Upgrading the Luino and Chiasso lines Development for freight traffic on the Italian railways connected to the new Gotthard line Novara, 17 September 2014
Rete Ferroviaria Italiana, territorial organization DTP Territorial units for infrastructure maintenance Innsbruck and operation staff. Brennero All lines connecting Switzerland and Italy are Fortezza managed by DTP Milano Merano S. Candido Lienz Bolzano Calalzo P.C.C. Tarvisio Villach Chiavenna Ginevra Bellinzona Domodossola Tirano Osoppo Gemona Luino Colico Premosello Ponte N.A. La Porto C. Trento ve Prè S. Didier no Varallo S. Chiasso Udine Ar Varese on Lecco a Albate Casarsa Aosta Calolziocorte Gorizia Sesto C. Conegliano Sacile Nova Gorica Borgomanero Molteno Ponte S.P. Romagnano Gallarate Carnate Bergamo Schio Bassano Montebelluna Monfalcone Seregno Cervignano Biella Oleggio Monza Vignale Rovato Castelfranco Portogruaro V.Opicina MILANO Cittadella Nova Gorica Brescia Treviso Ivrea Rho Novara Treviglio TRIESTE Lubjana Santhià Camposam. S.Zeno Modane Albairate VERONA Vicenza Vercelli MESTRE Susa Bussoleno Chivasso Mortara Padova VENEZIA S.L. Bardonecchia Pavia Casale M. Casalpust. Olmeneta Isola d.S. TORINO Cava Carb. Codogno Cremona Mantova Legnago Monselice TO Lingotto Bressana Trofarello Torreberetti Piadena Pinerolo Valenza Castelvetro Nogara Chioggia Broni Piacenza Alessandria Rovigo Carmagnola Voghera Torre Pellice Asti Cantalupo Tortona Cavallermaggiore Fidenza Nizza M. Parma Savigliano Castagnole Novi Bra Arquata S. Acqui T. Modena Ferrara Fossano Ovada DAO Bologna Cuneo Genova Mondovì Ceva San Giuseppe di C. Genova Territorial commercial unit: Limone Savona •Traffic management Ormea •Timetable planning Traffic in a typical day: •Works planning and train rerouting •400 Long-distance passenger trains •Infrastructure development planning Ventimiglia •3700 Short-distance passenger trains DAO, based in Milano, manages most of •700 Freight trains Northern Italy 2
Trans-European Rail Freight network in northern Italy New Road-Rail Terminals mainly fed by cross-Alp traffic through Switzerland: Milano, Brescia, Piacenza, Novara, Gallarate 3
European Rail Freight Corridor Stoccolma Corridor 3 – Stoccolma - Palermo Brennero Fortezza Rotterdam Merano S. Candido Lienz Bolzano Calalzo P.C.C. Tarvisio Villach Chiavenna Ginevra Corridor 1 – Rotterdam - GenovaDomodossola Bellinzona Tirano Luino Osoppo Gemona Colico Premosello Ponte N.A. La Porto C. Trento ve Prè S. Didier no Varallo S. Chiasso Udine Ar Varese Lecco on Casarsa a Albate Aosta Calolziocorte Gorizia Sesto C. Conegliano Sacile Nova Gorica Borgomanero Molteno Ponte S.P. Romagnano Gallarate Bergamo Schio Bassano Monfalcone Montebelluna Biella Oleggio Seregno Carnate Vignale Monza Rovato Castelfranco Portogruaro Cervignano V.Opicina Cittadella Brescia Treviso Nova Gorica Ivrea Rho Novara Treviglio TRIESTE Lubjana Santhià MILANO Camposam. S.Zeno Modane Albairate VERONA Vicenza Vercelli MESTRE Susa Bussoleno Chivasso VENEZIA Mortara Padova Bardonecchia Pavia S.L. Casale M. Casalpust. Olmeneta Isola d.S. TORINO Cava Carb. Bressana Codogno Cremona Mantova Legnago Monselice Pinerolo TO Lingotto Trofarello Valenza Torreberetti Broni Castelvetro Piadena Nogara Corridor 5 – Baltico - Adriatico Chioggia Piacenza Alessandria Voghera Rovigo Torre Pellice Carmagnola Asti Corridor 6 – Mediterraneo Cantalupo Tortona Fidenza Cavallermaggiore Nizza M. Parma Savigliano Castagnole Novi Bra Arquata S. Acqui T. Modena Ferrara Fossano Ovada Bologna Main freight terminals Cuneo Ceva Genova Mondovì Genova San Giuseppe di C. Limone Savona Ormea Palermo Ravenna Ventimiglia Genova The Gotthard line, with its two Italian gateways Luino and Chiasso, as well as the Simplon line, belongs to the European Rail Freight Corridor 1. Freight Corridors are main freight routes with simplified procedures for customers interested in cross-boundary traffic.
Memorandum of Understanding Italy-Switzerland Bern, 17 December 2012 Inter-governmental agreement 90 trains per day onto the Luino line to Gallarate and Novara terminals and beyond 170 trains per day onto the Chiasso line to the new Milano terminal and beyond High performance Corridor trains: • 700 m long • PC/80 load gauge • D4 axle load 5
• tunnel widening works Phasing the Luino line • 750 m - long trains Luino Objective: PC/80 load gauge and 700 m-long trains Laveno to both Novara and Gallarate terminals, to be achieved as soon as possible. Commitments: To interrupt freight and passenger traffic as less as Ternate possible. To work as effectively as possible, working at the Sesto C. same time on the Italian and Swiss sides. Phases: Oleggio •2018 - Novara branch completed •2018 - Gallarate branch (via Sesto) completed •2019 - Gallarate branch (via Ternate) completed Huckepack Hupac Novara Gallarate terminal terminal
What works to upgrade the lines? Chiasso line financed by • Technological upgrade (170 freight trains per day) Works on the • Load gauge upgrade (PC/80) Chiasso line • Train length upgrade (700 m) already started • Level crossing removal Luino line financed by • Technological upgrade (90 freight trains per day) • Load gauge upgrade (PC/80) • Train length upgrade (700 m) • Level crossing removal Scheduled completion: 2020 7
High-complexity works Load gauge upgrade Tunnels suitable for trucks and containers have a rectangular shape different from the traditional rounded-at-the-top railway load gauge. Tunnel upgrade can be obtained by two different techniques: •By consolidating the tunnel roof with concrete injections and than reshaping it •By digging the tunnel floor to lower it The choice is made by considering the geo-technical characteristics of rock and tunnel support walls and on the layout grades the railway line has. Train length upgrade Admitted train length is determined by the length of passing loops in station. To lengthen loops all switches and signals on one side of the station must be repositioned. Enlarging the area occupied by stations can be a difficult task, either because they are located in a densely-built territory or because of terrain shapes that requires important works. 8
Objective: more trains, less trucks For a cleaner environment 9