     Line, Stage II

                                                            This is the second stage of the South Australia         WSP formed part of the Aurecon design team
                                                            government’s long-term strategy to extend the           and managed the geometric design, traffic
                                                            light rail from the city to Semaphore. It involved a    engineering, pavement design, and environmental
                                                            2.8km extension of the light rail facility from North   services. In addition, WSP played a key role in
                                                            Terrace in the Adelaide Central Business District to    the innovation and safety in design workshops,
                                                            the Adelaide Entertainment Centre via a centre-of-      to develop the concept design, detailed
                     Location                               road alignment along two six-lane arterial roads.       design, and documentation for the project.
                     ADELAIDE, SOUTH AUSTRALIA, AUSTRALIA
Light Rail Transit

                                                            The project involved refinement of a                    The final design meets the project objectives and
                     Client
                                                            concept route alignment under the Early                 the design documentation was prepared within
                     THIESS-DOWNER EDI JOINT VENTURE
                                                            Contractor Involvement model, followed by               very tight time frames, allowing the project to
                     Status                                 development of design documentation for                 be delivered by early 2010 and within budget.
                     OPENED IN 2010                         the construction phase of the project.

     6
URBAN PASSENGER RAIL Light Rail Transit - WSP
Baltimore
Central Line

                                  © 1993 David Sailors

                                 WSP led the general engineering consultant joint      With both northbound and southbound trains
                                 venture responsible for development of the 35km,      sharing one track, delays were common and a
                                 24 station Phase I of this LRT system, to provide     disabled vehicle or system maintenance could shut
                                 service to the city’s central business district.      down the line. WSP, in joint venture, provided
                                 The project involved 22.5km of doubletrack            construction management and construction
                                 route and 12.9km of single-track route.               engineering and inspection services.

                                 The schedule for delivery of this project was         In December 2004, the MTA completed
                                                                                       the southern half of the project, making
Location                         ambitious because of the state's desire to initiate
BALTIMORE, MARYLAND,
                                                                                       light rail service from downtown Baltimore
                                 service for the opening of the new Baltimore
UNITED STATES                                                                          to Baltimore-Washington International
                                 Orioles baseball stadium in the spring of 1992. The
                                                                                       Airport more reliable and efficient.
Client                           WSP team received notice-to-proceed on May 18,

                                                                                                                                           Light Rail Transit
STATE OF MARYLAND MASS TRANSIT   1988, and revenue service began in April 1992.        On February 26, 2006, the MTA celebrated
ADMINISTRATION (MTA) +
STATE OF MARYLAND
                                                                                       the completion of the Light Rail Double
                                 In January 2002, construction began on the            Track project by reopening the last few
Status                           Double Track Project, which added a second set        miles of the line to Hunt Valley.
OPENED IN 2006                   of tracks to eight segments of the light rail line.

                                                                                                                                              7
URBAN PASSENGER RAIL Light Rail Transit - WSP
Calgary
                                                  West Expansion

                     Location
                     CALGARY, ALBERTA, CANADA     The West Light Rapid Transit Extension Project        Operating conditions, including rapid temperature
                                                  consists of an 8.2km addition to the Calgary LRT      fluctuations and snowfall accumulations,
                     Client                       system between 11th Street SW and 73rd Street SW.     were all considered in the design. In addition,
                     SNC LAVALIN                  WSP was a key member of the Design-Build              stormwater management modelling was
                                                  team awarded the contract to design, build, and       done to review any potential rainfall events
                     Status
                     OPENED IN 2012
                                                  undertake procurement for the project. WSP            or hail/snow events that locally could
                                                  provided the design for the entire civil/structural   impact guideway drainage performance.
                                                  infrastructure (tunnels, trenches, elevated
                                                  guideway, and roadworks) for this P3 project.         Throughout the project, WSP coordinated with
                     STATIONS
                                                                                                        all external stakeholders, including the City of
                                                  Included in the scope of work were six passenger      Calgary, the LRT Safety Committee, franchise
                     6                            stations (an elevated, an underground, two at-
                                                  grade, and two located in trenches), nine traction
                                                                                                        utilities, and environmental agencies. WSP also
                                                                                                        coordinated the third-party designs and vetted the
                                                  power substations, a major highway interchange,       design with the LRT infrastructure being built.
                     TRACTION POWER SUBSTATIONS   two park-and-ride facilities, a four-storey           Strong communication and organization skills

                     9                            office building, and the associated roadworks         were key ingredients to successfully managing
Light Rail Transit

                                                  and utilities. WSP designed two station area          all coordination with external stakeholders.
                                                  plans: Westbrook Station, which is Calgary’s
                     PARK-AND-RIDE FACILITIES     first underground station, and 45th Street

                     2
                                                  Station, a trench transition station, as
                                                  well as all of the traffic signals.

     8
URBAN PASSENGER RAIL Light Rail Transit - WSP
Light Rail Transit
                     9
URBAN PASSENGER RAIL Light Rail Transit - WSP
Canberra
                     Capital Metro

                                                     © 2017 Grahamec

                                                    As part of its vision to position Canberra as        Capital Metro will address many of the key
                                                    a sustainable and liveable city, the Australian      environmental concerns for the city, including air
                                                    Capital Territory government has commissioned        quality, traffic volumes and congestion, ambient
                                                    the start of the Capital Metro light rail project.   noise, greenhouse gas emissions, and urban
                                                    It is anticipated that an effective and reliable     growth within Canberra. Analysis has shown
                                                    light rail system will attract investment            that by 2031 without a transit system in place,
                                                    and employment opportunities, bring                  commuters north of the city will face travel
                                                    environmental benefits, and encourage more           times of up to an hour during peak periods.
                                                    active lifestyles for Australia’s capital city.
                                                                                                         WSP was engaged to provide planning and
                                                    Key objectives for the project are: increasing       environmental assessment services, including
                                                    the mode share of public transport, optimising       preparation of a preliminary environmental
                     Location                                                                            assessment and the subsequent Environmental
                                                    the frequency and service reliability, achieving
                     CANBERRA, AUSTRALIAN CAPITAL                                                        Impact Statement for Stage I of the Capital Metro, a
                                                    affordable capital and operational costs,
                     TERRITORY, AUSTRALIA                                                                12km light rail line between Gungahlin and Civic.
Light Rail Transit

                                                    growing a more diversified Canberra economy,
                     Client                         stimulating sustainable urban redevelopment
                                                                                                         WSP also provided a preliminary environmental
                     CAPITAL METRO AGENCY           along the corridor, increasing social and economic
                                                                                                         assessment and a Referral under the Environmental
                                                    participation, revitalising the Northbourne          Protection and Biodiversity Conservation Act 2001
                     Status
                     UNDER CONSTRUCTION
                                                    Avenue corridor, and reducing carbon emissions.      for a 3km extension of the light rail to Russell.

  10
Chicago
Construction
Management
On-Call Consultant

                                   WSP was chosen by the Chicago Transit Authority       of elevated and subway track systems since late
                                   (CTA) to manage the design and construction           2017, and we are currently managing the design-
                                   phases of the design-build rehabilitation of          build rehabilitation of an additional two stations.
                                   five transit stations on CTA’s Blue Line.
                                                                                         WSP was also chosen to manage the design and
                                   The stations restoration project marks the            construction phases of the Ravenswood Loop
                                   third consecutive task order for construction         Connector Signals Restoration project on the
                                   management services to be completed as part           CTA’s heavily travelled Brown Line on Chicago’s
Location                           of the CTA’s program to reduce rail slow-zones        North Side. The signals renewal follows our efforts
CHICAGO, ILLINOIS, UNITED STATES
                                   and modernize the stations along this line from       in managing the track renewal along much of the

                                                                                                                                               Light Rail Transit
Client
                                   Chicago’s central business district to O’Hare         same corridor and consists of a three-year project
                                   International Airport, including several upgrades     that will completely reconstruct and upgrade nearly
CHICAGO TRANSIT AUTHORITY
                                   needed to make the stations compliant with the        nine miles of rail signalization.
Status                             Americans with Disabilities Act. WSP has managed
ONGOING                            the rehabilitation of eight stations and over 6.4km

                                                                                                                                                11
Light Rail Transit

                     © 2006 David Sailors

  12
Cincinnati
                                  Bell Connector

                                  The Cincinnati Bell Connector streetcar is an         plan, transit network planning, environmental
Location                          electric mode of transportation operating on a        documentation, and completing final design
CINCINNATI, OHIO, UNITED STATES   5.8km loop connecting downtown Cincinnati’s           services for all elements of the streetcar system.
                                  Riverfront with the Over-the-Rhine neighbourhood
Client                            and Findlay Market. WSP was a substantial             The maintenance facility was designed to LEED
CITY OF CINCINNATI                contributor to the city’s development strategy. The   certified standards. Bio-swale is located at the
                                  Cincinnati Streetcar Feasibility Study, completed     majority of the station stops. The project will
Status
OPENED IN 2016
                                  in November 2007, assessed the economic impact,       improve quality of life by propagating community
                                  cost estimate, and route analysis for Phase I of      growth and development and improving
                                  the streetcar system. WSP served as designer and      infrastructure by linking transportation systems.
                                  project coordinator and worked with the city to       The project will also enhance historic and cultural
AVERAGE RIDERS PER DAY
                                  manage, plan, and design the 5.8km first phase        resources and minimize noise vibration.
                                  of the streetcar system that opened in September
3,200                             2016. In Phase II, WSP is developing alignments and
                                  routes for connectors and additional uptown loops.
                                                                                        The vision remains to create a streetcar system
                                                                                        that spurs development and is part of a larger
                                                                                        multimodal transportation system that links
LOOP STREETCAR SYSTEM             In Phase I, services included identifying and         areas outside the downtown core and throughout

5.8km                             procuring vehicles, creating and executing a          the region. Downtown is Cincinnati’s largest

                                                                                                                                               Light Rail Transit
                                  management and operational plan, including a          employment center, with approximately
                                  projected staffing plan for system management,        70,000 people in the area every day. The system
RAISED STATIONS                   streetcar operations, and infrastructure              will ultimately include a downtown circulator and

18
                                  maintenance (track, electrical, and control           a connector to the uptown area that serves the
                                  systems), establishing and implementing a security    region’s hospitals and the University of Cincinnati.

                                                                                                                                               13
Cleveland
                                                          Waterfront
                                                          Transit Line

                                                          WSP provided fast-track design and engineering   urban, and graphic design services as well as
                     Location                             services for the development of Cleveland's      engineering support during construction, reducing
                     CLEVELAND, OHIO, UNITED STATES       Waterfront Transit Line. As an extension         a typical 4 to 5-year project schedule to 2.5 years.
                                                          of the Blue/Green Line, the Waterfront           To meet the ambitious schedule, the project team
                     Client                               Line consists of a 3.5km, double-track light     used various time-saving methods, including a
                     GREATER CLEVELAND REGIONAL TRANSIT
                     AUTHORITY
                                                          rail line with four stations. It provides        precast segmental structure for the viaduct.
                                                          continuous public transportation through an
                     Status                               area that previously had limited bus service;    While the project's deadline was critical, aesthetics
                     OPENED IN 1996                       convenient transfer to the existing Red Line;    were also given a great deal of consideration
                                                          and stations at key points, improving access     in order to promote Cleveland's image. WSP
                                                          to businesses and other local attractions.       utilized a fully integrated design team, which
                                                                                                           included artists and architects together with
                     LENGTH OF EXTENSION                  In order for the system to serve Cleveland's     civil, structural, and systems engineers to provide

                     3.5km
                                                          Bicentennial celebration in July 1996, the WSP   a "cutting-edge urban design" on schedule.
                                                          team fast-tracked engineering, architectural,

                     TIME SAVED DUE TO FAST TRACKING

                     2.5 Years                            Awards
Light Rail Transit

                                                          - Waterfront Center Annual Award for a Quality Waterfront Project, 1996

                     STATIONS
                                                          - The Growth Association, Downtown Marketing, and Development Council of Cleveland -
                                                            Downtown Recognition Award, 1996
                     4                                    - Ohio Chapter of the American Society of Civil Engineers - Project of the Year Award, 1996

 14
Light Rail Transit
© 1996 David Sailors

                       15
Greater
                                            Copenhagen
                                            Light Rail

                     Location
                     COPENHAGEN, DENMARK

                     Client
                     HOVEDSTADENS LETBANE   The Greater Copenhagen Light Rail project is          production of the Environmental Impact
                                            being delivered under a partnership between           Assessment and, ultimately, with the securing
                     Status
                     UNDER CONSTRUCTION
                                            the Danish State, the Capital Region and eleven       of Construction Act powers for the scheme.
                                            local municipalities. It will extend over 28km
                                            between Lyngby in the north and Ishøj in the          In the subsequent phases of the project, WSP has
                                            south, passing through eight municipalities, and      delivered strategic advice, design services (including
                     STATIONS
                                            having 28 stations. At six of the stations (Lyngby,   production of the reference design for the light rail
                                            Buddinge, Herlev, Glostrup, Vallensbæk and Ishøj),    alignment, roads and structures), utility relocation
                     28                     it will be possible for passengers to change to
                                            the local S-trains which serve the wider Greater
                                                                                                  protocols, project management and controls, traffic
                                                                                                  planning, tender document preparation, evaluation
                                            Copenhagen region. It will provide a service          of tenders and support for the tender negotiations.
                     MUNICIPALITIES         running every five minutes in the daytime and

                     8                      every 10 minutes in the evenings and on weekends.     The project remains ongoing, and WSP is
Light Rail Transit

                                                                                                  continuing to assist Hovestadens Letbane
                                            WSP has provided consultancy services                 towards final owner’s approval and contract(s)
                     LENGTH OF LINE         for the civil works aspects of the light rail         awarded. The utility relocations phase and

                     28km
                                            project, including early design, planning             the main construction works will follow.
                                            and cost estimation in conjunction with the

  16
Light Rail Transit
                     17
18
      Light Rail Transit

     © Graham_Robson
Edinburgh
                                      Tram

Location
EDINBURGH, SCOTLAND, UNITED KINGDOM

Client                                With congestion forecasted to double by 2021,        WSP’s role included complete design services,
TRANSPORT INITIATIVES EDINBURGH       Edinburgh needed to address the issue of transport   specifications for overall system functionality,
                                      capacity. The development of a new tram system       integration of the system with other transport
Status
OPENED IN 2011                        provided a solution to the city’s growing public     modes for road use, pedestrians, traffic management
                                      transport needs. Potential routes were assessed,     and public transport issues, delivery of a design
                                      and the Leith Waterfront to Edinburgh airport        that maximizes the speed of construction,
                                      route was selected for development in Phase          system engineering, systems assurance processes,
LENGTH OF LINE
                                      I. WSP designed the first line of the planned        safety and RAM procedures, and energy
                                      network, which extends from east to west             evaluation and reduction recommendations,
14km                                  across the city and connects to the airport.         including regenerative braking designs.

                                      A wide and complex mix of urban realm and            WSP also provided support for the client’s
STATIONS                              streetscape was included in the route. Integration   procurement process for trams, covering

16                                    with existing traffic flows required significant     provision of specifications and technical

                                                                                                                                                 Light Rail Transit
                                      remodelling of roadway and traffic signal            support through to the development of the
                                      controlled junctions to permit practical runtimes    tender for tram provision and maintenance.
TRAM FREQUENCY                        for the tram. WSP provided key stakeholder

7-10 Minutes
                                      management, interfacing with the city planning
                                      authorities, Network Rail, and the bus operators.

                                                                                                                                                 19
Gold Coast
                                                         Rapid Transit

                                                         The Gold Coast light rail is one of the largest           were applied for each location. The LRT will
                                                         public transport projects in the country, as well         also reduce the carbon footprint by using clean
                                                         as the largest transport infrastructure project           electrical energy rather than fossil fuel.
                     Location                            ever undertaken on the Gold Coast. It is one of
                     GOLD COAST, QUEENSLAND, AUSTRALIA   Australia’s fastest growing local government areas,       The first stage of work connects 16 stations from
                                                         with over 400,000 residents and an estimated              Griffith University and Gold Coast University
                     Client                              60,000+ visitors each night. Traffic is also growing      Hospital near Southport to the Convention
                     TRANSLINK                           rapidly, particularly along the urbanized areas of        Centre at Broadbeach. This section includes
                                                         the coastline between Southport and Broadbeach.           13km of double track, a maintenance depot, and
                     Status
                     OPENED IN 2014
                                                         As development continues, a greater emphasis is           a stabling area. WSP provided detailed design
                                                         being placed on the need to provide a sustainable         of the overhead line system. The amount of
                                                         transport system that caters to future growth             documentation required on site was minimised,
                                                         and helps shape more sustainable land use.                allowing significant time saving while meeting
                     LENGTH OF TRACK
                                                                                                                   client’s strict program and cost requirements.
                                                         TransLink first commissioned WSP to complete a
                     16km                                comparative analysis study for a bus rapid transit
                                                         (BRT) or light rail transit (LRT) operation for the
                                                                                                                   The award and provision of the civil and track
                                                                                                                   alignment contract allowed for four months
                                                         Broadbeach to Parkwood corridor. The Gold Coast           to complete design and review. To meet time
                     STATIONS                            Light Rail Feasibility Study followed from previous       constraints, WSP compressed the design process

                     18                                  studies that identified the need for a high-              into a three-month period - from release of
Light Rail Transit

                                                         frequency public transport corridor on the Gold           civil and track alignment to complete design
                                                         Coast. Since the light rail route is proposed to travel   delivery for submission to government and
                     GOLD COAST RESIDENTS                underground, on the surface, and over structures,         relevant stakeholder review. WSP’s unique,

                     400,000+
                                                         appropriate geotechnical, hydrogeological, and            simplified drawing system contributed to
                                                         contaminated land investigation techniques                managing budget and time constraints.

20
Light Rail Transit
                     21
Light Rail Transit

                     © Tuomas Vuorinen

 22
Helsinki
                                 Raide-Jokeri Line

Location
HELSINKI TO ESPOO, UUSIMAA,
FINLAND

Client
HELSINKI'S CITY PLANNING
DEPARTMENT

Status
UNDER CONSTRUCTION

                                 The Raide-Jokeri LRT will be a dual-track light      stations, the depot, as well as affected roads.
                                 rail link between the Itäkeskus district in          These components will be carefully designed
PASSENGERS PER WEEKDAY BY 2040
                                 Helsinki and Keilaniemi in Espoo. A smooth,          to provide robust data on costs, feasibility,
                                 uninterrupted service is one of the key design       and impacts to facilitate proper decision-
100,000                          principles of this 25km transit corridor.            making. The project plan will serve as the
                                                                                      basis for the construction design process.
                                 With 32 stations, Raide-Jokeri will use
TRACK LENGTH                     modern trains to connect Finland’s two largest       This vital cross-region service requires a

25km                             cities. The light rail will partially replace        rail link with a higher capacity and a higher

                                                                                                                                            Light Rail Transit
                                 the Bussi-Jokeri, Helsinki's busiest bus             service level. Raide-Jokeri will also significantly
                                 service with 30,000 daily passengers.                influence land use in the vicinity of the track
STATIONS                                                                              in the near future. This consideration is also

32
                                 In addition to light-rail tracks, the project plan   a part of the scope of the project plan.
                                 will include stations, connections, exchange

                                                                                                                                            23
Hudson-Bergen
                                                       Light Rail

                                                       WSP provided general design consultant services to participated in financing, purchased the
                                                       NJ TRANSIT for the development of the Hudson-        vehicles, performed construction, and then
                                                       Bergen Light Rail, a 33km system encompassing        operates and maintains the system.
                                                       24 stations and five regional park-and-ride lots.
                     Location
                     HUDSON AND BERGEN COUNTIES,                                                            WSP provided preliminary engineering and
                     NEW JERSEY, UNITED STATES         The initial 15km segment, completed in 2002, runs    architectural services for all facilities and systems,
                                                       from 34th Street in Bayonne and West Side Avenue     final design and contract document preparation
                     Client                            in Jersey City to Hoboken Terminal; the second       for the Weehawken Tunnel and Bergenline Avenue
                     NEW JERSEY TRANSIT (NJ TRANSIT)
                                                       phase, completed in 2006, comprises a 10km           Station in Phase II, and advancement of design
                     Status                            segment from Hoboken Terminal to the Tonnelle        for inclusion into a design-build document.
                     COMPLETED IN 2006                 Avenue Park-Ride and from 21st Street to 34th Street
                                                       in Bayonne. Future extensions are planned.           Acting as an extension of NJ TRANSIT staff
                                                                                                            for the design-build phase, we also provided
                                                       NJ TRANSIT used the design-build-operate-            review of final design documents, technical
                     REGIONAL PARK-AND-RIDE LOTS       maintain procurement method, whereby                 support during construction, and construction

                     5
                                                       the contractor completed the design,                 quality and schedule monitoring.

                     STATIONS
                                                       Awards
                     32                                - Concrete Industry Board - Award of Merit for the Weehawken Tunnel
Light Rail Transit

                                                         and Bergenline Avenue Station, 2004
                     OPERATE AND MAINTAIN THE SYSTEM   - American Public Transportation Association - Innovation Award, 2000
                                                       - New York Construction News Top Projects - #1 Project, 1999
                     15 Years                          - Professional Women in Construction (PWC) - Project for the 21st Century Award, 1996

24
Light Rail Transit
© 2006 David Sailors

                       25
Light Rail Transit

26
Kuala Lumpur
                            Light Rail,
                            Line III

Location
KUALA LUMPUR, MALAYSIA

Project Owner
PRASARANA MALAYSIA BERHAD
                            Light Rail Transit III is the third LRT system       the southwestern areas of Kuala Lumpur. The
Client                      in the Greater Kuala Lumpur/Klang Valley             alignment will have 25 stations including a Grand
MRCB GEORGE KEN SDN BHD     region and will serve an estimated population        Central station near Stadium Shah Alam with an
                            of two million in the Western Corridor by            end-to-end travel time of around 51 minutes.
Status
UNDER CONSTRUCTION          2020. It is estimated that Line III will benefit
                            500,000 commuters. The new line will have            WSP will undertake the design of the linewide
                            26 stations, including five interchange stations,    system works, including the eight core
                            with existing and future public transport systems.   railway systems of light rail vehicles,
STATIONS
                            Total transit time will be approximately             signalling and train control, power supply
                            58 minutes.                                          and distribution, communications, depot
26                          WSP has been commissioned by Prasarana -
                                                                                 equipment and maintenance vehicles, track
                                                                                 work, automatic revenue collection, and
                            the organization established by the Malaysian        electronic access control for the entire Line III.
LENGTH OF LINE              Government for delivery and management of

36km                        its major rail projects - to undertake the role      The scope will also include interface

                                                                                                                                      Light Rail Transit
                            of line-wide system consultant for Line III.         and integration with civil works design,
                                                                                 preparation of tender documentation, tender
TOTAL TRANSIT LINE          This proposed new light rail line, extending         evaluation, construction stage support, testing

58 Minutes
                            36km from Bandar Utama to Johan Setia, will          and commissioning, and staff training.
                            serve as a major public transport system for

                                                                                                                                      27
Los Angeles
                                                       Metro Gold Line

                     Location
                     LOS ANGELES, CALIFORNIA,
                     UNITED STATES

                     Client
                     LOS ANGELES COUNTY METROPOLITAN
                     TRANSPORTATION AUTHORITY

                     Status
                     COMPLETED IN 2013
                                                       WSP performed preliminary engineering               at-grade system as well as detailed design and
                                                       and program management services for the             construction services for twin 2.7km tunnels under
                                                       original 22km section of the Gold Line, from        Boyle Heights. The eight stations, many of which
                                                       Los Angeles to Pasadena, which opened in 2003.      were designed by WSP architects and their joint
                     LENGTH OF ORIGINAL LINE
                                                       It included at-grade, elevated, and underground     venture colleagues, were planned to fit the context
                     22km                              sections. We also performed structural and
                                                       seismic analyses of the proposed alignment,
                                                                                                           of the neighbourhoods in which they are located.

                                                       given the area’s high level of seismic activity.    WSP also provided preliminary engineering
                     LENGTH OF EASTSIDE EXTENSION                                                          services for the Foothill Extension of the Gold

                     9.7km                             The 9.7km Metro Gold Line Eastside Extension,       Line. The first segment of the Foothill Extension,
Light Rail Transit

                                                       from Union Station in downtown Los Angeles          which extended the Gold Line 18km from Pasadena
                                                       to East Los Angeles, opened in 2009, offering       to Azusa, opened in 2016. The second phase
                     LENGTH OF FOOTHILL EXTENSION      residents of the city’s Eastside easy access to     of the Foothill Extension would extend the

                     38km
                                                       destinations throughout Los Angeles. WSP, in        Gold Line 19km from Azusa to Montclair.
                                                       joint venture, provided preliminary design of the

 28
Light Rail Transit
© 2009 David Sailors

                       29
Light Rail Transit

30
Los Angeles
                                         Expo Line,
                                         Phase II

Location                                 WSP was lead designer to the design-build               for relocating utilities. We also designed the
LOS ANGELES, CALIFORNIA, UNITED STATES   joint venture for Phase II of the Expo Line,            track guideway, structures, stations, traction
                                         which extended Los Angeles Metro light                  electrification system, overhead contact
                                         rail service 10.6km to Santa Monica.                    system, and the communication duct bank.
Client
EXPOSITION CONSTRUCTION AUTHORITY
                                         Phase II of the Expo Line opened for service in         Phase I of the Expo Line, from downtown to
Status                                   May 2016, marking the first time in six decades that    Culver City, opened in 2012. Phase II extended
COMPLETED IN 2016                        it was possible to travel by rail—in 46 minutes—        the line from Culver City to Santa Monica. The
                                         from downtown Los Angeles to the beach at               Expo Line serves neighbourhoods on the city’s
                                         Santa Monica. Phase II included seven stations,         Westside including Exposition Park, Century City,
                                         with the terminus at 4th Street and Colorado in         West Los Angeles and Westwood, and offers an
FEWER CARS ON THE I-10 DAILY             Santa Monica, just blocks from the Pacific Ocean.       alternative to travel on the congested Interstate

64,000                                   A dual-track light rail line was constructed in place
                                                                                                 10 freeway. Ridership on the Expo Line extension
                                                                                                 is expected to reach 18,000-20,000 weekday
                                         of an abandoned single track that had not operated      travellers after the first year of service.
LENGTH OF EXTENSION                      in decades. The project included station and track

10.6km
                                         design as well as 24 street crossings, in some cases    The Expo Line was delivered by the Exposition
                                         using newly constructed above-grade-level bridges       Construction Authority, which was created by the

                                                                                                                                                     Light Rail Transit
                                         and in others using at-grade crossings with gates.      state legislature to oversee the planning, design
                                                                                                 and construction of the Expo Line. The Expo
TRAVEL FROM DOWNTOWN LA
TO SANTA MONICA                          WSP was responsible for all design management           Authority turned the completed line over to the

46 Minutes
                                         and key design aspects of the project, including        Los Angeles County Metropolitan Transportation
                                         drainage and road improvements and strategies           Authority, which owns and operates it.

                                                                                                                                                     31
Lusail City
                                          Lusail Tram

                                          Qatar needed to upgrade its infrastructure in order   WSP, in a joint venture with Egis Rail, has been
                                          to attract businesses to the region and prepare       awarded a contract by the client, RKH-Qitarat, to
                                          for the 2022 FIFA World Cup. The country has a        provide the first principal inspection and technical
                                          modern highway system, but no rail network.           assistance for writing and updating the Civil
                                                                                                Assets Maintenance Program for Doha Metro
                                          The broad goals of the Qatar Rail Development         and Lusail Tram Civil Assets (Stations, Viaducts,
                                          Program are to deliver a world-class,                 Tunnels, Depots, Car Parks, Stabling yards, Pump
                     Location             environmentally friendly, safe and reliable rail      Stations, etc.). RKH-Qitarat has been awarded the
                     LUSAIL CITY, QATAR   network for Qatar, and also to support the            maintenance contract by QRail for the Doha Metro
                                          Qatar 2030 Vision for achieving the highest           and Lusail Light Rail Transit (LRT). The Lusail LRT
                     Client
                     RKH-QITARAT          economic, social and environmental development        system, in the new city of Lusail, which is 15 km
                                          standards for the Qatar community through             north of Doha, is being developed by QRail. The
                     Status               a sustainable urban development plan.                 LRT was conceived to enhance transportation
                     ONGOING                                                                    within the planned city and improve connectivity
                                          To this end, the Government of Qatar has launched     to entertainment centers such as Lusail Stadium
                                          a major rail-based mobility and transportation        that will host the 2022 FIFA World Cup matches.
                                          program known as the Qatar Integrated Rail            It will consist of 4 main tram lines that span
                                          Program (QIRP), developed by the Qatar Rail           19 km and 25 at-grade passenger train stations
                                          Company (QRail). The QIRP encompasses                 in various configurations (centre platform, side
                     LENGTH
                                          4 metro lines, a people-mover system, light           platforms and split side platforms). The project will
                     86km                 rail, high-speed rail and mixed-traffic lines.
                                          The first phase of the project is expected to be
                                                                                                also include one viaduct to accommodate Lusail
                                                                                                Tram passengers with a connection to the regional
                                          finished by 2019. When completed in 2026,             railway and one Lusail Tram depot and operation,
                     STATIONS             the network will have 230 km of rail lines and        maintenance and storage facility and test track.

                     25                   95 stations. Long-term plans include connecting
Light Rail Transit

                                          the network to the 32-km Lusail Light Rail,
                                          now under construction, and to the proposed
                     LINES                people-mover system in the West Bay area.

                     4
 32
Light Rail Transit
© 2009 David Sailors

                       33
Macau LRT,
                                                            Phase I

                     Location
                     MACAU, CHINA

                     Client
                     TRANSPORTATION INFRASTRUCTURE OFFICE
                     + MACAU SPECIAL ADMINISTRATIVE
                     GOVERNMENT
                                                            The Macau LRT Line forms the backbone of a              engagement support, and preparation of complete
                     Status
                     COMPLETED IN 2014                      comprehensive city-wide public transport network,       tender documentation for all construction contracts.
                                                            and will be delivered in two phases. Phase I
                                                            consists of a 21km elevated system with 21 stations     The Light Rapid Transit Phase I is a major
                                                            and a depot on a 12ha site. The system will serve the   transportation project in Macau. To enhance
                     STATIONS
                                                            Macau Peninsula and Taipa, connected by the Sai         the connectivity of the LRT network, the
                                                            Van Bridge. It will operate on a driverless rubber      Transportation Infrastructure Office has
                     21                                     tyre system in both a two-car (single unit train) and
                                                            a four-car (double unit train) train configuration.
                                                                                                                    implemented several public transport
                                                                                                                    interchange projects at designated stations.

                     LENGTH OF LINE                         WSP serves as Lead Design Consultant for both           The Barra Station project consists of an

                     21km                                   contracts, with responsibilities including civil,       underground parking facility with three 12,000m2
Light Rail Transit

                                                            structural, environmental, and E&M engineering          basements and one 250m2 sunken mezzanine, and
                                                            services. These services include studies, onsite        the associated road network, which provides access
                     DEPOT                                  survey works, conceptual to detailed design, depot      to the public transport interchange. The structure

                     12ha
                                                            planning, alignment design, architectural design        is a 25m-deep basement with three floor levels, and
                                                            of the viaduct and stations and depot, public           the wall support is a permanent diaphragm wall.

34
Light Rail Transit
© 2012 Doraemon.tvb

                      35
Manchester
                                                         Metrolink
                                                         Since 2007, we have worked to secure funding,           The 14.5km extension to Manchester Airport
                                                         develop, expand, and enhance Greater Manchester’s       opened to passengers in November 2014, over a
                                                         iconic tram system. This expansion programme            year ahead of schedule. Most notably, we developed
                                                         will nearly triple the size of the network with         an alternative rail junction control solution to bring
                                                         some 60km of new lines being delivered in a             forward the opening of the South Manchester Line.
                                                         range of urban environments as well as bringing
                                                         a range of improvements to transform the wider          The original design for the Oldham Town
                                                         network. This has included the construction             Centre extension did not fit within funding
                     Location                            and refurbishment of over 300 retaining                 parameters. We developed a solution to
                     MANCHESTER, ENGLAND,
                     UNITED KINGDOM
                                                         structures, tunnels, viaducts, and bridges.             construct an at-grade tramway integrated
                                                                                                                 with a fully remodeled highway layout, which
                     Client                              Operating as a fully integrated delivery team,          has transformed the area to support wider
                     TRANSPORT FOR GREATER               WSP has provided a comprehensive program                regeneration plans, with significant cost savings.
                     MANCHESTER                          management service, including risk management,
                                                         project controls, and contract management, as           Utility diversions are a key cost and program
                     Status
                     UNDER CONSTRUCTION                  well as extensive engagement with thousands             risk for Light Rail Schemes. They were a huge
                                                         of stakeholders − ranging from members of the           project in their own right, with over 500 separate
                                                         public to businesses, local authorities, politicians,   contracts. Our development of specific solutions
                                                         interest groups, and statutory bodies.                  to individual problems was a major achievement.
                     CONSTRUCTION AND REFURBISHMENT                                                              We achieved a saving of £10 million and a nine-
                     OF RETAINING STRUCTURES, TUNNELS,   Our accomplishments as part of the TfGM                 month reduction on the overall utility diversions
                     VIADUCTS, AND BRIDGES               Metrolink Integrated Delivery include bringing          program on the Manchester Airport Line, an

                     300+
                                                         5 new lines into service in 11 phases, with 24.5km      effort recognized by the Light Rail Awards.
                                                         of new line opening significantly ahead of schedule.

                     OPENED 12 MONTHS AHEAD
                     OF SCHEDULE
                                                         Awards
                     Manchester                          - National Transport Awards - Special Award for “Outstanding Performance”

                     Airport Line                        - Light Rail Awards, including Project of the Year for Three Consecutive Years
Light Rail Transit

                                                         - Chartered Institute for Highways and Transportation - Major Projects Award
                     LENGTH OF EXPANSIONS                - National Rail Civil Engineering Award for the Extension to Manchester Airport
                                                         - British Precast Concrete Award for the Highest Levels of Innovation, Quality and
                     60km                                  Efficiency in its Tram Stop Platform Construction, 2012

 36
Light Rail Transit
© Craig Willoughby

                     37
Maryland
                                                             Purple Line

                                                             The MTA’s Purple Line is a planned 26km,             Line will serve that market, and will also provide
                                                             21-station light rail line in the northern           access to the metro system for the people who
                     Location                                Washington D.C. suburbs, extending from Bethesda     live in the ‘wedges’ between the Metro lines.
                     MARYLAND, UNITED STATES
                                                             to New Carrollton in Maryland. It will provide the
                     Client                                  first circumferential rail transit line connecting   The Purple line is expected to provide significant
                     MARYLAND TRANSIT ADMINISTRATION (MTA)   to the existing metrorail system, providing light    travel time savings. In one segment of the
                                                             rail access to key business districts and activity   corridor, a bus trip that would take 40 minutes
                     Status                                  centers, the University of Maryland, four branches   during peak traffic hours would only take an
                     UNDER CONSTRUCTION
                                                             of the Washington Metropolitan Area Transit          estimated 9 minutes on the Purple Line.
                                                             Authority system, and Amtrak’s Northeast Corridor.
                                                                                                                  WSP is part of Maryland Transit Partners, a joint
                                                             The Washington DC Metro system, like most            venture serving as the program management
                     LENGTH OF LINE                          transit systems, is a radial system designed to      consultant. WSP provided numerous services

                     26km                                    get passengers into and out of downtown, but as
                                                             land uses have changed and more jobs are now
                                                                                                                  and guidance during the critical procurement and
                                                                                                                  financing stages to secure federal funding for the
                                                             located in the suburbs, there is now a growing       project. Construction began in August 2017.
                     COMMUTE TIME SAVED                      market for suburb-to-suburb travel. The Purple

                     31 Minutes
Light Rail Transit

                     STATIONS                                Awards
                                                             - Federal Transit Administration - Outstanding Achievement Award, 2015
                     21                                      - Maryland Quality Initiative Planning Award, 2014

 38
Light Rail Transit
© 1996 David Sailors

                       39
Light Rail Transit

                     © 2006 David Sailors

40
New Orleans
                                 Streetcar Expansion

                                 Streetcars have been an integral part of                   solar-powered transit shelters, relocation and
                                 New Orleans’ public transportation network since           replacement of numerous underground utilities, as
Location                         the first half of the 19th century. The St. Charles        well as road paving and striping and landscaping.
NEW ORLEANS, LOUISIANA,
                                 Avenue Streetcar, in operation since 1835, is the
UNITED STATES
                                 oldest continuously operating street railway               Work on the 2.1km Rampart Street/St. Claude
Client                           system in the world. Over a period of three                Avenue Extension began in January of 2015,
NEW ORLEANS REGIONAL TRANSIT     decades, WSP has contributed to the New Orleans            with completion and startup of service in
AUTHORITY                        Regional Transit Authority’s (RTA) expansion and           2016. WSP assisted the RTA with oversight
                                 revitalization of several of the city’s streetcar lines.   and constructability reviews during the final
Status
ONGOING
                                                                                            design, and assistance with coordination
                                 WSP served as construction manager to the                  of utility relocation agreements.
                                 RTA for the extension of the Loyola Avenue
                                 Line from Canal Street to the Union Passenger              As part of a joint venture, WSP served as general
TIGER GRANT
                                 Terminal, through the city’s central business              architecture and engineering consultant for the
                                 district, and for the re-establishment of the              revitalization of the Canal Street line, which
$45 Million                      Rampart Street/St. Claude Avenue Line from
                                 Canal Street to Elysian Fields Avenue. The
                                                                                            links downtown with mid-city residential
                                                                                            and commercial neighbourhoods, as well as
                                 firm provided construction management and                  important tourist destinations and the central
LINES IN OPERATION               support staff throughout the construction                  business district. WSP provided a variety of

4                                and close-out phases, as well as monitoring                services, including engineering oversight,

                                                                                                                                                Light Rail Transit
                                 and controlling the schedule and budget.                   transit operations analysis, environmental
                                                                                            review, rail systems engineering and rail
SOLAR-POWERED TRANSIT SHELTERS   The 2.6km extension of the Loyola Avenue Line              systems support during construction. Streetcar

8
                                 was completed in 2013, in time for the Super               service returned to Canal Street in 2004,
                                 Bowl. The project included eight state-of-the-art,         40 years after it had been shut down.

                                                                                                                                                41
Light Rail Transit

                     © 2006 David Sailors

42
Newark
                                    Light Rail Extension

Location
NEWARK, NEW JERSEY, UNITED STATES

Client
NEW JERSEY TRANSIT CORPORATION

Status                              Passenger service on the Newark Light Rail              and Riverfront Baseball Stadium. Then, returning
OPENED IN 2006                      Extension began on July 17, 2006. It connects the       southbound, the stops include Washington Park’s
                                    downtown district, providing service between            cultural institutions, and again Center Street. The
                                    two of Newark’s busiest intermodal facilities—          27.4m low-floor vehicles, the same vehicles used
                                    Penn Station and Broad Street Station.                  for the Hudson-Bergen Light Rail and the Newark
LENGTH
                                                                                            City Subway, can seat up to 70 riders. They are
1.6km                               The project included five new aboveground
                                    stops, and provided easier access to NJ
                                                                                            powered by 750 volts from the overhead catenary
                                                                                            system and operate at speeds up to 40km per hour.
                                    TRANSIT’s city subway, commuter rail and
TRIP FROM NEWARK PENN STATION       bus networks, Amtrak, Greyhound, and                    WSP, in joint venture, supported NJ TRANSIT’s
TO BROAD STREET STATION             Newark Liberty International Airport.                   efforts on this project with design, engineering,
Newcastle
                     Light Rail System

                                                             Transport for NSW was tasked with                      We were engaged as lead designer – performing
                                                             implementing two core elements of the transport        all aspects of the feasibility and definition design.
                                                             improvements: truncation of the heavy rail             Our role included the geometric design of the
                                                             branch line, and introduction of a light rail          light rail alignment, investigation into impacts
                                                             system. The light rail development was split into      on public utilities, assessment and appropriate
                                                             two stages: (1) replacing the heavy rail service       response to traffic network impacts, assessment
                                                             and (2) providing access to and connectivity           of the appropriate size of the light rail vehicle,
                                                             within the central business district.                  consideration of social, environmental and
                     Location                                                                                       heritage impacts, stakeholder consultation
                     NEWCASTLE, NEW SOUTH WALES, AUSTRALIA   One of the main objectives of this initiative was to   support, detailed cost estimates production, and
Light Rail Transit

                                                             provide a less intrusive transport mode, allowing      road safety evaluation. We also managed sub-
                     Client
                                                             greater permeability. The light rail network           consultants for the operations modelling, a variety
                     TRANSPORT FOR NSW
                                                             will travel east from a new Wickham transport          of surveys, and cost estimations, while taking
                     Status                                  interchange and terminate at Pacific Park.             into consideration community concern about
                     UNDER CONSTRUCTION                                                                             the potential reduction of on-street parking.

44
Odense
Tramway

                         Odense Light Rail is one of the first light rail     and, more recently, in the successful tendering
                         projects in Denmark and is funded through a          and award of the key delivery contracts in June
                         partnership of the national government, region,      2017. Utility diversions are largely complete, and
                         and local municipality. The project includes the     changes to the road layouts are ongoing. The project
                         construction of a new 14.3km bi-directional          remains on track to be completed in late 2020.
                         light rail line served by a new control and
                         maintenance centre. The line will connect the        WSP’s professional services have covered a wide
                         centre of Odense and the multimodal transport        range of disciplines, including strategic advisory,
                         hub to the new super hospital and the city’s ever-   project management, support in development of
                         growing university campus. It supports the wider     tender material for Transportation System (TS)
Location                 city vision of stimulating inward investment         and Rolling Stock (RS) contracts, and subsequent
ODENSE, DENMARK          and ongoing efforts of urban densification.          management of the tendering process. WSP has

                                                                                                                                     Light Rail Transit
                                                                              most recently been engaged to support the client
Client                   WSP has been providing client consultancy            in the delivery phase by undertaking design
ODENSE KOMMUNE DENMARK
                         services to Odense Municipality since the            assurance of the TS & RS contractor’s deliveries
Status                   feasibility stage. We have also supported the        and by continuing to offer the client further ad
UNDER CONSTRUCTION       project in securing EIA approval in May 2014         hoc support in all aspects of project delivery.

                                                                                                                                     45
Ottawa
                                                   Confederation Line

                                                   Ottawa’s Light Rail Transit is the first stage       and drafting of reports and recommendations.
                                                   in Canada’s capital city future rail network.
                                                   The 12.5km electric light rail system replaces       For Phase II, the City of Ottawa engaged our team
                                                   existing diesel powered buses, providing rapid       to develop a business case for the extension of
                                                   transit between Blair Station in the east and        the City’s LRT system to the south, east, and west,
                                                   Tunney’s Pasture in the west. The route includes     as well as providing a connection to the airport.
                                                   13 stations and a 2.5km tunnel that will alleviate   This economic and financial business case was
                     Location                      congestion through the downtown core.                developed to quantify and evaluate the benefits of
                     OTTAWA, ONTARIO, CANADA                                                            the PPP project and to provide a basis from which
                                                   For Phase I, WSP was retained by the City of         to pursue funding from the government. In 2015,
                     Client
                     CITY OF OTTAWA
                                                   Ottawa to develop a business case and multiple       the Ottawa City Council unanimously approved
                                                   account evaluation, provide program management       the project, and both provincial and federal
                     Status                        services and assist in the selection of a partner    governments have given funding commitments.
                     UNDER CONSTRUCTION            for a public-private partnership (PPP) to deliver
                                                   a light rail transit system to serve the city’s      This project represents one of the many
                                                   core north-south corridor. The team’s specific       projects that combine our engineering and
                                                   assignments included project management, analysis    planning expertise with the economic and
                                                   and recommendation of PPP delivery models,           financial capabilities of the Global Strategic
                                                   financial and economic viability and value for       Consulting team. It represents one of our
                     STATIONS
                                                   money analysis, advice on procurement strategies     many engagements working with the City
                     13                            and development of procurement tools, RFQ and
                                                   RFP preparation and evaluation of submissions,
                                                                                                        of Ottawa on the various iterations of LRT
                                                                                                        development since the early 2000s.
                                                   recommendation of the preferred proponent
                     TRIP DURATION PER DIRECTION

                     24 Minutes
Light Rail Transit

                                                   Awards
                     LENGTH OF DOWNTOWN TUNNEL     - Canadian Council for Public-Private Partnerships National Awards for Innovation and

                     2.5km                           Excellence, Gold Award, Transportation Innovation, 2013

46
Light Rail Transit
                     47
Perth
                                                           Metro Area Express

                     Location
                     PERTH, WESTERN AUSTRALIA, AUSTRALIA   Perth's population is expected to reach 2.7 million   assessment and appropriate response to traffic
                                                           by 2031, with public transport patronage predicted    network impacts; structural assessments
                     Client                                to double. A fast, efficient inner city transit       and design for bridges and retaining walls;
                     WA DEPARTMENT OF TRANSPORT            system is required to ease traffic congestion         consideration of social, environmental and
                                                           and meet public transport demands. Studies            heritage impacts; stakeholder consultation;
                     Status
                     ONGOING                               have shown that light rail could carry as many        detailed cost estimates; and road safety auditing.
                                                           passengers as currently used on the heavy rail
                                                           lines – up to about 35,000 people per day.           We later formed an integrated services team
                                                                                                                with the DOT, in joint venture, to deliver the
                                                           The Department of Transport (DOT) was tasked         next stages of the project. The team was tasked
                     EXPECTED PASSENGERS PER DAY           with delivering Metro Area Express (MAX), Perth’s with production of a business case as well as

                     35,000
                                                           first light rail network. The 22km alignment extends the documentation for the procurement of a
                                                           from Mirrabooka in the north through the Perth       design, construct, and operate contractor.
                                                           CBD before splitting into two branches – west to
                                                           the QEII Medical Centre, and east to the Causeway. Providing a safe, fast, and reliable service while
                     LENGHT OF LINE
                                                                                                                maintaining access to the existing properties along
                     22km
Light Rail Transit

                                                           WSP was the lead designer for the concept            the alignment was a considerable challenge. Our
                                                           design of the city centre portion of the project.    design solution minimized the length of alignment
                                                           Our role included the geometric design of the        where general traffic would share the trackway and
                     POPULATION BY 2031                    light rail alignment, including stops/stations;      limited turning movements across the alignment.

                     2.7 Million                           investigation into impacts on public utilities;

48
Light Rail Transit
© Courtesy of the Department of Transport WA

                                               49
Light Rail Transit

                     © 2008 David Sailors

50
Phoenix
                                  Valley Metro Rail

Location
PHOENIX, ARIZONA, UNITED STATES

Client
VALLEY METRO RAIL
                                  Valley Metro Rail is building the largest at-grade,      Valley Metro Rail’s 5km Central Mesa
Status
ONGOING                           in-street light rail system in the United States.        Extension, which includes four new stations
                                  Deciding to forego a phased approach, the                along Main Street, opened in August 2015,
                                  mandate is to build all three segments of                seven months early, bringing rail transit to
                                  the city’s 91.7km LRT system at once.                    the city’s downtown. The opening of the
PROJECTED FINAL LENGTH
                                                                                           Northwest Extension followed in June 2016.
                                  WSP served as general engineering consultant
92km                              for the final design and design support services
                                  during construction of the initial 32km segment,
                                                                                           WSP continues its relationship with Valley Metro
                                                                                           with a 3.2km extension to the Central Mesa
                                  which included 28 stations, 8 park-and-ride              Extension that is targeted for completion in 2018,
PASSENGER CAPACITY PER HOUR       locations, and 50 light rail vehicles. Trains replaced   while a second phase of the Northwest Extension

12,000                            bus routes along the Metro alignment, freeing            has been targeted for a 2023 opening. This

                                                                                                                                                 Light Rail Transit
                                  buses to travel expanded and new routes in the           extension will connect the Dunlap Avenue station
                                  Valley. The system has the capacity to carry up to       to points farther north along a 2.4km corridor that
SAVINGS FROM STREAMLINING         12,000 people per hour, the equivalent of a six-lane     will lead to the Metrocenter Mall in Phoenix.

$2 Million
                                  freeway. The system opened in December of 2008
                                  with 26,000 daily boardings in the first year.

                                                                                                                                                 51
Light Rail Transit

                     © 2004 David Sailors

 52
Portland
                                   Interstate MAX

                                   In the early 1980s, WSP, in joint venture,             except for a 4.8km tunnel through the region’s
                                   prepared an alternatives analysis and a draft          West Hills. The West Hills extension included
                                   environmental impact statement that examined           one station, at Washington Park, designed by
Location                           options for light rail and expanded bus service        WSP and its architectural subconsultant ZGG.
PORTLAND, OREGON, UNITED STATES    for the Portland metropolitan area. The Tri-           At 79m below ground, it is the deepest transit
                                   County Metropolitan Transit District of Oregon         station in North America. The 29km Westside
Client                             (TriMet) opted to build one of the first modern        MAX opened, on schedule and within budget,
TRI-COUNTY METROPOLITAN
TRANSPORTATION DISTRICT
                                   light rail systems in the United States, known         in September 1998, offering a 51-minute ride
                                   as MAX (Metropolitan Area Express).                    from downtown Portland to Hillsboro. The
Status                                                                                    Westside line connected with the existing
OPENED IN 2004                     The first segment, known as the Banfield or            Eastside line in downtown Portland, creating a
                                   Eastside line, extends from downtown Portland          53km line now known as the MAX Blue Line.
                                   24km east to Gresham and was completed in 1986.
                                   WSP, in joint venture, prepared the preliminary        Two years after the opening of the Westside line,
LENGTH OF WEST HILLS TUNNEL        design for that line, now part of the MAX Blue line.   WSP, as general engineering consultant to TriMet,

4.8km
                                                                                          began design of the Interstate MAX extension,
                                   In 1992, the firm began detailed design for a          now known as the Yellow Line, which runs from
                                   29km western extension of the MAX light rail,          the Rose Garden Transit Center 10km north along
DEEPEST TRANSIT STATION IN NORTH   from downtown Portland to the western suburb           Interstate Avenue to the Portland Exposition
AMERICA                            of Hillsboro. Beginning in 1993, the firm also         Center. Interstate Max opened four months

Washington
                                   performed construction management of the               early, in May 2004, and well under budget.
                                   line. Most of the western extension is at grade,

Park Station

                                                                                                                                              Light Rail Transit
WEEKDAY RIDERSHIP
                                   Awards
                                   - American Consulting Engineers Council - Grand Award, 1999
+95%                               - Consulting Engineers Council of Oregon - Grand Award, 1999

                                                                                                                                              53
Sacramento
                                                      South Corridor

                     Location
                     SACRAMENTO, CALIFORNIA,
                     UNITED STATES                    Phase I of the South Corridor Project extended       traction power facilities, as well as procurement
                                                      the Sacramento Regional Transit District’s light     of vehicles, track materials, traction power
                     Client                           rail system 10.1km connecting to the existing        substations, and other operating equipment.
                     SACRAMENTO TRANSIT DEVELOPMENT   light rail system between the 16th Street and 23rd
                     AGENCY
                                                      Street Stations and continuing south through         A minimum clearance of 6.1m was maintained
                     Status
                                                      the Union Pacific Railroad right-of-way to its       between the centerlines of the LRT and Union
                     OPENED IN 2003                   terminus at the Meadowview Road crossing. The        Pacific tracks. All the grade crossings were
                                                      entire alignment is at grade and includes 15 grade   constructed with prefabricated concrete crossing
                                                      crossings of existing city streets. The Phase I      panels and were protected by standard railroad
                                                      South Corridor extension includes eight stations     signals equipped with lights, bells, and gates.
                     STATIONS
                                                      spaced approximately 1.6km apart. The three          Sound walls and visual screening were provided
                     8                                southernmost stations have park-and-ride lots.       in selected sections where the line passed near
                                                                                                           residential areas. All the stations have low
                                                      WSP provided final design services for the           platforms that allow for wheelchair access.
                     PASSENGERS PER DAY               South Line’s civil, track, and structures, and

                     15,000                           traction electrification system contracts.           The Phase I extension serves a diverse cultural,
Light Rail Transit

                                                                                                           ethnic, and economic population. It provides
                                                      The project required right-of-way acquisition;       South Sacramento with a fast, efficient route
                     PARK-AND-RIDE LOTS               utility relocations; freight track relocation;       to major destinations, such as Sacramento