Bidding: Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties)
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Bid Date: January 22, 2021 by 10:00AM Invitation to Bid J.C. Ripberger Const. Corp. will be bidding as a prime contractor for the project listed below. We would like to invite MBE/WBE/VBE/DBE subcontractor/supplier firms interested to submit a bid proposal. PROJECT: Bankers Life Fieldhouse Expansion – Phase 2/3 COUNTY: Marion Bidding: Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) MBE/WBE/VBE/DBE firms interested in submitting a bid proposal may contact J.C. Ripberger at info@jcripberger.com to obtain plans and specs. Your written bid proposal should be sent to info@jcripbeger.com or FAXED to 317/873-3688 on or before 01/22/2021. If you are interested and/or require additional information, please contact our office by email at or call 317/873-3383 as soon as possible. Please include your company name, contact person, fax #, & phone#. Send a copy of your State of Indiana MBE/WBE/VBE/DBE certification with your quote.
Bankers Life Fieldhouse Expansion Project Phase 2/3 Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) December 18, 2020 SCOPE OF WORK PART 1 GENERAL 1.01 SUMMARY A. Contractor is responsible for all Contract Documents (drawings, specifications, addenda, etc.). Contractor shall review all documents to be sure that complete scope is reviewed and acknowledged. B. Contractor is required to attend weekly Safety Stand-down Meetings and weekly Contractor Progress Meetings. C. Safety Personnel – Refer to Contractor Safety Requirements D. Section 01 50 00, Part 3.3-E doesn’t apply to this scope of work. Employee parking is not provided. Parking for contractor employees and supervisors is not allowed at the Event Level Loading Dock nor at building perimeter at any time. Vehicle access to the Event Level Loading Dock and building perimeter is provided for deliveries, loading and unloading. Unauthorized vehicles will be removed at vehicle owner’s expense. E. All onsite contractor employees must attend Project Safety Orientation prior to first day of work. Orientation will be held daily. Project may be covered by an Owners Controlled Insurance Program (OCIP), which will require all contractor employees to provide information to the OCIP Administrator. F. Security and access to the site will be tightly controlled. All contractor employees will be issued an identification/access badge that will be used to access and to leave the site. G. Contractor is responsible to complete all quality control and safety requirements as indicated in the Contract Documents. H. Deliveries must be scheduled with the Construction Manager 48 hours in advance of arrival onsite. Access to the Event Level Loading Dock will be tightly controlled. Unscheduled deliveries will be turned away. I. No laydown or storage is provided inside the construction perimeter or adjacent properties. Deliveries must be Just-In-Time to meet the Project Schedule. Material delivered to meet daily installation requirements of the Project Schedule will be placed in a location approved by Construction Manager. J. Contractor shall begin field coordination, shop drawings and submittals for this Scope of Work immediately upon Execution of Contract. K. Contractor is responsible for detailed coordination and communication with other Contractors for the Scope of Work for this Bid Package and all other Bid Packages per all Contract Documents. 1
Bankers Life Fieldhouse Expansion Project Phase 2/3 Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) December 18, 2020 L. Contractor is responsible to furnish, install, maintain, remove and dispose of protection for the finishes installed for this Scope of Work. Protection shall keep the finishes in like new condition until Substantial Completion. Protection shall be suitable to protect finishes from wear & tear and minor damage that can result from normal construction activities. Contractor is responsible for repairs where finish protection is not maintained nor properly installed. M. Contractor understands and agrees that this is a fast-track oriented project with all ramifications and considerations of such a project. Contractor also agrees that the total scope of work is understood and that all considerations have been made for the intent of the total work involved. Therefore, all costs have been accounted for in this Bid Package alleviating requests for additional compensation. N. Contractor is responsible for daily cleanup to trash containers provided by others and distributed throughout work area. Emptying trash containers in dumpsters and returning to work area will be by others. Trash dumpsters as shown in Logistics Plan will be provided by others. 1.02 BID PACKAGE SCOPE OF WORK A. BID PACKAGE 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) 1. This Scope of Work includes, but is not limited to the inclusion of all overhead, insurance, permits, supervision, coordination, labor, equipment, tools, material, material handling, hoisting, rigging, surveying, layout, scaffolding, temporary enclosures, temporary shoring, etc. to complete the following per the Project Schedule: a. Division 00 – Procurement & Contracting Requirements 1. Contractor Safety Requirements b. Division 01 – General Requirements c. Specification Sections included in this Bid Package: 1. 07 13 26 Self-Adhering Sheet Waterproofing 2. 07 24 23 Cement Board Finish System (DAFS) 3. 07 62 00 Sheet Metal Flashing and Trim 4. 07 25 00 Weather Barriers 5. 07 81 00 Applied Fireproofing 6. 07 81 23 Intumescent Fireproofing 7. 07 84 43 Joint Firestopping 8. 07 84 46 Fire-Resistive Joint Systems 9. 07 92 00 Joint Sealants 10. 07 95 13 Expansion Joint Cover Assemblies 11. 07 14 00 Fluid-Applied Waterproofing 12. 08 11 13 Hollow Metal Doors and Frames 13. 08 14 16 Flush Wood Doors 14. 08 31 00 Access Doors and Panels 15. 08 31 13 Access Doors and Frames 16. 08 33 23 Overhead Coiling Doors 17. 08 33 29 Folding Grilles 2
Bankers Life Fieldhouse Expansion Project Phase 2/3 Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) December 18, 2020 18. 08 34 16 Sectional Overhead Doors 19. 08 38 00 Traffic Doors 20. 08 71 00 Door Hardware 21. 08 83 00 Mirrors 22. 08 91 00 Louvers 23. 08 91 19 Fixed Louvers 24. 09 00 00 Finish Legend 25. 09 77 23 Fabric-Wrapped Panels 26. 10 21 13.13 Metal Toilet Compartments 27. 10 21 13.17 Phenolic-Core Toilet Compartments 28. 10 21 23 Cubicle Curtains and Track 29. 10 26 00 Wall and Door Protection 30. 10 28 00 Toilet, Bath, Laundry Accessories 31. 10 43 13 Defibrillator Cabinets 32. 10 43 14 Automated External Defibrillators 33. 10 44 13 Fire Protection Cabinets 34. 10 44 16 Fire Extinguishers 35. 10 56 26 Mobile Storage Shelving 36. 10 75 16 Ground-Set Flagpoles 37. 11 13 23 Stationary Scissor Lift 38. 11 61 43 Arena Curtains 39. 11 81 29 Facility Fall Protection 1. 2. Contractor shall furnish and install all work in complete accordance with the Contract Documents including, but not limited to the following: a. Scope Specific Items Here b. Main Course – Removal, restore and re-install expanded mesh ceiling panels. Reference Key note #51 on P2-AD4- 3A, 3B, 3C and 3D. Coordinate MEP demo prior to removal. Once removed transport offsite immediately for restoration and store off site until reinstallation is scheduled. Final finish color to be submitted for approval. New or existing expanded metal supports to be painted to match. Verify / As built current elevation and location prior to removal. c. Provide and Install Wedge barrier located at the top of the dock ramp. Provide all demolition, excavation, installation and dock restoration. Coordinate wedge barrier controls and utilities requirements, including drain piping trench and excavation, with other prime contractors. Since this entrance ramp is the only egress point for work in the Bowl this contractor is responsible to maintain egress down this ramp while the Wedge is being installed. The use of steel plates etc. is required. d. Furnish, install, maintain and remove 45 each Emergency Action Plan (EAP) stations. EAP station to include: 20# ABC fire extinguisher with stand, Air Horn and Signage. Assume fifteen (15) locations on each floor at Event Level, Lower Suite Level & Main Concourse Level. All fire extinguishers shall have a valid inspection certificate at all times. 3
Bankers Life Fieldhouse Expansion Project Phase 2/3 Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) December 18, 2020 e. Furnish and install floor protection for the Pavilion existing Terrazzo Floor during the demolition and reconstruction periods. Use of megadeck with 2” of extruded polystyrene under the megadeck. This floor cannot be shored. f. Provide cleaning for entire Middle Bowl Seating area concrete surfaces at treads & risers following seat removal by others. Cleaning method must be coordinated with CM because area is not water-tight. g. Provide Final Cleaning for all Phase 2 construction areas. This contractor is additionally responsible to clean all Phase 1 areas, lower bowl, and Phase 3 areas upper bowl. h. Furnish, install, maintain and remove shrink wrap protection for center scoreboards and perimeter ribbon boards. i. Furnish, install, maintain and remove temporary protection over all Arena Bowl areas above the Lower Seating Bowl to include all seating, exposed portions of Club Level Suites and vomitory openings from Main Concourse Level through the Upper Concourse Level. j. Furnish, install, maintain and remove all temporary dust barriers as needed & provided for this scope of work. k. Provide all necessary dust barriers and required for all work provided by this Bid Package. Contain and manage all dust and silica produced by this Bid Package. l. Provide street sweeping as needed for Phase 2 construction. This includes all adjacent streets, North alley and access ramp to Event Level Garage. m. Division 7 1. Provide all Self-Adhering Sheet Waterproofing per Section 07 13 26. 2. Provide all Sheet Metal Flashing and Trim per Section 07 62 00. 3. Provide all Applied Fireproofing & Intumescent Fireproofing 4. Provide all Joint Firestopping per Section 07 84 43. 5. All top of fire-rated CMU wall details (Reference Detail A40B-35). 6. Provide all smoke resistant sealants at Event Level as indicated on Contract Documents. 7. Provide all Fire-Resistive Joint Systems per Section 07 84 46. 8. Provide all Joint Sealants per Section 07 92 00 as indicated on Contract Drawings, including, but not limited to: 9. All new joints in Lower Seating Bowl to match existing conditions. 10. All new concrete joints- concrete to concrete and concrete to dissimilar materials. 11. All interior and exterior sealants for the perimeter of all hollow metal door frames and window frames at both sides. 12. All interior and exterior sealants for the perimeter of all aluminum door frames and window frames at both sides. 13. All millwork countertops. 14. All plumbing fixtures. 15. All top of CMU wall details 16. All overhead coiling doors, overhead coiling shutters & overhead coiling grilles at both sides of jambs & head. n. Division 8 4
Bankers Life Fieldhouse Expansion Project Phase 2/3 Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) December 18, 2020 1. Furnish and install all interior Hollow Metal Doors and Frames per Section 08 11 13. Coordinate frames in masonry to be installed by this Bid Package 2105 General Trades. 2. Furnish and install all Flush Wood Doors per Section 08 14 16. 3. Furnish all Access Doors & Frames per Section 08 31 13 as indicated on Contract Drawings for all metal stud wall and ceiling locations to Bid Package 1100 Contractor for installation in their scope of work. 4. Furnish all Access Doors & Frames per Section 08 31 13 as indicated on Contract Documents for all CMU wall locations to Masonry Contractor for installation in this scope of work for Bid Package 1105 General Trades. 5. Furnish and install all Door Hardware per Section 08 71 00. 6. Coordinate power supply and terminations for electric door hardware with Bid Package 2170 Electrical Contractor. Furnish and install all low voltage cable, hardware and controller / transformers as indicated on the Contract Documents. This includes voltage verification and compatibility with door hardware. 7. Furnish and install plastic temporary core fillers for all new doors to allow room access without a key. 8. Furnish and install (20) each construction keyed cores to provide temporary security and isolation of finished areas. Furnish (10) keys to Construction Manager. 9. Furnish and install final key cores for all interior and exterior doors. Coordinate keying schedule with the Construction Manager, Architect and Owner. 10. Contractor is responsible to coordinate door, frame and hardware deliveries and storage with the Construction Manager. All doors, frames and hardware shall be stored and protected in accordance with manufacturer’s instructions to prevent damage, warping, rusting, etc. 11. Prepare all hollow metal frames and doors including prep for hardware. All doors and frames are to be clean and in like new condition prior to turnover to Bid Package 2100 Painting Contractor. This includes, if necessary, removal of dents, dings, divots, blemishes, etc. fill and sanding, etc. 12. Provide all Overhead Counter Doors, Overhead Coiling Doors & Overhead Coiling Grilles per Sections 08 33 13, 08 33 23 & 08 33 26 respectively. Furnish and install all Fixed Louvers per Section 08 91 19. 13. Provide all Aluminum-Framed Entrances & Storefronts per Section 08 41 13. 5
Bankers Life Fieldhouse Expansion Project Phase 2/3 Bid Package 2105 - General Trades (DFH, Millwork, Wood Trim, Accessories & Specialties) December 18, 2020 14. Provide all Mirrors per Section 08 83 00. 15. Store any excess material on-site as directed by CM. o. Division 10 Scope 1. Provide all work for all Division 10 Sections. 2. Furnish and install all folding panel partition systems completely. Structural steel will be furnished and installed by this Bid Package. Coordinate locations and elevations of support steel. 3. Remove, salvage and reinstall existing galvanized steel outside corner guards as indicated on the Construction Documents. 4. Furnish and install new galvanized steel outside corner guards as indicated on the Construction Documents. END OF SECTION 6
You can also read