Community Information Booklet - www.westerndownsgreenpowerhub.com.au - Western Down Green Power Hub
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Community Information Booklet www.westerndownsgreenpowerhub.com.au contact@westerndownsgreenpowerhub.com.au
Finland GLOBALLY Ireland The company is headquartered in Paris, France, and has two France Australian offices – in Sydney and United States Jamaica Canberra. Portugal We operate across renewable Mexico energy technologies including El Salvador solar, wind and storage in Europe, Central America, Africa, the Mozambique Middle East and Australia. Zambia Argentina Australia LOCALLY Neoen Australia began operations in 2012. Over the last seven years DeGrussa Solar and Storage Project the company has initiated the Dubbo Solar Hub development of more than 1GW Hornsdale Wind Farms 1, 2, 3 Hornsdale Power Reserve Parkes Solar Farm Griffith Solar Farm of solar and wind projects through Coleambally Solar Farm organic growth, local partnerships Bulgana Green Power Hub Numurkah Solar Farm and strategic acquisitions. Neoen produce green electricity from renewable sources such as sunlight and wind using mature, tried and tested technologies. We are also leaders in energy storage. Page 2
WORLD’S L A R G E S T B AT T E R Y HORNSDALE POWER RESERVE LESS THAN SIX MONTHS FROM PROJECT INCEPTION TO COMPLETION • 100MW Lithium-ion battery located next to Hornsdale Wind Farm • Owned and operated by Neoen • Installed and maintained by Tesla • Provides grid stability services • Saved SA energy consumers $50 million in 2018 • 50MW Stage 2 now under construction REDUCES RISK OF BLACKOUT IN SOUTH AUSTRALIA Page 3
DELIVERING CHEAPER ENERGY FOR INDUSTRY LAVERTON STEELWORKS VICTORIA Laverton Steelworks have agreed to take power from Neoen's 128 MW Numurkah Solar Farm under a 15-year deal. GFG Alliance’s Executive Chairman Sanjeev Gupta said the deal would help lower energy costs at Laverton. DEGRUSSA MINING WESTERN AUSTRALIA DeGrussa is the largest off-grid solar battery storage project in Australia. It powers a gold and copper mine in remote WA. Commissioned in June 2016, it provides a solar and storage solution to the majority of the mine’s daytime electricity requirements, offsetting up to 20% of total diesel consumption annually. NECTAR FARMS VICTORIA Bulgana Green Power Hub, consisting of 196 MW of wind backed by a 20MW battery, is co-located with agri-business Nectar Farms to provide secure and affordable energy. Nectar Farms is using the latest in hydroponic glasshouse and plant technology to create a 10 hectare state of the art facility and over 130 local jobs. Page 4
WESTERN DOWNS GREEN POWER HUB OVERVIEW Will span across 150MW 400MW Will be located High solar 1,545 hectares battery storage solar farm near the irradiance of of land Kogan Creek 1,968 W/m2 Power Station Page 5
PHASE 1: PROJECT LIFE CYCLE DE VEL OPM ENT Choose site Meet local Meet Environmental land owners traditional surveys, owners local input, design Community Info Day We are here CONTRACT Appoint Grid connection Government Public Government contractors agreement approval exhibition submission Local jobs session PHASE 2: CONST RUCT ION Regular community Arrange finance Prepare for Hire workers Build updates construction PHASE 3: Testing & OPERATION accreditation Operations & maintenance Launch Community Plant trees Generate Grid benefit sharing celebration electricity connection program Site visits & open days Back to phase 1 Plant operates for 25+ years Environmental Land management Annual benefits Renewal or monitoring & farming continues sharing program decommission? Decommission Page 6
W H AT H A P P E N S DURING CONSTRUCTION 300-400 people during peak construction 7-10 permanent staff EARLY WORKS CONSTRUCTION STAGES MAY/JUNE 2020 JULY 2020 TO FEBRUARY 2022 IN THE TOWN ON THE ROADS AT THE SITE Increased numbers Road upgrades Surveys being conducted As early construction works The project will b e accessed via Currently undergoing extensive commence, you will start to see Sixteen Mile Hall Road, which in consultation with the Barrangum more project and construction staff turn will be accessed via Kogan Native Title Group – Aboriginal around town. Condamine Road. cultural heritage survey, while a Cultural Heritage Agreement has The local service economy will see Prior to construction, extensive road been agreed and signed. an increase in their business. upgrades will be made to Sixteen Mile Hall Road to ensure that it is a Construction hours will be Monday to At peak, the numbers of construction graveled pavement road. Upgrades Saturday from 6am to 6pm. staff will be up to 300 to 400 people. to the road will be in-line with We expect construction staff to Western Downs Regional Council come from surrounding towns standards. Chinchilla, Dalby and Tara, as well as the wider Toowoomba and Brisbane areas. Page 7
OUR TEAM DEVELOPERS, OWNERS & OPERATORS Development Manager: Anne Frederic Construction Manager: Laszlo Csanyi Community Relations Manager: Lisa Stiebel EPC contract will be awarded in April 2020 ENGINEERING, PROCUREMENT & CONSTRUCTION CONTRACTOR Overall control of the site, managing deliveries of equipment and design of the solar farm. ELECTRICAL CIVIL & MECHANICAL SUBSTATION INSTALLATION SUBCONTRACTOR SUBCONTRACTOR SUBCONTRACTOR Site establishment, road and drainage Design and construction of the solar Electrical installation of AC and DC works. Mechanical installation of the farm’s substation including high cable systems and PV module cables. PV panels and tracking system. voltage (HV) equipment. Page 8
EMPLOYMENT OPPORTUNITIES Engineering, Procurement & Construction Contractor General roles available Administration Security Waste Recycling Electrical Installation Civil & Mechanical Substation Subcontractor Subcontractor Subcontractor Roles available Plant Operators Labour roles Administration Roles available Civil roles available available Electricians General Labour Loader Concreters Electricity installation Electricity installation Excavator Pipelayers Electrical Trade Assistants Grader General Labour Electrical Trade Assistants Roller Dump Truck Watercarts Forklift and/or Telehandler Trucks Pile Driver SUPPLIER OPPORTUNITIES Goods and services we expect to be procured with a planned start date of June/July 2020: Accommodation Safety Products (Local) Cleaners Septic Pump Out Services Computer Small Equipment Hire Network Support Transport (Minor) Crane (Minor Lifts) Waste Management (Liquid) Earthworks Plant (Wet and Dry Hire) Waste Management (Solid) Fencing and Gates Water (Construction) Food and Catering Service Water (Potable) Freight Concreters Fuel Concrete Supply Material Testing Welding & Engineering Fabrication (Site Services) Mechanical Fitter/Maintenance Operation & Maintenance Facility Construction Quarry Products Anyone interested in working on the project, can email contact@westerndownsgreenpowerhub.com.au with the following information: Name and Contact Details Service Area – Electrical/Mechanical/Civil Brief Summary of skills and experience Details will then be sent on to the appropriate person within one of our contractors. Page 9
P R O J E C T L AY O U T & L O C AT I O N General Information N PV-Module Rating (Wp) 340 Inverter Rating at 35°C (MVA) 2.2 W E Nb of MVPS type 1: 4.4 MVA 101 S Nb of MVPS type 2: 2.2 MVA 8 Nb of Panels/Strings 29 Nb of Strings/Tracker 3 Nb of Trackers/Inverter 80 Nb of Trackers 16,800 Nb of Strings 50,400 Nb of Panels 1,461,600 DC Power of PV plant (Wp) 496,944,000 AC Power of PV plant at 35°C (MVA) 462 Area of PV plant (Ha) 1,400 Distance between two tracker rows - "Pitch" (m) 7 LEGEND : MVPS BLOCK BOUNDARIES 5.5 MVA MVPS 2.75 MVA MVPS A0 Preliminary design N° Modifications Made by Date Check by Date Customer : N° of Project : NEOEN WESTERN DOWNS SOLAR FARM EPC Contractor : Title document : GENERAL LAYOUT PRELIMINARY DESIGN Drawn By : Checked By : Approved By : Date Scale Format Sheet 27/03/2018 1:20,000 A3 1/1 Project Title Area Code Issuer Doc type Pack code Seq N° Rev A0 Chinchilla W ar reg o Hw r Rd y a ooy ey C Western Downs Koga n Con Green Power Hub damin e Rd Oak Dalby Leich hard t Hw Toowoomba y 20km Page 10
LOCAL COMMUNITY ECONOMIC BENEFITS BENEFITS $100,000 PER YEAR FOR LOCAL PROJECTS AND INITIATIVES THROUGHOUT THE PROJECT LIFESPAN (APPROXIMATELY 30 YEARS) $540 MILLION 300-400 JOBS 7-10 JOBS INFRASTRUCTURE CREATED DURING CREATED DURING INVESTMENT CONSTRUCTION OPERATIONS E N V I R O N M E N TA L B E N E F I T S ABILITY TO PRODUCE APPROXIMATELY 1,031,400 MWh PER YEAR WHICH IS EQUIVALENT TO: DISPLACING POWERING REMOVING PLANTING 825,120 TONNES 224,364 HOMES 23,092 CARS 8,457,480 TREES OF CO 2 EMISSIONS FROM THE ROAD Page 11
www.neoen.com/en Natasha Lawrence, Project Manager 0499 490 330 natasha.lawrence@neoen.com
You can also read