2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
MONDAY, FEBRUARY 01, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 3 OF 5 10:49:05 AM TXDOT PHARR DISTRICT - HIGHWAY PROJECTS FY 2022 2021-2024 STIP 07/2020 Revision: Revising DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST PHARR STARR 0038-06-047 2022 US 83 C OTHER $ 24,256,909 LIMITS FROM 0.31 MI SOUTH OF PLACIDO RD. PROJECT SPONSOR TxDOT LIMITS TO 0.09 MI NORTH OF LOMA BLANCA RD. REVISION DATE 07/2020 PROJECT WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED MPO PROJ NUM DESCR FUNDING CAT(S) 4 REMARKS PROJECT P7 HISTORY TOTAL PROJECT COST INFORMATION AUTHORIZED FUNDING BY CATEGORY/SHARE PREL ENG $ 1,337,000 CATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL ROW PURCH $ 0 COST OF 4 $ 19,405,527 $ 4,851,382 $ 0 $ 0 $ 0 $ 24,256,909 CONSTR $ 24,256,909 APPROVED TOTAL $ 19,405,527 $ 4,851,382 $ 0 $ 0 $ 0 $ 24,256,909 CONST ENG $ 1,353,372 PHASES CONTING $ 542,986 $ 24,256,909 INDIRECT $ 0 BOND FIN $ 0 PT CHG ORD $ 907,208 TOTAL CST $ 28,397,475 2021-2024 STIP 07/2020 Revision: Revising DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST PHARR STARR 0038-06-045 2022 US 83 C OTHER $ 27,043,091 LIMITS FROM .255 MI NORTH OF STARR/ZAPATA CL PROJECT SPONSOR TxDOT LIMITS TO .31 MI NORTH OF FM 2098 (SOUTH LEG) REVISION DATE 07/2020 PROJECT WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED MPO PROJ NUM DESCR FUNDING CAT(S) 4 REMARKS PROJECT P7 HISTORY TOTAL PROJECT COST INFORMATION AUTHORIZED FUNDING BY CATEGORY/SHARE PREL ENG $ 1,252,279 CATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL ROW PURCH $ 0 COST OF 4 $ 21,634,473 $ 5,408,618 $ 0 $ 0 $ 0 $ 27,043,091 CONSTR $ 27,043,091 APPROVED TOTAL $ 21,634,473 $ 5,408,618 $ 0 $ 0 $ 0 $ 27,043,091 CONST ENG $ 1,267,613 PHASES CONTING $ 508,879 $ 27,043,091 INDIRECT $ 0 BOND FIN $ 0 PT CHG ORD $ 1,011,412 TOTAL CST $ 31,083,274 PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
MONDAY, FEBRUARY 01, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 4 OF 5 10:49:05 AM TXDOT PHARR DISTRICT - HIGHWAY PROJECTS FY 2023 2021-2024 STIP 07/2020 Revision: Revising DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST PHARR STARR 0921-26-113 2023 CS C OTHER $ 4,000,000 LIMITS FROM INTERSECTION OF US 83/FM 755, SOUTH PROJECT SPONSOR TxDOT LIMITS TO PORT OF ENTRY AT BRIDGE ROAD REVISION DATE 07/2020 PROJECT NEW LOCATION - CONSTRUCT 2 LANE ROADWAY MPO PROJ NUM DESCR FUNDING CAT(S) 3LC REMARKS PROJECT P7 HISTORY TOTAL PROJECT COST INFORMATION AUTHORIZED FUNDING BY CATEGORY/SHARE PREL ENG $ 196,000 CATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL ROW PURCH $ 0 COST OF 3LC $ 0 $ 0 $ 0 $ 0 $ 4,000,000 $ 4,000,000 CONSTR $ 4,000,000 APPROVED TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,000,000 $ 4,000,000 CONST ENG $ 198,400 PHASES CONTING $ 79,600 $ 4,000,000 INDIRECT $ 0 BOND FIN $ 0 PT CHG ORD $ 149,600 TOTAL CST $ 4,623,600 2021-2024 STIP 07/2020 Revision: Revising DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST PHARR WILLACY 0327-10-063 2023 IH 69E C OTHER $ 4,380,000 LIMITS FROM CAMERON/WILLACY CL PROJECT SPONSOR TxDOT LIMITS TO SPUR 413 REVISION DATE 07/2020 PROJECT Controlled Access Freeway Upgrade to Interstate Highway Design Standards MPO PROJ NUM DESCR FUNDING CAT(S) 4 REMARKS PROJECT P7 HISTORY TOTAL PROJECT COST INFORMATION AUTHORIZED FUNDING BY CATEGORY/SHARE PREL ENG $ 214,620 CATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL ROW PURCH $ 0 COST OF 4 $ 3,504,000 $ 876,000 $ 0 $ 0 $ 0 $ 4,380,000 CONSTR $ 4,380,000 APPROVED TOTAL $ 3,504,000 $ 876,000 $ 0 $ 0 $ 0 $ 4,380,000 CONST ENG $ 262,362 PHASES CONTING $ 113,880 $ 4,380,000 INDIRECT $ 0 BOND FIN $ 0 PT CHG ORD $ 163,812 TOTAL CST $ 5,134,674 2021-2024 STIP 07/2020 Revision: Revising DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST PHARR ZAPATA 0038-05-040 2023 US 83 C OTHER $ 37,076,000 LIMITS FROM 0.22 MI S OF LASSO LN PROJECT SPONSOR TxDOT LIMITS TO 0.28 MI N OF FM 2687 REVISION DATE 07/2020 PROJECT WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED MPO PROJ NUM DESCR FUNDING CAT(S) 4,11 REMARKS PROJECT P7 HISTORY TOTAL PROJECT COST INFORMATION AUTHORIZED FUNDING BY CATEGORY/SHARE PREL ENG $ 1,816,724 CATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL ROW PURCH $ 0 COST OF 4 $ 20,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 26,000,000 CONSTR $ 37,076,000 APPROVED 11 $ 8,860,800 $ 2,215,200 $ 0 $ 0 $ 0 $ 11,076,000 CONST ENG $ 1,838,970 PHASES TOTAL $ 29,660,800 $ 7,415,200 $ 0 $ 0 $ 0 $ 37,076,000 CONTING $ 737,812 $ 37,076,000 INDIRECT $ 0 BOND FIN $ 0 PT CHG ORD $ 1,386,642 TOTAL CST $ 42,856,148 PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
MONDAY, FEBRUARY 01, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 5 OF 5 10:49:05 AM TXDOT PHARR DISTRICT - HIGHWAY PROJECTS FY 2024 2021-2024 STIP 07/2020 Revision: Revising DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST PHARR KENEDY 0327-05-041 2024 US 77 C OTHER $ 76,159,272 LIMITS FROM NORIAS RD PROJECT SPONSOR TxDOT LIMITS TO 1.34 MI N OF WILLACY/KENEDY C.L. REVISION DATE 07/2020 PROJECT CONSTRUCT MAIN LANES & OVERPASSES (FUTURE I-69 CORRIDOR) MPO PROJ NUM DESCR FUNDING CAT(S) 4,12 REMARKS PROJECT P7 HISTORY TOTAL PROJECT COST INFORMATION AUTHORIZED FUNDING BY CATEGORY/SHARE PREL ENG $ 3,719,348 CATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL ROW PURCH $ 0 COST OF 4 $ 30,463,709 $ 7,615,927 $ 0 $ 0 $ 0 $ 38,079,636 CONSTR $ 75,905,069 APPROVED 12 $ 30,463,709 $ 7,615,927 $ 0 $ 0 $ 0 $ 38,079,636 CONST ENG $ 3,711,758 PHASES TOTAL $ 60,927,418 $ 15,231,854 $ 0 $ 0 $ 0 $ 76,159,272 CONTING $ 857,727 $ 76,159,272 INDIRECT $ 0 BOND FIN $ 0 PT CHG ORD $ 3,157,651 TOTAL CST $ 87,351,553 2021-2024 STIP 07/2020 Revision: Revising DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST PHARR BROOKS 0255-05-044 2024 US 281 C OTHER $ 88,900,000 LIMITS FROM 0.690 MI S OF FM 755 PROJECT SPONSOR TxDOT LIMITS TO HIDALGO/BROOKS COUNTY LINE REVISION DATE 07/2020 PROJECT CONSTRUCT 4 LANES WITH OVERPASSES AND TWO - 2 LANES FRONTAGE ROADS MPO PROJ NUM DESCR FUNDING CAT(S) 4,12 REMARKS PROJECT P7 HISTORY TOTAL PROJECT COST INFORMATION AUTHORIZED FUNDING BY CATEGORY/SHARE PREL ENG $ 5,264,624 CATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL ROW PURCH $ 0 COST OF 4 $ 55,120,000 $ 13,780,000 $ 0 $ 0 $ 0 $ 68,900,000 CONSTR $ 88,900,000 APPROVED 12 $ 16,000,000 $ 4,000,000 $ 0 $ 0 $ 0 $ 20,000,000 CONST ENG $ 5,253,898 PHASES TOTAL $ 71,120,000 $ 17,780,000 $ 0 $ 0 $ 0 $ 88,900,000 CONTING $ 1,214,091 $ 88,900,000 INDIRECT $ 0 BOND FIN $ 0 PT CHG ORD $ 0 TOTAL CST $ 100,632,613 PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
TIP Highway Financial Summary ‐ Year of Expenditure Cost TxDOT PHARR DISTRICT #21 Initial FY 2021 ‐ 2024 Transportation Improvement Program Funding by Category FY 2021 FY 2022 FY 2023 FY 2024 Total FY 2021 ‐ 2024 Funding Description Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized Category Preventive Maintenance 1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 and Rehabilitation Urban Area (Non‐ TMA) 2M or 2U $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Corridor Projects Non‐Traditionally Funded 3 $0 $0 $0 $0 $4,000,000 $4,000,000 $0 $0 $4,000,000 $4,000,000 Transportation Project 3DB Design Build (DB) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Urban and Regional 4 $0 $0 $51,300,000 $51,300,000 $30,380,000 $30,380,000 $106,979,636 $130,876,000 $188,659,636 $212,556,000 Connectivity 5 CMAQ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 6 Structures ‐ Bridge $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 7 Metro Mobility & Rehab $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 8 Safety $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 9 TAP Set‐Aside Program $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 10 Supplemental Transportation $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 10 CBI Corridor Border $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 11 District Discretionary $0 $0 $0 $0 $11,076,000 $11,076,000 $0 $0 $11,076,000 $11,076,000 11 Energy Sector $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 12 Texas Clear Lanes $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 12 Strategic Priority $0 $0 $0 $0 $0 $0 $58,079,636 $58,079,636 $58,079,636 $58,079,636 SW PE Statewide Budget PE $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 SW ROW Statewide Budget ROW $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $51,300,000 $51,300,000 $45,456,000 $45,456,000 $165,059,272 $188,955,636 $261,815,272 $285,711,636 Funding Participation Source Source FY 2021 FY 2022 FY 2023 FY 2024 Total FY 21‐24 Federal $0 $41,040,000 $33,164,800 $132,047,418 $206,252,218 State $0 $10,260,000 $8,291,200 $33,011,854 $51,563,054 Local Match $0 $0 $0 $0 $0 CAT 3 ‐ Local Contributions (LC) $0 $0 $4,000,000 $0 $4,000,000 CAT 3 ‐ Prop 1 $0 $0 $0 $0 $0 CAT 3 ‐ DB $0 $0 $0 $0 $0 CAT 3 ‐ Prop 14 Bonds $0 $0 $0 $0 $0 CAT 3 ‐ Texas Mobility Fund $0 $0 $0 $0 $0 CAT 3 ‐ TDC $0 $0 $0 $0 $0 Statewide Budget PE $0 $0 $0 $0 $0 Statewide Budget ROW $0 $0 $0 $0 $0 Total $0 $51,300,000 $45,456,000 $165,059,272 $261,815,272
Notice of Online Comment Opportunity Texas Department of Transportation 2021 - 2024 Rural Transportation Improvement Program Revision Pharr District The Texas Department of Transportation (TxDOT) Pharr District is conducting outreach to provide the public with an online comment opportunity for the proposed revision to the 2021-2024 Rural Transportation Improvement Program (Rural TIP). An in-person or virtual public meeting is not scheduled; however, the public is encouraged to view project information and submit comments about the revision by Monday, January 25, 2021. The purpose of the online comment opportunity is to receive comments on the revision to the 2021-2024 Rural Transportation Improvement Program (Rural TIP) for the Pharr TxDOT District. The projects that will be affected by the revision include: ADDING in Brooks County - US 281 (0255-05-044) from 0.690 Miles South of FM 755 to Hidalgo / Brooks County Line – Constructing 4 Lanes with Overpasses and Two – 2 Lanes Frontage Roads – 2024. REMOVING in Brooks County – SH 285 (CSJ #0102-07-046) from FM 2191 to Brooks / Kleberg County Line – Widen to 4 Lane w/shoulders – 2024. The 2021-2024 Rural TIP meeting(s) was held in the Spring pursuant to Title 43, Texas Administrative Code, Section 16.102, which calls for an opportunity for public comment concerning the program. As a continuation of the public involvement effort, the online comment opportunity will offer the public a chance to comment on the revision to the previously presented Rural TIP. To view the Rural TIP Revision exhibits and comment information, visit txdot.gov and keyword search: “Hearings and Meetings Schedule.” Once on the schedule page, scroll down to find the appropriate online comment opportunity link. Revision information will also be available for public review January 8 through January 25, 2021 at the TxDOT Pharr Office at 600 W I-2, Pharr, TX 78577. Please make appointment to view information between the hours of 8 a.m. and 5 p.m. For more information or questions, please contact Melba R. Schaus at 956-702-6181 or via email Melba.Schaus@txdot.gov. The public is encouraged to view this online information and provide input regarding the proposed revision(s). Written comments may be submitted online, emailed, or mailed. If mailed, written comments must be received or postmarked by January 25, 2021, either in person or by mail to TxDOT, Attn: Rural TIP Revision at 600 W IH- 2, Pharr, TX 78577. Comments can also be submitted by email to Melba.Schaus@txdot.gov. TxDOT will be accepting comments about this project until January 25, 2021. Special accommodations: TxDOT makes every reasonable effort to accommodate the needs of the public. The information will be posted in English. If you have special communication or accommodation needs, or have a need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call Norma Robledo at 956-702-6100 at least one week prior to the comment deadline. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.
2/1/2021 fileloader.ashx (5088×6560) https://apps.dot.state.tx.us/apps/estip/fileloader.ashx?pg_file_id=3076 1/1
Aviso de Oportunidad de Comentarios en Linea Departamento de Transporte de Texas 2021 - 2024 Revisión del Programa de Mejora del Transporte Rural Distrito de Pharr El distrito de Pharr del departamento de transporte de Texas está realizando actividades de divulgación para brindar al público una oportunidad de comentarios en línea para la revision propuesta del programa de mejora del transporte rural de 2021 - 2024. No se ha programado una reunion pública en persona o virtual; sin embargo, se alienta al público a ver la información del Proyecto y enviar comentarios sobre la revision antes del 25 de enero de 2021. El propósito de la oportunidad de comentarios en linea es recibir comentarios sobre la revision del programa de mejora del transporte rural del 2021-2024 para distrito de TxDOT Pharr. Los proyectos que se verán afectados por la revision incluyen: AGREGANDO en el condado de Brooks - US 281 (0255-05-044) desde 0.690 millas sur de FM 755 a la linea de los condados de Hidalgo / Brooks – la construcción de 4 carriles con pasos superiores y dos – 2 carriles frontales – en 2024. ELIMINANDO en el condado de Brooks – SH 285 (CSJ #0102-07-046) desde FM 2191 a hasta la línea del los condados de Brooks / Kleberg – ampliando a 4 carriles con hombros – en 2024. La reunion rural de TIP 2021-2024 se llevara a cabo en la primavera de conformidad con el Título 43, Código Administrativo de Texas, Sección 16.102, que exige una oportunidad para comentarios públicos sobre el programa. Como continuación del esfuerzo de participación pública, la oportunidad de comentarios en línea ofrecerá al público la oportunidad de comentar sobre la revision del TIP rural presentado anteriormente. Para ver las exhibiciones del Rural TIP Revisión e información de comentarios, visite txdot.gov y busque la palabra clave: “Programa de audiencias y reunions”. Una vez en la página de programación, desplácese hacia abajo para encontrar el enlace de oportunidad de comentario en línea apropiado. La información de revisión también estará disponible para revisión pública del 8 de enero al 25 de enero de 2021 en la Oficina de TxDOT Pharr en 600 W I-2, Pharr, TX 78577. Por favor, haga una cita para ver información entre las 8 a.m. y 5 p.m. Para obtener más información o preguntas, comuníquese con Melba Schaus al 956-702-6181 or por correo eletrónico Melba.Schaus@txdot.gov. Se alienta al público a ver esta información en línea y proporcionar comentarios sobre las revisions propuestas. Los comentarios escritos se pueden enviar en línea, por correo electrónico o por correo. Si se envían por correo, los comentarios por escrito deben recibirse o enviarse con matasellos antes del 25 de enero de 2021, ya sea en persona o por correo a TxDOT, Attn: Rural TIP Revisión at 600 W IH-2, Pharr, TX 78577. Los comentarios también se pueden enviar por correo electrónico a Melba.Schaus@txdot.gov. TxDOT aceptará comentarios sobre estos proyectos hasta el 25 de enero de 2021. Alojamiento especial: TxDOT hace cada razonable esfuerzo a acomodar las necesidades del público. La información su publicará en inglés. Si tiene necesidades especiales de comunicación, o necesita un intérprete, se puede hacer una solicitud. Si tiene una discapacidad y necesita ayuda, también se pueden hacer arreglos especiales para satisfacer la mayoría de las necesidades. Lame a Norma Robledo al 956-702- 6100 por lo menos una semana antes de la fecha límite de comentarios. Tenga en cuenta que se solicita un aviso con anticipación ya que algunos alojamientos requieren tiempo para que TxDOT organize.
Revision to Rural Transportation Improvement Plan 2021-2024 PHARR DISTRICT ONLINE PUBLIC COMMENTS 2021-2024 Rural TIP Revision January 2021 January 2021
Agenda 1 Safety Minute 2 Pharr District and its Boundaries 3 The Rural Transportation Improvement Program (TIP) 4 How the Rural TIP Impacts You 5 Projects by County 6 Funding 7 Next Steps 2021-2024 Rural TIP Revision January 2021 2
Safety 2021-2024 Rural TIP Revision January 2021 3
PHARR DISTRICT 2021-2024 Rural TIP Revision January 2021 4
Rural Transportation Improvement Program (TIP) THE RURAL TIP is list of local projects to be funded within a TxDOT District during the next four years, including those eligible for federal funding. It can include projects for : A Rural TIP project is It shows regional agreement anticipated to be funded (community-region-state) on the within need of a project. the next 4 years. 2021-2024 Rural TIP Revision January 2021 5
How the Rural TIP Impacts You The Rural TIP process includes opportunities to provide input on the priority of major projects that are listed on it. You know your community best! Local and small projects around your community dealing with safety and access also get funding through the Rural TIP, for example: Tell us what Road expansions project Sidewalks should come Bike lanes first and why Pavement repair or maintenance New or improved signals Turning lanes By participating today, you are providing input in the Pharr District projects! 2021-2024 Rural TIP Revision January 2021 6
ADD - Rural TIP Brooks County Project CSJ Highway Limits from Limits to Description of Work Cost Let Year CONSTRUCT 4 LANES 0.690 Mi S of Hidalgo/Brooks WITH OVERPASSES 0255-05-044 US 281 $88,900,000 2024 FM 755 County Line AND TWO -2 LANES FRONTAGE ROADS 2021-2024 Rural TIP Revision January 2021 7
REMOVE - Rural TIP Brooks County Project CSJ Highway Limits from Limits to Description of Work Cost Let Year BROOKS/ WIDEN TO 4 LANE W/ 0102-07-046 SH 285 FM 2191 $4,520,000 2024 KLEBERG CL SHOULDERS 2021-2024 Rural TIP Revision January 2021 8
Funding The Rural TIP is a fiscally constrained list of projects that functions as a budgeting tool for our “Fiscally District. constrained TIP” means: Funds can come from: Federal Government Through the Federal Highway and Transit Administrations It is realistic in terms of the amount of funding available. TxDOT Through its Unified Transportation Program funding categories Local governments Who may be required to provide matching funds for federal monies 2021-2024 Rural TIP Revision January 2021 9
Next Steps How to provide comments: 1. Visit TxDOT.gov – go to Hearings and Meetings Schedule (once on the schedule page, scroll down to find the appropriate online comment opportunity link.) 2. Mail a comment to: Texas Department of Transportation Pharr District, Attn: Rural TIP Revision 600 W IH-2 Pharr, TX 78577 3. E-mail a comment to: Melba.Schaus@txdot.gov, Attention: Rural TIP Revision Remember to submit your comments before January 25. 2021 to be included in the official summary of this meeting 2021-2024 Rural TIP Revision January 2021 10
Revisión del Programa de Mejoría del Transporte Rural (RTIP) 2021-2024 DISTRITO DE PHARR COMENTARIOS PUBLICOS EN LINEA Revisión del RTIP entre los años fiscales 2021 al 2024 Enero deldel enero 2021 2021
Agenda 1 Minuto de Seguridad 2 Distrito de Pharr y sus límites 3 Programa de Mejoría del Transporte Rural (RTIP) 4 Cómo te afecta el RTIP 5 Proyectos por condado 6 Fondos 7 Próximos pasos Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 2
Seguridad ¡La Seguridad Nunca se Detiene! Seguridad: Misión CERO Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 3
DISTRITO DE PHARR Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 4
Programa de Mejoría del Transporte Rural (RTIP) EL RTIP es una lista de proyectos locales que se financiarán dentro de un Distrito de TxDOT durante los próximos cuatro años, incluidos aquellos elegibles para recibir fondos federales. Puede incluir proyectos para: Se anticipa que un proyecto Muestra un acuerdo regional en el RTIP se financiará dentro (comunidad-región-estado) de los próximos 4 años. sobre la necesidad de un proyecto. Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 5
Cómo te afecta el RTIP El proceso de RTIP incluye oportunidades para proporcionar información sobre la prioridad de los principales proyectos que ¡Conoces figuran en él. mejor a tu Los proyectos locales y pequeños alrededor comunidad! de su comunidad que se ocupan de la seguridad y el acceso también obtienen Cuéntanos fondos a través del RTIP, por ejemplo: qué proyecto Expansiones de carreteras debería venir Aceras primero y por Carriles de bicicleta qué Reparación o mantenimiento de pavimentos. Señales nuevas o mejoradas Carriles de girar Al participar hoy, ¡está proporcionando aportes en todos los proyectos en el RTIP del distrito de Pharr! Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 6
Agregando Proyecto en el RTIP del condado de Brooks CSJ Carretera Límites de Límites a Descripción del trabajo Costo Año de oferta CONSTRUIR 4 CARRILES 0.690 millas HIDALGO / CON PASOS 0255-05-044 US 281 sur de FM $88,900,000 2024 BROOKS CL SUPERIORES Y DOS – 2 755 CARRILES FRONTALES Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 7
Eliminando Proyecto en el RTIP del condado de Brooks CSJ Carretera Límites de Límites a Descripción del trabajo Costo Año de oferta BROOKS / AMPLIADO A 4 CARRILES 0102-07-046 SH 285 FM 2191 KLEBERG $4,520,000 2024 CON HOMBROS CL Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 8
Fondos El RTIP es una lista de proyectos con restricciones fiscales que funciona como una herramienta de “RTIP con presupuesto para nuestro distrito. restricciones fiscales" Los fondos pueden provenir de: significa: Gobierno Federal A través de la Administración Federal de Carreteras y Tránsito Es realista en términos de la cantidad de fondos TxDOT disponibles. A través de sus categorías de financiación del Programa de Transporte Unificado Gobiernos locales ¿Quién puede estar obligado a proporcionar fondos de contrapartida para fondos federales? Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 9
Próximos Pasos Cómo proporcionar comentarios: 1. Visite TxDOT.gov – ir a Calendario de Audencias y Reuniones (una vez en la página de programación, desplácese hacia abajo para encontrar el enlace de oportunidad de comentario en línea apropiado.) 2. Envíe un comentario a: Texas Department of Transportation Pharr District, Attn: Rural TIP Revisión 600 W IH-2 Pharr, TX 78577 2. O envíe un comentario por correo electrónico a: Melba.Schaus@txdot.gov, Attention: Rural TIP Revisión Recuerde enviar sus comentarios antes del 25 de enero de 2021 para ser incluido en el resumen oficial de esta reunión Revisión del RTIP entre los años fiscales 2021 al 2024 Enero del 2021 10
Page 8, Falfurrias Facts, January 7, 2021 USDA of many regions, provides biodiversity of plant and animal populations and improves environmental quality. A separate CRP Grasslands signup is offered each year following general signup. Signed into law in 1985, CRP is one of the largest private-lands conservation programs in the United States. It was originally intended to primarily control soil erosion and potentially stabilize commodity prices by taking marginal lands out of production. The program has evolved over the years, providing many conservation and economic benefits. The program marks its 35-year anniversary this December. Program successes include: •Preventing more than 9 billion tons of soil from eroding, which is enough soil to fill 600 million dump trucks; •Reducing nitrogen and phosphorous runoff relative to annually tilled cropland by 95 and 85 percent, respectively; •Sequestering an annual average of 49 million tons of greenhouse gases, equal to taking 9 million cars off the road; •Creating more than 3 million acres of restored wetlands while protecting more than 175,000 stream miles with riparian forest and grass buffers, which is enough to go around the world seven times; and •Benefiting bees and other pollinators and increasing populations of ducks, pheasants, turkey, bobwhite quail, prairie chickens, grasshopper sparrows, and many other birds. The successes of CRP contribute to USDA’s Agriculture Innovation Agenda and its goal of reducing the environmental footprint of U.S. agriculture by half by 2050. Earlier this year, Secretary Perdue announced the department-wide initiative to align resources, programs, and research to position American agriculture to better meet future global demands. For more information on CRP, visit fsa.usda.gov or contact your local FSA county office; Brooks County residents, contact Jennifer García at 361-325-2272, ext. 2 or e-mail: jennifer.garcia@tx.usda.gov Calendar Jan. 21–Basketball: Feb. 9–Basketball: Jerseys day of school for students. School graduation. development day. regular school board Jr. High Boys vs. Santa (F, JV, V) @ Hebbronville, June 4–Falfurrias High June 4–Premont ISD staff June 14–Premont ISD meeting, 6:30 p.m. Gertrudis Academy. district game, 5 p.m. Jan. 21–Basketball: Jr. Feb. 12–Basketball: High Belles @ Santa Jerseys (JV, V) vs. London, Gertrudis Academy in district game, here, 5 p.m. Kingsville. Feb. 15–President’s Day; Jan. 22–Basketball: Brooks Co. offices closed. Notice of Online Comment Opportunity Belles (JV, V) vs. Laredo Feb. 15–Premont ISD Texas Department of Transportation Harmony, district game, regular school board here, 5 p.m. meeting. 2021 - 2024 Rural Transportation Improvement Program Revision Jan. 22–Basketball: Feb. 22–Brooks Co. ISD Pharr District Jerseys open date. staff development day. The Texas Department of Transportation (TxDOT) Pharr District is conducting outreach to provide the public with Jan. 25–Premont ISD Mar. 8–Premont ISD an online comment opportunity for the proposed revision to the 2021-2024 Rural Transportation Improvement regular school board regular school board Program (Rural TIP). An in-person or virtual public meeting is not scheduled; however, the public is encouraged to meeting. meeting, 6:30 p.m. view project information and submit comments about the revision by Monday, January 25, 2021. Jan. 26–Basketball: Mar. 12–Premont ISD Belles (JV, V) & Jerseys early release day. The purpose of the online comment opportunity is to receive comments on the revision to the 2021-2024 Rural Transportation Improvement Program (Rural TIP) for the Pharr TxDOT District. The projects that will be affected (JV, V) @ Santa Gertrudis Mar. 15-19–Brooks Co. by the revision include: Academy in Kingsville, ISD & Premont ISD Spring district games, 5 p.m. Break. Jan. 28–Basketball: Jr. ADDING in Brooks County - US 281 (0255-05-044) from 0.690 Miles South of FM 755 to High Belles vs. Bishop, Apr. 1–2–Easter holiday Hidalgo / Brooks County Line – Constructing 4 Lanes with Overpasses and Two – 2 Lanes here. & Good Friday; Brooks Frontage Roads – 2024. Jan. 28–Basketball: Jr. Co. offices closed. REMOVING in Brooks County – SH 285 (CSJ #0102-07-046) from FM 2191 to Brooks / High Boys @ Bishop. Apr. 2–Brooks Co. ISD Kleberg County Line – Widen to 4 Lane w/shoulders – 2024. Jan. 29–Basketball: Belles & Premont ISD Easter (JV, V) & Jerseys (V) vs. holiday. The 2021-2024 Rural TIP meeting(s) was held in the Spring pursuant to Title 43, Texas Administrative Code, San Diego, district games, Apr. 5–Easter Monday; Section 16.102, which calls for an opportunity for public comment concerning the program. As a continuation of the here, 5 & 7:30 p.m. Brooks Co. offices closed. public involvement effort, the online comment opportunity will offer the public a chance to comment on the revision Apr. 5–Premont ISD to the previously presented Rural TIP. Feb. 2–Basketball: Jerseys Easter holiday. To view the Rural TIP Revision exhibits and comment information, visit txdot.gov and keyword search: “Hearings (F, JV, V) & Belles (JV, V) Apr. 12–Premont ISD and Meetings Schedule.” Once on the schedule page, scroll down to find the appropriate online comment @ Bishop, district game, 5 regular school board opportunity link. Revision information will also be available for public review January 8 through January 25, 2021 p.m. meeting. at the TxDOT Pharr Office at 600 W I-2, Pharr, TX 78577. Please make appointment to view information between Feb. 4–Basketball: Jr. Apr. 16–Brooks Co. ISD the hours of 8 a.m. and 5 p.m. For more information or questions, please contact Melba R. Schaus at 956-702-6181 High Boys vs. Banquete, staff development day. or via email: Melba.Schaus@txdot.gov here. Feb. 4–Basketball: Jr. May 10–Premont ISD The public is encouraged to view this online information and provide input regarding the proposed revision(s). High Belles @ Banquete. regular school board Written comments may be submitted online, emailed, or mailed. If mailed, written comments must be received or Feb. 5–Basketball: Belles meeting. postmarked by January 25, 2021, either in person or by mail to TxDOT, Attn: Rural TIP Revision at 600 W IH-2, (F, JV, V) & Belles (JV, V) May 31–Memorial Day; Pharr, TX 78577. Comments can also be submitted by email to Melba.Schaus@txdot.gov. TxDOT will be accepting vs. Banquete, district game, Brooks Co. offices closed. comments about this project until January 25, 2021. here, 5 p.m. Feb. 8–Brooks Co. ISD June 1–Brooks Co. ISD Special accommodations: TxDOT makes every reasonable effort to accommodate the needs of the public. The holiday. early release day. information will be posted in English. If you have special communication or accommodation needs, or have a need Feb. 8–Premont ISD June 2-4–Brooks Co. ISD for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also regular school board staff development days. be made to accommodate most needs. Please call Norma Robledo at 956-702-6100 at least one week prior to the meeting, 6:30 p.m. June 3–Premont ISD last comment deadline. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange. Rooms...Rooms...Rooms...Rooms Fully Furnished Daily $40 and up + Tax * Weekly Special –––> SHOWER SPECIAL $20
6 Miércoles 6 de Enero 2021 AVISOS cLASIFICADOS Y LEGALES/ classifiedS and legal notices fundado en 1986 Pagos de impacto allá de lo que está disponible en IRS.gov. correo en algunos países demorarán la entrega. El IRS y el Departamento del Tesoro comenzaron a entre- El IRS enfatiza que las personas elegibles no tienen que gar una segunda ronda de pagos de impacto económico, hacer ninguna acción para recibir este segundo pago. Los a menudo conocida como pagos de estímulo, la semana pagos son automáticos, y las personas no deben comuni- económico en camino pasada. carse con sus instituciones financieras o el IRS con pregun- Los pagos de depósito directo pueden tardar varios días tas acerca de la fecha de pago. en registrarse en cuentas individuales. Algunos estadoun- Elegibilidad idenses pueden haber visto los pagos de depósito directo Por lo general, los ciudadanos de EE UU. y residentes ex- como pendientes o como pagos provisionales en sus cuen- tranjeros que no son elegibles para ser reclamados como • Recomiendan visitar IRS.gov tas antes de la fecha de pago programada del 4 de enero dependientes en una declaración de impuestos de otra per- en lugar de llamar de 2021, que es la fecha oficial en que los fondos están sona son elegibles para este segundo pago. Las personas disponibles. elegibles automáticamente recibirán un pago de impacto Los cheques en papel también comenzaron a enviarse y económico de hasta $600 para individuos o $1,200 para (Especial para El Periódico USA) continuarán enviándose durante el mes de enero. Algunas las parejas casadas y hasta $600 para cada hijo calificado. personas recibirán tarjetas de débito por correo en enero, La mayoría de las personas que tienen un ingreso bruto El Servicio de Impuestos Internos instó a las personas a vis- y el IRS insta a las personas a revisar cuidadosamente su ajustado en el 2019 de hasta $75,000 para individuos y itar IRS.gov para obtener la información más actualizada correo. Los pagos por correo requerirán más tiempo de pro- hasta $150,000 para las parejas casadas que declaran im- de la segunda ronda de pagos de impacto económico en cesamiento y envío. Aquellos que residen en el extranjero puestos en conjunto y cónyuges sobrevivientes, recibirán el lugar de llamar a la agencia o a sus instituciones financieras fundado en 1986 tendrán tiempo de espera más largos para los cheques, ya monto completo del segundo pago. Para los que declaran o proveedores de software de impuestos. Los asistentes que las interrupciones en los viajes aéreos y la entrega de impuestos por encima de estos ingresos, la cantidad del telefónicos del IRS no tienen información adicional más pago será reducida. Verificar el estado de un pago A partir de hoy, las personas pueden verificar el estado de sus primeros y segundos pagos mediante la herramienta Obtener mi pago, disponible en inglés y español solo en IRS.gov. ¿El pago no se recibió o es menos de lo esperado? Reclamar Aviso de Oportunidad de Comentarios en Linea en la declaración de impuestos de 2020 Departamento de Transporte de Texas Los pagos comenzaron a salir la semana pasada y contin- uarán hasta mediados de enero. Los pagos de depósitos 2021 - 2024 Revisión del Programa de Mejora del directos se realizan primero a aquellos que tienen infor- mación válida de ruta y cuenta bancaria registrada para Transporte Rural fines de depósito directo. Debido a la velocidad a la que el Distrito de Pharr IRS entregó esta segunda ronda de pagos, algunos pagos pueden haberse enviado a una cuenta que puede estar cer- El distrito de Pharr del departamento de transporte de Texas está realizando actividades de divulgación para brindar al público rada o inactiva. Por ley, la institución financiera debe de- una oportunidad de comentarios en línea para la revision propuesta del programa de mejora del transporte rural de 2021 - volver el pago al IRS, no puede retener y entregar el pago 2024. No se ha programado una reunion pública en persona o virtual; sin embargo, se alienta al público a ver la información a una persona cuando la cuenta ya no está activa. Mientras del Proyecto y enviar comentarios sobre la revision antes del 25 de enero de 2021. el IRS explora opciones para corregir estos pagos, si no ha recibido su pago completo en el momento en que presente El propósito de la oportunidad de comentarios en linea es recibir comentarios sobre la revision del programa de mejora del su declaración de impuestos de 2020, puede reclamar el transporte rural del 2021-2024 para distrito de TxDOT Pharr. Los proyectos que se verán afectados por la revision incluyen: Crédito de recuperación de reembolso en su declaración de impuestos. • AGREGANDO en el condado de Brooks - US 281 (0255-05-044) desde 0.690 millas sur de FM 755 a la El crédito se calcula como el pago de impacto económi- linea de los condados de Hidalgo / Brooks – la construcción de 4 carriles con pasos superiores y dos – 2 co, excepto que la elegibilidad del crédito y el monto del carriles frontales – en 2024. • ELIMINANDO en el condado de Brooks – SH 285 (CSJ #0102-07-046) desde FM 2191 hasta la línea de crédito se basan en la información del año tributario 2020, los condados de Brooks / Kleberg – ampliando a 4 carriles con hombros – en 2024. incluyendo ingresos. Para las personas elegibles que recibieron un pago de im- La reunion rural de TIP 2021-2024 se llevara a cabo en la primavera de conformidad con el Título 43, Código Administrativo pacto económico parcial, pueden reclamar el Crédito de de Texas, Sección 16.102, que exige una oportunidad para comentarios públicos sobre el programa. Como continuación recuperación de reembolso por cualquier cantidad restante del esfuerzo de participación pública, la oportunidad de comentarios en línea ofrecerá al público la oportunidad de comentar completando la línea 30 del Formulario 1040 o 1040-SR sobre la revision del TIP rural presentado anteriormente. 2020. Para ver las exhibiciones del Rural TIP Revisión e información de comentarios, visite txdot.gov y busque la palabra clave: Cambio de información de cuenta bancaria o de dirección “Programa de audiencias y reunions”. Una vez en la página de programación, desplácese hacia abajo para encontrar el El IRS no puede cambiar la información de pago, incluyen- enlace de oportunidad de comentario en línea apropiado. La información de revisión también estará disponible para revisión do la información de cuenta bancaria o de dirección. Si un pública del 8 de enero al 25 de enero de 2021 en la Oficina de TxDOT Pharr en 600 W I-2, Pharr, TX 78577. Por favor, haga contribuyente elegible no recibe un pago o es menor de lo una cita para ver información entre las 8 a.m. y 5 p.m. esperado, puede reclamarse en la declaración de impuestos Para obtener más información o preguntas, comuníquese con Melba Schaus al 956-702-6181 or por correo eletrónico Melba. de 2020 como el Crédito de recuperación de reembolso. Schaus@txdot.gov. Recuerde, los pagos de impacto económico son un pago por adelantado de lo que se llamará el Crédito de recu- Se alienta al público a ver esta información en línea y proporcionar comentarios sobre las revisions propuestas. Los comen- peración de reembolso en el Formulario 2020 o Formulario tarios escritos se pueden enviar en línea, por correo electrónico o por correo. Si se envían por correo, los comentarios por 1040-SR. escrito deben recibirse o enviarse con matasellos antes del 25 de enero de 2021, ya sea en persona o por correo a TxDOT, Attn: Rural TIP Revisión at 600 W I-2, Pharr, TX 78577. Los comentarios también se pueden enviar por correo electrónico a Melba.Schaus@txdot.gov. TxDOT aceptará comentarios sobre estos proyectos hasta el 25 de enero de 2021. Más información Para obtener más información acerca de los pagos de im- Alojamiento especial: TxDOT hace cada razonable esfuerzo a acomodar las necesidades del público. La información su pacto económico y el Crédito de recuperación de reemb- publicará en inglés. Si tiene necesidades especiales de comunicación, o necesita un intérprete, se puede hacer una solicitud. olso del 2020, visite IRS.gov/eip. A partir de la próxima Si tiene una discapacidad y necesita ayuda, también se pueden hacer arreglos especiales para satisfacer la mayoría de las semana, las personas pueden revisar el estado de su pago necesidades. Lame a Norma Robledo al 956-702-6100 por lo menos una semana antes de la fecha límite de comentarios. en IRS.gov/GetMyPayment. Para otros alivios tributarios Tenga en cuenta que se solicita un aviso con anticipación ya que algunos alojamientos requieren tiempo para que TxDOT relacionados con COVID-19, visite IRS.gov/Coronavirus. organize
2/1/2021 fileloader.ashx (5088×6560) https://apps.dot.state.tx.us/apps/estip/fileloader.ashx?pg_file_id=3075 1/1
2/1/2021 fileloader.ashx (5088×6560) https://apps.dot.state.tx.us/apps/estip/fileloader.ashx?pg_file_id=3076 1/1
SUNDAY, JANUARY 10, 2021 | The Monitor, www.themonitor.com 11A Cohen seeks to dismantle Trump GM unveils new logo legacy, one podcast at a time reflecting transition BY JIM MUSTIAN THE ASSOCIATED PRESS something extraordinary.” Cohen, 54, had been to electric vehicles scheduled to remain in pris- NEW YORK — The reha- on until November 2021 but BY JAMIE L. L AREAU bilitation of Michael Cohen was released in May to serve DETROIT FREE PRESS has reached a surreal new the remainder of his sen- stage: Quizzing the actor tence at home as part of an General Motors is work- Ben Stiller about his ap- attempt to slow the spread ing to remake its public im- proach to impersonating of the coronavirus in federal age with a new logo, a new him on “Saturday Night prisons. company-wide marketing Live.” He was further embold- campaign and a new web- Since September, Presi- ened to speak out after site as it shifts from a com- dent Donald Trump’s for- briefly returning to prison pany that makes largely in- mer lawyer and fixer has last year in what a federal ternal combustion vehicles been producing a podcast judge ruled was govern- to offering mostly all-elec- General Motors | TNS from the Park Avenue apart- ment retaliation for Cohen tric vehicles over the next GM’s new corporate logo ment where he is serving Jonathan Carroll | The Associated Press balking at a proposed pro- decade. to reflect its move to the remainder of his prison Michael Cohen, President Donald Trump’s former personal attorney, vision of home confine- On Friday, GM said electrification in the future. sentence for lying to Con- speaks May 4, 2019, in New York. ment that would have se- starting Monday it will gress, evading taxes and fa- verely restricted his public debut the campaign to zero emissions and zero cilitating campaign finance he told The Associated Trump cutting short his communications. promote mass adoption congestion. crimes. Press. “Accordingly, he will recent Florida vacation and Reception to the show, of EVs called “Every- Last fall, GM CEO Mary The show, “Mea Culpa,” continue to remain a topic returning to Washington to like to Cohen himself, has body In.” The company Barra told Wall Street the has been downloaded of discussion.” double down on his chal- been across the board. So will replace its familiar company has invested nearly 3 million times and The launch of the podcast lenge to the election results far, Cohen said, “the show blue square logo and will $27 billion in EV and AV is available in 37 countries, followed Cohen’s publica- “sent my blood pressure is profitable” for its pro- launch a new GM.com products through 2025 Cohen said. Before Stiller, tion over the summer of a through the roof!” Cohen duction company, the Los website to share the lat- and will launch 30 new featured in an episode re- tell-all memoir about his told listeners in his Long Is- Angeles-based startup est information about EVs globally by the end of leased Friday, guests have conversion from Trump ac- land cadence. AudioUp. work in electrification 2025. Previously, GM had included Rosie O’Donnell, olyte to avowed enemy. Cohen, despite years The success or failure of and self-driving cars. said it would bring 20 new the magician and former In his interview with Still- of introspection, has re- “Mea Culpa” could serve as The “Everybody In” EVs to market by 2023. “Celebrity Apprentice” star er, Cohen likened Trump’s mained at a loss to explain a litmus test for the viabil- campaign will feature The “Everybody In” Penn Jillette, political jour- signature scowl to the visage his unswerving allegiance ity of the disbarred attorney media influencers to campaign is intended to nalists, and current and for- of Derek Zoolander, Stiller’s to a businessman he feels and other erstwhile Trump help introduce a new excite a new generation mer operatives from both pouty male model persona. abandoned him at the most loyalists after the president generation of buyers to of buyers and challenge parties, including James Stiller, for his part, said he vulnerable point in his life. leaves office. EVs. Likewise, designers the perception of EVs by Carville and Anthony Scar- recognized in Cohen the “di- He has likened his fealty to “It’s probably going to have created a new logo highlighting the range, amucci. chotomy” of fear and a killer Trump to a mental illness wane and be relegated into using a color gradient of performance and flexi- The topic of every show instinct. and said he thought of him- some dark, niche corner of vibrant blue tones to rep- bility of GM’s Ultium bat- so far? Blistering criticism of “I felt like there was a hu- self as acting like a drug user the culture, where Cohen resent the cleaner skies of tery platform. the president’s every move. manity in there that I was in need of an intervention. himself belongs,” said Nick a zero-emissions future. Ultium will power near- Cohen, who once fa- trying to connect with,” The “most important vic- Quah, the founder of Hot “There are moments ly all of GM’s future EV mously claimed he would Stiller said, adding he didn’t tory” of the podcast, Cohen Pod, a well-read newsletter in history when every- lineup from mass-market take a bullet for Trump, want his SNL impression said, is that he believed about podcasts. thing changes. Inflection to high-performance ve- said he has made it part of “to be this scathing, mean some people who once sup- In the foreword to his points. We believe such a hicles, including the 2022 his penance to dismantle thing.” ported Trump changed their bestselling memoir, “Dis- point is upon us for the GMC Hummer pickup Trump’s legacy and “return Cohen, on the other minds after listening. loyal,” Cohen acknowledged mass adoption of electric due out late this year and this nation to a place of hand, seems to be going for “I have learned that there critics consider him “the vehicles,” said Deborah the Cadillac Lyriq SUV sanity,” though he catego- the jugular, while satisfy- are tens of thousands of least reliable narrator on the Wahl, GM global chief due out early next year. rizes his show as “a news ing his own addiction to the people who are exhausted planet.” marketing officer. Ultium will allow EVs commentary program” limelight. and anxious and in need The White House, for its to go up to 450 miles on instead of an “anti-Trump He rails breathlessly in of some type of outlet to part, has dismissed Cohen’s GENERATION E a full charge and it will program.” every show against the “id- channel their frustration criticism as “fan fiction” and GM has touted its power EVs of many sizes, He said he plans to con- iot in chief.” In one recent about our current political said it’s “unfortunate that transformation to EVs shapes and price points. tinue his podcast through- episode of “Mea Culpa,” he climate,” Cohen told the AP. the media is exploiting this and self-driving cars for It is capable of 0-60 mph out the Biden administra- complained that the presi- “If I can help them deal with sad and desperate man to years, saying it seeks a performance in three tion. dential pardon process had their fears or feel somewhat attack President Trump.” world with zero crashes, seconds on some models. “We cannot fool our- “devolved into a corrupt and better about the darkness selves into believing that transactional circus, with that is enveloping all of us, I Trump will just disappear,” Trump as its ringmaster.” feel like we’ve accomplished FAMILY MEDICINE We Proudly Welcome Notice of Online Comment Opportunity Texas Department of Transportation 2021 - 2024 Rural Transportation Improvement Program Revision Pharr District The Texas Department of Transportation (TxDOT) Pharr District is conducting outreach to provide the public with an online comment opportunity for the proposed revision to the 2021-2024 Rural Transportation Improvement Program (Rural TIP). An in-person or virtual public meeting is not scheduled; however, the public is encouraged to view project information and submit comments about the revision by Monday, January 25, 2021. The purpose of the online comment opportunity is to receive comments on the Audrey Gutierrez, MD revision to the 2021-2024 Rural Transportation Improvement Program (Rural $QCTF%GTVKƂGFKP(COKN[/GFKEKPG TIP) for the Pharr TxDOT District. The projects that will be affected by the revision include: • ADDING in Brooks County - US 281 (0255-05-044) from 0.690 Miles Her #1 Priority: Keeping You and Your Family Healthy South of FM 755 to Hidalgo / Brooks County Line – Constructing 4 Lanes with Overpasses and Two – 2 Lanes Frontage Roads – 2024. • REMOVING in Brooks County – SH 285 (CSJ #0102-07-046) from FM Dr. Gutierrez joins South Texas Health System Clinics in Mission, 2191 to Brooks / Kleberg County Line – Widen to 4 Lane w/shoulders – 2024. conveniently located off Expressway 83 in the same building as The 2021-2024 Rural TIP meeting(s) was held in the Spring pursuant to Title 5QWVJ6GZCU*GCNVJ5[UVGO'4/KUUKQP5JGKUDQCTFEGTVKƂGFKPHCOKN[ 43, Texas Administrative Code, Section 16.102, which calls for an opportunity medicine and provides compassionate care for newborns to older adults, for public comment concerning the program. As a continuation of the public including annual check-ups, follow-up care after emergency room visits, involvement effort, the online comment opportunity will offer the public a chance to comment on the revision to the previously presented Rural TIP. minor surgery and women’s health services. A graduate of The University of Texas Medical Branch in Galveston, To view the Rural TIP Revision exhibits and comment information, visit txdot. gov and keyword search: “Hearings and Meetings Schedule.” Once on the Dr. Gutierrez was a co-chief resident of the family medicine residency at schedule page, scroll down to find the appropriate online comment opportunity CHRISTUS Santa Rosa Health System in San Antonio. link. Revision information will also be available for public review January 8 through January 25, 2021 at the TxDOT Pharr Office at 600 W I-2, Pharr, TX TO MAKE AN APPOINTMENT: 78577. Please make appointment to view information between the hours of 8 a.m. and 5 p.m. For more information or questions, please contact Melba R. Schedule online at sthsclinics.com or call 956-515-2233 Schaus at 956-702-6181 or via email Melba.Schaus@txdot.gov. Virtual Visits Available | Walk-ins Welcome The public is encouraged to view this online information and provide input 900 E. Expressway 83 | Suite A | Mission, TX 78572 regarding the proposed revision(s). Written comments may be submitted online, emailed, or mailed. If mailed, written comments must be received We offer evening and weekend hours! or postmarked by January 25, 2021, either in person or by mail to TxDOT, Attn: Rural TIP Revision at 600 W I-2, Pharr, TX 78577. Comments can also Accepts Medicare, Medicaid and most medical insurance plans be submitted by email to Melba.Schaus@txdot.gov. TxDOT will be accepting comments about this project until January 25, 2021. Special accommodations: TxDOT makes every reasonable effort to accommodate the needs of the public. The information will be posted in English. If you have special communication or accommodation needs, or have a need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most Get social with us needs. Please call Norma Robledo at 956-702-6100 at least one week prior to For language assistance, disability accommodations and the the comment deadline. Please be aware that advance notice is requested as non-discrimination notice, visit our website. 204738-7729 12/20 TX-30176511 some accommodations may require time for TxDOT to arrange.
You can also read