2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS

Page created by Carol Moran
 
CONTINUE READING
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
2021-2024
Statewide Transportation
Improvement Program
TxDOT Pharr District
Highway Projects
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
MONDAY, FEBRUARY 01, 2021              STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM                                       PAGE: 3 OF 5
10:49:05 AM                                 TXDOT PHARR DISTRICT - HIGHWAY PROJECTS
                                                             FY 2022
2021-2024 STIP                                           07/2020 Revision: Revising
DISTRICT           MPO                   COUNTY         CSJ          TIP FY      HWY    PHASE          CITY                    YOE COST
 PHARR                                       STARR      0038-06-047 2022        US 83    C             OTHER              $    24,256,909
  LIMITS FROM 0.31 MI SOUTH OF PLACIDO RD.                                                  PROJECT SPONSOR TxDOT
      LIMITS TO 0.09 MI NORTH OF LOMA BLANCA RD.                                                      REVISION DATE 07/2020
      PROJECT WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED                                               MPO PROJ NUM
         DESCR                                                                                       FUNDING CAT(S) 4
      REMARKS                                                        PROJECT
             P7                                                      HISTORY
     TOTAL PROJECT COST INFORMATION                                   AUTHORIZED FUNDING BY CATEGORY/SHARE
   PREL ENG $       1,337,000                CATEGORY    FEDERAL           STATE      REGIONAL        LOCAL             LC         TOTAL
ROW PURCH $                 0    COST OF     4        $ 19,405,527 $    4,851,382 $           0 $          0 $           0 $   24,256,909
     CONSTR $      24,256,909   APPROVED     TOTAL    $ 19,405,527 $    4,851,382 $           0 $          0 $           0 $   24,256,909
 CONST ENG $        1,353,372    PHASES
    CONTING $         542,986 $   24,256,909
    INDIRECT $              0
   BOND FIN $               0
PT CHG ORD $          907,208
 TOTAL CST $       28,397,475
2021-2024 STIP                                           07/2020 Revision: Revising
DISTRICT           MPO                   COUNTY         CSJ          TIP FY      HWY    PHASE          CITY                    YOE COST
 PHARR                                       STARR      0038-06-045 2022        US 83    C             OTHER              $    27,043,091
  LIMITS FROM .255 MI NORTH OF STARR/ZAPATA CL                                              PROJECT SPONSOR TxDOT
      LIMITS TO .31 MI NORTH OF FM 2098 (SOUTH LEG)                                                   REVISION DATE 07/2020
      PROJECT WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED                                               MPO PROJ NUM
         DESCR                                                                                       FUNDING CAT(S) 4
      REMARKS                                                        PROJECT
             P7                                                      HISTORY
     TOTAL PROJECT COST INFORMATION                                   AUTHORIZED FUNDING BY CATEGORY/SHARE
   PREL ENG $       1,252,279                CATEGORY    FEDERAL           STATE      REGIONAL        LOCAL             LC         TOTAL
ROW PURCH $                 0    COST OF     4        $ 21,634,473 $    5,408,618 $           0 $          0 $           0 $   27,043,091
     CONSTR $      27,043,091   APPROVED     TOTAL    $ 21,634,473 $    5,408,618 $           0 $          0 $           0 $   27,043,091
 CONST ENG $        1,267,613    PHASES
    CONTING $         508,879 $   27,043,091
    INDIRECT $              0
   BOND FIN $               0
PT CHG ORD $        1,011,412
 TOTAL CST $       31,083,274

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
MONDAY, FEBRUARY 01, 2021                  STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM                                                PAGE: 4 OF 5
10:49:05 AM                                      TXDOT PHARR DISTRICT - HIGHWAY PROJECTS
                                                                  FY 2023
2021-2024 STIP                                                 07/2020 Revision: Revising
DISTRICT             MPO                     COUNTY           CSJ          TIP FY      HWY       PHASE            CITY                      YOE COST
 PHARR                                      STARR      0921-26-113 2023      CS       C            OTHER               $                     4,000,000
  LIMITS FROM INTERSECTION OF US 83/FM 755, SOUTH                                       PROJECT SPONSOR TxDOT
      LIMITS TO PORT OF ENTRY AT BRIDGE ROAD                                                      REVISION DATE 07/2020
      PROJECT NEW LOCATION - CONSTRUCT 2 LANE ROADWAY                                             MPO PROJ NUM
         DESCR                                                                                   FUNDING CAT(S) 3LC
      REMARKS                                                       PROJECT
             P7                                                     HISTORY
     TOTAL PROJECT COST INFORMATION                                  AUTHORIZED FUNDING BY CATEGORY/SHARE
   PREL ENG $        196,000                CATEGORY   FEDERAL           STATE    REGIONAL        LOCAL              LC                         TOTAL
ROW PURCH $                0    COST OF     3LC      $          0 $          0 $          0 $          0 $    4,000,000 $                    4,000,000
     CONSTR $      4,000,000   APPROVED     TOTAL    $          0 $          0 $          0 $          0 $    4,000,000 $                    4,000,000
 CONST ENG $         198,400    PHASES
    CONTING $         79,600 $    4,000,000
    INDIRECT $             0
   BOND FIN $              0
PT CHG ORD $         149,600
 TOTAL CST $       4,623,600
2021-2024 STIP                                                 07/2020 Revision: Revising
DISTRICT             MPO                     COUNTY           CSJ          TIP FY      HWY       PHASE            CITY                      YOE COST
 PHARR                                        WILLACY              0327-10-063 2023         IH 69E    C             OTHER              $     4,380,000
  LIMITS FROM CAMERON/WILLACY CL                                                                         PROJECT SPONSOR TxDOT
      LIMITS TO SPUR 413                                                                                           REVISION DATE 07/2020
      PROJECT Controlled Access Freeway Upgrade to Interstate Highway Design Standards                             MPO PROJ NUM
         DESCR                                                                                                    FUNDING CAT(S) 4
      REMARKS                                                                   PROJECT
             P7                                                                 HISTORY
     TOTAL PROJECT COST INFORMATION                                               AUTHORIZED FUNDING BY CATEGORY/SHARE
   PREL ENG $        214,620                  CATEGORY             FEDERAL             STATE       REGIONAL        LOCAL             LC         TOTAL
ROW PURCH $                0      COST OF     4               $     3,504,000 $       876,000 $            0 $          0 $           0 $    4,380,000
     CONSTR $      4,380,000    APPROVED      TOTAL           $     3,504,000 $       876,000 $            0 $          0 $           0 $    4,380,000
 CONST ENG $         262,362      PHASES
    CONTING $        113,880 $      4,380,000
    INDIRECT $             0
   BOND FIN $              0
PT CHG ORD $         163,812
 TOTAL CST $       5,134,674
2021-2024 STIP                                                 07/2020 Revision: Revising
DISTRICT             MPO                     COUNTY           CSJ          TIP FY      HWY       PHASE            CITY                      YOE COST
 PHARR                                        ZAPATA     0038-05-040 2023        US 83    C             OTHER              $                37,076,000
  LIMITS FROM 0.22 MI S OF LASSO LN                                                          PROJECT SPONSOR TxDOT
      LIMITS TO 0.28 MI N OF FM 2687                                                                   REVISION DATE 07/2020
      PROJECT WIDEN FROM 2 LANE RURAL TO 4 LANE DIVIDED                                                MPO PROJ NUM
         DESCR                                                                                        FUNDING CAT(S) 4,11
      REMARKS                                                         PROJECT
             P7                                                       HISTORY
     TOTAL PROJECT COST INFORMATION                                    AUTHORIZED FUNDING BY CATEGORY/SHARE
   PREL ENG $       1,816,724                 CATEGORY    FEDERAL           STATE      REGIONAL        LOCAL             LC                     TOTAL
ROW PURCH $                 0     COST OF     4        $ 20,800,000 $    5,200,000 $           0 $          0 $           0 $               26,000,000
     CONSTR $      37,076,000    APPROVED     11       $  8,860,800 $    2,215,200 $           0 $          0 $           0 $               11,076,000
 CONST ENG $        1,838,970     PHASES      TOTAL    $ 29,660,800 $    7,415,200 $           0 $          0 $           0 $               37,076,000
    CONTING $         737,812 $    37,076,000
    INDIRECT $              0
   BOND FIN $               0
PT CHG ORD $        1,386,642
 TOTAL CST $       42,856,148

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
MONDAY, FEBRUARY 01, 2021              STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM                                        PAGE: 5 OF 5
10:49:05 AM                                  TXDOT PHARR DISTRICT - HIGHWAY PROJECTS
                                                              FY 2024
2021-2024 STIP                                           07/2020 Revision: Revising
DISTRICT           MPO                   COUNTY          CSJ         TIP FY      HWY    PHASE           CITY                    YOE COST
 PHARR                                        KENEDY     0327-05-041 2024        US 77    C             OTHER              $    76,159,272
  LIMITS FROM NORIAS RD                                                                      PROJECT SPONSOR TxDOT
      LIMITS TO 1.34 MI N OF WILLACY/KENEDY C.L.                                                       REVISION DATE 07/2020
      PROJECT CONSTRUCT MAIN LANES & OVERPASSES (FUTURE I-69 CORRIDOR)                                 MPO PROJ NUM
         DESCR                                                                                        FUNDING CAT(S) 4,12
      REMARKS                                                         PROJECT
             P7                                                       HISTORY
     TOTAL PROJECT COST INFORMATION                                    AUTHORIZED FUNDING BY CATEGORY/SHARE
   PREL ENG $       3,719,348                 CATEGORY    FEDERAL           STATE      REGIONAL        LOCAL             LC         TOTAL
ROW PURCH $                 0     COST OF     4        $ 30,463,709 $    7,615,927 $           0 $          0 $           0 $   38,079,636
     CONSTR $      75,905,069    APPROVED     12       $ 30,463,709 $    7,615,927 $           0 $          0 $           0 $   38,079,636
 CONST ENG $        3,711,758     PHASES      TOTAL    $ 60,927,418 $   15,231,854 $           0 $          0 $           0 $   76,159,272
    CONTING $         857,727 $    76,159,272
    INDIRECT $              0
   BOND FIN $               0
PT CHG ORD $        3,157,651
 TOTAL CST $       87,351,553
2021-2024 STIP                                           07/2020 Revision: Revising
DISTRICT           MPO                   COUNTY          CSJ         TIP FY      HWY    PHASE           CITY                    YOE COST
 PHARR                                      BROOKS     0255-05-044 2024        US 281   C             OTHER              $      88,900,000
  LIMITS FROM 0.690 MI S OF FM 755                                                         PROJECT SPONSOR TxDOT
      LIMITS TO HIDALGO/BROOKS COUNTY LINE                                                           REVISION DATE 07/2020
      PROJECT CONSTRUCT 4 LANES WITH OVERPASSES AND TWO - 2 LANES FRONTAGE ROADS                     MPO PROJ NUM
         DESCR                                                                                      FUNDING CAT(S) 4,12
      REMARKS                                                       PROJECT
             P7                                                     HISTORY
     TOTAL PROJECT COST INFORMATION                                  AUTHORIZED FUNDING BY CATEGORY/SHARE
   PREL ENG $      5,264,624                CATEGORY    FEDERAL           STATE      REGIONAL        LOCAL             LC           TOTAL
ROW PURCH $                0    COST OF     4        $ 55,120,000 $   13,780,000 $           0 $          0 $           0 $     68,900,000
     CONSTR $     88,900,000   APPROVED     12       $ 16,000,000 $    4,000,000 $           0 $          0 $           0 $     20,000,000
 CONST ENG $       5,253,898    PHASES      TOTAL    $ 71,120,000 $   17,780,000 $           0 $          0 $           0 $     88,900,000
    CONTING $      1,214,091 $   88,900,000
    INDIRECT $             0
   BOND FIN $              0
PT CHG ORD $               0
 TOTAL CST $ 100,632,613

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
TIP Highway Financial Summary ‐ Year of Expenditure Cost

                                                                                       TxDOT PHARR DISTRICT #21
                                                                     Initial FY 2021 ‐ 2024 Transportation Improvement Program
Funding by Category
                                                           FY 2021                      FY 2022                         FY 2023                        FY 2024                   Total FY 2021 ‐ 2024
  Funding
                          Description             Programmed    Authorized    Programmed      Authorized      Programmed      Authorized     Programmed       Authorized     Programmed       Authorized
  Category
                 Preventive Maintenance
         1                                            $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
                 and Rehabilitation
                 Urban Area (Non‐ TMA)
  2M or 2U                                            $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
                 Corridor Projects
                 Non‐Traditionally Funded
         3                                            $0             $0            $0             $0           $4,000,000      $4,000,000         $0              $0           $4,000,000      $4,000,000
                 Transportation Project
        3DB      Design Build (DB)                    $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
                 Urban and Regional
         4                                            $0             $0        $51,300,000    $51,300,000      $30,380,000     $30,380,000    $106,979,636    $130,876,000    $188,659,636    $212,556,000
                 Connectivity
         5       CMAQ                                 $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
         6       Structures ‐ Bridge                  $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
         7       Metro Mobility & Rehab               $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
         8       Safety                               $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
         9       TAP Set‐Aside Program                $0             $0            $0             $0               $0              $0             $0              $0              $0              $0

        10       Supplemental Transportation          $0             $0            $0             $0               $0              $0             $0              $0              $0              $0

    10 CBI       Corridor Border                      $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
        11       District Discretionary               $0             $0            $0             $0           $11,076,000     $11,076,000        $0              $0          $11,076,000     $11,076,000
        11       Energy Sector                        $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
        12       Texas Clear Lanes                    $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
        12       Strategic Priority                   $0             $0            $0             $0               $0              $0         $58,079,636     $58,079,636     $58,079,636     $58,079,636
    SW PE        Statewide Budget PE                  $0             $0            $0             $0               $0              $0             $0              $0              $0              $0
   SW ROW        Statewide Budget ROW                 $0             $0            $0             $0               $0              $0             $0              $0              $0              $0

                                          Total       $0             $0       $51,300,000    $51,300,000      $45,456,000     $45,456,000    $165,059,272    $188,955,636    $261,815,272    $285,711,636

Funding Participation Source
                   Source                          FY 2021       FY 2022        FY 2023        FY 2024       Total FY 21‐24
Federal                                               $0        $41,040,000    $33,164,800    $132,047,418    $206,252,218
State                                                 $0        $10,260,000    $8,291,200     $33,011,854      $51,563,054
Local Match                                           $0             $0            $0             $0               $0
CAT 3 ‐ Local Contributions (LC)                      $0             $0        $4,000,000         $0           $4,000,000
CAT 3 ‐ Prop 1                                        $0             $0            $0             $0               $0
CAT 3 ‐ DB                                            $0             $0            $0             $0               $0
CAT 3 ‐ Prop 14 Bonds                                 $0             $0            $0             $0               $0
CAT 3 ‐ Texas Mobility Fund                           $0             $0            $0             $0               $0
CAT 3 ‐ TDC                                           $0             $0            $0             $0               $0
Statewide Budget PE                                   $0             $0            $0             $0               $0
Statewide Budget ROW                                  $0             $0            $0             $0               $0

                                          Total      $0        $51,300,000    $45,456,000    $165,059,272    $261,815,272
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
Notice of Online Comment Opportunity
                      Texas Department of Transportation
         2021 - 2024 Rural Transportation Improvement Program Revision
                                  Pharr District
The Texas Department of Transportation (TxDOT) Pharr District is conducting outreach to provide the public
with an online comment opportunity for the proposed revision to the 2021-2024 Rural Transportation
Improvement Program (Rural TIP). An in-person or virtual public meeting is not scheduled; however, the public
is encouraged to view project information and submit comments about the revision by Monday, January 25,
2021.

The purpose of the online comment opportunity is to receive comments on the revision to the 2021-2024
Rural Transportation Improvement Program (Rural TIP) for the Pharr TxDOT District. The projects that will be
affected by the revision include:

       ADDING in Brooks County - US 281 (0255-05-044) from 0.690 Miles South of FM 755 to
        Hidalgo / Brooks County Line – Constructing 4 Lanes with Overpasses and Two – 2 Lanes
        Frontage Roads – 2024.
       REMOVING in Brooks County – SH 285 (CSJ #0102-07-046) from FM 2191 to Brooks /
        Kleberg County Line – Widen to 4 Lane w/shoulders – 2024.

The 2021-2024 Rural TIP meeting(s) was held in the Spring pursuant to Title 43, Texas Administrative Code,
Section 16.102, which calls for an opportunity for public comment concerning the program. As a continuation
of the public involvement effort, the online comment opportunity will offer the public a chance to comment on
the revision to the previously presented Rural TIP.

To view the Rural TIP Revision exhibits and comment information, visit txdot.gov and keyword search:
“Hearings and Meetings Schedule.” Once on the schedule page, scroll down to find the appropriate online
comment opportunity link. Revision information will also be available for public review January 8 through
January 25, 2021 at the TxDOT Pharr Office at 600 W I-2, Pharr, TX 78577. Please make appointment to view
information between the hours of 8 a.m. and 5 p.m. For more information or questions, please contact Melba
R. Schaus at 956-702-6181 or via email Melba.Schaus@txdot.gov.

The public is encouraged to view this online information and provide input regarding the proposed revision(s).
Written comments may be submitted online, emailed, or mailed. If mailed, written comments must be received
or postmarked by January 25, 2021, either in person or by mail to TxDOT, Attn: Rural TIP Revision at 600 W IH-
2, Pharr, TX 78577. Comments can also be submitted by email to Melba.Schaus@txdot.gov. TxDOT will be
accepting comments about this project until January 25, 2021.

Special accommodations: TxDOT makes every reasonable effort to accommodate the needs of the public. The
information will be posted in English. If you have special communication or accommodation needs, or have a
need for an interpreter, a request can be made. If you have a disability and need assistance, special
arrangements can also be made to accommodate most needs. Please call Norma Robledo at 956-702-6100
at least one week prior to the comment deadline. Please be aware that advance notice is requested as some
accommodations may require time for TxDOT to arrange.
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
2/1/2021                                                                  fileloader.ashx (5088×6560)

https://apps.dot.state.tx.us/apps/estip/fileloader.ashx?pg_file_id=3076                                 1/1
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
Aviso de Oportunidad de Comentarios en Linea
                     Departamento de Transporte de Texas
        2021 - 2024 Revisión del Programa de Mejora del Transporte Rural
                                Distrito de Pharr

El distrito de Pharr del departamento de transporte de Texas está realizando actividades de divulgación para
brindar al público una oportunidad de comentarios en línea para la revision propuesta del programa de mejora
del transporte rural de 2021 - 2024. No se ha programado una reunion pública en persona o virtual; sin
embargo, se alienta al público a ver la información del Proyecto y enviar comentarios sobre la revision antes
del 25 de enero de 2021.

El propósito de la oportunidad de comentarios en linea es recibir comentarios sobre la revision del programa
de mejora del transporte rural del 2021-2024 para distrito de TxDOT Pharr. Los proyectos que se verán
afectados por la revision incluyen:

       AGREGANDO en el condado de Brooks - US 281 (0255-05-044) desde 0.690 millas sur de FM 755 a
        la linea de los condados de Hidalgo / Brooks – la construcción de 4 carriles con pasos superiores y
        dos – 2 carriles frontales – en 2024.
       ELIMINANDO en el condado de Brooks – SH 285 (CSJ #0102-07-046) desde FM 2191 a hasta la línea
        del los condados de Brooks / Kleberg – ampliando a 4 carriles con hombros – en 2024.

La reunion rural de TIP 2021-2024 se llevara a cabo en la primavera de conformidad con el Título 43, Código
Administrativo de Texas, Sección 16.102, que exige una oportunidad para comentarios públicos sobre el
programa. Como continuación del esfuerzo de participación pública, la oportunidad de comentarios en línea
ofrecerá al público la oportunidad de comentar sobre la revision del TIP rural presentado anteriormente.

Para ver las exhibiciones del Rural TIP Revisión e información de comentarios, visite txdot.gov y busque la
palabra clave: “Programa de audiencias y reunions”. Una vez en la página de programación, desplácese hacia
abajo para encontrar el enlace de oportunidad de comentario en línea apropiado. La información de revisión
también estará disponible para revisión pública del 8 de enero al 25 de enero de 2021 en la Oficina de TxDOT
Pharr en 600 W I-2, Pharr, TX 78577. Por favor, haga una cita para ver información entre las 8 a.m. y 5 p.m.
Para obtener más información o preguntas, comuníquese con Melba Schaus al 956-702-6181 or por correo
eletrónico Melba.Schaus@txdot.gov.

Se alienta al público a ver esta información en línea y proporcionar comentarios sobre las revisions
propuestas. Los comentarios escritos se pueden enviar en línea, por correo electrónico o por correo. Si se
envían por correo, los comentarios por escrito deben recibirse o enviarse con matasellos antes del 25 de
enero de 2021, ya sea en persona o por correo a TxDOT, Attn: Rural TIP Revisión at 600 W IH-2, Pharr, TX
78577. Los comentarios también se pueden enviar por correo electrónico a Melba.Schaus@txdot.gov. TxDOT
aceptará comentarios sobre estos proyectos hasta el 25 de enero de 2021.

Alojamiento especial: TxDOT hace cada razonable esfuerzo a acomodar las necesidades del público. La
información su publicará en inglés. Si tiene necesidades especiales de comunicación, o necesita un
intérprete, se puede hacer una solicitud. Si tiene una discapacidad y necesita ayuda, también se pueden
hacer arreglos especiales para satisfacer la mayoría de las necesidades. Lame a Norma Robledo al 956-702-
6100 por lo menos una semana antes de la fecha límite de comentarios. Tenga en cuenta que se solicita un
aviso con anticipación ya que algunos alojamientos requieren tiempo para que TxDOT organize.
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
Revision to Rural
   Transportation
   Improvement Plan
   2021-2024
   PHARR DISTRICT
   ONLINE PUBLIC COMMENTS

2021-2024 Rural TIP Revision   January 2021
                                 January 2021
2021-2024 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM - TXDOT PHARR DISTRICT HIGHWAY PROJECTS
Agenda

   1     Safety Minute

   2     Pharr District and its Boundaries

   3     The Rural Transportation Improvement Program (TIP)

   4     How the Rural TIP Impacts You

   5     Projects by County

   6     Funding

   7     Next Steps

2021-2024 Rural TIP Revision                                  January 2021   2
Safety

2021-2024 Rural TIP Revision   January 2021   3
PHARR DISTRICT

2021-2024 Rural TIP Revision   January 2021   4
Rural Transportation Improvement Program (TIP)

                               THE RURAL TIP
      is list of local projects to be funded within a TxDOT District
     during the next four years, including those eligible for federal
                                   funding.

                               It can include projects for :

            A Rural TIP project is              It shows regional agreement
           anticipated to be funded           (community-region-state) on the
                    within                            need of a project.
               the next 4 years.

2021-2024 Rural TIP Revision                                         January 2021   5
How the Rural TIP Impacts You

  The Rural TIP process includes opportunities
  to provide input on the priority of major
  projects that are listed on it.                  You know
                                                     your
                                                   community
                                                     best!
 Local and small projects around your
 community dealing with safety and access also
 get funding through the Rural TIP, for example:    Tell us what
             Road expansions
                                                       project
             Sidewalks
                                                   should come
             Bike lanes
                                                   first and why
             Pavement repair or maintenance
             New or improved signals
             Turning lanes

 By participating today, you are providing input in the
 Pharr District projects!
2021-2024 Rural TIP Revision                            January 2021   6
ADD - Rural TIP Brooks County Project
    CSJ           Highway        Limits from   Limits to    Description of Work      Cost       Let
                                                                                                Year

                                                             CONSTRUCT 4 LANES
                                0.690 Mi S of Hidalgo/Brooks WITH OVERPASSES
0255-05-044 US 281                                                                $88,900,000 2024
                                FM 755        County Line    AND TWO -2 LANES
                                                             FRONTAGE ROADS

 2021-2024 Rural TIP Revision                                                         January 2021     7
REMOVE - Rural TIP Brooks County Project

     CSJ            Highway      Limits from     Limits to   Description of Work     Cost        Let
                                                                                                Year
                                               BROOKS/    WIDEN TO 4 LANE W/
0102-07-046 SH 285               FM 2191                                           $4,520,000 2024
                                               KLEBERG CL SHOULDERS

  2021-2024 Rural TIP Revision                                                         January 2021    8
Funding

 The Rural TIP is a fiscally constrained list of
 projects that functions as a budgeting tool for our                    “Fiscally
 District.
                                                                      constrained
                                                                      TIP” means:
 Funds can come from:
     Federal Government
         Through the Federal Highway and Transit Administrations     It is realistic in terms
                                                                        of the amount of
                                                                       funding available.
         TxDOT
         Through its Unified Transportation Program funding
         categories

         Local governments
         Who may be required to provide matching funds for federal
         monies

2021-2024 Rural TIP Revision                                                   January 2021     9
Next Steps

                        How to provide comments:

      1. Visit TxDOT.gov – go to Hearings and Meetings Schedule (once on the
      schedule page, scroll down to find the appropriate online comment opportunity
      link.)
      2. Mail a comment to:
                        Texas Department of Transportation
                       Pharr District, Attn: Rural TIP Revision
                                     600 W IH-2
                                  Pharr, TX 78577
      3. E-mail a comment to:
                      Melba.Schaus@txdot.gov, Attention: Rural TIP Revision

                   Remember to submit your comments before January 25. 2021
                      to be included in the official summary of this meeting

2021-2024 Rural TIP Revision                                                   January 2021   10
Revisión del Programa de
Mejoría del Transporte
Rural (RTIP)
2021-2024
   DISTRITO DE PHARR
   COMENTARIOS PUBLICOS EN LINEA

Revisión del RTIP entre los años fiscales 2021 al 2024   Enero deldel
                                                           enero   2021
                                                                      2021
Agenda

   1      Minuto de Seguridad

   2      Distrito de Pharr y sus límites

   3      Programa de Mejoría del Transporte Rural (RTIP)

   4      Cómo te afecta el RTIP

   5      Proyectos por condado

   6      Fondos

   7      Próximos pasos

Revisión del RTIP entre los años fiscales 2021 al 2024      Enero del 2021   2
Seguridad

  ¡La Seguridad
Nunca se Detiene!

      Seguridad: Misión

  CERO
Revisión del RTIP entre los años fiscales 2021 al 2024   Enero del 2021   3
DISTRITO DE PHARR

Revisión del RTIP entre los años fiscales 2021 al 2024   Enero del 2021   4
Programa de Mejoría del Transporte Rural (RTIP)

                                                     EL RTIP
    es una lista de proyectos locales que se financiarán dentro de
       un Distrito de TxDOT durante los próximos cuatro años,
      incluidos aquellos elegibles para recibir fondos federales.

                                         Puede incluir proyectos para:

       Se anticipa que un proyecto                        Muestra un acuerdo regional
      en el RTIP se financiará dentro                      (comunidad-región-estado)
         de los próximos 4 años.                            sobre la necesidad de un
                                                                    proyecto.

Revisión del RTIP entre los años fiscales 2021 al 2024                        Enero del 2021   5
Cómo te afecta el RTIP

  El proceso de RTIP incluye oportunidades
  para proporcionar información sobre la
  prioridad de los principales proyectos que              ¡Conoces
  figuran en él.                                          mejor a tu
 Los proyectos locales y pequeños alrededor              comunidad!
 de su comunidad que se ocupan de la
 seguridad y el acceso también obtienen                   Cuéntanos
 fondos a través del RTIP, por ejemplo:                  qué proyecto
          Expansiones de carreteras                      debería venir
          Aceras                                         primero y por
          Carriles de bicicleta                              qué
          Reparación o mantenimiento de pavimentos.
          Señales nuevas o mejoradas
          Carriles de girar

 Al participar hoy, ¡está proporcionando aportes en todos
 los proyectos en el RTIP del distrito de Pharr!
Revisión del RTIP entre los años fiscales 2021 al 2024       Enero del 2021   6
Agregando Proyecto en el RTIP del condado de Brooks
    CSJ           Carretera       Límites de         Límites a   Descripción del trabajo   Costo       Año de
                                                                                                       oferta
                                                       CONSTRUIR 4 CARRILES
                                0.690 millas
                                             HIDALGO / CON PASOS
0255-05-044 US 281              sur de FM                                   $88,900,000                 2024
                                             BROOKS CL SUPERIORES Y DOS – 2
                                755
                                                       CARRILES FRONTALES

 Revisión del RTIP entre los años fiscales 2021 al 2024                                       Enero del 2021    7
Eliminando Proyecto en el RTIP del condado de Brooks
    CSJ           Carretera       Límites de         Límites a    Descripción del trabajo   Costo       Año de
                                                                                                        oferta
                                                  BROOKS /
                                                                 AMPLIADO A 4 CARRILES
0102-07-046 SH 285              FM 2191           KLEBERG                              $4,520,000        2024
                                                                 CON HOMBROS
                                                  CL

 Revisión del RTIP entre los años fiscales 2021 al 2024                                        Enero del 2021    8
Fondos

 El RTIP es una lista de proyectos con restricciones
 fiscales que funciona como una herramienta de                         “RTIP con
 presupuesto para nuestro distrito.
                                                                     restricciones
                                                                        fiscales"
 Los fondos pueden provenir de:                                        significa:
  Gobierno Federal
    A través de la Administración Federal de Carreteras y Tránsito      Es realista en
                                                                       términos de la
                                                                     cantidad de fondos
    TxDOT                                                                disponibles.
    A través de sus categorías de financiación del Programa de
    Transporte Unificado

    Gobiernos locales
    ¿Quién puede estar obligado a proporcionar fondos de
    contrapartida para fondos federales?

Revisión del RTIP entre los años fiscales 2021 al 2024                     Enero del 2021   9
Próximos Pasos

                Cómo proporcionar comentarios:

      1. Visite TxDOT.gov – ir a Calendario de Audencias y
      Reuniones (una vez en la página de programación, desplácese hacia abajo
      para encontrar el enlace de oportunidad de comentario en línea apropiado.)
      2. Envíe un comentario a:
                                      Texas Department of Transportation
                                     Pharr District, Attn: Rural TIP Revisión
                                                  600 W IH-2
                                                         Pharr, TX 78577
      2. O envíe un comentario por correo electrónico a:
                       Melba.Schaus@txdot.gov, Attention: Rural TIP Revisión
                  Recuerde enviar sus comentarios antes del 25 de enero de 2021
                      para ser incluido en el resumen oficial de esta reunión
Revisión del RTIP entre los años fiscales 2021 al 2024                          Enero del 2021   10
Page 8, Falfurrias Facts, January 7, 2021

 USDA
 of many regions, provides biodiversity of plant and animal populations and improves environmental quality. A separate CRP Grasslands signup is offered each year following general
 signup.
  Signed into law in 1985, CRP is one of the largest private-lands conservation programs in the United States. It was originally intended to primarily control soil erosion and potentially
 stabilize commodity prices by taking marginal lands out of production. The program has evolved over the years, providing many conservation and economic benefits. The program
 marks its 35-year anniversary this December. Program successes include:
  •Preventing more than 9 billion tons of soil from eroding, which is enough soil to fill 600 million dump trucks;
  •Reducing nitrogen and phosphorous runoff relative to annually tilled cropland by 95 and 85 percent, respectively;
  •Sequestering an annual average of 49 million tons of greenhouse gases, equal to taking 9 million cars off the road;
  •Creating more than 3 million acres of restored wetlands while protecting more than 175,000 stream miles with riparian forest and grass buffers, which is enough to go around the
 world seven times; and
  •Benefiting bees and other pollinators and increasing populations of ducks, pheasants, turkey, bobwhite quail, prairie chickens, grasshopper sparrows, and many other birds.
  The successes of CRP contribute to USDA’s Agriculture Innovation Agenda and its goal of reducing the environmental footprint of U.S. agriculture by half by 2050. Earlier this year,
 Secretary Perdue announced the department-wide initiative to align resources, programs, and research to position American agriculture to better meet future global demands.
  For more information on CRP, visit fsa.usda.gov or contact your local FSA county office; Brooks County residents, contact Jennifer García at 361-325-2272, ext. 2 or e-mail:
 jennifer.garcia@tx.usda.gov

 Calendar
  Jan.        21–Basketball:       Feb. 9–Basketball: Jerseys    day of school for students.   School graduation.              development day.               regular    school      board
 Jr. High Boys vs. Santa          (F, JV, V) @ Hebbronville,      June 4–Falfurrias High        June 4–Premont ISD staff        June 14–Premont        ISD    meeting, 6:30 p.m.
 Gertrudis Academy.               district game, 5 p.m.
  Jan. 21–Basketball: Jr.          Feb.        12–Basketball:
 High Belles @ Santa              Jerseys (JV, V) vs. London,
 Gertrudis Academy in             district game, here, 5 p.m.
 Kingsville.                       Feb. 15–President’s Day;
  Jan.        22–Basketball:      Brooks Co. offices closed.                            Notice of Online Comment Opportunity
 Belles (JV, V) vs. Laredo         Feb. 15–Premont ISD                                   Texas Department of Transportation
 Harmony, district game,          regular     school     board
 here, 5 p.m.                     meeting.
                                                                            2021 - 2024 Rural Transportation Improvement Program Revision
  Jan.        22–Basketball:       Feb. 22–Brooks Co. ISD                                            Pharr District
 Jerseys open date.               staff development day.
                                                                  The Texas Department of Transportation (TxDOT) Pharr District is conducting outreach to provide the public with
  Jan. 25–Premont ISD              Mar. 8–Premont ISD             an online comment opportunity for the proposed revision to the 2021-2024 Rural Transportation Improvement
 regular     school     board     regular     school board        Program (Rural TIP). An in-person or virtual public meeting is not scheduled; however, the public is encouraged to
 meeting.                         meeting, 6:30 p.m.              view project information and submit comments about the revision by Monday, January 25, 2021.
  Jan.        26–Basketball:       Mar. 12–Premont ISD
 Belles (JV, V) & Jerseys         early release day.              The purpose of the online comment opportunity is to receive comments on the revision to the 2021-2024 Rural
                                                                  Transportation Improvement Program (Rural TIP) for the Pharr TxDOT District. The projects that will be affected
 (JV, V) @ Santa Gertrudis         Mar. 15-19–Brooks Co.
                                                                  by the revision include:
 Academy in Kingsville,           ISD & Premont ISD Spring
 district games, 5 p.m.           Break.
  Jan. 28–Basketball: Jr.                                                 ADDING in Brooks County - US 281 (0255-05-044) from 0.690 Miles South of FM 755 to
 High Belles vs. Bishop,           Apr. 1–2–Easter holiday                 Hidalgo / Brooks County Line – Constructing 4 Lanes with Overpasses and Two – 2 Lanes
 here.                            & Good Friday; Brooks                    Frontage Roads – 2024.
  Jan. 28–Basketball: Jr.         Co. offices closed.                     REMOVING in Brooks County – SH 285 (CSJ #0102-07-046) from FM 2191 to Brooks /
 High Boys @ Bishop.               Apr. 2–Brooks Co. ISD                   Kleberg County Line – Widen to 4 Lane w/shoulders – 2024.
  Jan. 29–Basketball: Belles      & Premont ISD Easter
 (JV, V) & Jerseys (V) vs.        holiday.                        The 2021-2024 Rural TIP meeting(s) was held in the Spring pursuant to Title 43, Texas Administrative Code,
 San Diego, district games,        Apr. 5–Easter Monday;          Section 16.102, which calls for an opportunity for public comment concerning the program. As a continuation of the
 here, 5 & 7:30 p.m.              Brooks Co. offices closed.      public involvement effort, the online comment opportunity will offer the public a chance to comment on the revision
                                   Apr. 5–Premont ISD             to the previously presented Rural TIP.
  Feb. 2–Basketball: Jerseys      Easter holiday.
                                                                  To view the Rural TIP Revision exhibits and comment information, visit txdot.gov and keyword search: “Hearings
 (F, JV, V) & Belles (JV, V)       Apr. 12–Premont ISD
                                                                  and Meetings Schedule.” Once on the schedule page, scroll down to find the appropriate online comment
 @ Bishop, district game, 5       regular    school    board
                                                                  opportunity link. Revision information will also be available for public review January 8 through January 25, 2021
 p.m.                             meeting.                        at the TxDOT Pharr Office at 600 W I-2, Pharr, TX 78577. Please make appointment to view information between
  Feb. 4–Basketball: Jr.           Apr. 16–Brooks Co. ISD         the hours of 8 a.m. and 5 p.m. For more information or questions, please contact Melba R. Schaus at 956-702-6181
 High Boys vs. Banquete,          staff development day.          or via email: Melba.Schaus@txdot.gov
 here.
  Feb. 4–Basketball: Jr.           May 10–Premont ISD             The public is encouraged to view this online information and provide input regarding the proposed revision(s).
 High Belles @ Banquete.          regular  school      board      Written comments may be submitted online, emailed, or mailed. If mailed, written comments must be received or
  Feb. 5–Basketball: Belles       meeting.                        postmarked by January 25, 2021, either in person or by mail to TxDOT, Attn: Rural TIP Revision at 600 W IH-2,
 (F, JV, V) & Belles (JV, V)       May 31–Memorial Day;           Pharr, TX 78577. Comments can also be submitted by email to Melba.Schaus@txdot.gov. TxDOT will be accepting
 vs. Banquete, district game,     Brooks Co. offices closed.      comments about this project until January 25, 2021.
 here, 5 p.m.
  Feb. 8–Brooks Co. ISD            June 1–Brooks Co. ISD          Special accommodations: TxDOT makes every reasonable effort to accommodate the needs of the public. The
 holiday.                         early release day.              information will be posted in English. If you have special communication or accommodation needs, or have a need
  Feb. 8–Premont ISD               June 2-4–Brooks Co. ISD        for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also
 regular    school      board     staff development days.         be made to accommodate most needs. Please call Norma Robledo at 956-702-6100 at least one week prior to the
 meeting, 6:30 p.m.                June 3–Premont ISD last        comment deadline. Please be aware that advance notice is requested as some accommodations may require time for
                                                                  TxDOT to arrange.

  Rooms...Rooms...Rooms...Rooms
                  Fully Furnished
  Daily $40 and up + Tax * Weekly Special
      –––> SHOWER SPECIAL $20
6    Miércoles 6 de Enero 2021                                                                         AVISOS cLASIFICADOS Y LEGALES/ classifiedS and legal notices
                                                                                      fundado en 1986

Pagos de impacto
                                                                  allá de lo que está disponible en IRS.gov.                        correo en algunos países demorarán la entrega.
                                                                  El IRS y el Departamento del Tesoro comenzaron a entre-           El IRS enfatiza que las personas elegibles no tienen que
                                                                  gar una segunda ronda de pagos de impacto económico,              hacer ninguna acción para recibir este segundo pago. Los
                                                                  a menudo conocida como pagos de estímulo, la semana               pagos son automáticos, y las personas no deben comuni-

económico en camino
                                                                  pasada.                                                           carse con sus instituciones financieras o el IRS con pregun-
                                                                  Los pagos de depósito directo pueden tardar varios días           tas acerca de la fecha de pago.
                                                                  en registrarse en cuentas individuales. Algunos estadoun-         Elegibilidad
                                                                  idenses pueden haber visto los pagos de depósito directo          Por lo general, los ciudadanos de EE UU. y residentes ex-
                                                                  como pendientes o como pagos provisionales en sus cuen-           tranjeros que no son elegibles para ser reclamados como
• Recomiendan visitar IRS.gov                                     tas antes de la fecha de pago programada del 4 de enero           dependientes en una declaración de impuestos de otra per-
en lugar de llamar                                                de 2021, que es la fecha oficial en que los fondos están          sona son elegibles para este segundo pago. Las personas
                                                                  disponibles.                                                      elegibles automáticamente recibirán un pago de impacto
                                                                  Los cheques en papel también comenzaron a enviarse y              económico de hasta $600 para individuos o $1,200 para
(Especial para El Periódico USA)
                                                                  continuarán enviándose durante el mes de enero. Algunas           las parejas casadas y hasta $600 para cada hijo calificado.
                                                                  personas recibirán tarjetas de débito por correo en enero,        La mayoría de las personas que tienen un ingreso bruto
El Servicio de Impuestos Internos instó a las personas a vis-
                                                                  y el IRS insta a las personas a revisar cuidadosamente su         ajustado en el 2019 de hasta $75,000 para individuos y
itar IRS.gov para obtener la información más actualizada
                                                                  correo. Los pagos por correo requerirán más tiempo de pro-        hasta $150,000 para las parejas casadas que declaran im-
de la segunda ronda de pagos de impacto económico en
                                                                  cesamiento y envío. Aquellos que residen en el extranjero         puestos en conjunto y cónyuges sobrevivientes, recibirán el
lugar de llamar a la agencia o a sus instituciones financieras
                                                                    fundado en 1986

                                                                  tendrán tiempo de espera más largos para los cheques, ya          monto completo del segundo pago. Para los que declaran
o proveedores de software de impuestos. Los asistentes
                                                                  que las interrupciones en los viajes aéreos y la entrega de       impuestos por encima de estos ingresos, la cantidad del
telefónicos del IRS no tienen información adicional más
                                                                                                                                    pago será reducida.

                                                                                                                                    Verificar el estado de un pago
                                                                                                                                    A partir de hoy, las personas pueden verificar el estado de
                                                                                                                                    sus primeros y segundos pagos mediante la herramienta
                                                                                                                                    Obtener mi pago, disponible en inglés y español solo en
                                                                                                                                    IRS.gov.
                                                                                                                                    ¿El pago no se recibió o es menos de lo esperado? Reclamar
              Aviso de Oportunidad de Comentarios en Linea                                                                          en la declaración de impuestos de 2020
                   Departamento de Transporte de Texas                                                                              Los pagos comenzaron a salir la semana pasada y contin-
                                                                                                                                    uarán hasta mediados de enero. Los pagos de depósitos
              2021 - 2024 Revisión del Programa de Mejora del                                                                       directos se realizan primero a aquellos que tienen infor-
                                                                                                                                    mación válida de ruta y cuenta bancaria registrada para
                             Transporte Rural                                                                                       fines de depósito directo. Debido a la velocidad a la que el
                              Distrito de Pharr                                                                                     IRS entregó esta segunda ronda de pagos, algunos pagos
                                                                                                                                    pueden haberse enviado a una cuenta que puede estar cer-
  El distrito de Pharr del departamento de transporte de Texas está realizando actividades de divulgación para brindar al público   rada o inactiva. Por ley, la institución financiera debe de-
  una oportunidad de comentarios en línea para la revision propuesta del programa de mejora del transporte rural de 2021 -          volver el pago al IRS, no puede retener y entregar el pago
  2024. No se ha programado una reunion pública en persona o virtual; sin embargo, se alienta al público a ver la información       a una persona cuando la cuenta ya no está activa. Mientras
  del Proyecto y enviar comentarios sobre la revision antes del 25 de enero de 2021.                                                el IRS explora opciones para corregir estos pagos, si no ha
                                                                                                                                    recibido su pago completo en el momento en que presente
  El propósito de la oportunidad de comentarios en linea es recibir comentarios sobre la revision del programa de mejora del        su declaración de impuestos de 2020, puede reclamar el
  transporte rural del 2021-2024 para distrito de TxDOT Pharr. Los proyectos que se verán afectados por la revision incluyen:       Crédito de recuperación de reembolso en su declaración
                                                                                                                                    de impuestos.
          • AGREGANDO en el condado de Brooks - US 281 (0255-05-044) desde 0.690 millas sur de FM 755 a la                          El crédito se calcula como el pago de impacto económi-
            linea de los condados de Hidalgo / Brooks – la construcción de 4 carriles con pasos superiores y dos – 2
                                                                                                                                    co, excepto que la elegibilidad del crédito y el monto del
            carriles frontales – en 2024.
          • ELIMINANDO en el condado de Brooks – SH 285 (CSJ #0102-07-046) desde FM 2191 hasta la línea de
                                                                                                                                    crédito se basan en la información del año tributario 2020,
            los condados de Brooks / Kleberg – ampliando a 4 carriles con hombros – en 2024.                                        incluyendo ingresos.
                                                                                                                                    Para las personas elegibles que recibieron un pago de im-
  La reunion rural de TIP 2021-2024 se llevara a cabo en la primavera de conformidad con el Título 43, Código Administrativo        pacto económico parcial, pueden reclamar el Crédito de
  de Texas, Sección 16.102, que exige una oportunidad para comentarios públicos sobre el programa. Como continuación                recuperación de reembolso por cualquier cantidad restante
  del esfuerzo de participación pública, la oportunidad de comentarios en línea ofrecerá al público la oportunidad de comentar      completando la línea 30 del Formulario 1040 o 1040-SR
  sobre la revision del TIP rural presentado anteriormente.                                                                         2020.
  Para ver las exhibiciones del Rural TIP Revisión e información de comentarios, visite txdot.gov y busque la palabra clave:        Cambio de información de cuenta bancaria o de dirección
  “Programa de audiencias y reunions”. Una vez en la página de programación, desplácese hacia abajo para encontrar el               El IRS no puede cambiar la información de pago, incluyen-
  enlace de oportunidad de comentario en línea apropiado. La información de revisión también estará disponible para revisión        do la información de cuenta bancaria o de dirección. Si un
  pública del 8 de enero al 25 de enero de 2021 en la Oficina de TxDOT Pharr en 600 W I-2, Pharr, TX 78577. Por favor, haga         contribuyente elegible no recibe un pago o es menor de lo
  una cita para ver información entre las 8 a.m. y 5 p.m.                                                                           esperado, puede reclamarse en la declaración de impuestos
  Para obtener más información o preguntas, comuníquese con Melba Schaus al 956-702-6181 or por correo eletrónico Melba.            de 2020 como el Crédito de recuperación de reembolso.
  Schaus@txdot.gov.                                                                                                                 Recuerde, los pagos de impacto económico son un pago
                                                                                                                                    por adelantado de lo que se llamará el Crédito de recu-
  Se alienta al público a ver esta información en línea y proporcionar comentarios sobre las revisions propuestas. Los comen-       peración de reembolso en el Formulario 2020 o Formulario
  tarios escritos se pueden enviar en línea, por correo electrónico o por correo. Si se envían por correo, los comentarios por
                                                                                                                                    1040-SR.
  escrito deben recibirse o enviarse con matasellos antes del 25 de enero de 2021, ya sea en persona o por correo a TxDOT,
  Attn: Rural TIP Revisión at 600 W I-2, Pharr, TX 78577. Los comentarios también se pueden enviar por correo electrónico a
  Melba.Schaus@txdot.gov. TxDOT aceptará comentarios sobre estos proyectos hasta el 25 de enero de 2021.                            Más información
                                                                                                                                    Para obtener más información acerca de los pagos de im-
  Alojamiento especial: TxDOT hace cada razonable esfuerzo a acomodar las necesidades del público. La información su                pacto económico y el Crédito de recuperación de reemb-
  publicará en inglés. Si tiene necesidades especiales de comunicación, o necesita un intérprete, se puede hacer una solicitud.     olso del 2020, visite IRS.gov/eip. A partir de la próxima
  Si tiene una discapacidad y necesita ayuda, también se pueden hacer arreglos especiales para satisfacer la mayoría de las         semana, las personas pueden revisar el estado de su pago
  necesidades. Lame a Norma Robledo al 956-702-6100 por lo menos una semana antes de la fecha límite de comentarios.                en IRS.gov/GetMyPayment. Para otros alivios tributarios
  Tenga en cuenta que se solicita un aviso con anticipación ya que algunos alojamientos requieren tiempo para que TxDOT             relacionados con COVID-19, visite IRS.gov/Coronavirus.
  organize
2/1/2021                                                                  fileloader.ashx (5088×6560)

https://apps.dot.state.tx.us/apps/estip/fileloader.ashx?pg_file_id=3075                                 1/1
2/1/2021                                                                  fileloader.ashx (5088×6560)

https://apps.dot.state.tx.us/apps/estip/fileloader.ashx?pg_file_id=3076                                 1/1
SUNDAY, JANUARY 10, 2021 | The Monitor, www.themonitor.com                                                                                                                                                                        11A

Cohen seeks to dismantle Trump GM unveils new logo
legacy, one podcast at a time  reflecting transition
BY JIM MUSTIAN
THE ASSOCIATED PRESS
                                                                                                       something extraordinary.”
                                                                                                          Cohen, 54, had been
                                                                                                                                               to electric vehicles
                                                                                                       scheduled to remain in pris-
   NEW YORK — The reha-                                                                                on until November 2021 but              BY JAMIE L. L AREAU
bilitation of Michael Cohen                                                                            was released in May to serve            DETROIT FREE PRESS
has reached a surreal new                                                                              the remainder of his sen-
stage: Quizzing the actor                                                                              tence at home as part of an                General Motors is work-
Ben Stiller about his ap-                                                                              attempt to slow the spread              ing to remake its public im-
proach to impersonating                                                                                of the coronavirus in federal           age with a new logo, a new
him on “Saturday Night                                                                                 prisons.                                company-wide marketing
Live.”                                                                                                    He was further embold-               campaign and a new web-
   Since September, Presi-                                                                             ened to speak out after                 site as it shifts from a com-
dent Donald Trump’s for-                                                                               briefly returning to prison              pany that makes largely in-
mer lawyer and fixer has                                                                                last year in what a federal             ternal combustion vehicles
been producing a podcast                                                                               judge ruled was govern-                 to offering mostly all-elec-                             General Motors | TNS
from the Park Avenue apart-                                                                            ment retaliation for Cohen              tric vehicles over the next             GM’s new corporate logo
ment where he is serving                                     Jonathan Carroll | The Associated Press   balking at a proposed pro-              decade.                                 to reflect its move to
the remainder of his prison       Michael Cohen, President Donald Trump’s former personal attorney,    vision of home confine-                     On Friday, GM said                   electrification in the future.
sentence for lying to Con-        speaks May 4, 2019, in New York.                                     ment that would have se-                starting Monday it will
gress, evading taxes and fa-                                                                           verely restricted his public            debut the campaign to                   zero emissions and zero
cilitating campaign finance        he told The Associated               Trump cutting short his         communications.                         promote mass adoption                   congestion.
crimes.                           Press. “Accordingly, he will      recent Florida vacation and           Reception to the show,               of EVs called “Every-                      Last fall, GM CEO Mary
   The show, “Mea Culpa,”         continue to remain a topic        returning to Washington to         like to Cohen himself, has              body In.” The company                   Barra told Wall Street the
has been downloaded               of discussion.”                   double down on his chal-           been across the board. So               will replace its familiar               company has invested
nearly 3 million times and           The launch of the podcast      lenge to the election results      far, Cohen said, “the show              blue square logo and will               $27 billion in EV and AV
is available in 37 countries,     followed Cohen’s publica-         “sent my blood pressure            is profitable” for its pro-              launch a new GM.com                     products through 2025
Cohen said. Before Stiller,       tion over the summer of a         through the roof!” Cohen           duction company, the Los                website to share the lat-               and will launch 30 new
featured in an episode re-        tell-all memoir about his         told listeners in his Long Is-     Angeles-based         startup           est information about                   EVs globally by the end of
leased Friday, guests have        conversion from Trump ac-         land cadence.                      AudioUp.                                work in electrification                  2025. Previously, GM had
included Rosie O’Donnell,         olyte to avowed enemy.               Cohen, despite years               The success or failure of            and self-driving cars.                  said it would bring 20 new
the magician and former              In his interview with Still-   of introspection, has re-          “Mea Culpa” could serve as                 The “Everybody In”                   EVs to market by 2023.
“Celebrity Apprentice” star       er, Cohen likened Trump’s         mained at a loss to explain        a litmus test for the viabil-           campaign will feature                      The “Everybody In”
Penn Jillette, political jour-    signature scowl to the visage     his unswerving allegiance          ity of the disbarred attorney           media influencers to                     campaign is intended to
nalists, and current and for-     of Derek Zoolander, Stiller’s     to a businessman he feels          and other erstwhile Trump               help introduce a new                    excite a new generation
mer operatives from both          pouty male model persona.         abandoned him at the most          loyalists after the president           generation of buyers to                 of buyers and challenge
parties, including James          Stiller, for his part, said he    vulnerable point in his life.      leaves office.                           EVs. Likewise, designers                the perception of EVs by
Carville and Anthony Scar-        recognized in Cohen the “di-      He has likened his fealty to          “It’s probably going to              have created a new logo                 highlighting the range,
amucci.                           chotomy” of fear and a killer     Trump to a mental illness          wane and be relegated into              using a color gradient of               performance and flexi-
   The topic of every show        instinct.                         and said he thought of him-        some dark, niche corner of              vibrant blue tones to rep-              bility of GM’s Ultium bat-
so far? Blistering criticism of      “I felt like there was a hu-   self as acting like a drug user    the culture, where Cohen                resent the cleaner skies of             tery platform.
the president’s every move.       manity in there that I was        in need of an intervention.        himself belongs,” said Nick             a zero-emissions future.                   Ultium will power near-
   Cohen, who once fa-            trying to connect with,”             The “most important vic-        Quah, the founder of Hot                   “There are moments                   ly all of GM’s future EV
mously claimed he would           Stiller said, adding he didn’t    tory” of the podcast, Cohen        Pod, a well-read newsletter             in history when every-                  lineup from mass-market
take a bullet for Trump,          want his SNL impression           said, is that he believed          about podcasts.                         thing changes. Inflection                to high-performance ve-
said he has made it part of       “to be this scathing, mean        some people who once sup-             In the foreword to his               points. We believe such a               hicles, including the 2022
his penance to dismantle          thing.”                           ported Trump changed their         bestselling memoir, “Dis-               point is upon us for the                GMC Hummer pickup
Trump’s legacy and “return           Cohen, on the other            minds after listening.             loyal,” Cohen acknowledged              mass adoption of electric               due out late this year and
this nation to a place of         hand, seems to be going for          “I have learned that there      critics consider him “the               vehicles,” said Deborah                 the Cadillac Lyriq SUV
sanity,” though he catego-        the jugular, while satisfy-       are tens of thousands of           least reliable narrator on the          Wahl, GM global chief                   due out early next year.
rizes his show as “a news         ing his own addiction to the      people who are exhausted           planet.”                                marketing officer.                          Ultium will allow EVs
commentary          program”      limelight.                        and anxious and in need               The White House, for its                                                     to go up to 450 miles on
instead of an “anti-Trump            He rails breathlessly in       of some type of outlet to          part, has dismissed Cohen’s             GENERATION E                            a full charge and it will
program.”                         every show against the “id-       channel their frustration          criticism as “fan fiction” and             GM has touted its                     power EVs of many sizes,
   He said he plans to con-       iot in chief.” In one recent      about our current political        said it’s “unfortunate that             transformation to EVs                   shapes and price points.
tinue his podcast through-        episode of “Mea Culpa,” he        climate,” Cohen told the AP.       the media is exploiting this            and self-driving cars for               It is capable of 0-60 mph
out the Biden administra-         complained that the presi-        “If I can help them deal with      sad and desperate man to                years, saying it seeks a                performance in three
tion.                             dential pardon process had        their fears or feel somewhat       attack President Trump.”                world with zero crashes,                seconds on some models.
   “We cannot fool our-           “devolved into a corrupt and      better about the darkness
selves into believing that        transactional circus, with        that is enveloping all of us, I
Trump will just disappear,”       Trump as its ringmaster.”         feel like we’ve accomplished
                                                                                                                                          FAMILY MEDICINE

                                                                                                                                We Proudly Welcome
                   Notice of Online Comment Opportunity
                    Texas Department of Transportation
         2021 - 2024 Rural Transportation Improvement
                       Program Revision
                         Pharr District
  The Texas Department of Transportation (TxDOT) Pharr District is conducting
  outreach to provide the public with an online comment opportunity for the
  proposed revision to the 2021-2024 Rural Transportation Improvement Program
  (Rural TIP). An in-person or virtual public meeting is not scheduled; however,
  the public is encouraged to view project information and submit comments
  about the revision by Monday, January 25, 2021.

  The purpose of the online comment opportunity is to receive comments on the
                                                                                                                                          Audrey Gutierrez, MD
  revision to the 2021-2024 Rural Transportation Improvement Program (Rural                                                    $QCTF%GTVKƂGFKP(COKN[/GFKEKPG
  TIP) for the Pharr TxDOT District. The projects that will be affected by the
  revision include:

     •   ADDING in Brooks County - US 281 (0255-05-044) from 0.690 Miles                                             Her #1 Priority: Keeping You and Your Family Healthy
         South of FM 755 to Hidalgo / Brooks County Line – Constructing 4 Lanes
         with Overpasses and Two – 2 Lanes Frontage Roads – 2024.
     •   REMOVING in Brooks County – SH 285 (CSJ #0102-07-046) from FM                                               Dr. Gutierrez joins South Texas Health System Clinics in Mission,
         2191 to Brooks / Kleberg County Line – Widen to 4 Lane w/shoulders – 2024.
                                                                                                                     conveniently located off Expressway 83 in the same building as
  The 2021-2024 Rural TIP meeting(s) was held in the Spring pursuant to Title                                        5QWVJ6GZCU*GCNVJ5[UVGO'4/KUUKQP5JGKUDQCTFEGTVKƂGFKPHCOKN[
  43, Texas Administrative Code, Section 16.102, which calls for an opportunity                                      medicine and provides compassionate care for newborns to older adults,
  for public comment concerning the program. As a continuation of the public                                         including annual check-ups, follow-up care after emergency room visits,
  involvement effort, the online comment opportunity will offer the public a
  chance to comment on the revision to the previously presented Rural TIP.                                           minor surgery and women’s health services.

                                                                                                                     A graduate of The University of Texas Medical Branch in Galveston,
  To view the Rural TIP Revision exhibits and comment information, visit txdot.
  gov and keyword search: “Hearings and Meetings Schedule.” Once on the                                              Dr. Gutierrez was a co-chief resident of the family medicine residency at
  schedule page, scroll down to find the appropriate online comment opportunity                                       CHRISTUS Santa Rosa Health System in San Antonio.
  link. Revision information will also be available for public review January 8
  through January 25, 2021 at the TxDOT Pharr Office at 600 W I-2, Pharr, TX                                          TO MAKE AN APPOINTMENT:
  78577. Please make appointment to view information between the hours of 8
  a.m. and 5 p.m. For more information or questions, please contact Melba R.                                         Schedule online at sthsclinics.com or call 956-515-2233
  Schaus at 956-702-6181 or via email Melba.Schaus@txdot.gov.                                                        Virtual Visits Available | Walk-ins Welcome
  The public is encouraged to view this online information and provide input                                         900 E. Expressway 83 | Suite A | Mission, TX 78572
  regarding the proposed revision(s). Written comments may be submitted
  online, emailed, or mailed. If mailed, written comments must be received                                           We offer evening and weekend hours!
  or postmarked by January 25, 2021, either in person or by mail to TxDOT,
  Attn: Rural TIP Revision at 600 W I-2, Pharr, TX 78577. Comments can also                                          Accepts Medicare, Medicaid and most medical insurance plans
  be submitted by email to Melba.Schaus@txdot.gov. TxDOT will be accepting
  comments about this project until January 25, 2021.

  Special accommodations:         TxDOT makes every reasonable effort to
  accommodate the needs of the public. The information will be posted in English.
  If you have special communication or accommodation needs, or have a need
  for an interpreter, a request can be made. If you have a disability and need
  assistance, special arrangements can also be made to accommodate most                                              Get social with us
  needs. Please call Norma Robledo at 956-702-6100 at least one week prior to                                                                                            For language assistance, disability accommodations and the