Ways to improve field operation on NPPs facilities by bringing additional operator aids - F. Dionis EDF/R&D D. Pirus EDF/SEPTEN
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Ways to improve field operation on NPPs facilities by bringing additional operator aids F. Dionis EDF/R&D D. Pirus EDF/SEPTEN 1 8th IEEE conference / Monterey August 2007
Low dissemination and use of modern IT solutions across power plants, while complexity and requirements are continuously growing EDF Nuclear fleet : • From now up to 2020, almost of the existing 58 plants (+ 1 or 2 EPR) still in operation. • Target for life expectancy over 50 years For all the fleet : • Growing expectations and requirement : safety, environment, communication and reputation • Continuous increasing complexity of the processes and the constraints • Human Reliability stakes, linked to changes in workforce : ageing workforce, retirements, needs for knowledge capture and transfer, different expectation and culture of new hires « MSN generation », increasing needs for training, attractiveness of jobs,… One of the identified ways of improvement • More use of modern IT solutions within the plants But • Numerous barriers that hindered their deployment : safety requirements, standardization of the plants, size of the fleet, usability of new technologies, … 3 8th IEEE conference / Monterey August 2007
Two major projects : a new EAM and INTEP SAP Enterprise Resources Systems A main enterprise project : • EDF is redesigning its nuclear fleet technical Information system (EAM) : EAM in service in ~2011 Technical Information System A main R&D project • The new INTEP project is dedicated to Operation Aids operation aids, based on advances IT technologies • Normal operation INTEP • Outage • Field operation • Training I&C Moving to distributed sharable operation information for all trades (jobs) Process 4 8th IEEE conference / Monterey August 2007
INTEP Smart applications to support operation and diagnosis • Smart co-pilot for some focused operations (b. eg. help to follow temp. gradient after refueling) • Shared dashboard with process monitoring KPI • Anticipated diagnosis from process data harvesting :search and retrieval capabilities, anticipation of failures through datamining and prediction models Smart help for field operations : • Priority focused on padlocking and lining-up for outage • Integrated solution to invent : prepare > load on PDA > simplify and secure (RFID, barcodes) > visualize (control room, OCC, ..) Wireless solution, RFID and suitable mobile terminals and local networks • design an optimized WiFi + network adaptation solution, EMI compliant, cost effective : best coverage with minimum extra wires • define standards + select/validate mobile terminals and peripherals (tablet PC, PDA, RFID tags, antennas...) New solutions for outage management : • audio& video monitoring, share real time information (dashboards) , … • for innovatives organization solutions(outage c. center, radiation c.center, one stop shop, …) 3D solutions for outage management and maintenance/logistics preparation • Under deployment : Global outage preparation (packing), Detailed simulation on specific maintenance operations • Next priority : 3D / pictures / video bases for logistics preparation and maintenance pre-job briefing New solutions for training 8th IEEE conference / Monterey August 2007 5
Launch time table Jan 07 Jul 07 Jan 08 Chose projects themes with EDF operation top managers Determine projects objectives; outputs, road maps and budgets Prioritize outputs and lock R&D budgets for 2008 Launch R&D projects • Solutions should be ready for on site demonstration after 3 years or less • Implementation should be feasible in 5 years or less • 58 nuclear plants : more than 12 plants a year • At this stage, we don’t take into account the possible opportunity of a deep 6 renovation of CC system at mid life 8th IEEE conference / Monterey August 2007
The Everest Platform Everest is a flow measurement loop • 120 I/O • 4 rooms (2 floors) Total renewal of its I&C system Open architecture 8 8th IEEE conference / Monterey August 2007
Working on Everest Collaborative approach, including all visions Operator I&C designer Everest Field operator Maintenance Human Factor Researcher 9 8th IEEE conference / Monterey August 2007 Manager
Working on Everest Methodology To define project objectives, outputs, road maps and budgets Selection of the best proposals To prototype on Everest To prototype on NPP 10 8th IEEE conference / Monterey August 2007
3 Smart applications to support operation and diagnosis 11 8th IEEE conference / Monterey August 2007
Smart co-pilot for some focused operations By example: help to follow temperature gradient after refueling • An « intelligent Co-pilot » that proposes: • An optimal operation strategy • A vision of future potential risks : i.e. risk of cold • The tasks to perform • Training just before an operation (no need of process data) Co-pilot Simulation Tools Process Data 12 8th IEEE conference / Monterey August 2007
Shared dashboard with process monitoring KPI (1/2) To improve efficiency and environmental performance for pulverised coal unit… 4 stakes Safety Environment Overall A optimisation compromise of the unit between the performance Customer Production Economy constraints. …from the control room to the operating manager ¬ Diagnosis ¬ Stake quantification ¬ Immediate action plan ¬ Analysis of end results ¬ Help on line Dashboards ¬ Predict to anticipate and & guidelines optimise under constraints 13 8th IEEE conference / Monterey August 2007
Shared dashboard with process monitoring KPI (2/2) • Survey of NI operation set points • Survey of CI operation set points • Following of CI components performances • CI overall identification of efficiency loss Steam Gen. Condenser vacuum « clogging » Condenser Evolution Efficacite AHP 2,5 fur-up 25 2 20 1,5 15 1 10 0,5 5 0 1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 0 01/01/03 01/02/03 01/03/03 01/04/03 01/05/03 01/06/03 01/07/03 01/08/03 01/09/03 01/10/03 01/11/03 01/12/03 01/01/04 01/02/04 -0,5 -1 Evol 501 Evol 502 Evol 601 Evol 602 14 8th IEEE conference / Monterey August 2007
Anticipated diagnosis from process data harvesting Anticipated diagnosis from process data harvesting :search and retrieval capabilities, anticipation of failures through datamining and prediction models Process data recovering diagnostic and prognostic Visualization tools (I&C, operation aids, modules maintenance sensors network) 15 8th IEEE conference / Monterey August 2007
4 Smart help for field operations 16 8th IEEE conference / Monterey August 2007
Padlocking and lining-up for outage (1/4) MCR Début Operation diagram procedures Demande à l'AT de lancer le lignage mécanique pour mise en brassage du réservoir 011BA CR de l'AT d'exécution du lignage mécanique pour mise en brassage du réservoir 011BA OUVRIR 1ASG263VD METTRE 1ASG171PO EN MARCHE laisser brasser le réservoir 011BA pendant 2 H, sauf avis section chimie demander à la section chimie une analyse du Citerne mob. réservoir 011BA en brassage Compte rendu, section chimie, de l'eau 011BA C 1 Temp. COF
Padlocking and lining-up for outage (2/4) Integrated solution to invent : prepare > load on PDA > simplify and secure (RFID, barcodes) > visualize (control room, OCC, ..) Padlocking (line-up) Database Communication Prototype 8th IEEE conference / Monterey August 2007 18 GDMI Bx
Padlocking and lining-up for outage (3/4) Simplify and secure : wrong configurations Survey (RFID, PDA, Networks, CAD) 19 8th IEEE conference / Monterey August 2007
Integrated solution to invent L-Up Db Pré-job Briefing Goals : to design specific modules in order to facilitate the pre-job-briefing, the action, Current activities and the verifications Planning of activities • To prepare : Risk analysis / Verification of conditions Process Data Verifications • To act : Tasks following checking, synchronizations following. Operation documents • To verify : Tracing, reporting, checking with the pre-job-briefing OC C OC C OC C 20 8th IEEE conference / Monterey August 2007
5 New solutions for outage management 21 8th IEEE conference / Monterey August 2007
General presentation • Adaptation of US solutions of organization: Outage Control Center, Remote New solutions for Monitoring Center for Radiation Protection, One Stop Shop, Pre-job Briefing outage areas… management • Links with Control Room • Connection with critical operations: audio, video links, teledosimetry… • Optimization of RP cartographies: initial data, real-time updating • Shared visualizations Salle de Control Screens for One stop Stop shop Shop commande shared Room « sanctuarisée» visualizations Objectives : RP Supervision Preparation • Reduce the delays of information transfer Préparation Supervision Coordination fieldconduite operation, Remote OCC and decision making Radiopro Monitoring work délivrance régimes, • Improve efficiency and safety for CSRP authorizations, Center permis Zone permits « pre-job briefing» maintenance operators thanks to a direct Video, audio prestataire areas assistance on critical operations links, shared • Shared and real-time updated information, data visualizations: state of the power plant, … Essai Lignage Critical (un)availability of systems, fire areas, radiation Chantier HighChantier Critical Critical test critique critique lining-up packing, planning, hazards… Critique operation dosant operation • Specific services to partner suppliers for the monitoring of their operations 22 8th IEEE conference / Monterey August 2007
What has to be done… Shared information through innovative dashboards and visualizations To share as much as possible up to date information on the real progress of field operations Interactive plans Lining up progress . . . Planning . .. Utilisation du dégazeur par la tranche voisine 1COFASG001: appoint 011BA/tr . 1COFASG002: appoint 011BA/trv C 1COFASG003: appoint 011BA/dgz 263VD 259VD 602VD 1COFASG010: dégazage 011BA C V 1COFASG012: refroidissement 011BA V 1COFASG011: brassage 011BA V 1COFASG013: filtration 011BA V Radiological cartographies 23 8th IEEE conference / Monterey August 2007
What has to be done… Communication tools • DECT under implementation for cell phones • Audio and video links with critical operations Through wireless and ethernet • Teledosimetry + mobile RP measurement systems network (DSL technology) • Unique integrated interface for video and IS data To share as much as possible up to date information on the real progress of field operations 24 8th IEEE conference / Monterey August 2007