COMMUNICATION PRESERVING THE PLAYER WILLS FACTORY BUILDING THE PROPOSED PLAYER WILLS SCHEME DEMAND FOR APARTMENTS - Bailey Gibson and Player Wills ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
JANUARY 2021 COMMUNICATION – PRESERVING THE PLAYER WILLS FACTORY BUILDING – THE PROPOSED PLAYER WILLS SCHEME – DEMAND FOR APARTMENTS DEVELOPMENT Former Bailey Gibson and Player Wills Sites UPDATE
JANUARY 2021 COMMUNIT Y BULLETIN Welcome to our latest STRATEGIC HOUSING THE FACTORY BUILDING A NEW HUB FOR update and best DEVELOPMENT APPLICATION PRESERVING THE PLAYER WILLS THE WHOLE COMMUNITY wishes for 2021. SUBMITTED FOR THE FACTORY BUILDING Extending from the South Circular Road through We appreciate all of the feedback we received FORMER PLAYER WILLS Guided by a heritage consultant, David Slattery Conservation Architects, the new vision for the to the new Players Park, the factory building straddles and connects both the new and existing in response to the previous newsletter and earlier Open Days, and very much welcome FACTORY SITE former Player Wills Factory building is to restore, repurpose and transform the existing, unused communities. The landscape design features a “red carpet” paving the way of a new public further comments, queries, discussion and In December 2020, Hines and APG submitted a building into a cultural and entertainment hub route from the South Circular Road, through the suggestions at the following contact numbers Strategic Housing Development Application to An for the community. In addition, as part of the Factory, to the new public park. and email: Bord Pleanála for the construction of 732 new homes repurposing, it’s proposed to add two extra floors and two new public parks. set back from the existing front façade onto the Features of the reimagined Player Wills Factory • Community Consultation with Hines, South Circular Road. To the rear, at the north building include: including construction related queries: The planning application proposes the retention eastern corner, where a later extension to the 087 3836512 (Operating hours: Monday • 852 sq.m. of ground floor area devoted entirely and transformation of the iconic Player Wills Factory factory is removed, a new 8 storey building to Friday 9am to 5pm) to community and cultural uses such as building and the development of a multi-purpose, with amenities is proposed. community arts & studio space – equivalent in • Community Engagement with Andrew cultural and social space that will be open for all to size to the Project Arts Centre in Temple Bar. Kinsella who can be contacted for more enjoy including local residents and the general public. information, comments and concerns not This significant change to the original plans is a result • The internal open-air courtyard will be used related directly to construction issues: of feedback we received from the local community. for many purposes including, for example, kinsellaandy@gmail.com or 086 852 0565 It will add to the vitality and life of the proposed Christmas market stalls or evening events & development and to the local area. performances, open for the enjoyment of the • Other queries: info@hinesopenday-d8.com local community and wider Dublin 8 residents. If you didn’t receive our first newsletter All of the planning documents for the redevelopment • In total over 2,500 sqm of the building will be you can find a copy on our website: can be viewed at www.pwscr2shd.ie. open to the community including a 500 sqm www.hinesopenday-d8.com convenience shop and a café/restaurant/bar The pre-planning pack for Phase Three will be space where people can meet, socialise or submitted to An Bord Pleanala on the 26th January work together. 2021. The Phase Three application will include the full V I E W O F T H E P L AY E R W I L L S FAC TO RY B U I L D I N G F R O M T H E S O U T H C I R C U L A R R OA D W I T H T H E BA I L E Y G I B S O N S I T E S E E N I N T H E L E F T- sized Municipal Playing Pitch. H A N D CO R N E R. V I E W O F T H E CO U R T YA R D I N T H E P L AY E R W I L L S FAC TO RY B U I L D I N G. T H I S CO U R T YA R D I S E N V I SAG E D TO B E A N E XC I T I N G N E W CO M M U N I T Y S PAC E T H AT CA N B E U S E D F O R E V E N I N G E V E N T S A N D M A R K E T S F U L LY O P E N TO T H E W H O L E CO M M U N I T Y - B OT H N E W A N D E X I S T I N G.
JANUARY 2021 COMMUNIT Y BULLETIN THE PROPOSED N t tS nS PLAYER WILLS SCHEME ll S ow we C Br am ax M er on St Over the past two years our design team has been working on the planning application for the Player St Wills site. As mentioned earlier this application was rm an Ha submitted in December 2020. For more information visit our website here www.pwscr2shd.ie or contact St al ng Fi St info@hinesopenday-d8.com. Feel free to contact us ne ace ge err if you’d like one of the team to help you navigate Eu er T nez Ebe around the masterplan. PHASE ONE Bailey Gibson Don ore Planning Lodged Ave 25th May 2020 Planning Decision Date 150m 14th September 2020 Target Start Date 15* June 2021 (Pending Legal Review) St .C ath PHASE TWO eri ne ’s A 3 3 ve Player Wills 90m Planning Lodgement 8 6 8 1 67m 6 Ave December 2020 Do 16 oth 15 no Planning Decision Date 26m 2 155m re Rehob Av April 2021 19 e 3 3 Target Start Date 5 11 August 2021 5 6 2 4 3 3 PHASE THREE 9 Rehoboth Pl St. 115m 4 3 Cat h PW3 erin e’s 3 6 Ave Pre-Application pack submitted to An Bord Pleanala 6 3 Week commencing 25th January 2021 4 Planning Lodgement e Dolphin Av Sou April 2021 th C ircu la r Rd Planning Decision Date dS August 2021 ’s R Target Start Date nne *The building height proposed as per SDRA Masterplan 2017 A January 2022 St. A R R OWS I N D I CAT E T H E NUMBERS REPRESENT 5 0 M - 1 X O LY M P I C Culture Cafe / Bar / Restaurant Retail D I S TA N C E F R O M T H E S I T E E D G E B U I L D I N G F LO O R H E I G H T S SWIMMING POOL PUBLIC PARKS + PLAYGROUNDS MUNICIPAL PLAYING PITCH BUILDING HEIGHTS B E F O R E D E V E LO P M E N T ( A N A LYS I S TA K E N O N M A R C H , 2 P M ) VS O N CO M P L E T I O N O F D E V E LO P M E N T T H E R E I S M I N I M A L OV E R S H A D OW I N G OF EXISTING HOMES (MARCH, 2PM) The largest of the two parks at 6,000 sqm is equiva- A highlight and one of the most exciting features of At 27 acres in total the masterplanned site is a very BEFORE AFTER lent in size to Weaver Park on Cork street and more the masterplan is the proposal for a municipal playing large area – 9 times bigger than the size of Croke than twice the size of Oscars Square in The Tenters. pitch on the north east corner of the site adjacent to Park. Sensitively designed and gradually rising to This public park will be a large green open space for Donore Avenue. include a building of 19 stories at its centre, the the wider community to enjoy and is in addition to total site area can accommodate the heights in The Municipal Playing Pitch forms part of the Phase numerous smaller parks and courtyards which will a manner which delivers the new homes and sits Three planning application and it’s proposed as a full serve the new residents. comfortably within the existing built environment size, all weather pitch available to local sporting of low rise houses. The more curated of the two parks is adjacent to the clubs. The planning pack for the pre-application con- proposed creche facility and St. Catherine’s National sultation with An Bord Pleanala will be submitted the The proposal and introduction of new buildings School and will include a playground. week commencing the 25th January. Consultations will change the view at street level and change BEFORE AFTER with Dublin City Council and local sporting bodies the existing sky-view, however, the buildings are continue to take place, with the latest consultation designed in such a way so as not to over shadow having taken place on the 21st January where plans existing buildings or reduce sunlight as they sit for the pitch and associated community facilities between 90 meters to 155 meters from existing were further progressed. housing which is equivalent to approximately 2 - 3 Olympic swimming pools in length. SHADOW ANALYSIS B E F O R E D E V E LO P M E N T ( A N A LYS I S TA K E N O N J U N E , 2 P M ) A NEW NETWORK OF STREETS White is existing homes VS O N CO M P L E T I O N O F D E V E LO P M E N T T H E R E I S M I N I M A L OV E R S H A D OW I N G O F E X I S T I N G H O M E S (J U N E , 2 P M ) St S Yellow in ‘Before’ is Existing Buildings on site. ll St n we ow Yellow in ‘After’ is buildings in masterplan. C Br am ax M er on Blue in ‘After’ is proposed buildings for the Player Wills site St r Te rra ce Donore Avenue eze ben E St Catherine’s Avenue St gal Fin St e ne ace ug err E dg eT le Rut HOMES THANK YOU In addition to shops, cafes, a crèche, parks and the new Our vision for the wider masterplan Don ore community hub, the application for the Player Wills site Ave includes 732 new homes. is to create a thriving, sustainable, Throughout the wider masterplan, the layout of the residential led community that sits proposed 1,2 and 3 bedroom apartments and the comfortably within the existing proposed townhouses is familiar including bedrooms, built environment, connects with living room, kitchen, bathroom etc. No vehicle access other than emergency local communities and enhances the vehicles. Pedestrian and Cycle access th Ave quality of living experience for all Do no Rehobo The historic Player Wills Factory building, however, re Av residents – new and old. We want to e presents its own unique challenges. To preserve its original character including the internal, industrial hear from local residents and others steel grid design, a more innovative solution had to on our plans for what is a wonderful St. be found. Our architects, heritage consultant and site and a great opportunity for true Cath Rehoboth Pl erin e’s Ave design teams explored several uses for the factory building. In the end they concluded that the building’s urban regeneration. original industrial design and layout are not conducive Dolphin Ave Sou th C S T. CAT H E R I N E ’S AV E N U E S T. CAT H E R I N E ’S AV E N U E ircu lar Rd to a standard apartment design and layout. The proposal is a loft style, shared accommodation dS – B E FO R E – AFTER ’s R nne solution which combines more compact private A St. living and bedroom space with the benefits of large open communal spaces for socialising, recreation, Primary Secondary Shared Space Street Cycle Parking working or exercising. The design makes the most of the industrial heritage and feel of the building, Traffic calmed. High pedestrian/ Equal priority to Parking as shown for benefiting from the original double height ceilings and cycle priority with pedestrians and cyclists Bailey Gibson and Player refurbished steel frame windows found in industrial Car Parking minimal traffic to reduce the dominance Wills, around St Teresa’s buildings and warehouse loft conversions elsewhere. of cars. Gardens to follow.
JANUARY 2021 DEMAND FOR APARTMENTS • 70-80% of all demand for housing in Dublin is for smaller 1-2 person homes, indeed c.90% of this local districts rental properties searched on Daft.ie were for 1-2 bedroom homes. • Census data for this local district shows over 50% of housing stock is family homes or bungalows, many of which were built prior to 1919 and often occupied by numerous singles or couples sharing as there is not enough apartments in the area. Ideally this housing stock would be freed up to be converted back into family homes over time, by the development of more apartments in the area. • The proposed development addresses this local district’s need for more modern, highly energy efficient, right-sized homes. I N D I CAT I V E CG I O F T H E L I V I N G A R E A I N A 2 B E D A PA R T M E N T I N • The scheme’s density on a vacant brownfield P L AY E R W I L L S B U I L D I N G 2 site addresses urgent calls to reduce Dublin’s urban sprawl and build more sustainably for • It moves beyond the model of individual future generations in line with both National private landlords and allows the scaling of and City objectives. operation which means there will be full time • The scheme includes significant amenities and management on site, to deal with any repairs communal spaces to support this density, some and maintenance. It provides a lot more of which will be for the residents and some of certainty for tenants as the landlord is very which will be for the wider community to enjoy. keen to promote long term occupation. • The arrival of a significant new population will • The proposal delivers modern, high quality bring a lot of new spend on groceries, local apartments and a quality of life experience. services such as barbers and hairdressers, and • The apartments, including the parks, the food & beverage in the local community. This municipal playing pitch and amenities, will be will help existing retailers, cafés’ and other completed in approximately one third of the local service providers significantly and allow time it would take to build apartments that are them to potentially expand and invest in their built for sale due, to the slower rate at which business bringing a lot of long-term benefit for apartments can be sold vs rented. both the new and existing residents in the area. • Long term, purpose built and professionally owned rental accommodation, is commonplace in Europe and is also becoming important for Dublin.
You can also read