ARTC & INLAND RAIL
8 NOVEMBER 2017

OLIVIA NEWMAN, PROGRAMME DELIVERY MANAGER NSW/VIC - INLAND
RAIL

                                                             1
ARTC & INLAND RAIL - HunterNet
CONTENTS
• Introduction to ARTC
• Inland Rail Overview
• Programme Business Case
• Delivering Inland Rail
• Inland Rail Benefits for NSW

                                 2
ARTC & INLAND RAIL - HunterNet
INTRODUCTION
TO ARTC

               3
ARTC & INLAND RAIL - HunterNet
ARTC: AUSTRALIA’S LARGEST RAIL FREIGHT NETWORK
   • 8500 kilometers of track • 1100 employees • 450 trains per day operating on network

PRIMARILY SUPPORTING GENERAL FREIGHT TRANSPORT
  East West: Increase rail volume above economic growth
  North South: Increase rail volumes through significant growth in
  rail’s share of freight transport market
PRIMARILY SUPPORTING COAL TRANSPORT
  Hunter Valley: Increase capacity to meet port allocations &
                                                                                           4
domestic coal requirements
ARTC & INLAND RAIL - HunterNet
ARTC: DIVERSIFIED CUSTOMER BASE
                               FY15 ARTC Revenue By Market
   Steel—$30m (4%)                                         Grain   Minerals
                                                            2%       3%
                                         General Freight
                                              2%

   Intermodal—$162m (22%)
                                                                   Intermodal
                                                                      22%

   Passenger—$26m (3%)                                                          Passenger
                                                                                   3%

                                                           Coal                 Steel
   Grain—$14m (2%)                                         64%                   4%

   Coal—$484m (64%)

   Minerals—$26m (3%)

   General Freight—$17m (2%)

                                                                                            5
ARTC & INLAND RAIL - HunterNet
INLAND RAIL
OVERVIEW

              6
ARTC & INLAND RAIL - HunterNet
THE FREIGHT CHALLENGE: SCOPE FOR INLAND RAIL

                                           7
ARTC & INLAND RAIL - HunterNet
INLAND RAIL OVERVIEW
• Inland Rail is a project of national significance -
  a new 1700km freight rail line via regional
  VIC, NSW and QLD
• A road-competitive rail service based on
  transit time, reliability and cost (
ARTC & INLAND RAIL - HunterNet
TIMELINE TO DATE

                   9
ARTC & INLAND RAIL - HunterNet
10
INLAND RAIL OVERVIEW
BUILDING WHAT INDUSTRY WANTS

•   The Inland Rail Service Offering is central to
    Inland Rail and reflects the priorities of freight
    customers – Inland Rail as a road
    competitive service that offers competitive
    pricing, 98 per cent reliability, a transit time of
    less than 24 hours and freight that is
    available when the market wants

•   The Service Offering was developed in
    consultation with customers, rail users,
    including rail operators, freight forwarders,
    end customers, and other key stakeholders
                                                          11
INLAND RAIL SERVICE OFFERING

     Enter the Presentation Footer here, or delete   12
                                                     12
PROGRAMME
BUSINESS CASE

                13
INLAND RAIL ECONOMIC BENEFITS
Reducing freight
    costs

                            1/3 of the fuel of road

                                                      14
WE ARE ALREADY
DELIVERING INLAND RAIL

                         15
WHAT’S BEEN DELIVERED TO DATE

        Reference Design and EISs for 2 NSW priority projects
   2       • EIS publicly exhibited for Parkes to Narromine
           • Construction of P2N commencing mid-2018
           • EIS for Narrabri to North Star exhibited later this year

        Concept Design is complete for the other 11 projects
  11       • Contracts for Reference Design and EIS studies being
             progressively let from Q4 2017

                                                                        16
DELIVERING INLAND RAIL
Category        Project                          Description                                      Length (approx)
Upgrade works   Narrabri to North Star (NSW)     Upgrading to interstate mainline standards       300km
                Parkes to Narromine (NSW)

Enhancement     Kagaru to Acacia Ridge (QLD)     Providing double-stack capability and passing    700km
works           Albury to Illabo (NSW)           loops
                Stockinbingal to Parkes (NSW)
                Tottenham to Albury (VIC)
Missing Link    Helidon to Calvert (QLD) - PPP   New greenfield plus upgrade to dual gauge        700km
works           Calvert to Kagaru (QLD) - PPP    (includes Toowoomba and Little Liverpool Range
                                                 tunnels)

                Border to Gowrie (QLD)           New greenfield plus upgrade to dual gauge
                Gowrie to Helidon (QLD) - PPP

                Narromine to Narrabri (NSW)      New greenfield standard gauge
                North Star to Border (NSW)
                Illabo to Stockinbingal (NSW)
                                                                                                             17
                                                                                                             17
INLAND RAIL FOR
NEW SOUTH WALES

                  18
INLAND RAIL IN NEW SOUTH WALES
7 projects
• Albury to Illabo
• Illabo to Stockinbingal
• Stockinbingal to Parkes
• Parkes to Narromine
• Narromine to Narrabri
• Narrabri to North Star
• North Star to Qld Border

                                 19
BENEFITS IN NEW SOUTH WALES
• Over 40% of the total project cost will be invested in
  NSW – that’s over $4 billion of the cost of Inland Rail
• Inland Rail will boost the NSW Gross State Product by
  $2.6 billion – benefiting residents of NSW living in our
  cities and in our regions
• Around 5,000 jobs will be created in NSW during the
  peak of construction of Inland Rail – concentrated in
  Northern and North West NSW
• NSW Producers will benefit from Inland Rail, opening up
  new options to both domestic and export markets
• In 2050, up to 70 services per week (in each direction)
  will be diverted from the Sydney Metro Area by Inland Rail
  – relieving pressure on the Sydney Metro network.

                                                               20
INLAND RAIL IN NSW
PROGRAMME UPDATE
• NSW Priority Projects (Parkes to Narromine and Narrabri to North Star) are being
  advanced ahead of the rest of the Programme - current planning has construction on the
  Parkes to Narromine project commencing in 2018.
• The current Programme Master Schedule provides for the commencement of Melbourne-
  Brisbane services from 2024/25,
• ARTC are at an advanced state in the procurement of Technical and Approvals
  Consultancy Services (TACS) that will progress design and environmental assessment /
  approvals for the individual component projects across the programme. To date 4
  contracts have been awarded with the remaining planned for late 2017 and early 2018.

                                                                                           21
INLAND RAIL IN NSW
PROGRAMME UPDATE

• Parkes to Narromine (P2N): The P2N EIS was placed on public exhibition on
  the 19 July 2017 and will remain there until 18 August 2017. Procurement
  process has commenced for construction contracts.
• Narrabri to North Star (N2NS) EIS: We are in the process of finalising the
  release of the EIS for public exhibition planned for mid November 2017
• Illabo to Stockinbingal (I2S) and North Star to Border (NS2B): The
  lodgement of a State Significant Infrastructure (SSI) application and EPBC
  referral with the NSW Department of Planning and Environment is anticipated
  to take place in Q4 2017

                                                                                22
MAJOR OPPORTUNITY FOR INVOLVEMENT
• $7+ billion across the non-PPP
  elements of the programme

• Major design and construction
  opportunities, predominantly in
  ‘bread and butter’ railway
  construction activities – design and
  track & civil construction (including
  regional contractors)

                                          23
INLAND RAIL IN NSW
LOCAL PARTICIPATION

Inland Rail working with it’s Contractors and Operators
• Are committed to supporting competitive local industry
• Will ensure local industry is provided with full, fair and reasonable opportunities to
  tender for Inland Rail projects

Under pinned by Inland Rail’s Local Industry Participation Policy

More information
https://inlandrail.artc.com.au/suppliers

        •   LOCAL INDUSTRY AND ABORIGINAL PARTICIPATION: ARTC is committed to supporting local industry and Aboriginal
            businesses to ensure they are prepared for and provided with opportunities to participate in Inland Rail.    24
LOOK AHEAD
12-18 MONTHS
• Commencement of construction on Parkes to Narromine
  and potentially Narrabri to North Star projects
• Reference design and EISs across the rest of the
  programme
• EOI and RFP process for the Gowrie-Kagaru PPP

LONGER TERM
• Procurement for construction of remaining projects
• First train currently scheduled for 2024/25

                                                        25