Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
Ways to improve field
                                             operation on NPPs
                                             facilities by bringing
                                             additional operator aids

                                             F. Dionis EDF/R&D
                                             D. Pirus EDF/SEPTEN

1   8th IEEE conference / Monterey August 2007
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
Introduction :

    1                       The new EDF / R&D
                            project INTEP

2       8th IEEE conference / Monterey August 2007
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
Low dissemination and use of modern IT solutions across power plants,
     while complexity and requirements are continuously growing

    EDF Nuclear fleet :
          • From now up to 2020, almost of the existing 58 plants (+ 1 or 2 EPR) still in operation.
          • Target for life expectancy over 50 years

    For all the fleet :
          • Growing expectations and requirement : safety, environment, communication and
            reputation
          • Continuous increasing complexity of the processes and the constraints
          • Human Reliability stakes, linked to changes in workforce : ageing workforce,
            retirements, needs for knowledge capture and transfer, different expectation and
            culture of new hires « MSN generation », increasing needs for training, attractiveness
            of jobs,…
    One of the identified ways of improvement
          • More use of modern IT solutions within the plants
    But
          • Numerous barriers that hindered their deployment : safety requirements,
            standardization of the plants, size of the fleet, usability of new technologies, …

3                                                                 8th IEEE conference / Monterey August 2007
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
Two major projects : a new EAM and INTEP

                                                            SAP
                                                Enterprise Resources Systems
A main enterprise project :
     • EDF is redesigning its nuclear fleet
       technical Information system (EAM) :                 EAM
       in service in ~2011                       Technical Information System

A main R&D project
     • The new INTEP project is dedicated to   Operation Aids
       operation aids, based on advances IT
       technologies
           • Normal operation                                                    INTEP
           • Outage
           • Field operation
           • Training
                                                             I&C

Moving to distributed sharable operation
information for all trades (jobs)
                                                        Process
4                                              8th IEEE conference / Monterey August 2007
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
INTEP

    Smart applications to support operation and diagnosis
         • Smart co-pilot for some focused operations (b. eg. help to follow temp. gradient after refueling)
         • Shared dashboard with process monitoring KPI
         • Anticipated diagnosis from process data harvesting :search and retrieval capabilities, anticipation of
           failures through datamining and prediction models
    Smart help for field operations :
         • Priority focused on padlocking and lining-up for outage
         • Integrated solution to invent :
           prepare > load on PDA > simplify and secure (RFID, barcodes) > visualize (control room, OCC, ..)
    Wireless solution, RFID and suitable mobile terminals and local networks
         • design an optimized WiFi + network adaptation solution, EMI compliant, cost effective : best coverage
           with minimum extra wires
         • define standards + select/validate mobile terminals and peripherals (tablet PC, PDA, RFID tags,
           antennas...)
    New solutions for outage management :
         • audio& video monitoring, share real time information (dashboards) , …
         • for innovatives organization solutions(outage c. center, radiation c.center, one stop shop, …)
    3D solutions for outage management and maintenance/logistics preparation
         • Under deployment : Global outage preparation (packing), Detailed simulation on specific maintenance
           operations
         • Next priority : 3D / pictures / video bases for logistics preparation and maintenance pre-job briefing
    New solutions for training                                           8th IEEE conference / Monterey August 2007
5
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
Launch time table

     Jan 07            Jul 07             Jan 08

                     Chose projects themes with EDF operation top managers

                                     Determine projects objectives; outputs, road maps and budgets

                                             Prioritize outputs and lock R&D budgets for 2008

                                                                                          Launch R&D projects

     • Solutions should be ready for on site demonstration after 3 years or less
     • Implementation should be feasible in 5 years or less
     • 58 nuclear plants : more than 12 plants a year
     • At this stage, we don’t take into account the possible opportunity of a deep
6      renovation of CC system at mid life                    8th IEEE conference / Monterey August 2007
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
2            The EVEREST Plateform

                 concept of “operation lab”

7       8th IEEE conference / Monterey August 2007
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
The Everest Platform

Everest is a flow
measurement loop
 • 120 I/O
 • 4 rooms (2 floors)

Total renewal of its
I&C system

Open architecture

8                          8th IEEE conference / Monterey August 2007
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
Working on Everest

Collaborative approach, including all visions

                        Operator                    I&C designer

                                   Everest

    Field operator
                                                                     Maintenance

                Human Factor                    Researcher
9                                               8th IEEE conference / Monterey August 2007
                                   Manager
Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
Working on Everest

Methodology

  To define project
     objectives,
 outputs, road maps
    and budgets
                                                       Selection of the
                                                       best proposals
                          To prototype on
                              Everest

                                                           To prototype on NPP

10                                          8th IEEE conference / Monterey August 2007
3
                             Smart applications to
                             support operation and
                             diagnosis

11       8th IEEE conference / Monterey August 2007
Smart co-pilot for some focused operations

By example: help to follow temperature gradient after refueling

• An « intelligent Co-pilot » that proposes:
   • An optimal operation strategy
   • A vision of future potential risks : i.e. risk of cold
   • The tasks to perform
   • Training just before an operation (no need of process data)

                                        Co-pilot

              Simulation Tools

                                 Process Data
12                                                 8th IEEE conference / Monterey August 2007
Shared dashboard with process monitoring KPI (1/2)

 To improve efficiency and environmental performance for pulverised coal unit…
                                  4 stakes
                     Safety                        Environment

  Overall                                                                            A
optimisation                                                                     compromise
 of the unit                                                                     between the
performance        Customer                  Production Economy                  constraints.

                 …from the control room to the operating manager
      ¬ Diagnosis                                      ¬ Stake quantification
      ¬ Immediate action plan                          ¬ Analysis of end results
      ¬ Help on line
                                    Dashboards         ¬ Predict to anticipate and
                                    & guidelines         optimise under constraints
 13                                                     8th IEEE conference / Monterey August 2007
Shared dashboard with process monitoring KPI (2/2)

     •   Survey of NI operation set points
     •   Survey of CI operation set points
     •   Following of CI components performances
     •   CI overall identification of efficiency loss

          Steam Gen.                                                                                                                                                                    Condenser vacuum
          « clogging »

                                                                                                                                                                                    Condenser
                                                             Evolution Efficacite AHP

           2,5
                                                                                                                                                                                    fur-up
                                                                                                                                           25

             2
                                                                                                                                           20

           1,5
                                                                                                                                           15

             1

                                                                                                                                           10

           0,5

                                                                                                                                            5

             0
                  1

                      5

                          9

                              13

                                   17

                                        21

                                             25

                                                   29

                                                        33

                                                                37

                                                                       41

                                                                            45

                                                                                 49

                                                                                        53

                                                                                             57

                                                                                                  61

                                                                                                       65

                                                                                                             69

                                                                                                                  73

                                                                                                                       77

                                                                                                                            81

                                                                                                                                 85

                                                                                                                                      89

                                                                                                                                            0
                                                                                                                                                01/01/03

                                                                                                                                                           01/02/03

                                                                                                                                                                      01/03/03

                                                                                                                                                                                 01/04/03

                                                                                                                                                                                            01/05/03

                                                                                                                                                                                                       01/06/03

                                                                                                                                                                                                                  01/07/03

                                                                                                                                                                                                                             01/08/03

                                                                                                                                                                                                                                        01/09/03

                                                                                                                                                                                                                                                   01/10/03

                                                                                                                                                                                                                                                              01/11/03

                                                                                                                                                                                                                                                                         01/12/03

                                                                                                                                                                                                                                                                                    01/01/04

                                                                                                                                                                                                                                                                                               01/02/04
           -0,5

            -1

                                                  Evol 501           Evol 502     Evol 601        Evol 602

14                                                                                                                                                                               8th IEEE conference / Monterey August 2007
Anticipated diagnosis from process data harvesting

 Anticipated diagnosis from process data harvesting :search
 and retrieval capabilities, anticipation of failures through
 datamining and prediction models

 Process data recovering       diagnostic and prognostic             Visualization tools
   (I&C, operation aids,                modules
maintenance sensors network)

15                                               8th IEEE conference / Monterey August 2007
4                       Smart help for field
                             operations

16       8th IEEE conference / Monterey August 2007
Padlocking and lining-up for outage (1/4)

                                                                                          MCR                                                                                  Début

Operation diagram                                                                         procedures
                                                                                                                                   Demande à l'AT de lancer le lignage mécanique pour
                                                                                                                                         mise en brassage du réservoir 011BA

                                                                                                                                     CR de l'AT d'exécution du lignage mécanique pour
                                                                                                                                           mise en brassage du réservoir 011BA

                                                                                                                                                                 OUVRIR 1ASG263VD

                                                                                                                                                     METTRE 1ASG171PO EN MARCHE

                                                                                                                                     laisser brasser le réservoir 011BA pendant 2 H, sauf
                                                                                                                                                       avis section chimie

                                                                                                                                          demander à la section chimie une analyse du
             Citerne mob.                                                                                                                       réservoir 011BA en brassage

                                                                                                                                          Compte rendu, section chimie, de l'eau 011BA

                                                                                           C
                                                                     1 Temp.                                                               COF
Padlocking and lining-up for outage (2/4)

Integrated solution to invent :
prepare > load on PDA > simplify and secure (RFID, barcodes) >
visualize (control room, OCC, ..)

                                                                    Padlocking
                                                                     (line-up)
                                                                     Database

                                                                         Communication

                                                    Prototype
                                             8th IEEE conference / Monterey August 2007
18
                                                     GDMI Bx
Padlocking and lining-up for outage (3/4)

     Simplify and secure :
     wrong configurations
     Survey

     (RFID, PDA, Networks, CAD)

19                                           8th IEEE conference / Monterey August 2007
Integrated solution to invent

                          L-Up
                           Db    Pré-job Briefing
                                                      Goals : to design specific modules in order
                                                      to facilitate the pre-job-briefing, the action,
                                 Current activities   and the verifications
         Planning of
         activities                                      • To prepare : Risk analysis / Verification
                                                           of conditions
         Process Data
                                 Verifications           • To act : Tasks following checking,
                                                           synchronizations following.
          Operation documents                            • To verify : Tracing, reporting, checking
                                                           with the pre-job-briefing
                OC
                   C

OC
   C
        OC
           C

20                                                           8th IEEE conference / Monterey August 2007
5                       New solutions for
                             outage management

21       8th IEEE conference / Monterey August 2007
General presentation

                              • Adaptation of US solutions of organization: Outage Control Center, Remote
   New solutions for            Monitoring Center for Radiation Protection, One Stop Shop, Pre-job Briefing
       outage                   areas…
     management               • Links with Control Room
                              • Connection with critical operations: audio, video links, teledosimetry…
                              • Optimization of RP cartographies: initial data, real-time updating
                              • Shared visualizations

                                                                             Salle de
                                                                             Control
 Screens for                                 One stop
                                                 Stop shop
                                                      Shop                  commande
   shared                                                                     Room
                                                                         « sanctuarisée»
visualizations                                                                                 Objectives :
           RP        Supervision        Preparation                            •   Reduce the delays of information transfer
                                         Préparation
       Supervision   Coordination     fieldconduite
                                             operation,
         Remote
                        OCC
                                                                                   and decision making
        Radiopro
       Monitoring                            work
                                    délivrance  régimes,                       •   Improve efficiency and safety for
         CSRP                         authorizations,
         Center                             permis              Zone
                                           permits       « pre-job briefing»       maintenance operators thanks to a direct
        Video, audio                                         prestataire
                                                             areas                 assistance on critical operations
        links, shared                                                          •   Shared and real-time updated
        information,
        data
                                                                                   visualizations: state of the power plant,
         …                    Essai          Lignage
                                               Critical                            (un)availability of systems, fire areas,
     radiation Chantier
HighChantier     Critical Critical test
                            critique          critique
                                             lining-up                             packing, planning, hazards…
                Critique
  operation
    dosant      operation
                                                                               •   Specific services to partner suppliers for
                                                                                   the monitoring of their operations

  22                                                                                  8th IEEE conference / Monterey August 2007
What has to be done…

Shared information through innovative dashboards and visualizations

     To share as much as possible up to date information on the real progress of field
                                       operations
     Interactive plans
                                    Lining up progress

              . .         .
                                                                                                                 Planning

                         . ..
                                                                                       Utilisation du dégazeur
                                                                                       par la tranche voisine
                                                                             1COFASG001: appoint 011BA/tr

               .
                                                                            1COFASG002: appoint 011BA/trv

                                                  C
                                                                            1COFASG003: appoint 011BA/dgz

                                                       263VD 259VD 602VD
                                                                             1COFASG010: dégazage 011BA
                                                   C
                                                                                                 V

                                                                           1COFASG012: refroidissement 011BA
                                                                                                 V

                                                                             1COFASG011: brassage 011BA
                                                                                                 V

                                                                             1COFASG013: filtration 011BA
                                                                                                 V

                                   Radiological cartographies

23                                                                   8th IEEE conference / Monterey August 2007
What has to be done…

Communication tools
   • DECT under implementation for cell phones

     • Audio and video links with critical operations      Through wireless and ethernet
     • Teledosimetry + mobile RP measurement systems       network (DSL technology)

     • Unique integrated interface for video and IS data

      To share as much as possible up to date information on the real progress of field
                                        operations

24                                                         8th IEEE conference / Monterey August 2007