Where to start? How? Why DH? (Location, Mapping (Delivering Viable (The Big Opportunity) & Stakeholders) Projects – Steps & Support)
Why DH? – The Big Opportunity Carbon saving potential Renewable heat potential Heat 4GDH CO2 saving 37% potential in South Dublin region (250,000 tCO2/a) Transport 42% Electricity 21% SDCC Total Emissions (11,800 tCO2/a)
Benefits recognised in EU & national policy Energy Efficiency Directive: Project Ireland 2040 Article 14 – Comprehensive DCCAE Climate Action Fund assessment of potential for DHC Climate Action Plan 2019: Article 14(4) – Adequate measures be taken to develop Action 70 – DH Policy framework DH if cost effective Action 53 – Assessing financing Recast Renewable Energy Action 133 – 3rd level campus DH Directive: Action 151 - Geothermal where Acknowledges the contribution DH seen as key enabling of DHC to increasing the share of infrastructure renewable heat
Heat Sources • Total heat capacity identified within SDCC = 493 MW • Total number of heat sources identified = 115 *Surface water could be over 10 times the listed capacity figure if mean flow was used
Physical Obstacles These obstacles include; Infrastructure, Historical & architectural heritage sites, Habitat, Rivers & lakes.
Start Here Rank Name 1 Clonburris / Grange Castle 2 Clondalkin 3 Ballymount / Templeogue 4 Palmerstown 5 Lucan 6 Citywest 7 Rathcoole 8 Newcastle
Where to Start with Stakeholders? • What roles need to be filled • Further information on the methods of communication and common stakeholder questions can be found in the Transition Roadmap.
How? – Delivering Viable Projects Short Term Medium Term Long Term 2019 2020 2021 2022 2023 2024 2025 Further Use and Create zoning investigation Develop a heat continual areas for DH into the map improvement enabled geothermal of heat maps buildings potential Feasibility High-level Funding & Funding & Developm study for high Development Re-evaluate ranking of procurement procurement ent of ranking of new DH opportunity opportunity for feasible for feasible new DH opportunity network area rankings areas project project network area Create Include development identified plan that looks major growth to co-locate areas in heat high heat map / demand with Planning transition heat sources Consider In 4DHC zones supplying new secure buildings from provision of the return of thermal older buildings storage Identify areas Investigat Locate new suitable for Create low- e development locating energy temperature opportuni sites close to centres and 4DHC zoning ties to link heat source thermal areas existing storage networks Consider opportunities for renewable
How? – Delivering Viable Projects Short Term Medium Term Long Term 2019 2020 2021 2022 2023 2024 2025 Pilot - Proof of Develop TDHS as Extend initial Concept proof of concept TDHS Continually Highlight the Stakeholder engage whole energy Engagement developers / system benefits stakeholders Develop suite of Update legal Legal legal documents documents Continually work Encourage high with national density authorities for developments the inclusion of with DH in applicable futureproofed building centralised Policy regulations systems Planning policy support for generation and distribution of low-carbon heat Develop secondary system Technical design guidance Guidance to improve connectability Develop capacity Develop capacity within within Capacity Create SDDH Co. - SDCC/SDDH Co. to SDCC/SDDH Co. to Development SPV manage the operate the DH operation of TDHS system