Being part of UFuture Group Impact Investment Innovation & Hi-Tech 1st Ukrainian innovation park 11 projects in education and economics 500K m2 for businesses, education Kyiv International Economic Forum – and innovation by 2025 the biggest platform to discuss prospects 300+ companies and R&D laboratories of Ukraine’s economic development Real estate by 2025 Leading real estate investor Innovation & Hi-Tech and developer 3 mn m constructed 2 Innovation park 11 commercial and residential 40K m2 of commercial real estate $550 M projects completed 3K tenants from IT companies MEDIA of total assets Among top-10 advertising companies 14% share of the local market Out-of-home media Infrastructure Ukraine’s 2nd biggest international airport 40 airlines, 5mn+ passengers per year 2 310-meter runway 100+ UFuture is a holding company of Ukrainian entrepreneur Vasyl Khmelnytsky employees that consolidates all his business and impact investment projects group of The only manufacturer of blood- IT companies derived medicines in Ukraine 20 mn packs of drugs per year Developer, investment and asset management company Export to 36 countries 100% projects in renewables 150 MW in solar Pharma 2 industrial parks 182,2 MW in wind 70 ha area with all industrial Innovative production cluster utilities 1st Ukraine’s manufacturer of modern Renewables electro-technic systems Industrial 4.6 mn units of polymers and Infrastructure composites per year Advanced Materials 2
Development path Cooperation with E-Group Cooperation with Acciona 182 MW Incorporation 150 MW 125 MW 86 MW 57 MW 70 MW 70 MW 57 MW 50 MW 24 MW 50 MW 6 MW operational 6 MW development operational development 2016 2017 2018 2019 2020 2021 3
Our services 1. Project development 2. (Co)financing Site selection Deal structuring Feasibility study Strategic partnership RTB confirming documents Attraction of loan finance Project design Loan refinancing core business 4. Asset 3. Construction management supervision Operational management Tender for an EPC contractor Loan service Supervision on schedule, budget and quality O&M control Grid connection Efficiency assessment Obtaining FiT 4
PV location PV commissioned PV commissioned by the end of Q2 2020 I stage Wind project development 57.0 mw II stage Volyn West Wind Volyn region 56.8 mw 6.0 mw Dymerka-1 Kyiv region III stage 1150 kWh/m2 68.4 mw 13.0 20.0 mw Scythia-1 Zaporizhia region 1 321 Terslav (Goryanivka) mw kWh/m2 33.1 Dnipro region 1 272 kWh/m2 6.5 mw Pervomaisk mw Scythia-2 Zaporizhia region Mykolayiv region 1 321 1 256 kWh/m2 kWh/m 2 18.3 mw Free-Energy Kherson region 17.6 mw 1 350 kWh/m2 Artsyz 1 401 Odesa region 24.4 kWh/m2 Gudzovka 1,2 Odesa region mw 8.6 mw Port-Solar Odesa region 1 467 1 467 kWh/m2 kWh/m 2 5
Operational PVPP Dymerka-1 6.0 mw Kyiv region First PV project pointing Fact sheet the way to the future Location Velyka Dymerka, Kyiv region Located 35 km from Kyiv city, Dymerka-1 PV was Commissioned UDPR’s pilot project launched in 2016. The PVPP September 2017 sells 100% of solar energy to the State Enterprise PV modules Guaranteed Buyer under the FiT 0.15 EUR/1kWh. JINKO SOLAR JKM275PP-60 polycrystalline With a gross energy yield of over 7 000 MWh per Inverters year, the solar plant saves over 6 500 tons of CO2 KNESS PVTECH-500 emissions. Mounting systems KNESS PVMS-2R-25-4, double-support As a continuation of the project, ACCIONA Energia has started construction of 57 MW PV PP, which will enter into service in 2019 being wholly owned by that company. 6
Operational PVPP Partyzany 18.3 mw Kherson region PVPP on the sunny South Fact sheet Location Located on the South of Ukraine, the Partyzany PVPP Henichesk district, Kherson region benefits from high level of annual solar radiation, which Commissioned averages at 1 350 kWh/m2. The plant sells 100% of November 2018 solar energy to the State Enterprise Guaranteed Buyer PV modules under the FiT 0.15 EUR/1kWh. JINKO SOLAR JKM280M-60 monocrystalline With a gross energy yield of over 23 450 MWh per Inverters year, the solar plant saves over 22 000 tons of CO2 KNESS PVTECH-500 emissions. Mounting systems KNESS PVMS-2RV-60-8, single-support 7
Operational PVPP Scythia-1 13.0 mw Zaporizhia region Phase I of the Fact sheet Melitopol Project Location Melitopol district, Zaporizhia region Construction of the phase I of the Melitopol project Commissioned started in May 2018. The plant was commissioned in March 2019 March 2019 and generates 16 219 MWh per year. PV modules JAM72S01-375/PR The 20-ha land plot benefits from high annual JAM72S01-380/PR solar radiation, 1 321 kWh/m2. The State Enterprise Guaranteed Buyer is a single buyer of the energy Inverters KNESS PVTECH-500 produced under the FiT 0.15 EUR/1kWh. Mounting systems KNESS PVMS-4RH-25-4, double-support 8
Operational PVPP Scythia-2 33.1 mw Zaporizhia region Phase II of the Fact sheet Melitopol Project Location Melitopol district, Zaporizhia region Construction of the phase II of the Multipool Commissioned project started in September 2018. The plant was July 2019 commissioned in July 2019, with annual generation of PV modules 41 845 MWh. JA Solar JAM72S01 monocrystalline The 50-ha land plot benefits from high annual Inverters solar radiation of 1 321 kWh/m2. The State Enterprise KNESS PVIS.2000/35 Guaranteed Buyer is a single buyer of the energy Mounting systems produced, under the FiT 0.15 EUR/1kWh. KNESS PVMS-4RH-25-4, double-support 9
Operational PVPP PORT-SOLAR 8.5 mw Odesa region The second smallest but Fact sheet the most Southern PVPP Location Izmail city, Odesa region Construction of the most-Southern project started Commissioned in October 2018, with commissioning in October October 2019 2019. The PVPP benefits from the highest level of PV modules insolation of 1 467 kWh/m2, with annual production JINKO JKM335M-72 mono crystylline 11 830 MWh/year. Inverters The State Enterprise Guaranteed Buyer is a GPTech PV900wd-iNT-O single buyer of the energy produced under the FiT Mounting systems 0.15 EUR/1kWh. Termobud Karkas ФМС-Г-Р2-Ф36 10
Operational PVPP Pervomaisk 6.5 MW Mykolaiv region PV PP on the South Fact sheet of Ukraine Location Mykolaiv region, Pervomaisk town Construction of Pervomaysk project started in May Commissioned 2019, with commissioning in November 2019. The November 2019 PVPP benefits from the highest level of insolation of PV modules 1 254 kWh/m2, with annual generation of 7 591 MWh. Jinko Solar JKM330PP-72-V polycrystalline The State Enterprise Guaranteed Buyer is a sin- Inverters gle buyer of the energy produced under the FiT PVCIS.2500/35 (2 items) 0.15 EUR/1kWh. Mounting systems PVMS-2RV-72-8 11
operational PVPP Terslav (Goryanivka) 20 MW Dnipro region Obukhiv village council PV project in the Fact sheet Southeastern Ukraine Location Dnipro region, Obukhiv village council Located 25 km away from Dnipro city. The PVPP sells Commissioned 100% of solar energy to the State Enterprise Guaran- April 2020 teed Buyer under the FiT 0.15 EUR/1kWh. PV modules Longi Solar LR6-72PH-365M & LR6-72PH-370M Construction of Terslav project started in July 2019, monocrystalline with commissioning in April 2020. The PVPP benefits Inverters from the highest level of insolation of 1 272 kWh/m2, Inverter SMA Solar Technology SHP75-10 Sunny with annual generation of 23 275 MWh. Highpower PEAK1 (206 items) Mounting systems Metal mounting frame with four-row horizontal panel layout 12
operational PV Gudzovka 1, 2 PV project on the South Fact sheet of Ukraine Location 24,4 mw Izmail city, Odesa region Located on the South of Ukraine, Gudzovka PVPP Commissioned benefits from high level of annual solar radiation, which September 2020 Odesa region averages at 1 467 kWh/m2, with annual production PV modules 33 580 MWh/year. This PV PP to be commissioned on JAP72S01 335/SC, JA Solar September 2020. Inverter station The State Enterprise Guaranteed Buyer is a single buyer PV3MVD3-HV560 of the energy produced under the FiT 0.15 EUR/1kWh. Mounting systems KM-30 With an expected gross energy yield of over 16 533 MWh per year, the solar plant saves over 25 000 tons of CO2 emissions. 13
operational PV Artsyz PV project in Odessa Fact sheet region Location 17,6 mw Pavlivka town, Artsyz’kyi district, Odessa Region Located on the South of Ukraine, Artsyz PVPP ben- Commissioned efits from high level of annual solar radiation, which July 2020 averages at 1 401 kWh/m2. This PV PP to be commis- PV modules Odesa region sioned on July 2020. JAP72S01 335/SC, JA Solar The State Enterprise Guaranteed Buyer is a sin- Inverter Station gle buyer of the energy produced under the FiT IS3MWD3-HV560 0.15 EUR/1kWh, with annual production 23 307 MWh/ Mounting systems year. KM-30 With an expected gross energy yield of over 11 286 MWh per year, the solar plant saves over 15 000 tons of CO2 emissions. 14
Volyn Wind Project I stage II stage III stage Nominal capacity Capacity 57.0 MW 56.8 MW 68.4 MW 182,2 MW Turbine Turbines 10 10 12 Nordex Delta 4000 N163-5.7 Vestas EnVetus V162-5.6 Project status RTB RTB - Annual production 653.937 / 642.438 MWh Land + + - Mean wind speed (GEO NET) 7.1 m/s at 120 m, 7.4 m/s at 140 m Environment impact study + + + Capacity factor 40,9% (10% technical losses) Wind measurement ongoing ongoing ongoing Interconnection cost €8,5mn Terms of interconnection + + - Location Pre PPA + + - Zaturtsi, Volyn region, Ukraine 15
drivers of our growth Goal-oriented 1 strategic partnerships Empowered and motivated teams 5 2 Commitment to strategy Timely Local 5 risk-taking expertise 3 4 16
Experienced local partner. Prime investment opportunities. 20 Lavrska Street Kyiv, Ukraine 01015 +380444965507 www.udpr.com.ua info@udpr.com.ua 1