Detailed programme of presentations in the paper sessions - CIGRE - 2020 e-session / Paper presentations
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
CIGRE - 2020 e-session / Paper presentations Detailed programme of presentations in the paper sessions Last update: 21/8/2020 Page 1 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (A1 sessions) Main author's Main author number country presentation (CEST) Is reliance on synchronous machines holding us back from Tue. A1-101 D. VAUGHAN AUSTRALIA A1 - Session 1 evolving the power grid to facilitate renewables? Aug. 25 The benefits of implementing Synchronous Compensators in Tue. A1-102 H BIELLMANN FRANCE A1 - Session 1 Grids with high penetration of renewables Aug. 25 Generator Stability and Efficiency Enhancement in Power Tue. A1-NGN 1 System with Abruptly Variable Load by use of Electrical Energy G. NESTERENKO RUSSIA A1 - Session 1 Aug. 25 Storage System Experimental Study of Vibration Sparking Erosion on Stator Tue. A1-201 H. ZHU USA A1 - Session 1 Bars Aug. 25 Diagnosis and Prognosis of Wind Turbines using Machine Tue. A1-202 F. FREITAS BRAZIL A1 - Session 1 Learning Algorithms on SCADA and Gearbox Vibration Datasets Aug. 25 Evaluation of the Behavior of Partial Discharges in Generator Tue. A1-203 P. VILHENA BRAZIL A1 - Session 1 Heating and Operating Range Tests Aug. 25 Developments in maintenance processes increase operational Tue. A1-204 availability and contribute to the operating efficiency of the M. MAURO BRAZIL A1 - Session 1 Aug. 25 hydroelectric plant of Itaipu. Partial discharge characterization of stator windings taken Tue. A1-205 E. EBERG NORWAY A1 - Session 1 from a hydro generator after 50 years of service Aug. 25 Features of the design and operating modes of the Wed. A1-206 M. ROYTGARTS RUSSIA A1 - Session 2 asynchronized turbogenerator T3FSU-320 Aug. 26 A Study on the Resonance problems and Anti-Vibration Design Not A1-207 K.Y. KIM KOREA 0 of Large Vertical Motor-Pump sets presented Motor Maintenance Management for Power Plant Operation Tue. A1-208 Reliability with Work Optimization by On-Line Condition Based C. SUPHATTANA THAILAND A1 - Session 1 Aug. 25 Monitoring PD Measurement Of Rotating Machine For Condition SANJAY KUMAR Tue. A1-209 INDIA A1 - Session 1 Monitoring PRASAD Aug. 25 Optimization of turbogenerator's core suspension system Wed. A1-210 reconstruction methods for life time extension in the power D. KUZNETSOV RUSSIA A1 - Session 2 Aug. 26 plant conditions. A study of the drop test to detect damper faults and sensitivity Wed. A1-211 analysis in order to identify the parameters that have an K.L. ZAPPELLINI FRANCE A1 - Session 2 Aug. 26 impact on the test results Potential of VLF PD measurements for diagnosis of stator Tue. A1-212 T. BRUEGGER SWITZERLAND A1 - Session 1 insulation of large hydro generators Aug. 25 Evaluation of High Voltage Isolation Systems - Electrodynamic Wed. A1-213 J. ROCHA SC A1 A1 - Session 2 Meaning of Typically Specified Tests Aug. 26 Thermal Optimization of a Radially Air-Cooled Rotor for a Wed. A1-301 Pumped Storage Hydro Power Motor Generator, applying T. HILDINGER BRAZIL A1 - Session 2 Aug. 26 advanced 3D Conjugate Heat Transfer Simulations Static Eccentricity Fault Detection Method for Electrical Wed. A1-302 Rotating Machines Based on The Magnetic Field Analysis in the S. TVORIC CROATIA A1 - Session 2 Aug. 26 Air Gap by Measuring Coils Page 2 de 50
CIGRE - 2020 e-session / Paper presentations Magnetic Balancing System for Synchronous Machines – A Full Wed. A1-303 F EVESTEDT SWEDEN A1 - Session 2 Scale Demonstration of Unbalanced Pull Mitigation Aug. 26 Technical challenges and solutions for the new Terna's Tue. A1-304 M. REBOLINI ITALY A1 - Session 1 standardized synchronous condensers/flywheel systems Aug. 25 Wed. A1-305 How To Choose Electric Drive According IEC 60034-1? M. DIGALOVSKI MACEDONIA A1 - Session 2 Aug. 26 Considerations on IEEE 1310-2012, Numbers of Start-Stops Wed. A1-306 T. HILDINGER GERMANY A1 - Session 2 and Life Time of Stator Windings in Hydro-Generators Aug. 26 Development of Reliable Stator Coil End Design of Large Wed. A1-308 S. MURAMATSU JAPAN A1 - Session 2 Turbine Generator Aug. 26 Impact of the q-axis sub-transient reactance on the rotor Wed. A1-309 L. ROUCO SPAIN A1 - Session 2 oscillations of a hydro generator Aug. 26 The Design and Application of New Fast-response, Large- Tue. A1-310 Y. JIN CHINA A1 - Session 1 scaled Rotary Condensers in UHV Power Grid Aug. 25 Design, Implementation and Field Application of a New Wed. A1-311 Generation Flexible Excitation System for High-Power J. ZHANG CHINA A1 - Session 2 Aug. 26 Synchronous Generators Failures of Large Turbo-Generators on Prolonged Site Storage - Wed. A1-312 HIRDESH GUPTA INDIA A1 - Session 2 Case Studies of Indian Power Utility Aug. 26 Design and Application of State-of-the-art Synchronous Tue. C4-129 K. CHAN SWITZERLAND A1 - Session 1 Condensers to facilitate the energy transition Aug. 25 Page 3 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (A2 sessions) Main author's Main author number country presentation (CEST) Distributed Energy Resources (DERs): Impact of Reverse Power Tue. A2-101 P. UPADHYAY USA A2 - Session 3 Flow on Transformer Sept. 1 Active power control with 400/130 kV transformers. Tue. A2-102 P NORBERG SWEDEN A2 - Session 3 Experience from two recent projects Sept. 1 Tue. A2-103 Dynamic thermal behavior of wind power transformers T LANERYD SWEDEN A2 - Session 3 Sept. 1 Solar Farm Transformer Condition Monitoring and Automated UNITED Not A2-104 C V SIMMONS 0 Anomaly Detection Using Micro-Synchrophasors KINGDOM presented Smart dynamic shunt compensation - inductive and capacitive Not A2-105 R. FRITSCHE GERMANY 0 reactive power based on common transformer technology presented Effects of TVR application on various voltage changes caused Tue. A2-106 by reverse power flow, distributed power supply and M. KAKIHARA JAPAN A2 - Session 3 Sept. 1 renewable energy Enhanced cooling of dry-type transformers for wind Tue. A2-107 A. NOGUÉS SPAIN A2 - Session 3 applications Sept. 1 Study on key technology and demonstration application of Tue. A2-108 X. WANG CHINA A2 - Session 3 UHV AC controlled shunt reactor Sept. 1 System for on-line evaluation of power transformer dynamic Tue. A2-109 TIM GRADNIK SLOVENIA A2 - Session 3 thermal capability Sept. 1 Tue. A2-110 Thermal design aspects of subsea transformers E. VIRTANEN FINLAND A2 - Session 3 Sept. 1 Influence of harsh operation conditions present on offshore S UNITED Tue. A2-111 platforms to the design of power transformers and shunt RAJAMANICKAM KINGDOM A2 - Session 3 Sept. 1 reactors Simulations and tests based on dielectric studies to improve Mon. A2-201 the power transformers technical specifications and their M RYADI FRANCE A2 - Session 2 Aug. 31 performances Resonant overvoltages inside power transformer windings and Mon. A2-203 the measures improving their ability to withstand high- V. LARIN RUSSIA A2 - Session 2 Aug. 31 frequency stresses Electric Field Analysis for Valve-side Lead-out Insulation Mon. A2-204 J. ZHENG CHINA A2 - Session 2 Structure of UHVDC Converter Transformer Aug. 31 Partial Discharge Localization Algorithm for Power Not A2-205 B. W. MIN KOREA 0 Transformer using UHF Signals presented Advances of Dielectric Frequency Response testing for HV OIP Mon. A2-206 R. ALVAREZ ARGENTINA A2 - Session 2 bushings Aug. 31 Simulation and Measurements of Special Termination Not A2-207 D. VIR USA 0 Lightning Impulse Test on Power Transformers presented Verification of Withstand Capability for Very Fast Transients of Mon. A2-208 A. RABEL AUSTRIA A2 - Session 2 a 200 MVA, 500 kV GSU-Transformer by Modelling and Testing Aug. 31 Ten Years of Experience with Natural Ester in 245 kV: Shunt Mon. A2-301 R. IGNACIO BRAZIL A2 - Session 2 Reactor of Vilhena Substation Aug. 31 Page 4 de 50
CIGRE - 2020 e-session / Paper presentations Investigation on the Operating Conditions of MV/LV WAHIB Mon. A2-302 Transformers and Recommendations to Improve their CHABANE ALGERIA A2 - Session 1 Aug. 31 Reliability Continuous improvement of transformer specifications at a Mon. A2-303 C. RAJOTTE CANADA A2 - Session 1 large utility Aug. 31 Power Transformers using Esters next generation - ready to Not A2-304 R. FRITSCHE GERMANY 0 cope with all grid operation challenges presented Compatibility tests between solid and liquid materials for Mon. A2-305 C PERRIER FRANCE A2 - Session 2 reliable transformers Aug. 31 Reliability Evaluation of Ester Oil Filled Onload Tap Changers RV Mon. A2-306 INDIA A2 - Session 2 through Critical Tests TALEGAONKAR Aug. 31 Improving the reliability of key power transformers (GSU for Mon. A2-307 P HURLET FRANCE A2 - Session 1 Nuclear Power Plants) through specifications Aug. 31 GIC Magnetic and Thermal Assessment of a Large Fleet of Mon. A2-308 R. GIRGIS USA A2 - Session 2 Power Transformers - A Case Study Aug. 31 Health Index and Hierarchizing Scale Methodologies for Mon. A2-309 Prioritizing On-line Monitoring of Power Transformers and M. ALVES BRAZIL A2 - Session 1 Aug. 31 Reactors in the Brazilian Transmission Grid Improving transformer reliability through operation, Mon. A2-310 L. QUEIROZ BRAZIL A2 - Session 1 maintenance, repair and asset management for extended life Aug. 31 Transformer management by learning from condition, failure Mon. A2-311 J. FOROS NORWAY A2 - Session 1 and scrapping data collected nation-wide Aug. 31 Fleet Asset Management Opportunities Arising From Transient Mon. A2-312 T. ZUPAN CROATIA A2 - Session 1 Monitoring of Power Transformers and Shunt Reactors Aug. 31 Mon. A2-313 Fleet screening of HVDC transformers E ERMAKOV SWEDEN A2 - Session 1 Aug. 31 Field experience of small quasi DC bias on power transformers Mon. A2-314 A first classification of low-frequency current pattern and D. ALBERT AUSTRIA A2 - Session 2 Aug. 31 identification of sources Rationalization and high precision of transformer lifetime Mon. A2-315 S. MIYAZAKI JAPAN A2 - Session 1 evaluation method Aug. 31 Large Power Autotransformers filled with natural ester – Mon. A2-316 L. LOMBINI ITALY A2 - Session 2 Working parameters from the field and Maintenance notes Aug. 31 Mon. A2-317 Experiences in Transformer Onsite Refurbishment R. LI AUSTRALIA A2 - Session 1 Aug. 31 Application of Conditional Probability assessment to optimise Mon. A2-318 C. BECKETT AUSTRALIA A2 - Session 1 Transformer Design, Operation and Maintenance practices Aug. 31 Development and Implementation of Intelligent Condition Mon. A2-319 SHALI RAJ INDIA A2 - Session 1 Monitoring System for Transformers and Reactors Aug. 31 Increasing Reliability Tertiary Voltage Side of Power Not A2-320 S. LAOHANAN THAILAND 0 Transformer by Installing Relay Protection presented An innovative solution to assess the Reliability of Transformers Mon. A2-321 RAJAG KOMMU INDIA A2 - Session 1 by Integrated Transformer Health Monitoring Aug. 31 Mon. A2-322 Advancements in Transformer Site Dryouts E. TENYENHUIS CANADA A2 - Session 1 Aug. 31 Mon. A2-323 Power Transformer Life Extension Rebuilds T. O'NEILL SC A2 A2 - Session 1 Aug. 31 Page 5 de 50
CIGRE - 2020 e-session / Paper presentations Burak Tue. A2-NGN 1 Solid-state transformer for solar integration USA A2 - Session 3 ESENBOGA Sept. 1 Oasis Mon. A2-NGN 2 Impregnation of insulation by ester liquids USA A2 - Session 2 SANCIBRIAN Aug. 31 Sam Mon. A2-NGN 3 Impact of weather on transformer failures USA A2 - Session 1 McCORMICK Aug. 31 Tue. WG A2.60 Dynamic Thermal Performance of Power Transformers Tim GRADNIK SLOVENIA A2 - Session 3 Sept. 1 Stefan Mon. WG A2.62 Reliability of ac transformers GERMANY A2 - Session 2 TENBOHLEN Aug. 31 Ebrahim Mon. WG A2.63 Transformer impulse testing GERMANY A2 - Session 2 RAHIMPOUR Aug. 31 Page 6 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (A3 sessions) Main author's Main author number country presentation (CEST) Wed. A3-101 EDISON: A New Generation DC Circuit Breaker L. GRABER USA A3 - Session 1 Aug. 26 Environmental Performance of Dead-Tank Circuit Circuit Wed. A3-102 V. HERMOSILLO USA A3 - Session 2 Breakers with SF6 and Alternative Gases Aug. 26 VARC DC circuit breaker – a versatile concept for non-zero Wed. A3-103 L ÄNGQUIST SWEDEN A3 - Session 1 current interruption Aug. 26 Innovative T&D Switching Equipment and Development of its Wed. A3-104 R.P.P SMEETS NETHERLANDS A3 - Session 1 Testing Technology Aug. 26 Wed. A3-105 Low loss DC circuit breakers and DC GIS equipment M. KOSAKADA JAPAN A3 - Session 1 Aug. 26 First CO2-neutral 145 kV and up to 63 kA Dead Tank Circuit Wed. A3-106 Breakers based on Vacuum Switching and Clean Air Insulation S. KOSSE GERMANY A3 - Session 2 Aug. 26 Technology Fault current limiters for electrical grids 220 kV on the base of Thu. A3-107 N. NOVIKOV RUSSIA A3 - Session 3 the fast-acting highvoltage explosive commutators Aug. 27 Studying the characteristics of non-traditional current and Wed. A3-108 A. YABLOKOV RUSSIA A3 - Session 1 voltage converters for digital substations Aug. 26 Power plants Modernization by Smart integrated vacuum Wed. A3-109 G. URQUIZA SPAIN A3 - Session 2 generator breaker switchgears Aug. 26 Development and Electrical Performance Research of a 12kV Wed. A3-110 R. ZHANG CHINA A3 - Session 2 C4F7N/CO2 Ring Main Unit Aug. 26 Experience of Capacitive Current Switching of EHV and UHV AC Wed. A3-111 G. LI CHINA A3 - Session 1 Circuit Breaker in Power System and Test Aug. 26 Basic aspects of switching with series-connected vacuum Wed. A3-112 interrupter units in high-voltage metal-enclosed and live tank P. G. NICOLIC GERMANY A3 - Session 2 Aug. 26 arrangements Interrupting Performance Evaluation of High-Voltage Gas Wed. A3-113 Circuit Breakers Using CFD Simulation and Data Analysis H. K KIM KOREA A3 - Session 2 Aug. 26 Technique The First Development of SF6-free 170kV 50kA 60Hz GIS with Wed. A3-114 H.E. JUNG KOREA A3 - Session 2 Fluoronitile (C4F7N) Mixtures Aug. 26 Case Study – Improving Reliability of Circuit Breaker by using Wed. A3-115 JIVESH KHANNA INDIA A3 - Session 2 Controlled Switching and removing Pre Insertion Resistor (PIR) Aug. 26 Innovative SF6 Free Load Break Switch with Shunt Vacuum Wed. A3-116 C PREVE FRANCE A3 - Session 2 Interruption (SVI) Technology Aug. 26 Return of experience of the SF6-free solution by the use of Wed. A3-117 fluoronitrile gas mixture and progress on coverage of full J OZIL FRANCE A3 - Session 2 Aug. 26 range of transmission equipment C5 fluoroketone based gas mixtures as current interrupting Wed. A3-118 P. STOLLER SWITZERLAND A3 - Session 2 media in high voltage switchgear Aug. 26 Theoretical and Practical Behaviour of Eco-friendly SF6 Wed. A3-119 J. MANTILLA SWITZERLAND A3 - Session 2 Alternatives in High Voltage Switchgear Aug. 26 H. ITO ON Thu. A3-201 CIGRE Reliability Survey on Equipment BEHALF OF SC A3 A3 - Session 3 Aug. 27 CIGRE AG A3.01 Page 7 de 50
CIGRE - 2020 e-session / Paper presentations Operational Experience, Field Test and EMT Simulation for EHV Wed. A3-202 G. BLANCHET NORWAY A3 - Session 2 Shunt-Reactor Switching Aug. 26 In-service Diagnosis of Grading Capacitor Dielectric UNITED Thu. A3-204 P MOORE A3 - Session 3 Deterioration KINGDOM Aug. 27 Circuit Breaker De-Rating Assessment under High DC Time UNITED Thu. A3-205 Z EMIN A3 - Session 3 Constant KINGDOM Aug. 27 Actual use survey and maintenance practice of circuit breakers Thu. A3-206 J. KIDA JAPAN A3 - Session 3 for frequent switching applications Aug. 27 A campaign for the ageing evaluation of station hollow core Thu. A3-207 M. MARZINOTTO ITALY A3 - Session 3 composite insulators after a number of years of service Aug. 27 Overvoltages research in switching modes of cable and mixed overhead-cable lines, power transformers, shunt reactors and Wed. A3-208 V. SMEKALOV RUSSIA A3 - Session 2 capacitor banks of 110-750 kV and development of a Aug. 26 controlled switching device for the above electrical equipment X-ray inspection of operating high-voltage oil-filled circuit Not A3-209 L. DARIAN RUSSIA 0 breakers presented Wed. A3-210 On-line monitoring of paper-oil insulated current transformers J.M. NOGUEIRAS SPAIN A3 - Session 1 Aug. 26 Influence of Contact Heating on Main Circuit Resistance Thu. A3-211 Measurement and Dynamic Contact Resistance Measurement T. CHENG CHINA A3 - Session 3 Aug. 27 in High Voltage Circuit Breakers Research on Simulation Testing Method of System Level's Wed. A3-212 L. CHENG CHINA A3 - Session 1 Strong Electromagnetic Disturbance in Substations Aug. 26 Operational Aged Switchgear With The Age Up To 50 Years - Thu. A3-213 Investigations, Testing, Results - Considerations For The Design T. GRÄF GERMANY A3 - Session 3 Aug. 27 And Operation Of Old and New Switchgear Investigation of ferroresonance oscillations in the systems Wed. A3-214 with electromagnetic potential transformers by experimental A. SIVKOV RUSSIA A3 - Session 1 Aug. 26 and calculation methods Development of 362kV 63kA 60Hz Self-Blast Breaker without Thu. A3-215 additional capacitors to prevent ferro-resonance by improving J. H. YOON KOREA A3 - Session 3 Aug. 27 the SLF performance Damping Performance of VFTO using Magnetic Rings in 800kV Thu. A3-216 J. W. KIM KOREA A3 - Session 3 GIS Aug. 27 Approach & Experience of IoT Based Predictive Maintenance HUKUM CHAND Thu. A3-217 INDIA A3 - Session 3 Technologies in Power Distribution Network SHARMA Aug. 27 Technical-Economic Study on Spark Gaps Replacement by WAHIB Wed. A3-218 ALGERIA A3 - Session 2 Surge Arresters on Pole-Mounted MV/LV Transformers CHABANE Aug. 26 Pollution and Humidity Effects on Air Insulated Switchgear WAHIB Wed. A3-219 ALGERIA A3 - Session 2 (AIS) of MV/LV Substations CHABANE Aug. 26 Digital Disconnector and smart sensors: example of integration Thu. A3-221 T PEGOURET FRANCE A3 - Session 3 in the condition base asset management cloud tool Aug. 27 Thu. A3-222 External flashover of a 245kV live tank circuit breaker D CHUN FRANCE A3 - Session 3 Aug. 27 Page 8 de 50
CIGRE - 2020 e-session / Paper presentations Monitoring of asymmetric short circuit currents at a hydro Wed. A3-223 T. HEID SWITZERLAND A3 - Session 1 power plant using electronic fibre optical current transformers Aug. 26 Accuracy study of a combined low-power instrument Wed. A3-224 T. HEID SWITZERLAND A3 - Session 1 transformer in different climatic and pollution conditions Aug. 26 Thu. A3-225 Development of Light Asset Models based on Data Mining T MAUFFREY FRANCE A3 - Session 3 Aug. 27 First 170 kV / 50 kA GIS with Clean Air and Vacuum Interrupter Wed. A3-301 K. KIM KOREA A3 - Session 2 Technology as a Climate-neutral Alternative to SF6 Aug. 26 Page 9 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (B1 sessions) Main author's Main author number country presentation (CEST) Life-Cycle Experiences for 115kV Underground Pipe-Type Mon. B1-101 E.C. BASCOM III USA B1 - Session 1 Transmission Circuit Cooling System Aug. 31 Development of a New High-Voltage Dry Type Cable Mon. B1-102 Terminator with Optional Integrated Partial Discharge R. MIDDLETON USA B1 - Session 1 Aug. 31 Monitoring ALEGrO – Extended type testing of the HVDC XLPE cable Mon. B1-103 B. MAMPAEY BELGIUM B1 - Session 1 system and additional tests for Transient Over Voltages (TOV) Aug. 31 Mechanical characterization of smooth welded copper sheaths Mon. B1-104 T. KOUTI FINLAND B1 - Session 1 for high voltage submarine cables Aug. 31 Extended Thermal Rating Calculations of 400 kV XLPE Cables Mon. B1-105 for Urban Grid Applications based on long-term Experimental A. AINHIRN AUSTRIA B1 - Session 1 Aug. 31 Data UNITED Mon. B1-106 Online prognostic system for cable joints for Industry 4.0 S CHRISTOU KINGDOM B1 - Session 1 Aug. 31 Mon. B1-107 Development HV External Gas Pressure Cable Systems Retrofit J. VAN ROSSUM NETHERLANDS B1 - Session 1 Aug. 31 Total System Development on Innovative and Large Scaled Mon. B1-108 HVDC Cable System towards Expanded Installation of Large K. KOYAMA JAPAN B1 - Session 1 Aug. 31 Offshore Wind Farms Machine Learning Based Temperature Forecast for Offshore Mon. B1-109 S. H. H. KAZMI DENMARK B1 - Session 1 Windfarm Export Cables Aug. 31 Comprehensive tests of the 1200 m HTS DC cable system for Mon. B1-110 A. KASHCHEEV RUSSIA B1 - Session 1 Saint-Petersburg Aug. 31 A Novel Self-healing Intelligent Power Cable Sheathing Not B1-111 L. PENG CHINA 0 Material presented A Commercial Implementation of an Innovative Mon. B1-112 Superconducting Cable System and Its Future Prospect in C. H. RYU KOREA B1 - Session 1 Aug. 31 Korea Application of Horizontal Directional Drilling and Other Mon. B1-201 E.C. BASCOM III USA B1 - Session 2 Trenchless Methods to Electric Power Cable Installations Aug. 31 230 kV Mixed Transmission Line: Submarine, Underground and Mon. B1-202 J. LOPES BRAZIL B1 - Session 2 Overhead Aug. 31 Qualifying an extruded 420 kV cable system for installation in a Mon. B1-203 K. RØNNINGEN NORWAY B1 - Session 2 4 km long blasted tunnel Aug. 31 System Analysis of Fiber Optic Cable Faults in Underground Mon. B1-204 R. STØLAN NORWAY B1 - Session 2 Cable Systems Aug. 31 Cable design for deep water applications and low losses M. Mon. B1-206 GREECE B1 - Session 2 transmission links: first project experience CHATZIPANOS Aug. 31 Rigorous calculation of external thermal resistance in non- A. I. Mon. B1-207 GREECE B1 - Session 2 uniform soils CHRYSOCHOS Aug. 31 Evaluation of Degrees of Freedom for the Design of Metallic Mon. B1-208 Screen Grounding Systems of Long HVDC Underground Cable A. WAGNER GERMANY B1 - Session 2 Aug. 31 Systems Long Horizontal Directional Drill for 220 kV Subsea Cable Mon. B1-209 T. RALPH IRELAND B1 - Session 2 Installation Aug. 31 Page 10 de 50
CIGRE - 2020 e-session / Paper presentations Statistics, experiences and learnings from failures in power P. VAN DER Mon. B1-210 cable systems during pq and type tests, tests after installation WIELEN NETHERLANDS B1 - Session 2 Aug. 31 and service operation Induced voltages issues in relation with long export cables for Mon. B1-211 P CHRISTENSEN DENMARK B1 - Session 2 large offshore wind farms Aug. 31 Mon. B1-212 Lessons learned from joint bay implementation A. MARTÍN SPAIN B1 - Session 2 Aug. 31 Study on Recognition and Location of Partial Discharge in XLPE Mon. B1-213 L. ZHANG CHINA B1 - Session 2 Cable under Damped AC Voltage Aug. 31 Tue. Sep. B1-214 Qualification process of ±400 kV HVDC extruded cable system X. GU CHINA B1 - Session 3 1 3D-FEM modelling of losses in armoured submarine power Tue. Sep. B1-215 S. STURM GERMANY B1 - Session 3 cables and comparison with measurements 1 Proposal for a non-destructive protocol for the Verification of Tue. Sep. B1-216 P. MIREBEAU FRANCE B1 - Session 3 Absence of Voltage of Insulated Cable Systems 1 Construction of underground conduits through structures with Tue. Sep. B1-217 P. SRIWAN THAILAND B1 - Session 3 a depth of more than 25 meters under the canal 1 Development of Self-healable Insulator Applicable to High Tue. Sep. B1-218 D. H. SHIN KOREA B1 - Session 3 Voltage Pre-molded Joint 1 Tue. Sep. B1-219 Development of Wet Type AC 66kV TR-XLPE Insulated Cable K.S KIM KOREA B1 - Session 3 1 A Numerical Study on DC Electric Field Distribution in HVDC MI- Tue. Sep. B1-220 I. K. KWON KOREA B1 - Session 3 PPLP Cable Considering Parameters Related to Load Cycle Test 1 Design and Development of Back-to-Back Gas-to-Cable M. MOHANA Tue. Sep. B1-221 INDIA B1 - Session 3 Termination for 420kV Gas Insulated Switchgear RAO 1 Power Cables insulation & establishing relationship between Tue. Sep. B1-222 ROBIN GIRI INDIA B1 - Session 3 insulation level selection and aging 1 Damage on the 110 kV cable during measurements on the Tue. Sep. B1-223 JURE STRMEC SLOVENIA B1 - Session 3 earthing system 1 Use of Augmented Reality (AR) for Asset Management of HV Tue. Sep. B1-301 I. JOVANOVIC USA B1 - Session 4 Devices and Training of Field Personnel 1 On line monitoring of partial discharge on an underground Not B1-302 E. INUCENCIO BRAZIL 0 transmission line presented Tue. Sep. B1-303 Practical experience and challenges for DTS/RTTR systems S. STUL BELGIUM B1 - Session 4 1 Deep Water 500 kV HVDC Mass Impregnated Cable Tue. Sep. B1-304 L LERVIK NORWAY B1 - Session 4 Interconnection between Montenegro and Italy 1 Tue. Sep. B1-305 Dynamic Current Rating - Thermal Transient Response E. OLSEN NORWAY B1 - Session 4 1 Reducing the likelihood of power transmission cable failures Tue. Sep. B1-306 M JEROENSE SWEDEN B1 - Session 4 by increasing the role of quality assurance and quality control 1 Implementation of an integrated monitoring system for real- Tue. Sep. B1-307 time assessment of HV cable links in the Terna's Italian L. GUIZZO ITALY B1 - Session 4 1 electrical grid Failure Analysis and Asset Management of Cable Trifurcating UNITED Tue. Sep. B1-308 S TEE B1 - Session 4 Joints KINGDOM 1 Tue. Sep. B1-310 Enhanced Cable Security through Fibre Optic Monitoring J. CAIRNS AUSTRALIA B1 - Session 4 1 Page 11 de 50
CIGRE - 2020 e-session / Paper presentations Automated sheath current monitoring system for cable sheath Tue. Sep. B1-311 F. GARNACHO SPAIN B1 - Session 4 diagnostics purposes 1 Non-Electrical Multi-Sensor Solution for Partial Discharge Tue. Sep. B1-312 K. VATERRODT GERMANY B1 - Session 4 Detection in HV Cable Accessories 1 Construction Products Regulation: HVAC and HVDC cable Tue. Sep. B1-313 G CAPON FRANCE B1 - Session 4 classification criteria and application 1 Complete offshore cable condition monitoring and load Tue. Sep. B1-314 E. ROCHAT SWITZERLAND B1 - Session 4 management using distributed fibre optic sensing 1 Determination of the pre-qualification rules for the acceptance Mon. B1-NGN 1 A. SANTOSH NETHERLANDS B1 - Session 2 testing of medium voltage DC cable systems Aug. 31 UNITED Tue. Sep. B1-NGN 2 Wimbledon Digital Engineering Cross Site Cable Systems G.RICCARDI B1 - Session 3 KINGDOM 1 Page 12 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (B2 sessions) Main author's Main author number country presentation (CEST) Wed. B2-101 Monitoring of a New Transmission Line Design M. FULK USA B2 - Session 1 Sep. 2 A structural reliability approach to transmission line Wed. B2-102 engineering – a consistent way to make use of monitoring and A. ISTAD LEM NORWAY B2 - Session 1 Sep. 2 inspection data Development of sensors for real-time monitoring of ice loads Wed. B2-103 B. E. NYGAARD NORWAY B2 - Session 1 on overhead lines Sep. 2 The THOR Hammer Tester – A Step Change in the UNITED Wed. B2-104 R EYRE-WALKER B2 - Session 1 Management of Wooden Utility Poles KINGDOM Sep. 2 An Approach to Determine Temperature Exceedance in Wed. B2-105 T. KAVANAGH IRELAND B2 - Session 1 Overhead Line Compression Fittings Sep. 2 Utilization of environmental factor maps and corrosion rate Wed. B2-106 maps for advanced maintenance of overhead transmission S. OHARA JAPAN B2 - Session 1 Sep. 2 towers Experimental Study and Mechanism Analysis of Abnormal Wed. B2-108 M. LU CHINA B2 - Session 1 Fever Composite Insulators in AC 500kV Overhead Line Sep. 2 A Development of Compact Corrosion Detector to Diagnosis of Wed. B2-109 Y.H. KIM KOREA B2 - Session 1 Aged Overhead Conductor Sep. 2 Indian Experience of Refurbishment of Tower Foundation CHAITANYA Wed. B2-110 INDIA B2 - Session 1 located in water bodies KUNTE Sep. 2 Creation of a geographic information system of thunderstorm A. Wed. B2-111 activity based on the existing complex of 6-110 kV grids using KUCHERIAVENK RUSSIA B2 - Session 1 Sep. 2 OV the devices for identifying faults in OHL Practical Procedure to Define the Maintenance Priority of Not B2-112 S. ASTO PERU 0 Transmission Line Cables presented Holistic Regulatory Framework of Resilience for Electrical Wed. B2-113 R. SERRANO CHILE B2 - Session 2 Facilities against Wildfire Sep. 2 Overhead powerline LiDAR inspection with unmanned aerial Wed. B2-114 A. COELHO PORTUGAL B2 - Session 2 vehicles Sep. 2 N. PINHO DA Wed. B2-115 Remote monitoring overhead lines using satellite images SILVA PORTUGAL B2 - Session 1 Sep. 2 Wed. B2-116 Condition Assessment Study of OHTL Steel Towers in Iceland A. B. JONASSON ICELAND B2 - Session 1 Sep. 2 Artificial Intelligence (AI) Augmented Transmission Line Wed. B2-117 J. TOTH ICELAND B2 - Session 1 Inspection Sep. 2 Limits of vibration amplitude measurement based conductor Wed. B2-118 K. SCHILLAI SWITZERLAND B2 - Session 1 fatigue design Sep. 2 Hydrophobicity Classification of Composite Insulators Using Wed. B2-119 C. C. KOKALIS GREECE B2 - Session 1 Convolutional Neural Networks Sep. 2 Thu. Sep. B2-201 Flexible HTLS-High Temperature Low Sag Conductor S. UEDA BRAZIL B2 - Session 3 3 Sensitivity Effects of High Temperature Overhead Line (OHL) Thu. Sep. B2-202 A. ABBOUD USA B2 - Session 3 Conductors to Line Rating Variables 3 Mega High Strength steel core for HTLS conductor on 2nd Wed. B2-203 Scheldt long span crossing of new 380 kV line in the port of J.F. GOFFINET BELGIUM B2 - Session 2 Sep. 2 Antwerp Page 13 de 50
CIGRE - 2020 e-session / Paper presentations A. KVAMME Wed. B2-204 Electrical design and testing of composite towers for 420 kV BERSTAD NORWAY B2 - Session 2 Sep. 2 Thu. Sep. B2-205 Optimization of losses in new 400 kV overhead lines K LENARCZYK POLAND B2 - Session 3 3 RTV Coated OHL Insulators in Harsh Desert Environment ENG. AHMAD Wed. B2-206 Optimization of Coating Thickness & Assessment of Sand ALTHAGFI GULF STATES B2 - Session 2 Sep. 2 Blasting Impact Field experience and laboratory results on the application of Wed. B2-208 M. MARZINOTTO ITALY B2 - Session 2 RTV coating on HVDC lines Sep. 2 compactLine - Experience with a Pilot installation of an Wed. B2-209 R. SCHLOSSER GERMANY B2 - Session 2 innovative overhead transmission line concept for 400kV Sep. 2 Overhead Transmission Line Performance with Respect to Thu. Sep. B2-210 S. PACK AUSTRIA B2 - Session 3 Grounding Impedance on Alpine Terrain 3 Design Validation of HTLS Conductor through a High Wed. B2-211 P. PORTER IRELAND B2 - Session 2 Temperature Field Test Sep. 2 Conception, Construction and Realisation of an innovative OHL Wed. B2-212 S. STEEVENS GERMANY B2 - Session 2 Design Sep. 2 Development and implementation of digital line-to-cable Wed. B2-213 termination points for connecting 110 kV overhead and cable M. ERMOSHINA RUSSIA B2 - Session 2 Sep. 2 lines Advantage Analysis of Composite Insulated Crossarm in Wed. B2-214 Uprating Voltage and Transmission Capacity of Transmission Y. LI CHINA B2 - Session 2 Sep. 2 Lines Research on Design of Compact Transmission Line Tower Wed. B2-215 P. ZHAO CHINA B2 - Session 2 Based on Composite Cross-arm Sep. 2 Transient Overvoltage by pole-to-ground fault on ±500kV 8GW Thu. Sep. B2-216 HVDC Double Bi-pole System with Metallic Return Conductor G.M. KWON KOREA B2 - Session 3 3 in Korea Experience of Live Line or Zero Shutdown Reconductoring in Thu. Sep. B2-217 SHACHIDEVI T. K. INDIA B2 - Session 3 India 3 Assessment of performance of insulators through leakage Wed. B2-218 J.M. GEORGE FRANCE B2 - Session 2 current monitoring under contaminated conditions Sep. 2 Development and realization of a complex transmission line Wed. B2-219 BALINT NEMETH HUNGARY B2 - Session 2 management system Sep. 2 Research of steel - aluminium plastically compacted Wed. B2-220 V. KURYANOV RUSSIA B2 - Session 2 conductors for overhead lines (OHL) Sep. 2 Technical Demands to Improve Today's Composite Insulator Wed. B2-221 C. BAER SWITZERLAND B2 - Session 2 Reliability Sep. 2 Comparing the Corona Performance of AC and DC Overhead Wed. B2-222 Lines in both Indoor and Outdoor Experiments Using novel P. BLEULER SWITZERLAND B2 - Session 2 Sep. 2 Techniques An integral approach to ensuring the integrity of the tower and NENAD Wed. B2-223 SLOVENIA B2 - Session 2 conductors GUBELJAK Sep. 2 Case of Dynamic Line Rating (DLR) for Overhead Transmission SMRUTI RANJAN Thu. Sep. B2-224 SC B2 B2 - Session 3 in Context of Tropical Countries Like India MOHAPATRA 3 Development of an Overhead Transmission Line Portable Thu. Sep. B2-302 A.J. PHILLIPS USA B2 - Session 3 Protective Arrester (PPA) for Live Work 3 Page 14 de 50
CIGRE - 2020 e-session / Paper presentations Robotic installation of aircraft warning markers on Thu. Sep. B2-303 L. M. DICKIE NORWAY B2 - Session 3 transmission lines 3 Exposure of workers to electric and magnetic field during Thu. Sep. B2-304 MAJA GRBIC SERBIA B2 - Session 3 maintenance work on double-circuit overhead power lines 3 Audible Noise Management of Newly Reconductored Thu. Sep. B2-305 J. RANIGA AUSTRALIA B2 - Session 3 Transmission Lines 3 Selecting Equipment for Construction of Overhead Lines Based Thu. Sep. B2-307 F. GHELICHI IRAN B2 - Session 3 on CO2 Emissions Calculation 3 UAV (Unmanned Aerial Vehicle) Electromagnetic Fields (EMF) Thu. Sep. B2-308 C. ROZE FRANCE B2 - Session 3 Compatibility and Tests requirements for use in OHL 3 Thu. Sep. B2-309 Development of Vertical Separated Tubular Steel Pole for OHL W. K. LEE KOREA B2 - Session 3 3 Optimal Placement of Anti-Cascading Structures in Overhead Thu. Sep. B2-310 A. HALDAR CANADA B2 - Session 3 Line Design – A Probabilistic Framework 3 Peruvian Experience on Insulation Design for 500 kV Overhead Thu. Sep. B2-311 A. MARAVI PERU B2 - Session 3 Transmission Lines at Very High Altitude 3 New solution for reduction of the ground potential rise around ROBERT Thu. Sep. B2-312 SLOVENIA B2 - Session 3 construction of high voltage overhead lines MARUŠA 3 THE METHODOLOGY FOR OVERHEAD POWER Wed. B2-NGN 01 TRANSMISSION LINES TECHNICAL STATE ASSESSMENT A.STEPANOVA RUSSIA B2 - Session 2 Sep. 2 BASED ON MACHINE LEARNING Corona Protection of HV composite Insulators with considering Wed. B2-NGN 02 Weather Conditions and Pollution layer R.GHASEMI IRAN B2 - Session 2 Sep. 2 (Design / Simulation) Page 15 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (B3 sessions) Main author's Main author number country presentation (CEST) Water-Oil Separation Device for Mitigating Environmental and Wed. B3-101 J. QUERIDO BRAZIL B3 - Session 1 Safety Risks in Substations Sep. 2 New 420-kV GIS Substation Design in the Norwegian Wed. B3-102 Transmission System – Up-to-date Technology, Design G. BLANCHET NORWAY B3 - Session 1 Sep. 2 Optimisation and Connection Interface Issues Wed. B3-103 Safety Aspects related to Electric Fields in Converter Stations J HERNANDEZ SWEDEN B3 - Session 1 Sep. 2 TenneT's giant leap to be able to replace 140 substations Wed. B3-104 within next 10 year, while in service and coming from different A. LATHOUWERS NETHERLANDS B3 - Session 1 Sep. 2 lay-outs Arc flash hazard in high voltage substations: incident energy Wed. B3-105 A. VALANT ITALY B3 - Session 1 calculation and statistical risk evaluation Sep. 2 Wed. B3-106 Seismic Design Optimization of Substation Equipment in Japan S. IWASAKI JAPAN B3 - Session 1 Sep. 2 First 145 kV / 40 kA gas-insulated switchgear with climate- neutral insulating gas and vacuum interrupter as an alternative Wed. B3-107 M. KUSCHEL GERMANY B3 - Session 1 to SF6 - Design, Manufacturing, Qualification and Operational Sep. 2 Experience Flexible integration of phase-shifting transformers in AIS Wed. B3-108 H. KÖRNER GERMANY B3 - Session 1 substations - Comparison of approaches Sep. 2 Wed. B3-109 Design Changes in GIS Substations after experience from i-DE A. RICONDO SPAIN B3 - Session 1 Sep. 2 Operation Scheme of Modular Green Substation with BESS for Wed. B3-110 I. LIM KOREA B3 - Session 1 Transmission and Distribution System Sep. 2 Influence of power harmonics on the non-ionizing EMF Wed. B3-112 L. ROCHA PORTUGAL B3 - Session 2 exposure values in electrical installations Sep. 2 SF6 circuit breakers' monitoring system – development and Wed. B3-113 B. STOGNII UKRAINE B3 - Session 2 implementation in Ukrainian power industry Sep. 2 Health and safety partnership approach to improve safety Wed. B3-114 V GUIGNARD FRANCE B3 - Session 2 records Sep. 2 Alternative to SF6: an on-site 145kV GIS pilot project from a Wed. B3-115 M INVERSIN FRANCE B3 - Session 2 TSO perspective Sep. 2 French Offshore Substation - Analysis of the HV equipment Wed. B3-116 V CHATEL FRANCE B3 - Session 2 design and maintenance Sep. 2 Impact assessment of optimization methods for the Wed. B3-117 M. MONTOYA COLOMBIA B3 - Session 2 construction of high voltage air-insulated substations Sep. 2 Specification, project planning and design of the World's first Wed. B3-118 N. MAHDIZADEH SWITZERLAND B3 - Session 2 420 kV SF6-free GIS substation Sep. 2 Bus-Node Substations – Lower Lightning Overvoltages and Wed. B3-119 Easier Lightning Protection (Georg Koeppl, Thomas G. KOEPPL SWITZERLAND B3 - Session 2 Sep. 2 Aschwanden th.aschw@bluewin.ch) Wed. B3-120 HVDC gas-insulated systems for compact substation design U. RIECHERT SWITZERLAND B3 - Session 2 Sep. 2 Prototype Installation Test of HVDC GIS for Meshed Offshore Wed. B3-121 M. GATZSCHE SWITZERLAND B3 - Session 2 Grids Sep. 2 Page 16 de 50
CIGRE - 2020 e-session / Paper presentations Integration of Condition Monitoring into Substation Asset Risk Thu. Sep. B3-201 T. MCGRAIL USA B3 - Session 4 Management 3 Thu. Sep. B3-202 Additive Manufacturing of spare parts for Power Equipment A. PINHEL BRAZIL B3 - Session 4 3 Refurbishment and Replacement of a 132 kV Substation Thu. Sep. B3-203 Coupled to Hydroelectric Power Plant with State-of-the-art G. BLANCHET NORWAY B3 - Session 4 3 Technologies with high level of Service Continuity Contractors as modern Master Builders: Virtual Design and Thu. Sep. B3-204 Construction (VDC) as an enabler of meaningful experiences to A. FOSKULO CROATIA B3 - Session 4 3 project teams for achieving optimized substation management Value Quantification for Digital Substations in HV Transmission Thu. Sep. B3-205 L. ASGARIEH GERMANY B3 - Session 4 Grids 3 Investigation on the dynamic rating of tubular busbars in Thu. Sep. B3-206 K. REICH AUSTRIA B3 - Session 4 substations 3 Evolution of skills and managing competency in high voltage Thu. Sep. B3-207 T. CONDON IRELAND B3 - Session 4 substation engineering design 3 A Novel Evaluation Method for the Integrity of Grounding Thu. Sep. B3-208 Grids in High Voltage Substations Based on Magnetic Field M. MISRA NETHERLANDS B3 - Session 4 3 Measurements Thu. Sep. B3-209 Repair cost planning as a reliability factor Y. ZHILKINA RUSSIA B3 - Session 4 3 Thu. Sep. B3-210 Non-intrusive diagnostic methods for AIS & GIS HV equipment J. TOURIGUINE FRANCE B3 - Session 4 3 Optimization of Health Indices for Power Assets in Substation Thu. Sep. B3-211 J. R. JUNG KOREA B3 - Session 4 Using Machine Learning Method 3 Thu. Sep. B3-212 Aeolian vibration challenges at Renewable substation NIHAR RAJ INDIA B3 - Session 4 3 Maintenance, Monitoring & Strengthening of Substation Thu. Sep. B3-213 ASHA AGRAVATT INDIA B3 - Session 4 Grounding – Experience of GETCO 3 3D Design/BIM/Digital Twin for Electrical Substation - P. Thu. Sep. B3-301 Exaggerated Expectations, Current Realities, and Future SOMBOONYANO USA B3 - Session 3 3 N Opportunities Data to Decisions: Future-proof Integration of Substation Thu. Sep. B3-302 G. RAJAPPAN USA B3 - Session 3 Intelligence 3 A fleet of digital substations at Alliander, a blessing after an Thu. Sep. B3-303 M. VAN RIET NETHERLANDS B3 - Session 3 intense learning curve 3 FITNESS: Performance Evaluation & Comparison Across UNITED Thu. Sep. B3-304 Conventional, Non-Conventional, Analog & Digital Substation S W A CLARK KINGDOM B3 - Session 3 3 Measurement Chains Intelligent IoT-connected transmission equipment in Thu. Sep. B3-305 D. HELBIG GERMANY B3 - Session 3 substations 3 Implementation of Artificial Neural Networks in Design of Steel OMER BURAK Thu. Sep. B3-306 TURKEY B3 - Session 3 Cap Plates of Substation Support Structures YUCEL 3 Thu. Sep. B3-307 Pre-Qualification Testing of Digital Substations B. BAUM NETHERLANDS B3 - Session 3 3 Digitalization solutions for substation planning, design, Thu. Sep. B3-308 M. NAKAHATA JAPAN B3 - Session 3 construction, operation and maintenance 3 Page 17 de 50
CIGRE - 2020 e-session / Paper presentations Innovation Practices of Substation Maintenance Operation Thu. Sep. B3-309 Y. ZHOU CHINA B3 - Session 3 Scheme based on VR Visualization 3 Experience with reconstruction of industrial SVC analogue CZECH & Thu. Sep. B3-310 M CERNAN B3 - Session 3 controller SLOVAK Reps. 3 Group Specification for Power Transformers Using Edge Thu. Sep. B3-311 T.Y. KIM KOREA B3 - Session 3 Computing Technology 3 Green and Digital GIS Substation Substation 50 kV Thu. Sep. B3-312 R TROOST FRANCE B3 - Session 3 Middelharnis II 3 Interface of large offshore windturbines into the electrical grid Wed. B3-313 L. TREIER SWITZERLAND B3 - Session 2 at 66kV voltage level Sep. 2 Position on application of substation equipment using SF6 Wed. B3-NGN 01 K. NAKAMURA JAPAN B3 - Session 1 alternative technologies in Japan Sep. 2 Challenges and Expectations of Transitioning to Digital Thu. Sep. B3-NGN 02 D. STAFFORD AUSTRALIA B3 - Session 3 Substations 3 Return on Experience on Condition-Based Circuit Breaker Thu. Sep. B3-NGN 03 N. GADACZ NORWAY B3 - Session 4 Monitoring Applications 3 Page 18 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (B4 sessions) Main author's Main author number country presentation (CEST) Brazilian Experience in Switching 800 kV LCC Converter Mon. B4-101 R. TENORIO BRAZIL B4 - Session 2 Transformers Aug. 31 Principles for paralleling HVDC-LCC converters: point-to-point Mon. B4-102 P. TOLEDO BRAZIL B4 - Session 2 transmission, multi-terminal and HVDC grids Aug. 31 Mon. B4-103 The measurement of HVDC ground electrodes resistance P. FREIRE BRAZIL B4 - Session 2 Aug. 31 Large-capacity multi-infeed HVDC configuration – Managing Mon. B4-104 simultaneously scheduled line outages to ensure power P. GOMES BRAZIL B4 - Session 2 Aug. 31 system security Simulation and Development of HVDC Control Room with Mon. B4-105 Advanced HMI, Interface Systems, Analytical Tools and S.P. ASHOK USA B4 - Session 2 Aug. 31 Cybersecurity Infrastructure and Monitoring Compacting HVDC VSC and LCC Converter Stations for Land Mon. B4-106 R. ADAPA USA B4 - Session 2 Use Minimization Aug. 31 Towards a deployment plan for a future European offshore Tue. Sep. B4-107 O. ANTOINE BELGIUM B4 - Session 3 grid: development of topologies 1 Black-start and system restoration utilizing the NEMO Modular Mon. B4-108 Multilevel Converter – a practical test in the Belgian J. RIMEZ BELGIUM B4 - Session 1 Aug. 31 transmission system Commissioning of VSC HVDC converters for STATCOM Tue. Sep. B4-109 S. BØDAL NORWAY B4 - Session 3 operation 1 Tue. Sep. B4-110 Open-Source HVDC Control - a High-Level Perspective K. SHARIFABADI NORWAY B4 - Session 4 1 European Experiences in HVDC System Reliability and Tue. Sep. B4-111 P. LINDBLAD FINLAND B4 - Session 4 Availability 1 Challenges of HVDC standardization in external insulation Tue. Sep. B4-112 L AREVALO SWEDEN B4 - Session 4 design of converter stations 1 HVDC Lifecycle management – a Reliability & Availability Tue. Sep. B4-113 U ELGQVIST SWEDEN B4 - Session 4 perspective 1 Mon. B4-114 Improved VSC HVDC for over head line HVDC transmission Y HÄFNER SWEDEN B4 - Session 2 Aug. 31 System studies for the Baihetan-Jiangsu ±800 kV Hybrid Mon. B4-115 M ANDERSSON SWEDEN B4 - Session 1 UHVDC project Aug. 31 Planning and implementation of an HVDC link embedded in a Mon. B4-116 low fault level AC system with high penetration of wind K LINDEN SWEDEN B4 - Session 1 Aug. 31 generation Levelized Energy Cost Improvement through Concept Selection Mon. B4-117 and Availability Optimization for the Norfolk Windfarms' C.A. PLET NETHERLANDS B4 - Session 2 Aug. 31 Export Links Dynamic stability issues of VSC-HVDC systems in AC Mon. B4-118 Transmission Emulation Control: the Piossasco - Grande Ile C. PISANI ITALY B4 - Session 1 Aug. 31 case Design and functional aspects of a new HVDC link of Crete Mon. B4-119 K. LEONTARITIS GREECE B4 - Session 1 Island with the mainland Transmission System of Greece Aug. 31 Multi Terminal Extension of Embedded Point to Point VSC UNITED Mon. B4-120 O D ADEUYI B4 - Session 1 HVDC Schemes KINGDOM Aug. 31 Page 19 de 50
CIGRE - 2020 e-session / Paper presentations UNITED Mon. B4-121 A new approach to operational type testing of HVDC valves C C DAVIDSON KINGDOM B4 - Session 2 Aug. 31 Combined Bridge MMC as efficient solution for HVDC systems Tue. Sep. B4-122 S. SEMMLER GERMANY B4 - Session 3 with DC fault ride through requirements 1 Towards a deployment plan for a future European offshore Mon. B4-123 J. MOORE NETHERLANDS B4 - Session 1 grid: cost-benefit analysis of topologies Aug. 31 Demonstration of Multi-terminal DC Grid Integration with an Mon. B4-124 F. LOKU GERMANY B4 - Session 2 MMC Test Bench Aug. 31 Improving synthetic inertia provision by power electronic Mon. B4-125 W. GAWLIK AUSTRIA B4 - Session 2 interfaced power sources to support future system stability Aug. 31 The Celtic Interconnector – linking the electricity grids of Mon. B4-126 K. FRENCH IRELAND B4 - Session 2 Ireland and France Aug. 31 Functions and Commissioning test of New Hokkaido-Honshu Tue. Sep. B4-127 M. MORI JAPAN B4 - Session 3 HVDC Link 1 Experience in the HVDC equipment development for Vyborg Tue. Sep. B4-128 E. DAVYDOV RUSSIA B4 - Session 4 converter complex upgrade at SS 400 Vyborg PJSC FGC UES 1 Method for detecting of faulted section in cable-overhead Tue. Sep. B4-129 J. KAPITULA RUSSIA B4 - Session 4 HVDC line 1 Improvement of the oscillatory behaviour of the HVDC link Mon. B4-130 A. DÍAZ-GARCÍA SPAIN B4 - Session 2 between Spain and France Aug. 31 Optimization and Simulation for Network Performance of Back Tue. Sep. B4-131 L. LIU CHINA B4 - Session 3 to Back VSC-HVDC Systems 1 Calculation method for peak short-circuit currents for the Tue. Sep. B4-132 A. SACIAK GERMANY B4 - Session 3 security of HVDC grids 1 System Design and Development of HYOSUNG 200MW BTB Tue. Sep. B4-133 J. H. KIM KOREA B4 - Session 3 VSC-HVDC in a KEPCO System 1 The Method of Components Critical Priority Assessment for Tue. Sep. B4-134 Y. M. KIM KOREA B4 - Session 3 HVDC Station Asset Management System 1 Tue. Sep. B4-135 Seismic Design and Validation of the HVDC Valve Structure S.M. KIM KOREA B4 - Session 3 1 Fundamental Frequency Blocking Filters for Champa- Tue. Sep. B4-136 Kurukshetra HVDC ±800kV, 6000MW HVDC Parallel Bipole AAKAN DUGAR INDIA B4 - Session 3 1 Transmission System – Design Consideration Tue. Sep. B4-137 Assessment of protection strategy options for future DC grids A BERTINATO FRANCE B4 - Session 4 1 Technical solutions to predict and mitigate inadvertent Tue. Sep. B4-138 interaction of two parallel connected VSC-HVDC schemes S DENNETIERE FRANCE B4 - Session 3 1 feeding an islanded offshore Oil and Gas grid A Survey of the Reliability of HVDC Systems throughout World Mon. B4-139 M.G. BENNETT SC B4 B4 - Session 2 during 2017 – 2018 Aug. 31 Engineering Design and Control Method for Hangzhou's Mon. B4-201 J. LIAN CHINA B4 - Session 1 Flexible DC Distribution Network Aug. 31 A New Method for Distinguishing DC Line Faults in Flexible DC Mon. B4-202 J. YANG CHINA B4 - Session 1 Distribution System Aug. 31 Development of Multi-Terminal DC link in Distribution Mon. B4-203 C. HAN KOREA B4 - Session 1 Network Aug. 31 The Flexible Power Link of Western Power Distribution: A Case Mon. B4-204 P. MAIBACH SWITZERLAND B4 - Session 1 Study Aug. 31 Page 20 de 50
CIGRE - 2020 e-session / Paper presentations Advantages of M-SSSC Devices over Traditional Series Tue. Sep. B4-301 B. BOJORQUEZ USA B4 - Session 4 Compensation 1 Recent FACTS Applications in Chesf Power Grid: Aspects of Tue. Sep. B4-302 M. LIMA BRAZIL B4 - Session 4 Technological Development 1 Phoenix: The World's First Hybrid Synchronous Condenser Mon. B4-303 R RIVAS SWEDEN B4 - Session 1 System Aug. 31 Capability and Flexibility of Energy Storage Enhanced Mon. B4-304 T SOONG SWEDEN B4 - Session 1 STATCOMs in Low Inertia Power Grids Aug. 31 Evaluating Modular Voltage Source Converter Based UNITED Tue. Sep. B4-306 R GUPTA B4 - Session 4 Technology in the GB Transmission System with EMT Studies KINGDOM 1 Not B4-307 Development of active filter function for STATCOM T. TATSUMI JAPAN presented 0 NSSS STATCOM – The Optimal Dynamic Reactive Support Tue. Sep. B4-309 J. HU CANADA B4 - Session 4 Solution for a Weak Network 1 Study and Operational Experiences of STATCOM for Emerging Mon. B4-310 SANGI JANA INDIA B4 - Session 1 Grid with Renewable Power Network Aug. 31 Tue. Sep. B4-311 Ascutney SVC - Engineering, Testing and Commissioning J. HU CANADA B4 - Session 4 1 Analysis and Protection of Valve-Side Single-Phase-to-Ground UNITED Tue. Sep. B4-NGN 01 Gen Li B4 - Session 3 Faults in HB-MMC based Bipolar HVDC Systems KINGDOM 1 Malsha Tue. Sep. B4-NGN 02 Inverter Design Considerations for Low Inertia Weak Grids CANADA B4 - Session 4 Annakkage 1 Page 21 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (B5 sessions) Main author's Main author number country presentation (CEST) Impact of Standardization of PACS on Reducing Human Errors Thu. B5-101 A.P. APOSTOLOV USA B5 - Session 2 in Engineering and Testing Aug. 27 Prevention of Human Errors in Transmission Line Protection Thu. B5-102 and Fault Location Functions by Eliminating the Need for F. LOPES BRAZIL B5 - Session 2 Aug. 27 Settings Challenges and experiences of utilities in Brazil to new Thu. B5-103 procedures and human resources management to reduce PAC P. FLORES BRAZIL B5 - Session 2 Aug. 27 systems risks in a new complex digital enviroment Thu. B5-104 Formal Methods to Power-System Automation L. LISBOA BRAZIL B5 - Session 2 Aug. 27 Human Aspects in Protection, Automation and Control Thu. B5-105 S. CAMPOS BRAZIL B5 - Session 2 Systems (PACS) Aug. 27 The challenge of tackling human errors in the PACS Thu. B5-106 A. PEREIRA BRAZIL B5 - Session 2 environment Aug. 27 Human Errors related to PACS: Experience and Expectations of Fri. Aug. B5-107 C. MOORS BELGIUM B5 - Session 3 Elia, the Belgian TSO 28 The central role of human resources in PACS Asset Fri. Aug. B5-108 M. PETRINI ITALY B5 - Session 3 Management 28 Process bus based Busbar Protection – Easier Installation and UNITED Fri. Aug. B5-109 C TEOH B5 - Session 3 Life-Cycle Management for the Digital Substation KINGDOM 28 Engineering and Validation Support Framework for Power Fri. Aug. B5-110 J. RESCH AUSTRIA B5 - Session 3 System Automation and Control Applications 28 Common Errors and Traps in Design, Testing and Fri. Aug. B5-111 S. BHOLA AUSTRALIA B5 - Session 3 Commissioning of Protection and Control Schemes 28 Human aspects related to IEC 61850 testing: How to believe or Fri. Aug. B5-112 J. CARDENAS SPAIN B5 - Session 3 don´t believe in testing 28 Benefits derived from the use of Digital Twins of Protection Fri. Aug. B5-113 J. ROMÁN SPAIN B5 - Session 3 and Control Systems 28 How to Improve Human Decisions with a PMU´S Automatic Fri. Aug. B5-114 System for the Control of Stability of a HVDC Link in Red J. MARTÍN SPAIN B5 - Session 3 28 Eléctrica de España (REE) The Decision Tree Forest for the Defects and Weak Points of Fri. Aug. B5-115 Y. LIU CHINA B5 - Session 3 Relay Protection Devices 28 Human Errors in Maintenance and Modification of Protection Fri. Aug. B5-116 B. KONGKAEO THAILAND B5 - Session 3 System in Thailand 28 Human aspects in testing and commissioning of digital Fri. Aug. B5-117 S. MEIER SWITZERLAND B5 - Session 3 substations, based on experiences from real installations 28 Model-Based Systems Engineering Views of Software Defined Thu. B5-201 D.K. HOLSTEIN USA B5 - Session 2 Process Bus Networks Aug. 27 Thu. B5-202 Analyzing the Limits of Data Transmission in the Process Bus P. JUNIOR BRAZIL B5 - Session 2 Aug. 27 Digitalization at Eletrobras Eletrosul – Challenges on fully M. Thu. B5-203 digital substation PACS communication network architecture ALEXANDRINO BRAZIL B5 - Session 2 Aug. 27 specifications Page 22 de 50
CIGRE - 2020 e-session / Paper presentations Best practices and challenges on designing a LAN Thu. B5-204 M. ZAPELLA BRAZIL B5 - Session 2 communication network for 61850 Digital Substations Aug. 27 Test Systems Consideration in the Design of Communications Thu. B5-205 A.P. APOSTOLOV USA B5 - Session 2 Networks for Digital Substations Aug. 27 Architecture of Communication Network in Statnett Digital Thu. B5-206 N. HURZUK NORWAY B5 - Session 1 Substation Aug. 27 Experience gained and Recommendations for Implementation Thu. B5-207 of Process Bus in Protection, Automation and Control Systems R. LØKEN NORWAY B5 - Session 1 Aug. 27 (PACS) FITNESS: Live comparison of reliability and availability of UNITED Thu. B5-208 different communication and redundancy architectures for P MOHAPATRA KINGDOM B5 - Session 1 Aug. 27 digital substations Development of Advanced Communication Unit for Ring Thu. B5-209 Topology Network and Application to Special Protection M. KUWABARA JAPAN B5 - Session 1 Aug. 27 Scheme Implementation of Overload Protection Relay System based on Thu. B5-210 K. NISHIZAWA JAPAN B5 - Session 1 IEC 61850 for Simplification of communication network Aug. 27 Data segregation and traffic anomaly detection within the Thu. B5-211 E. CASALE ITALY B5 - Session 2 transmission substations and the whole power system Aug. 27 Experience in organization of communication network PMU Thu. B5-212 data transmission in protection, automation and control D. DUBININ RUSSIA B5 - Session 1 Aug. 27 systems IEC 61850 communications monitoring and diagnostics system Thu. B5-213 D. ZHUKOV RUSSIA B5 - Session 1 implementation experience Aug. 27 Optimising LAN Architecture For Improved Reliability And Not B5-214 R. HUGHES AUSTRALIA 0 Resilience presented 5G wireless communications for smart grid: a PACS case with Thu. B5-215 Y. CAO CHINA B5 - Session 2 network slice Aug. 27 Design constraints and choices for the LAN in RTE's R#SPACE Thu. B5-216 X. MICHAUT FRANCE B5 - Session 1 system Aug. 27 Redundancy in the IEC 61850-Based Digital Substation System Thu. B5-217 S. Y. MOON KOREA B5 - Session 1 for KEPCO's 154kV Substations Aug. 27 Engineering and Management of Communication Networks in BARIN DE Thu. B5-218 INDIA B5 - Session 1 Powergrid's Full Digital Substations BHOWMICK Aug. 27 Assessment of Dynamic and Programmable Network UNITED Thu. B5-219 Redundancy Management Method based on Software Defined H LI KINGDOM B5 - Session 1 Aug. 27 Network Technology in A Fully Digital Substation Experience in Communication Network Design for High Thu. B5-220 Performance Requirements in IEC 61850 Process Bus based PRAVEEN A.N INDIA B5 - Session 1 Aug. 27 Substation Implementation of QOS in the process bus for Digital Not B5-221 N. NELIS CHILE 0 Substations presented The ‘Protection over MPLS' project - Testing line differential Thu. B5-222 protection and teleprotection over an IP/MPLS J. CASEIRO PORTUGAL B5 - Session 1 Aug. 27 communication network Page 23 de 50
CIGRE - 2020 e-session / Paper presentations Pilot Experience of IEC 61850 real-time communication Thu. B5-223 between digital substations enabling new protection and P. KREUTZER SWITZERLAND B5 - Session 1 Aug. 27 automation concepts in Al-Dhafrah in Transco Power system Testing, Commissioning and Operational Aspects of Substation Fri. Aug. B5-NGN 01 Automation System – Areas of Human Intervention and S.K.JADAV INDIA B5 - Session 3 28 Approach to Mitigate Human Errors Page 24 de 50
CIGRE - 2020 e-session / Paper presentations Paper Session of Day Paper title (C1 sessions) Main author's Main author number country presentation (CEST) Quantifying Extreme Events Impacts Using a Coupled Mon. C1-101 V. KUMAR USA C1 - Session 2 Electricity Economy Model Aug. 31 Methodology for Defining the Configuration of Transmission Lines in Two Simple Circuits Instead of a Double Circuit – Mon. C1-102 M. CURY BRAZIL C1 - Session 1 Approach under Electric and Environmental Aspects and Aug. 31 Forced Shutdown Susceptibility Brazil's Power Transmission Grid Geographic Database Mon. C1-103 S. FEITOSA BRAZIL C1 - Session 2 Regulation Aug. 31 Mon. C1-104 Development of a Resilient Master Plan For Dominica F. SPARAVIER BELGIUM C1 - Session 2 Aug. 31 Improving reliability and stability of supply industrial customer Mon. C1-105 by grid reinforcement and installation of intra-factory M PRZYGRODZKI POLAND C1 - Session 1 Aug. 31 generation Multicriterial analyses and selection of the best option for revitalization and development of the southern part of Not C1-106 G. MAJSTROVIC CROATIA 0 Croatian 400 kV network and connection to the power system presented of Bosnia and Herzegovina Planning Studies for Connection of 500 MW Photovoltaic ENG. HISHAM AL Mon. C1-107 GULF STATES C1 - Session 2 Power Plant to Oman Grid at Ibri RIYAMI Aug. 31 OPEX benchmarking exercise amongst GCC Transmission ENG. ABDULLAH Mon. C1-108 GULF STATES C1 - Session 2 Utilities HASSAN Aug. 31 Sizing of the series and shunt compensation of the COA-WOA Mon. C1-109 interconnection and impacts on the maximum transfer ENG. AL-ASERI GULF STATES C1 - Session 1 Aug. 31 capacity Techno-Economic Evaluation of 1500MW Generation Mon. C1-110 Connection to the Main Interconnected Transmission System ENG. AL SIYABI GULF STATES C1 - Session 2 Aug. 31 in Oman A methodology to compute resilience indicators for the Italian Mon. C1-111 E. CIAPESSONI ITALY C1 - Session 1 Transmission System Aug. 31 "Elicitation of Structured Expert Judgment to estimate the UNITED Mon. C1-112 K BELL C1 - Session 1 probability of a major power system unreliability event " KINGDOM Aug. 31 Planning for 100% Variable Renewable Energy (VRE) on an Mon. C1-113 P. TUSON SOUTH AFRICA C1 - Session 2 Island Power System Aug. 31 Development of Resilience Issues and Challenges in the SEERC Not C1-114 K. REICH AUSTRIA 0 Region (South East European Regional Council of CIGRE) presented Mon. C1-115 Bulk System Planning Aiming to Improve System Resilience D. SEKIGUCHI JAPAN C1 - Session 1 Aug. 31 North Sea Wind Power Hub – System Configurations, Grid Mon. C1-116 G. MISYRIS DENMARK C1 - Session 1 Implementationand Techno-economic Assessment Aug. 31 Software and hardware complex for making decisions on the impact on power grid equipment, taking into account its Not C1-117 A. GUSAROVA RUSSIA 0 technical condition and importance index using modern presented methods of diagnostics and data processing Economic and social Contribution from Red Electrica Group Mon. C1-118 R. DE LA FUENTE SPAIN C1 - Session 2 Investments Aug. 31 Page 25 de 50
You can also read