How to implement charging infrastructure in existing residential buildings? - e-MOTICON FINAL EVENT March 26, 2019 Milan, Palazzo Lombardia ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
How to implement charging infrastructure in existing residential buildings? e-MOTICON FINAL EVENT March 26, 2019 Milan, Palazzo Lombardia Christian STEGER-VONMETZ
About us • We are a federal company owned by the Austrian Federal Ministry of Transport, Innovation and Technology. • We are a think tank with about 50 employees. • We are a neutral partner who coordinates between infrastructure operators, industry and government institutions. • We support the development of new mobility technologies, such as ITS and electromobility and their integration into the transport system. • We are a driver of technological and organizational developments and development processes and operate quality control for mobility services. • We offer content consulting for legal requirements, based on the comprehensive technological knowledge of our specialized experts. AUSTRIATECH 2018 PAGE 2
Our fields of action and expertise Digital Infrastructure Mobility as a Service Connectivity Decarbonisation Automated Mobility AUSTRIATECH 2018 PAGE 3
Our Activities AustriaTech publishes monthly the latest facts & figures on AustriaTech monitors developments of Electromobility with focus e-mobility. They are available on our website. on charging infrastructure, vehicle deployment and regulatory framework. With the contribution in working groups and networking events AustriaTech supports the ministry regarding the increasing activities of Electromobility. AUSTRIATECH 2018 PAGE 4
What drives us Nearly CO2-neutral until 2050 2015 Paris climate agreement to reach the 1.5°/2°C goal national strategic framework Nearly CO2-neutral transport 2016 until 2050 (electrification) "Clean energy in traffic" EU Fleet Targets 2017 China announces to introduce 20% of registration The EU Fleet Targets are a big an e-car quota from 2019 New Energy Vehicles until 2025 incentive to introduce e-cars. Otherwise high penalties are 2018 #mission 2030: the Austrian Focus shift to emission-free imminent. Climate and Energy Strategy cars / LNF by 2030 2019 National Energy- and Climate plans 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 5
Development of new EV-registrations to reach the goal (BEV* und PHEV**) 99,6% 96,4% 100,0% 350 000 90,0% Nearly 100% Anteil E-Fahrzeuge an Neuzulassungen [%] Anzahl neu zugelassener E-Fahrzeuge [absolut] 300 000 76,3% 80,0% 250 000 70,0% by 2036 60,0% 200 000 351 758 340 658 50,0% 269 458 150 000 40,0% 27,7% 30,0% 100 000 20,0% 97 985 50 000 4,4% 10,0% - 0,0% 2015 2019 2023 2012 2013 2014 2016 2017 2018 2020 2021 2022 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 Jahr Neuzulassungen E-Fahrzeuge Österreich Elektrofahrzeuge-Anteil an Neuzulassungen *BEV … Battery Electric Vehicle **PHEV … Plug-In-Hybrid Electric Vehicle 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 6
Electrifying parkings in residential buildings 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 7
Challenges Create Legal adjustments Product Know-how „Right to plug“ development Processes guidelines Standards Grid expansion 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 8
Challenges Tariff Operator Funding and models financing instruments Power Production and Trainings Interfaces storage 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 9
We need charging infrastructure in residential buildings! • Strong increase in charging infrastructure from 2020+ • Network-friendly charging only possible with integrated solution • Diverse challenges but also opportunities for all • That‘s why we start with the E-Mobility-Check now! 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 10
Steps towards a charging infrastructure Analysis Decision Implementation needs analysis Info residents / owners announcement inventory Forming of opinion commissioning Follow-up question operator model Effort stock planning proposed resolution installation cost estimate house meeting Info / Training funding opportunities Ev. Uncontested proceedings Integration Billing 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 11
e-Mobility Check includes: • sound inventory • plan for the gradual implementation of charging infrastructure • uniform and recognized quality criteria • cost estimate • recommendation for action • will be available by the end of 2019 27. MÄRZ 2019 E-MOTICON FINAL EVENT FOLIE 12
Thank you for your attention Speaker Christian Steger-Vonmetz T: +43 1 26 33 444-27 christian.steger-vonmetz@austriatech.at Contact Raimundgasse 1/6 T: +43 1 26 33 444 1020 Wien, Österreich F: +43 1 26 33 444-10 office@austriatech.at
You can also read